RFI__1_1110_Roof.pdf

PDF 97 KB Posted

Attached to
Bld 1110 roof replacement Federal contract opportunity
Solicitation number
W912K6-17-B-5002
Issued by
Department of the Army Maryland Army National Guard

About this file

RFI #1

View the file

Other files for this federal contract opportunity

Other files attached to Bld 1110 roof replacement, newest first.
File Type Posted
W912K6-17-B-5002-0001.pdf PDF
SOW_PJMS_172016_Replace_Roof_bldg_1110-8-30.doc DOC document
SOW_PJMS_172016_Replace_Roof_bldg_1110.doc DOC document
EXHIBIT_F.doc DOC document
Roof_Plan_SHT_1.pdf PDF
W912K6-17-B-5002.pdf PDF
Canopy_Detail.pdf PDF
WF_113_-_Installation_Access_Application.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI #1 Date 12 Sep 2017

1. In the statement of work, page 24, 2.5.4.3 references two-way vents to be installed. The roofing manufacturer does not require vents in complete tear off installations. Will they still be required? If the manufacturer does not require vents in this roofing system its fine; however for a sealed roof membrane at edges ventilation is required to prevent condensation and moisture problems.

2. Page 24, 3.2.0 is it the intent to replace the roof drains and the associated PVC cast iron drain piping? If so, should piping be PVC or cast iron? The roof drain must be of a similar product type, its termination must transition into the existing PVC drain discharge.

3. Page 24, 3.4.0 references .032 mill aluminum. Should the .032 aluminum math the existing color of the metal siding? The color for all aluminum should match the existing.

4. There is a piece of equipment laying on the roof. It appears that it may be some type of lifting device. Is this to be removed from the roof? If so, will the Government take ownership or should it be disposed of? The equipment will be removed by the government.

5. Are the two (2) 10’ sections of gutter on the west side of the building to be replaced or reused? All guttering to be new.

6. With the existing drainage design, the main roof area drains to the exterior edges causing water to drain off the edge. Will perimeter gutters be required? This would require approximately 400 LF of gutter to be incorporated into the bid. The slope edges of the roof must receive guttering.