PDPG172399_RFI__&_SOW_FTU_Temp_Trailers.pdf
PDF 14 KB Posted
- Attached to
- TRAILERS Federal contract opportunity
- Solicitation number
- W912LA-17-R-8003
About this file
Answers to RFIs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FTU_Trailer_Drawings.pdf | ||
| Trailer_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI
FTU Temp Trailers Page 1 of 1 Buildings 2272 March Air Reserve Base, California
RFI
FTU TEMP TRAILERS
BUILDING 2272
MARCH AIR RESERVE BASE CA
PDPG172399
California Air National Guard 163 Civil Engineering Squadron
5237 Air Guard Way, Ste 23, Bldg 2276 March ARB, CA 92519
(909) 655-5456
31 AUG 2017
The attached revised SOW dated 31 AUG includes all items revised or clarified per the RFI’s. Drawings remain unchanged.
1 None of the line items reflect a 12 month lease for the base year, only for the option years.
R Added in SOW CLIN 1 & 2
2 CLIN's 1 & 2 represent a format for 1 charge for the 60 x 60 and 36 x 60 trailers. Is this for the delivery? If so, there is not a CLIN to represent the tear down and removal once the project is complete. This tear down could be in 1 year or 3 years, so there should be a separate line item for this.
R See SOW CLIN 1 & 2. Teardown is regardless of lease duration.
3 CLIN 3 says "Modifications" of the 36 x 60 trailer. What Modifications would be needed on this trailer vs the 60 x 60?
R See SOW CLIN 3. Adding wall and door to standard open trailer. Other mods including conduit drops and power are in CLIN 1 & 2.
4 Would it be possible to competitively price you a building that would put everything under one roof?
We have a set up already on the ground that is very similar to what you are looking for, but mates together to form one building instead of two separate buildings.
R See Site Plan. One single building whether rectangular or L shaped will not fit on the L shaped site.
Note that a new building will be constructed prior to removal of the trailers and limit removal as indicated on the Site Plan.
5 CLIN 1 needs to be done in 60 days from notice to proceed. When is CLIN 2 need to be done?
R CLINS 1, 2 & 3 shall be complete 60 days from NTP.
6 How far away will electrical power be coming from?
R Power will be coming from Building 2272 under another construction contract.
7 Do these buildings need sprinklers?
R No
FTU TEMP TRAILERS
Building 2272 Page 1 of 2 March Air Reserve Base, California
STATEMENT OF WORK
BUILDING 2272
PDPG172399
163 CES, MARCH AIR RESERVE BASE CA
California Air National Guard 163 Civil Engineering Squadron
March ARB, CA 92519
31 AUG 2017
1 GENERAL REQUIREMENTS
1.1 PURPOSE
Provide one 60’x 60’ office trailer and one 36’x 60’ classroom trailer to support the increase in MQ-9 Reaper Flight Training Unit (FTU) operations at March ARB for a period of 1 year & 3 option years.
The trailers will be needed until the completion of the new FTU MILCON, PDPG169013 scheduled for completion in late 2019.
1.2 SCOPE
Provide work as shown on the Attachments.
A CLIN 1 60x60 TRAILER
1 3,600 SF Office Trailer with two unisex restrooms.
2 Anchors and skirting.
3 Ramps and stairs.
4 Setup and tear down.
5 Com conduit drops and boxes, power receptacles.
6 (2) 250 gallon septic holding tanks and service weekly. Locate under building. National Septic Service 909-574-1406 or equal.
7 (5) HVAC filter replacement quarterly and monthly during the summer.
8 Base year rental and service.
B CLIN 2 36x60 TRAILER
1 2,160 SF Classroom Trailer with two classrooms.
2 Anchors and skirting.
3 Ramps and stairs.
4 Setup and tear down.
5 Com conduit drops and boxes, power receptacles.
6 (8) HVAC filter replacement quarterly and monthly during the summer. (5) will be for existing trailers.
7 Base year rental and service.
C CLIN 3 36x60 TRAILER MOD
1 Add Wall and Door
Building 2272 Page 2 of 2 March Air Reserve Base, California
D CLIN 4 ANNUAL RENTAL & SERVICE OPTION YEAR 1
E CLIN 5 ANNUAL RENTAL & SERVICE OPTION YEAR 2
F CLIN 5 ANNUAL RENTAL & SERVICE OPTION YEAR 3
1.3 PERIOD OF PERFORMANCE
The contractor shall complete CLIN 1, 2, & 3 within 60 days from the Notice to Proceed.
2 GERNAL CONDITIONS
2.1 SUBMITTALS
Submit Project Schedule and Material Product Data in PDF format at Preconstruction Meeting.
2.2 CONTRACTOR IDENTIFICATION BADGES
March Air Reserve Base is a DOD installation. All badging and security checks will be done in accordance with DOD, Air Force and base Security Forces requirements.
A Badges or temporary base passes will be issued. All commercial vehicles will be inspected each time they enter the base.
B Badges will be issued by the 452nd Security Forces Squadron (SFS) to the contractor through the 163d Civil Engineering Squadron (CES). Badges shall be issued, tracked, and collected in accordance with instructions from Security Forces.
2.3 CHANGES
All work shall be completed in a workmanlike manner according to generally accepted standard practices. Any alteration, or deviation from the drawings/specifications or contract involving extra costs or credits, will be executed as mutually agreed upon and be verified by written change order.
2.4 CLEANUP
Keep site clean by removing any debris daily.
2.5 DAMAGE
The Contractor shall be responsible for any damages contractor causes for government property.
3 ATTACHMENTS
3.1 DRAWINGS
| RFI FTU Temp Trailers PDPG172399 |
| SOW FTU Temp Trailers PDPG172399 |