W912K6-14-R-0004.docx.pdf
PDF 279 KB Posted
- Attached to
- Storm Water Pipe Installtion Federal contract opportunity
- Solicitation number
- W912K6-14-R-0004
About this file
Soliciation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Storm_Sewer_EXHIBIT_E_Proposal_Form_Supporting_Document.docx | DOCX document | |
| Storm_Sewer_EXHIBIT_A.doc | DOC document | |
| Storm_Sewer_EXHIBIT_G_Environmental_Protection_Plan_for_Contractors.pdf | ||
| Storm_Sewer_EXHIBIT_B.doc | DOC document | |
| Storm_Sewer_EXHIBIT_F_Proposal_Inquiry_Format.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F7U3MB4178A001
175th MSC Contracting Division, Upgrade Storm Sew er System, PJMS 142022
Construction Contract for Project PJMS 142022 Upgrade Storm Sew er System, at the 175th Wing, 2701 Eastern BLVD, Baltimore, MD 21220.
Work w ill be performed in accordance w ith the contract, plans and technical specifications. This action is being solicited as a total small business set-aside. The North American Industry Classification (NAICS) Code is 237110 and the Size Standard for Small Business is $36.5M average annual revenue for the past three years. IAW FAR Part 36.204 the Project magnitude is betw een $100,000 and $250,000. A single aw ard Firm Fixed Price contract to the Low est Price Technically Acceptable (LPTA) Offeror is contemplated. Failure to submit an offer on all items shall result in rejection of the proposal. Solicitation and all information, notices, amendments for this solicitation w ill be posted at http://w w w .fbo.gov. Instructions for obtaining Plans for this solicitation are located in Section 00100, paragraph 3.4.2.1. Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available.
MICHAEL DOMBKIEWICZ 410-918-6218
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Aug-2014
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________90 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________02 Sep 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MD ANG BASE CONTRACTING OFFICE
MD AIR NATIONAL GUARD
MARTIN STATE AIRPORT
2701 EASTERN BOULEVARD
MIDDLE RIVER MD 21220-2801
W912K6
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
410-918-6584FAX:TEL: 410-918-6218 TEL: FAX:
W912K6-14-R-0004 72
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912K6-14-R-0004
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job PJMS142022-Upgrade Storm Sewer System
FFP
Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary. The work includes the demolition of an existing storm drain system (approximately 725 feet), the construction of a new storm drain system averaging 30-inch RCP, and incidental related work. The site shall be restored to existing grade and conditions after construction. Gravel and paved roads impacted by construction shall be replaced in kind. Provision for one-to-one mitigation for any trees 6-inch DBH (Diameter at Breast Height) or greater removed during construction. Replacement trees shall be a minimum size of 3-inch caliper and of a species on MAA's approved plant list. The work is located at the Maryland Air National Guard Base at Martin State Airport, Middle River Maryland.
FOB: Destination
PURCHASE REQUEST NUMBER: F7U3MB4178A001
SIGNAL CODE: A
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job Prepare Storm Water Pollution Prevention
FFP
Non personal services: Provide all labor, material, transportation, supplies, services, permits, insurance and supervision necessary to prepare an officially approved Storm Water Pollution Prevention Plan.
FOB: Destination
NET AMT
SOLICITATION CONTRACT FORM
SECTION 00010 Solicitation Contract Form
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 - SOLICITATION CONTRACT FORM AND NOTES
SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00110 – SUBMISSION REQUIREMENTS AND INSTRUCTIONS
SECTION 00120 – PROPOSAL EVALUATIONS AND BASIS FOR AWARD
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 - CONTRACT CLAUSES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project # 142022 Dated 8 July 2014 ATTACHMENT 2 - WAGE DETERMINATION -– MD140027 06/27/2014 MD27 -- To be inserted at award.
See section 00100 of solicitation.
ATTACHMENT 3 - SOLICITATION QUESTIONS AND ANSWERS DOCUMENT -- To be inserted at award
EXHIBIT A- Performance Relevancy Questionnaire EXHIBIT B- Subcontractor Information and Consent Form EXHIBIT C- Reserved – Not Used EXHIBIT D- Reserved – Not Used EXHIBIT E- Proposal Form Supporting Document Breakdown for CLIN 0001 EXHIBIT F- Proposal Inquiry Format EXHIBIT G- Environmental Protection Plan for Contractors
SECTION 00010 NOTES
NOTES
1. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.
2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5 Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.
3. Reference DFARS Provision 252.236-7008, Contract Prices – Bidding Schedules. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.
4. Offeror’s attention is invited to EXHIBIT G- Environmental Protection Plan for Contractors – This plan must be adhered to in all its aspects in the execution of the awarded contract.
5. Funds IAW FAR Provision 52.232-18, Availability of Funds. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
6. CLINS 0001 & 0002—Offeror’s must provide a breakdown of CLIN 0001 (Base Bid for entire job) and CLIN 0002 Prepare Storm Water Pollution Prevention Plan as outlined on EXHIBIT E (Enclosed)
7. Significant Liquidated Damages (see FAR Clause 52.211-12, Liquidated Damages - Construction) apply for exceeding performance period of this contract.
8. Facsimile transmission of proposal is not authorized
End of Section 00010
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 90 dys. ADC 1 F7U3MB - WALTER MODDISON
2701 EASTERN BLVD
BALTIMORE MD 21220
410-918-6538 FOB: Destination
F7U3MB
0002 N/A N/A N/A N/A
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS TO OFFERORS
Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. SCOPE
1.1. You are invited to submit a proposal in response to our Request for Proposal (RFP) W912K6-14-R-0004 entitled Upgrade Storm Sewer System, Project Number 142022, at 175th Wing Maryland Air National Guard at Warfield Air National Guard Base, 2701 Eastern BLVD, Middle River, MD 21220. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal is the Lowest Price Technically Acceptable (LPTA) after evaluation in accordance with the factors and sub factors in this solicitation.
1.2. This solicitation is set-aside 100% for small businesses.
2. NOTICE OF PRE-PROPOSAL CONFERENCE
2.1.1. A pre-proposal conference will be conducted on 7 Aug 2014 at 0900 for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at the Maryland Air National Guard first floor Multi-Purpose Room (located directly off the main lobby) in the 175th Wing Headquarters, Building 4200, Warfield Air National Guard Base, 2701 Eastern BLVD, Baltimore, MD 21220. Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.
2.1.2. Due to security conditions, all offerors MUST register to attend this conference and site visit.
Email the following information for all attendees to Gary Workman at the following addresses:
gary.workman.ctr@ang.af.mil and 175WG.MSC@ang.af.mil
Use Wing Access Form, copy available on http://www.fbo.gov under this solicitation.
2.1.3. This information must be provided in advance, not later than 5 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
2.1.4. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
2.1.5. A record of the conference shall be made and furnished to all prospective offerors via posting to http://www.fbo.gov . The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
3.1. Submit all questions on the by email to the contracting office at the address shown below.
Subject Line: Reference No. W912K6-14-R-0004
Email: gary.workman.ctr@ang.af.mil and 175WG.MSC@ang.af.mil
INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING INFORMATION. See EXHIBIT F – Proposal Inquiry Format
Date of Proposal Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Phone Number: _____________________________ Fax Number:______________________________
Email address: ________________________________________________________________________
Proposal Inquiry: Be specific as to part of solicitation you are questioning.
3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
3.3. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED
TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to our web site at:
http://www.fbo.gov.
3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information:
3.4.2.1. The solicitation and associated information and the plans and specifications will be available only from the Federal Business Opportunities (FedBizOpps) website on-line at https://www.fbo.gov/ .
FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information: Marketing Partner Identification Number (MPIN), 2) DUNS Number and CAGE Code, 3) Telephone Number, 4) Email address. Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. (Please note the registration for access to the secure site takes approximately 15 business days. PLAN ACCORDINGLY) Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents.
Contractors who do not already have a MPIN are advised that the normal processing is 7 to 15 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on FBO. See video in vendor guide at 3.3 on advanced functions for other information. .
Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation with their MPIN.
Bidders/Offerors cannot log into the FedBizOpps home page and search for data.
3.4.2.2. Effective May 29, 2012 Government systems such as CCR and ORCA (on-line representations and certifications) migrated to in System for Award Management (SAM). Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register. Instructions for registering are on the web page.
4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS
4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted on the following website: http://www.fbo.gov
4.2. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the lasted information.
5. HAND CARRIED PROPOSALS/INVITATIONS
5.1. A bid repository is provided for hand carried proposals and is located at Base Contracting Office, Room 229, Building 4200 (175th Wing HQ), 2701 Eastern BLVD, Baltimore, MD 21220. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.
5.2. Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined in paragraph 2.1.2 for entry. Delays are probable at the entry point and should be accommodated for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
6. WAGE DETERMINATION
Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are General Decision Number: WAGE DETERMINATION – MD140027 06/27/2014
MD27.
6.1. , State of Maryland, Construction Type: Heavy (Including sewer/water construction), Baltimore County, Maryland.
In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of this solicitation, it is the offeror’s responsibility to insure the most recent determination is used in preparing the proposal. An Amendment will not be issued prior to closing to change Wage Determination dates and/or numbers. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c) (4) will apply.
6.2. Applicable wage rates can be found for Baltimore County, Maryland at http://www.wdol.gov/wdol/scafiles/davisbacon/md27.dvb
7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
8. REMOVAL OF SECTIONS AT TIME OF AWARD
Sections 00100, 00110, 00120, 00600 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
9. DISPOSITION OF UNSUCCESSFUL PROPOSALS
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals. The Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.
10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES
10.1. It has been determined that all reasonable amounts of electricity and water, where/if physically available, used in connection with this project will be furnished to contractor without cost. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-14, Availability and Use of Utility Services)
11. EXCEPTIONS
11.1. If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00800) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
12. CLAUSES
12.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
12.2. Clauses and provisions in this document may not appear in consecutive order.
13. List of Brand Name or Sole Source Justifications posted on FBO
NONE
SECTION 00110 SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. PROPOSAL PREPARATION INSTRUCTIONS
1.1. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section 00100, FAR Provision 52.215-1, Instruction to Offerors – Competitive Acquisition.
1.2. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award.
2. SOURCES OF PERSONNEL ON SELECTION BOARD
2.1. Offerors are advised that employees of the firms identified below may serve as advisors to Source Selection Evaluation Board members in the source selection process. These individuals will be authorized access to only those portions of the proposal data and discussions that are necessary to enable them to perform their respective duties. Such firms are expressly prohibited from competing on the subject acquisition and from rating proposals or recommending a selection.
Contact Name: Gary Workman Firm: Odyssey-TCI JV, LLC Phone: 410-918-6284 Email: gary.workman.ctr@ang.af.mil
Contact Name: Frank Pinizzotto Firm: MacDonald-Bedford, LLC Phone: 410-918-6835 Email: frank.pinizzotto.ctr@ang.af.mil
Contact Name: Jerry Roberson Firm: MacDonald-Bedford, LLC Phone: 410-918-6843 Email: jerry.roberson@ang.af.mil
2.2. In accomplishing their duties related to the source selection process, the aforementioned firms may require access to proprietary information contained in the offeror’s proposals. Therefore, pursuant to FAR 9.505-4, these firms must execute an agreement with each offeror that states that they will (1) protect the offerors’ information from unauthorized use or disclosure for as long as it remains proprietary and (2) refrain from using the information for any purpose other than that for which it was furnished. To expedite the evaluation process, each offeror must contact the above companies to effect execution of such an agreement prior to submission of proposals.
Each offeror shall submit copies of the agreement with their proposal. Offerors who fail to execute agreements do solely at their own risk.
3. PROPOSAL CONTENT
3.1. Prospective offerors shall submit the following volumes in two separate packages:
3.1.1. Submit Volume 1, Price proposal, pro forma documents, in original and (3) three hard copies, in accordance with instructions contained herein and;
3.1.2. Volume 2, (Part 1) Technical Capability Proposal information in original and three (3) hard copies and one (1) CD/DVD.
3.1.3. Offerors are cautioned to carefully review the proposal requirements for these Volumes and ensure a complete proposal is submitted.
3.2. PROPOSAL DUE DATE SCHEDULE
3.2.1. The entire proposal (Volumes 1 and 2 and the CD/DVD copy) are due by the date and time set for the receipt of proposals shown in Block 13 of the SF 1442. Past performance references should provide questionnaire responses to the Contracting Officer not later than the closing date.
3.2.2. After compiling all required information, submit original and specified number of copies to the issuing office listed in Block 7 of the SF 1442. Mark the front of the envelope/box with the following:
“PROPOSAL No. W912K6-14-R-0003, DO NOT OPEN--- Competitive Acquisition”.
3.3. PROPOSAL FORMAT
3.3.1. Purpose: These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposed data. The proposal shall include all of the information requested in the specific instructions. Failure to include all information requested may adversely affect the evaluation.
3.3.2. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
3.3.3. Offerors are cautioned to submit enough information to enable the evaluators to fully ascertain each offeror’s capability to perform all of the requirements contemplated by this solicitation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.
3.3.4. Written proposals shall be prepared on standard 8.5 x 11 inch paper (charts may be landscaped but must be on 8.5 x 11 inch paper) and shall be in a legible font size (10). All pages of each proposal shall be appropriately numbered, and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required. Type size for graphics, charts, diagrams and tables shall be of an appropriate font and size for the application, and must be clearly readable without magnification assistance to the normal eye. Text lines will be no less than single-space. To the maximum extent practicable, proposal submission shall be double sided.
3.3.5. Binding: Elaborate format and binding are neither necessary nor desirable. All binders will be capable of lying flat when opened. Three ring binders are preferred. The cover and spine of each binder will clearly identify the offeror’s name, Project number, RFP number, RFP title and copy number, (e.g. copy 2 of 3). The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages.
3.3.6. Indexing: Each binder will contain a “Table of Contents” for that volume. The “Table of Contents” will identify major areas, paragraphs and subparagraphs by number and title, as well as by page number and volume locations. Tab indexing will be used to identify Sections as appropriate.
3.3.7. Electronic Copy: Provide one (1) electronic copy of all Volume 1 and Volume 2 of the proposal information. Electronic copies shall be submitted on CD/DVD saved in Microsoft Word format or Adobe Acrobat.
(“Read Only” files are acceptable). All disks shall be virus checked prior to submission. Submission shall be within 3 working days.
3.3.8. If revised proposals are requested, all proposal revisions shall be submitted on colored paper as page changes with each page identified by date and page number. Revised pages shall be printed on one side and punched with a 3-hole punch along the left margin. The number of revised copies to be submitted is the same as the initial proposal.
3.3.9. Offeror may, at the discretion of the Government, be asked to provide clarifications regarding their proposals in accordance with FAR 15.306 (a). Requests for such information do not constitute discussions.
3.3.10. The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.
3.4. PROPOSAL VOLUME CONTENTS: Each offeror’s proposal shall be submitted as set forth below and all information shall be confined to the appropriate part to facilitate independent evaluation. Proposals, which do not include the requested minimum information, may be eliminated from further consideration for award.
3.4.1. VOLUME 1, PRICE/COST INFORMATION AND PRO FORMA DOCUMENTS
3.4.1.1. Offerors shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project set forth in Section 00120 of this solicitation.
The Government is not, and does not intend on, requesting certified cost or pricing data. Offerors may be required during the evaluation process to provided sufficient price/cost information that will enable the Government to perform a meaningful evaluation. If an offeror proposes an unusually low price, the offeror should also provide rationale to justify the price. Detailed requirements follow:
3.4.1.2. Provide an introductory page to include Cage Code, DUNS Number, Tax Identification Number (TIN), points of contact, authorized negotiators, contact phone, facsimile numbers, and email addresses.
Also, include your business socioeconomic status, e.g. small business, woman-owned small business, HUBZone small business, etc.
3.4.1.3. Offer and Section 00010 – Complete in its entirety the “Offeror” portion of the Standard Form (SF) 1442. An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF 1442 is required to have an original signature.
3.4.1.4. Section 00010 – Insert the price/cost associated with the project in the line items. All line items (CLINs) must be priced to be considered.
3.4.1.5. Representations and Certifications- Section 00600- insert the required certifications and representations and return only those shown in section 00600. Return the entire Section 00600 with your proposal.
All other required representations and certifications are to be completed on line in “ORCA”.
3.4.1.6. Effective May 29, 2012 Government systems such as CCR and ORCA (on-line representations and certifications) migrated to System for Award Management (SAM). Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number to register. Instructions for registering are on the web page. Complete annual Representations and Certifications on line at “SAM” if you have not already done so. You are not required to provide a copy of the Representations and Certifications completed in ORCA with your written proposal. DO include any Representations and Certifications and other statements of offerors contained in Section 00600 of this solicitation, which are in addition to the annual certifications on ORCA. Information provided on your introductory page will assist us in locating and verifying your data in (CCR) and ORCA.
3.4.1.7. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the Central Contractor Registration (CCR) database.
Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1).
Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration ( IAW FAR 19.302 (b)) to determine eligibility. Note that there were significant changes in 2011 to the SBA requirements for a Joint venture agreement. Ensure that you have the most up to date regulations from the Small Business Administration. All questions regarding this must be directed the Small Business Administration and not the Contracting Officer.
3.4.2. VOLUME 2, PART 1, OFFEROR TECHNICAL CAPABILITY PROPOSAL
3.4.2.1. Volume 2 Part 1 is obtained for the purposes of evaluating an offeror’s technical capability to perform a project of this size and complexity. This factor is comprised of three (3) subfactors.
Subfactor 1: Contractor Experience and Capability, Subfactor 2: LEED -- Not applicable to this project, and Subfactor 3: Adherence to the Environmental Protection Plan. The technical capability proposal (Volume 2 Part
1) is limited to 10 pages excluding tabs, indexes, and resumes.
3.4.2.1.1. Subfactor 1: Demonstrate offerors technical experience and capability to perform a project of this magnitude and complexity. Discuss and provide experience of key construction personnel including, but not limited to, Project Manager, Site Superintendent(s), Quality Assurance Manager (on site), Site engineering personnel. Discuss any previous projects that are similar to this project in terms of scope, size and complexity. If no experience so state and indicate in detail how you plan to overcome this lack of experience. The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience.
(Resumes or experience cut sheets are limited to 2 pages each and are not part of the page count.) In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered.
3.4.2.1.2. Subfactor 2: LEED – Not applicable to this project.
3.4.2.1.3. Subfactor 3: Discuss how your company will comply with the requirements of EXHIBIT G – Environmental Protection Plan for Contractors.
SECTION 00120 PROPOSAL EVALUATIONS AND BASIS FOR AWARD
1. GENERAL INFORMATION
1.1. This solicitation is for a Firm Fixed Price Contract. The Government intends to award a single contract to a qualified Small Business. Offeror deemed responsible in accordance with the Federal Acquisition Regulation (FAR), whose proposal conforms to all the RFP's requirements and is judged to represent the Lowest Price Technically Acceptable (LPTA) to the Government in accordance with the evaluation scheme set out in this solicitation. The LPTA proposal is the lowest priced offer that meets or exceeds the technical factors consistent with the Government's stated importance of evaluation criteria. Please note that the evaluation scheme for this solicitation is in accordance with Lowest Priced Technically Acceptable approach (FAR 15.101-2).
1.2. To arrive at a decision this acquisition will utilize the FAR Part 15.101-2 process. While the
Government and the Source Selection Authority will strive for maximum objectivity, the evaluation process, by its nature, is subjective and therefore, professional judgment is implicit throughout the entire evaluation process.
1.3. The source selection process will be conducted in accordance with FAR Subpart 15.3, Source Selection procedures. Offers will be evaluated using the criteria listed in “Evaluation Factors for Award.”
Noncompliance with the RFP requirements may raise serious questions regarding an offeror’s technical ability and/or pricing and may be grounds to eliminate the proposal from consideration for contract award. Failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
1.4. The Contracting Officer will begin the evaluation process by conducting a proposal compliance review for all timely-received proposals for determination of basic proposal adequacy prior to providing the proposals to the evaluators. Failure to provide a complete proposal may result in the proposal being removed from further consideration for award. Failure to address any factor Technical or Price or any technical subfactor shall be grounds for elimination from evaluation and consideration for award.
1.5. Offerors must ensure that no pricing information is displayed in Volume 2, Technical Proposal.
1.6. The Government also reserves the right to obtain additional information solely for the purpose of making a responsibility determination from all offerors after receipt of proposals. Requests for responsibility information do not constitute discussions.
1.7. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer, in his/her sole discretion, later determines them to be necessary or appropriate.
1.8. The Government reserves the right to reject any or all offers if such action is in the Government's best interest.
1.9. ENFORCEABILITY OF PROPOSAL: The proposal must set forth full, accurate and complete information as required by this solicitation. By submission of the offer, the Offeror agrees that all items proposed (if applicable e.g., key personnel, subcontractors, etc.) will be utilized for the duration of the contract and any substitutions shall require prior Contracting Officer's approval.
2. EVALUATION FACTORS FOR AWARD
2.1. The evaluation factors are Price and Technical Capability. The relative importance of the evaluation factors is as follows: Technical is approximately equal to the Price Factor. The evaluation process will follow a sequence in which proposals will be ranked low to high by price. The process will continue beginning with the lowest priced proposal evaluated based on Technical capability. At the point where the lowest priced technically acceptable proposal is determined the remaining proposals will not be evaluated. If the lowest priced proposal is deemed technically unacceptable the next lowest priced proposal will then be technically evaluated. This process will continue in order of price ranking until a technically acceptable proposal is determined. The Technical Factor will be evaluated rated as “Acceptable” or “Unacceptable.” In rank order, if an offeror is deemed to be unacceptable, it will be set aside and will not continue further in this competition. Pricing is always evaluated to determine if it is reasonable and realistic. If pricing is deemed “unreasonable,” or “unrealistic,” based on government estimates and funding available for this project an award will not be made.
2.1.1. TECHNICAL CAPABILITY: Technical Capability will be evaluated on an Acceptable/Unacceptable basis. An offeror shall obtain an “Acceptable” rating to continue further in the competition. Offerors who are deemed to merit an “Unacceptable” rating in the Technical Capability Factor will be removed from further consideration for award. Technical Capability Limited to 10 pages (Resumes or experience cut sheets, NTE 2 pages each are not included in page count.)
2.1.2. Subfactor 1 - Experience and Capability -To be deemed “Acceptable” the proposal must demonstrate experience and capability to perform a project of this magnitude and complexity. The proposal also needs to demonstrate that the named key construction personnel, to include but not limited to, Project Manager, Site Superintendent and Quality Control Manager have experience and required qualifications in assigned roles. If there is no such experience, the onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience. The Government, in its sole and broad discretion, will analyze the above-referenced plans to overcome the lack of experience.
2.1.3. Subfactor 2- (USGBC) LEED® -Not Used.
2.1.4 Subfactor 3 - EXHIBIT G – Environmental Protection Plan for Contractors -- To be deemed “Acceptable” the proposal must demonstrate adherence to the standards set forth in EXHIBIT G
2.2. PAST/PRESENT PERFORMANCE EVALUATION -- NOT USED
3. PRICE EVALUATION
3.1. The purpose of the price/cost evaluation is to determine whether an offeror's proposed prices/costs for the project are reasonable and realistic in relation to the solicitation requirements and demonstrates the offeror understands the proposal requirements. Price is not rated.
3.2. The Government reserves the right to obtain additional information concerning the price (cost) as necessary to obtain a better understanding of the price proposed. No proposal revisions will be allowed under these conditions. Request for such information is for clarification purposes only. This does not constitute and shall not be construed as discussions.
3.3. The Government will conduct a price/cost evaluation of the lowest priced technically acceptable proposal to determine whether or not it complies with the stated criteria: "Reasonableness" and “Realism". Affordability may also be considered. If there are multiple projects in the solicitation, pricing will address each project as a separate evaluation for "Reasonableness" and “Realism" and “Affordability.” The LPTA proposal evaluated as not satisfying all of the price/cost criteria may be eliminated from further consideration, as well as all higher priced proposals, unless the Contracting Officer determines:
3.3.1. A minor clerical error has occurred, in which case the offeror may be given an opportunity to correct the minor error within the constraints of the "clarifications" process or
3.3.2. The Contracting Officer in his/her sole discretion later determines discussions to be necessary or appropriate.
3.4. Reasonableness of an offeror's proposal is evaluated through cost or price analysis techniques as described in FAR Subpart 15.305(a)(1) and (4). For cost (Price) to be reasonable, it must represent a cost (Price) that provides value to the Government when consideration is given to prices in the market and functional capabilities of the offeror. A price reasonableness analysis is primarily concerned with determining whether or not an offered price is too high.
3.5. Realism is evaluated by assessing the compatibility of proposed costs with proposal scope and effort. For cost (Price) to be realistic, it must reflect what it would cost the offeror to perform the effort if the offeror operates with reasonable economy and efficiency. Proposals unrealistically low in price, when compared to the Government estimate, and/or market conditions evidenced by other competitive proposals received, may be indicative of an inherent lack of understanding of the solicitation requirements and may result in proposal rejection without discussion. Any inconsistency, whether real or apparent, between proposed performance and price must be clearly explained in the price proposal. For example, if unique and innovative approaches or conditions are the basis for an unbalanced/inconsistently priced proposal, the nature of these approaches and their impact on price must be completely documented. The burden of proof of cost (Price) realism rests solely with the offeror. A price realism analysis is primarily concerned with determining whether or not an offered price is too low.
3.6. Discounts: Prompt payment discounts will not be considered in the evaluation of offers. However, any offered discount will form part of the award, and will be taken if payment is made within the discount period indicated in the offer by the offeror. As an alternative to offering a prompt payment discount in conjunction with the offer, offerors awarded contracts may include prompt payment discounts on individual invoices.
3.7. In the event the Government does not award a contract pursuant to this solicitation within 60 calendar days after receipt of proposals and award will be made without discussions, the following will apply:
3.7.1. The Government reserves the right to allow offerors to make an adjustment in their price proposals to accommodate cost changes caused by fluctuating construction material market conditions. The Contracting Officer will notify Offerors, normally by electronic mail (email) of a common closing date for receipt of the adjusted price proposals. No additional proposal revisions will be allowed under these conditions. This does not constitute and shall not be construed as discussions.
3.8. In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not be construed as discussions if award without discussions is contemplated.
4. AWARD and DEBRIEFINGS
4.1. Award: A written award or acceptance of offer mailed, or otherwise furnished to the successful offeror within the time for acceptance specified in the offer shall be deemed to result in a binding contract without further action by either party.
4.2. Debriefings
4.2.1. Offerors excluded from the competitive range or otherwise excluded from the competition before award may submit a written request for a debriefing to the Contracting Officer in accordance with FAR 15.505.
4.2.2. After award, unsuccessful offerors may submit a written request for a debriefing to the
Contracting Officer in accordance with FAR 15.506.
4.2.2.1. Written requests for debriefing will not be accepted by facsimile or email unless specifically authorized by the Contracting Officer in the notice. Submitted means delivered to the Contracting Officer at the location indicated on the SF 1442 for receipt of proposals.
End of Section 00120
CLAUSES INCORPORATED BY REFERENCE
52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.236-28 Preparation of Proposals--Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN
CERTIFIED COST OR PRICING DATA (OCT 2010)
(a) Exceptions from certified cost or pricing data. (1) In lieu of submitting certified cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following subparagraphs.
The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.