Questions_and_Answers_(6004-1).docx
DOCX document 12 KB Posted
- Attached to
- Boiler Heating System Replacement Federal contract opportunity
- Solicitation number
- W912LA-17-T-6004
About this file
Answers that provide BTUs and a boiler brand
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_Bldg_225_Boiler_revised.pdf | ||
| SOW_Bldg_2600_Boiler_revised.pdf | ||
| SOW_Bldg_2600_Boiler_revised.pdf | ||
| SOW_Bldg_225_&_2600_Boiler.pdf | ||
| Wade_Determination_SCA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers:
| Q1: | Should the boiler be provided by the contractor? |
| A1: | Yes. The contractor is required to uninstall and remove the old boilers. The contractor must also provide and install a new boiler in each building. |
| Q2: | What type of boiler is requested for the buildings? |
| A2: | A condensing CAMUS Dynamax boiler that meets the heating needs of the buildings is requested. An “or equal’ model that meets the operational needs of the government may also be considered. |
| Q3: | How many BTUs are needed per building? |
| A3: | The current boiler in building 225 operates at 1,050,000. The new boiler in building 225 must operate at the same capacity. The current boiler in building 2600 operates at 2,000,000. The new boiler in building 2600 must operate at 800,000. |