QA_1_ W912L721Q1403_.docx
DOCX document 15 KB Posted
- Attached to
- Kitchen Equipment for TNARNG DFAC Federal contract opportunity
- Solicitation number
- W912L721Q1403
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 52.204-24 Representation.pdf | ||
| Solicitation 21Q1403 Kitchen Equipment for Catoosa DFAC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers 1: W912L721Q1403 Kitchen Equipment
Question 1. Is the install taking place on the ground floor if not is there a freight elevator?
Answer 1. Installations are Ground Floor.
Question 2. Does the location have a loading dock?
Answer 2. No Loading Dock at site. Contractor’s Lift gate is required; fork lift is on site to assit contractor.
Question 3. Is there any equipment that needs to be removed and/or disposed of? If so what is the brand and model #’s?
Answer 3. Tennessee Army National Guard will remove and dispose Equipment the week before scheduled installation.
Question 4. Are the utilities in place for the new equipment?
Answer 4. YES, utilities are in place for the new equipment.
Question 5. You list installation but no SOW. Is there a SOW for the install?
Answer 5. No SOW needed. Install is basic unpacking and assembly of equipment and utility hook up.
Question 6. Do you have a projected date for installation of equipment or is it based on equipment availability/lead times?
Answer 6. Installation schedule is based on equipment ETA or delivery, estimated 1 to 2 days of installation.
(End of Questions and Answers 1)