Quetions.pdf
PDF 40 KB Posted
- Attached to
- Lafayette Armory Caging Federal contract opportunity
- Solicitation number
- W912L920R0018
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912L9-20-R-0018.pdf | ||
| Lafayette Strorage Caging Model (1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• Does the area between the tapered columns and the building skin need secured with caging Yes, the space between the Columns needs caging but only in the actual caged area.
• Does the area between the end wall columns and the building skin need secured with caging Yes, the space between the Columns needs caging but only in the actual caged area
• Will the ceiling panels stop at the inside of the girt or will they need to extend over the girt to the building skin Over the girt to the skin.
Please provide drawings for the existing building, or confirm how many main structure/tapered columns, and how many end wall columns are in the building. There are no drawings except for what was provided in the solicitation. That is why the site visit was required.
SET B:
* Will you accept 96”H wide-span shelving? Yes
* Will you accept 18”D or 24”D cabinets? 24”
* Per attached layout, please clarify the circled areas:
* 2 dashed “walls” seem to be block access to the cages on either side (lower area of drawing)? Those dashes should not be there, that is a hall way to access the cage doors.
* 1 solid and 1 partial dashed/partial solid lines (upper area of drawing) – are they to be dashed (as in caging), also?
Yes that is caging also
* Any cut-outs in the wire cages, or are all walls straight? Straight
* Will you accept 96”H wide-span shelving? Yes
* Will you accept 18”D or 24”D cabinets? 24”
* Will the shelving require floor anchoring? No
* Will the cabinets require floor anchoring? No
* Is the site accessible 7 days per week? No Mon-Fri
* Is the site accessible 12 hours per day (0700 – 1900) 0700-1800
* does the 45'-6 x 12' area at the top left corner of CE-1 get a ceiling? Is it a cage or is it open like the hallway? Yes it needs a ceiling because it is mechanic storage for tools.
File details come from the government source that posted it. Updated .