About this file
SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Base_Location-New_Gate.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Power Washing and Painting of Building 1110
STATEMENT OF WORK
PROJECT NUMBER: PJMS152023
| Base Engineer: | 175 CES/CC |
| Using Agency: | 175 CES/CEX |
| Fire Chief: | 175 CES/CEF |
| Security Forces: | 175 SFS/CC |
| Communications: | 175 CF/CC |
| Environmental: | 175 WG/EMO |
| Safety: | 175 WG/SE |
MARYLAND AIR NATIONAL GUARD
MARTIN STATE AIRPORT
NATIONAL GUARD BASE
BALTIMORE, MARYLAND 21220
22 JUNE 2015
1. General Project Information:
This objective of this project is to power wash and paint the exterior of BLDG 1110.
2. Existing Conditions:
The exterior of BLDG 1110 is deteriorating due to age and use.
3. Project Location and Background:
BLDG 1110 is located at Martin State Airport, Maryland Air National Guard Base, Baltimore, MD 21202. Entrance to the Air Guard side of the airport is at Lynbrook road off of Eastern Boulevard.
4. Use of Premises:
Coordinate access to premises with Contracting Officer’s Representative (COR), Major Ethan England, at (410) 918-6538 for execution of work. Emergency situations, military operations, or other contingencies, may cause suspension of work or restrictions on access to the construction site. If military emergency operations require escorts, the Government will provide them to the Contractor at no cost.
The Contractor shall designate employees; usually the job superintendent and one other person, to sign a background check release form for base access. Once a background check has been completed with no negative findings, those employees will be granted escort privileges. This employee shall be responsible for escorting all employees that do not have badges, including subcontractors and delivery persons.
The COR will determine the equipment, material and other staging locations or work areas available under this contract.
Contractor shall assume full responsibility for protection and security of materials and equipment stored on site.
Contractor shall move any stored products, under their control, which interfere with operations of the Government.
5. Government Equipment:
Contractor use of Government owned or leased equipment such as: hoists, forklifts, compressors, welding machines, cutting rigs, etc. shall not be permitted on either a reimbursable or non-reimbursable basis. Cost for all equipment required to accomplish the work shall be included in the Contractors final bid price.
6. Permits and Inspections:
Normally no permits or inspections by local building officials are required. All inspections will be performed by COR unless modified by the Statement of Work. Any testing is the responsibility of the contractor. All testing must get prior approval by the /Contracting Officer.
| Unless otherwise specified in other sections of this specification, the use of burning equipment or open flame welding and cutting shall be allowed only as authorized in | writing by the local Fire Inspector (Facility 3150); telephone #: 410-918-6257. Once approved by the Fire Inspector, a written AF Form 592 - USAF Welding, Cutting, and Brazing | Permit will be issued. The permit is will be issued by the fire department within one | (1) hour of request, and must be renewed daily. In addition to this permit, a Risk | Assessment for the hot work will be provided by Safety (Facility 4200); telephone #:410-918-6524 |
| Digging permits are obtained from the Work Control Office (Facility 2100) at (410) | 918-6300. The Contractor is responsible for contacting Miss Utility to mark the gas and electrical lines. The Contractor is responsible for hiring a private underground utility marking company to mark the water, sanitary sewer, storm sewer, broadband | cable, and communication lines. |
7. Change Orders:
Only the Base Civil Engineer (BCE) or the Contractor may initiate change order requests. Do not proceed with any work until a signed modification or other written authority is received from the Contracting Officer. Only the Contracting Officer may approve a change order.
8. Field Changes:
No changes in the cost or the scope of the project may be made without processing a change order. Field changes not involving cost or scope may be initiated by the BCE, COR, Contracting Officer or the Contractor.
9. Contractor Passes:
Contractor’s Passes and ID cards for all Contractor personnel are required for access to the Base and construction site. All employees who will be driving on base must have a valid driver’s license, proof of vehicle insurance, vehicle registration and a vehicle pass. Vehicle Passes and Base ID cards can be obtained from the Security Forces (Facility 2020).
10. Daily Reports and Sign-In Register:
Each day the Contractor is on site to perform any work, the Superintendent/Foreman shall sign in at Base Engineering (Facility 2100), indicating specific Facility/Location and the number of persons who shall be performing work that day. Upon Notice to Processed (NTP) contractor will provide at the end of every week separate daily reports to the Governments Project Manager
11. Hours of Operations:
The hours of operations at the Martin State Airport Air National Guard Base are 10 hours per day (0630 – 1700) Tuesday – Friday. Coordinate access to premises with COR for execution of work. Emergency situations, military operations, or other contingencies, may cause suspension of work or restrictions on access to the construction site.
12. Off-Hours Work:
Except as otherwise specified, all work shall be performed during regular work hours (indicated above). If the Contractor desires or is required to work on Mondays, Saturdays, Sundays, Holidays or other hours outside normal work schedule, the Contractor shall be required to seek written approval from the Contracting Officer. The Contractor is not entitled to premium time if the request is approved.
13. Clean up:
The work site is an active civilian and military airport. Site cleanliness and Foreign Object Debris (FOD) control is essential. The Contractor will clean up all construction debris and refuse and will remove it from the work site and the Base daily at their own expense.
14. Safety:
The Contractor is responsible for performing all work In Accordance With (IAW) State and Federal OSHA requirements as well as compliance with the most current USACE EM 385 1-1.
15. Environmental Protection and Waste Disposal:
The Contractor shall, at their own expense, remove all sludge, dusts and debris from the property of the Martin State Airport Air National Guard Base which have resulted from specific work described in (Statement of Work (SOW). The disposal of all such materials, which may include hazardous or toxic liquids that are used to perform the work, shall conform to all Federal, State, and Local environmental regulations with regards to both transportation and ultimate disposal. This project must comply with all Federal, State, and Local environmental regulations. All dumpster service and waste management shall be provided at no additional cost to the Government. All recyclable metal shall be placed into Maryland Air National Guard scrap metal recycling containers. Please contact the Base Environmental Engineer Lt Col Peter Loebach at (410) 918-6486 for detailed information.
16. Hazardous Materials:
If suspected hazardous materials are discovered, do not disturb, and contact the COR.
17. Drawings:
Drawings furnished by the government to the Contractor may be used for general information only and shall not be relied upon or used as the basis for preparation of contract drawings required by this contract without complete on-site verification by the Contractor.
18. Specific Project Information:
19. Site Visit:
TBD
20. Cost Proposal: Provide a detailed cost proposal indicating costs and breakdown for:
a. Labor
b. Site work
c. Material
d. Installation
21. Description of Work:
The Contractor shall describe in his or her proposal how they will manage the project. The Contractor shall identify key staff and their abilities to manage projects of this magnitude, including scheduling methods, reporting and execution.
22. Construction Performance Period:
The Contractor shall identify the proposed construction performance period. The proposed performance period will be included in the Cost Proposal/Final Bid
23. Meetings:
A Preconstruction Meeting will be required post award and prior to construction. Bi-Weekly progress meetings will also be required.
24. Sundry Elements:
Any material, devices or services not specifically mentioned or indicated in this specification that are reasonably required for a complete, finished and first class operating installation, shall be provided by the Contractor at no additional cost to the owner. The work shall be installed in accordance with this Statement of Work (SOW) and best industry practices.
25. POWER WASHING AND PAINTING OF BLDG 1110 STATE OF WORK (SOW)
General:
Contractor is to provide in bid all material, equipment and labor to successfully complete the statement of work described.
1. POWER WASHING:
Contractor is to power wash approximately 19,500 square feet of the exterior of building 1110.
Contractor is to power wash all exterior surfaces to include but not limited to; all metal frame, eaves, fascia, under side of flashing, coping, down spouts and all windows.
Contractor is to submit to government any and all chemical used for cleaning during power washing.
Contractor will ensure not to directly power wash or paint any facility antennas, cameras or communication equipment. Any equipment in question will be directed to the COR
Contractor is to have the MSDS for said chemicals on hand at all times.
Contractor is to ensure that the work site is cleaned-up after work is completed to included but not limited to all garbage, old paint chips and any trash that is a result of the work being done
2. PAINTING OF EXTERIOR OF BUILDING 1110:
Contractor is to paint approximately 6,000 square feet of the exterior of building 1110 with proper paint set forth by industry standards for all metal frames of old windows, eaves, fascia, flashing, coping, down spouts and completely paint two old windows in Shoppette area. In addition:
Contractor is to prep and scrape six (6) exterior doors.
Contractor is to prep and scrape two (2) exterior vents and protective grating.
Contractor is to paint two (2) exterior vents and protective grating
Contractor is to paint six (6) selected exterior doors.
Contractor is to provide paint color for approval by government.
Contractor is to ensure that the work site is cleaned-up after work is completed to included but not limited to all garbage, old paint chips and any trash that is a result of the work being done.
26. Quality Assurance: Once installation is complete, a manufacturer’s Quality Assurance Specialist (QAS) shall inspect the visible details of the roofing system for acceptability and for issuance of the final warranty. Any deficiencies shall be corrected by the Contractor and made ready for re-inspection within five (5) working days. Warranty shall be promptly issued upon final acceptance by the QAS.
27. Quality Control:
The Contractor shall establish and maintain quality control to assure compliance with contract requirements and shall maintain records of his quality control for all construction operations required under this the statement of work (SOW). A copy of these records, as well as the records of corrective action taken, shall be furnished to the Government.
28. Existing Utility Interruptions:
Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions:
Notify the COR prior to arranging with Baltimore Gas and Electric (BG&E) to shut off and turn on electrical and/or natural gas utilities. Notify the COR not less than 7 days in advance of proposed utility interruptions. The Government will be responsible for all BG&E connection fees.
Do not proceed with utility interruptions without the COR’s written permission.
29. Submittals:
a. Safety Plan/AHA
b. MSDS
c. Product data sheets and color samples as required for:
Paint
30. Shop Drawings:
Provide drawings required to show the systems involved and clearly show the extent, type and detailed requirements of the work for approval by the COR prior to construction. Submit 4 sets of all drawings; 1 set for BCE, 1 set for Contracting, and 2 sets will be returned to the Contractor. Drawings shall include but not be limited to: (If applicable)
a. Schedules as required.
b. Typical sections.
c. Construction plans and details.
31. As-Built Drawings:
Provide redlined As-Built drawings of all new construction. Utility redlines shall show the locations of utility lines and connections with dimensions that are triangulated to building corners. (If applicable)
32. Product Information:
Provide all material submittals utilizing AF IMT 3000, Material Approval Submittal available at: http://www.usmilitarycontracting.com/uploads/Attach_6.pdf for approval by the COR prior to construction. Submit 4 sets of all AF IMT 3000 with attachments; 1 set for BCE, 1 set for Contracting, and 2 sets will be returned to the Contractor. Provide the following product information, calculations, and material samples for approval by the COR prior to construction:
d. Safety Plan/AHA
e. MSDS
f. Product data sheets and color samples as required for:
Paint
33. Installer’s Qualification:
N/A
34. Certifications:
N/A
35. Prescriptions/Clauses:
N/A
36. Wage Determination:
Currently, General Decision Number MD150044 04/03/2015 MD44 is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award. (If applicable)
37. Performance and Payment Bonds:
In accordance with Contract Clause 52.228-15, Contractors are reminded that any award over $25,000 shall require Payment Bonds and awards exceeding $100,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award. (If applicable)
38. Construction: ( ) YES or ( x ) NO, reference Contract Clause 52.246-21, Warranty of Construction Clause is applicable to this task order.
File details come from the government source that posted it. Updated .