Amendment20Q0185.pdf
PDF 422 KB Posted
- Attached to
- Exercise Pull-Up Bars Federal contract opportunity
- Solicitation number
- W912L1-20-Q-0185
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_W912L1-20-Q0185.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011528650
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er the questions submitted in response to the above referenced solicitation and make changes to the solicitation as follow s: 1. The spec description issued w ith the origninal solicitation (SF1449) is hereby deleted in it’s entireity and replace w ith - EXHIBIT A. 2. Change/correct the Solicitation Block 10. - FROM THIS ACQUISITION IS UNRESTRICTED TO 100% SMALL BUSINESS SET ASIIDE. 3. Buy American Act applies.4. Vendors shall acknow ledge amendment by signing /returning w ith their quote. 5. All other terms and conditions remain unchanged. SEE PAGE 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912L120Q0185
X 9B. DATED (SEE ITEM 11)
28-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Sep-2020
CODE
USPFO
2200 WEST 35TH STREET, BLDG. 66
AUSTIN TX 78703-1222
W912L1 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912L120Q0185
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTION AND ANSWER
Question:
Does this one look different but conforming to the spec description, which is just a little confusing...
ANSWER: The spec description issued with the origninal solicitation (SF1449) is hereby deleted in it’s entireity and replace with the following specs- EXHIBIT A
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
DETAIL LIST
Specification The specifications for the climbing bars follow:
• Five posts.
• Each of the five posts measures 6 inches square by 12 feet long.
• Each post is sunk 3 feet into the ground.
• Two bars.
• Each of the two bars is a threaded, hollow metal pipe.
• Each bar measures 1.5 inches outside diameter by 12 feet long. Diameter variance of 1.25 to 1.75 inches is allowed for ACFT testing.
• Each bar has two 1-inch deep end caps.
• The bars are through the 6 by 6s at 7.5 and 8 feet above the ground. Any higher increases the risk of injury from an uncontrolled drop from the bar. A higher bar is too high for Spotters to be able to reach to support the exercising Soldier.
• The distance from inside post edge to inside post edge is about 62 inches . This is to allow enough bar space to allow room for Spotters and to conduct all exercises safely.
• The step-ups (16 inches long) are cut from 4 by 4 inches by 8-foot posts and secured to the 6 by 6s with 3-inch screws that are countersunk.
• The step-ups on the outside 6 by 6 posts are 18 inches from the ground; the step-ups on the inside post are 24 inches above the ground
PORTABLE PULL-UP BAR
Note: A portable pull-up bar is authorized as an alternate to the Climbing Bar for the Leg Tuck event in the ACFT. It does not conform to the standard for the conduct for safe physical readiness training of Climbing Drills 1 and 2. One pull-up bar per lane is required for the ACFT. A squat-style rack stand with a 90 inch (7 feet 6 inch) high bar that is 48 to 62 inches long gives ample space for the Leg Tuck event and will fit under an 8 foot-high indoor ceiling. The pull-up bar will be able to be dissembled for storage and transportation to and from ACFT test sites.
Specification
• 1.25 to 1.75 inch outside diameter of the bar. 2 inch diameter is too large for safe performance of the test.
• Smooth unpainted galvanized steel bar, with shallow knurling is acceptable.
• System weight of approximately 146 lbs.
• Bar length of 48 to 62 inches.
• Bar height minimum of 86 inches, preferably 90 inches.
• 2 x 3 inch 11 gauge steel frame.
• Load capacity of 1,000lbs.
• Color is non-specific.
Height: min 86".
(End of Summary of Changes)