Specifications.pdf

PDF 18 MB Posted

Attached to
Repair Maintenance Ramp Federal contract opportunity
Solicitation number
W912JV19B7001
Issued by
Department of the Army Oregon Army National Guard

About this file

This notice provides details for a firm fixed-price construction contract to repair a maintenance ramp at Kingsley Field Air National Guard Base in Klamath Falls, Oregon. The project scope includes full depth replacement of concrete pavement, contaminated soil disposal, replacement of storm sewer and electrical vaults, airfield lighting, and installation of a utility corridor. There are five optional contract line items related to construction of a temporary haul road and relocation of an existing fuel tank. The contract duration is 720 calendar days. The estimated value is between $25-100 million. The solicitation is expected to be issued on April 25, 2019, with a pre-bid conference on April 26 and site visit to follow. The bid opening is scheduled for May 29, 2019. Interested contractors must register in SAM and access plans and specifications through the FedBizOpps website using their MPIN.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Ramp, newest first.
File Type Posted
Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPE B-3 (100%) SUBMITTAL

SPECIFICATIONS

KINGSLEY FIELD ANGB – KLAMATH FALLS, OREGON

REPAIR MAINTENANCE RAMP

KJAQ162682

Prepared For:

Prepared By:

3500 Parkway Lane, Suite 500 Peachtree Corners, Georgia 30092

678.336.7740 www.pondco.com

15 March 2019 Pond Project No. 1180105

Oregon Air National Guard

173rd Fighter Wing

Kingsley Field ANGB

Klamath Falls, OR 97603

Oregon Air National Guard

173rd Civil Engineering Squadron

Kingsley Field ANGB

Klamath Falls, OR 97603

This Page Intentionally Left Blank

ORANG Repair Maint. Ramp

KJAQ162682

Type B-3 Submittal

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 35 13 SPECIAL PROJECT PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

CONTAMINATED SITES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 26 - ELECTRICAL

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 05 21 GEOGRID SOIL REINFORCEMENT

31 05 22 GEOTEXTILES USED AS FILTERS

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 23.23 BASE COURSE DRAINAGE LAYERS

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 15.13 ASPHALT PAVING FOR AIRFIELDS

32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY

PAVEMENTS

32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

ORANG Repair Maint. Ramp

KJAQ162682

Type B-3 Submittal

PROJECT TABLE OF CONTENTS Page 2

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 01 30.72 RELINING SEWERS

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 34 00 FORCE MAINS AND INVERTED SIPHONS; SEWER

33 40 00 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE PIPING

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

DIVISION 34 - TRANSPORTATION

34 73 13 MOORING AND GROUNDING POINTS FOR AIRCRAFT

APPENDICES

APPENDIX A KINGSLEY FIELD CONTAMINATED MEDIA MANAGEMENT PLAN

APPENDIX B SOIL SAMPLING REPORTS

APPENDIX C GEOTECHNICAL REPORT

-- End of Project Table of Contents --

ORANG Repai r Mai nt . Ramp KJAQ162682 Ki ngsl ey Fi el d ANGB Type B- 3 Submi t t al

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/11

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

( SEE ATTACHED SHEET LI ST f ol l owi ng t hi s sect i on) .

1. 3 SUPPLEMENTARY DRAWI NGS

These suppl ement ar y dr awi ngs may not be a par t of t he cont r act but ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on.

1. 3. 1 Not Used

1. 3. 2 Bor i ng Logs

The Gover nment does not guar ant ee t hat bor i ngs i ndi cat e act ual condi t i ons, except f or t he exact l ocat i ons and t he t i me t hat t hey wer e made.

1. 3. 3 Not Used

- - End of Document - -

DOCUMENT 00 01 15 Page 1

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Ut i l i t y Out age Request s

Ut i l i t y Connect i on Request s

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes f ur ni shi ng al l pl ant , equi pment , l abor , devi ces, t ool s, mat er i al s, t r anspor t at i on, ser vi ces, super vi s i on and al l mi scel l aneous r equi r ement s t o per f or m al l oper at i ons i n conj unct i on wi t h t he ef f or t s t o accompl i sh t he wor k. Wor k i ncl udes t he r epl acement of t he mai nt enance r amp, i ncl udi ng per i pher al Taxi way Del t a, al ong t he east edge, t he concr et e f l oor s wi t hi n t he Char l i e Bar ns and t he hangar access apr ons adj acent t o Hangar 219. The pr oj ect wi l l cal l f or t he r epl acement i n- k i nd f or al l exi st i ng paved ar eas wi t h a uni f or m PCC pavement t o mat ch t he desi gn ai r cr af t l oadi ng and oper at i ons. Ai r f i el d El ect r i cal wor k wi l l i nc l ude r epl acement of t he t axi way edge l i ght i ng, associ at ed i mpr ovement s t o t he ai r f i el d s i gnage associ at ed wi t h t he r amp, r epai r s wi t hi n exi st i ng el ect r i cal vaul t s, and ot her var i ous associ at ed wor k. Al l wor k shal l be compl et e and f unct i on as i nt ended, as i f i dent i f i ed excl usi vel y. Al l wor k shal l be accompl i shed i n accor dance wi t h appl i cabl e dr awi ngs, speci f i cat i ons, i ndust r y st andar ds, appl i cabl e Bui l di ng and Envi r onment al Codes, Regul at i ons, and Laws. Pr oj ect el ement s i ncl ude, but ar e not l i mi t ed t o: s i t ewor k, ut i l i t i es, st or mwat er , el ect r i cal , s i t e l i ght i ng, and pavement wor k.

1. 2. 2 Location

The wor k i s l ocat ed at t he Ki ngsl ey Fi el d- Kl amat h Fal l s, Or egon, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

1. 3 EXISTING WORK

I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

SECTI ON 01 11 00 Page 1

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 48 hour s pr i or t o st ar t i ng excavat i on wor k.

1. 5 SALVAGE MATERI AL AND EQUI PMENT

I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed st or age ar ea l ocat ed wi t hi n 3 mi l es of t he const r uct i on s i t e.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 2

SECTI ON 01 30 00

ADMI NI STRATI VE REQUI REMENTS

08/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s Pr ogr ess and Compl et i on Pi ct ur es; G

1. 3 VI EW LOCATI ON MAP

Submi t , pr i or t o or wi t h t he f i r s t di gi t al phot ogr aph submi t t al s, a sket ch or dr awi ng i ndi cat i ng t he r equi r ed phot ogr aphi c l ocat i ons. Updat e as r equi r ed i f t he l ocat i ons ar e moved.

1. 4 PROGRESS AND COMPLETI ON PI CTURES

Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600x1200x24 bi t t r ue col or i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect f r om a mi ni mum of t en v i ews f r om poi nt s l ocat ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es.

Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he v i ew l ocat i on sket ch. Al so pr ovi de t he v i ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e.

I ncl ude a dat e desi gnat or i n f i l e names. Cr oss r ef er ence submi t t al s i n t he appr opr i at e dai l y r epor t . Phot ogr aphs pr ovi ded ar e f or unr est r i c t ed use by t he Gover nment .

1. 5 MI NI MUM I NSURANCE REQUI REMENTS

Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 LI ABI LI TY, dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by St at e of Or egon law.

SECTI ON 01 30 00 Page 1

1. 6 SUPERVISION

1. 6. 1 Mi ni mum Communi cat i on Requi r ement s

Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on skills.

1. 6. 2 Super i nt endent Qual i f i cat i ons

The pr oj ect super i nt endent must have a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.

For r out i ne pr oj ect s wher e t he super i nt endent i s per mi t t ed t o al so ser ve as t he Qual i t y Cont r ol ( QC) Manager as est abl i shed i n Sect i on 01 45 00. 00 20 QUALI TY CONTROL, t he super i nt endent must have qual i f i cat i ons i n accor dance wi t h t hat sect i on.

1. 6. 3 Non- Compl i ance Act i ons

The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o i nsur e t i mel y compl et i on. Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .

1. 7 PRECONSTRUCTION CONFERENCE

Af t er awar d of t he cont r act but pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, and cl ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al . Maj or subcont r act or s who wi l l engage i n t he wor k must al so at t end.

1. 8 PARTNERING

To most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment r equi r es t he f or mat i on of a cohesi ve par t ner shi p wi t hi n t he Pr oj ect Team whose member s ar e f r om t he Gover nment , t he Cont r act or and t hei r Subcont r act or s. Key per sonnel f r om t he Suppor t ed Command, t he End User ( who wi l l occupy t he f aci l i t y) , t he Gover nment Desi gn and Const r uct i on t eam and Subj ect Mat t er Exper t s, t he I nst al l at i on, t he Cont r act or and Subcont r act or s, and t he

SECTI ON 01 30 00 Page 2

Desi gner of Recor d wi l l be i nvi t ed t o par t i c i pat e i n t he Par t ner i ng pr ocess. The Par t ner shi p wi l l dr aw on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a pr oj ect t hat i s wi t hout any saf et y mi shaps, conf or ms t o t he Cont r act , and st ays wi t hi n budget and on schedul e.

The Cont r act i ng Of f i cer wi l l pr ovi de I nf or mat i on on t he Par t ner i ng Pr ocess and a l i s t of key and opt i onal per sonnel who shoul d at t end t he Par t ner i ng meeting.

1. 8. 1 For mal Par t ner i ng

Pr ovi de and host t he Par t ner i ng sessi ons wi t h key per sonnel of t he Pr oj ect Team, i ncl udi ng Cont r act or per sonnel and Gover nment per sonnel . Pay al l cost s associ at ed wi t h t he Par t ner i ng ef f or t i ncl udi ng t he Faci l i t at or , t he meet i ng r oom, and ot her i nci dent al i t ems. I n except i on, each par t i c i pant bear s t hei r own cost s f or meal s, l odgi ng, and t r anspor t at i on associ at ed wi t h t he Par t ner i ng sessi ons.

Bef or e a Par t ner i ng sessi on, coor di nat e wi t h t he Faci l i t at or al l r equi r ement s f or i nci dent al i t ems ( such as audi o- v i sual equi pment , easel s, f l i pchar t paper , col or ed mar ker s, not e paper , pens/ penci l s, col or ed f l ash car ds) , and have t hese i t ems avai l abl e at t he Par t ner i ng sessi on. Pr ovi de copi es of document s f or di st r i but i on t o al l at t endees. Pr ovi de a Faci l i t at or exper i enced i n conduct i ng Par t ner i ng Wor kshops, and who i s accept abl e t o bot h t he Gover nment and t he Cont r act or . The Faci l i t at or i s r esponsi bl e f or l eadi ng t he t eam i n a t i mel y manner and maki ng sur e t hat i ssues ar e i dent i f i ed and r esol ved. A l i s t of Par t ner i ng Faci l i t at or s i s avai l abl e f r om t he Cont r act i ng Of f i cer .

a. Schedul e t he I ni t i al Par t ner i ng Sessi on f or a dur at i on of one day mi ni mum. Locat e t hi s sessi on at a pl ace of f t he const r uct i on s i t e, as agr eed t o by t he Cont r act i ng Of f i cer and t he Cont r act or . I t may t ake pl ace concur r ent l y wi t h t he Pr e- Const r uct i on Meet i ng.

b. Schedul e f ol l ow- on Par t ner i ng Sessi on( s) f or a maxi mum of 4 hour s.

Schedul e t hem at no mor e t han 3 t o s i x mont h i nt er val s. Par t i c i pant s ar e encour aged t o ut i l i ze el ect r oni c means t o expedi t e meet i ngs.

Meet i ngs may be hel d at a l ocat i on of f - Base, at t he pr oj ect s i t e, or i n a Gover nment Faci l i t y on Base. Fol l ow- on meet i ngs may be hel d concur r ent l y wi t h ot her schedul ed meet i ngs. At t endees need onl y be t hose r equi r ed t o r esol ve cur r ent i ssues. Recommend usi ng t he same Faci l i t at or f r om t he I ni t i al Par t ner i ng sessi on t o achi eve best r esul t s and f or cont i nui t y.

1. 9 ELECTRONI C MAI L ( E- MAI L) ADDRESS

Est abl i sh and mai nt ai n el ect r oni c mai l ( e- mai l ) capabi l i t y al ong wi t h t he capabi l i t y t o open var i ous el ect r oni c at t achment s as t ext f i l es, pdf f i l es, and ot her s i mi l ar f or mat s. Wi t hi n 10 days af t er cont r act awar d, pr ovi de t he Cont r act i ng Of f i cer a s i ngl e ( onl y one) e- mai l addr ess f or el ect r oni c communi cat i ons f r om t he Cont r act i ng Of f i cer r el at ed t o t hi s cont r act i ncl udi ng, but not l i mi t ed t o cont r act document s, i nvoi ce i nf or mat i on, r equest f or pr oposal s, and ot her cor r espondence. The Cont r act i ng Of f i cer may al so use emai l t o not i f y t he Cont r act or of base access condi t i ons when emer gency condi t i ons war r ant , such as hur r i canes or t er r or i st t hr eat s.

Mul t i pl e emai l addr esses ar e not al l owed.

I t i s t he Cont r act or ' s r esponsi bi l i t y t o make t i mel y di st r i but i on of al l Cont r act i ng Of f i cer i ni t i at ed e- mai l wi t h i t s own or gani zat i on i ncl udi ng

SECTI ON 01 30 00 Page 3 f i el d of f i ce( s) . Pr ompt l y not i f y t he Cont r act i ng Of f i cer , i n wr i t i ng, of any changes t o t hi s emai l addr ess.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 30 00 Page 4

SECTI ON 01 32 01. 00 10

PROJECT SCHEDULE

02/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AACE I NTERNATI ONAL ( AACE)

AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s

AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

ER 1- 1- 11 ( 1995) Admi ni st r at i on - - Pr ogr ess, Schedul es, and Net wor k Anal ysi s Syst ems

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr oj ect Schedul er Qual i f i cat i ons; G

Pr el i mi nar y Pr oj ect Schedul e; G

I ni t i al Pr oj ect Schedul e; G

Per i odi c Schedul e Updat e; G

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2- year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nc i pl es and appl i cat i on.

SECTI ON 01 32 01. 00 10 Page 1

PART 2 PRODUCTS

2. 1 SOFTWARE

The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s specification.

2. 1. 1 Cont r act or Sof t war e

Schedul i ng sof t war e used by t he cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed sdef f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o FAR Cl ause 52. 236- 15 Schedul es f or Const r uct i on Cont r act s. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of const r uct i on i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.

Pr epar e each Pr oj ect Schedul e usi ng t he Pr ecedence Di agr am Met hod ( PDM) .

3. 2 BASI S FOR PAYMENT AND COST LOADI NG

The schedul e i s t he basi s f or det er mi ni ng cont r act ear ni ngs dur i ng each updat e per i od and t her ef or e t he amount of each pr ogr ess payment . The aggr egat e val ue of al l act i v i t i es coded t o a cont r act CLI N must equal t he val ue of t he CLI N.

3. 2. 1 Act i v i t y Cost Loadi ng

Act i v i t y cost l oadi ng must be r easonabl e and wi t hout f r ont - end l oadi ng.

Pr ovi de addi t i onal document at i on t o demonst r at e r easonabl eness i f r equest ed by t he Cont r act i ng Of f i cer .

3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on

Fai l ur e t o meet t he r equi r ement s of t hi s speci f i cat i on may r esul t i n t he di sappr oval of t he pr el i mi nar y, i ni t i al or per i odi c schedul e updat es and subsequent r ej ect i on of payment r equest s unt i l compl i ance i s met .

I n t he event t hat t he Cont r act i ng Of f i cer di r ect s schedul e r evi s i ons and t hose r evi s i ons have not been i nc l uded i n subsequent Pr oj ect Schedul e r evi s i ons or updat es, t he Cont r act i ng Of f i cer may wi t hhol d 10 per cent of pay r equest amount f r om each payment per i od unt i l such r evi s i ons t o t he pr oj ect schedul e have been made.

SECTI ON 01 32 01. 00 10 Page 2

3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS

3. 3. 1 Level of Det ai l Requi r ed

Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer wi l l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l :

3. 3. 2 Act i v i t y Dur at i ons

Reasonabl e act i v i t y dur at i ons ar e t hose t hat al l ow t he pr ogr ess of ongoi ng act i v i t i es t o be accur at el y det er mi ned bet ween updat e per i ods.

Less t han 2 per cent of al l non- pr ocur ement act i v i t i es may have Or i gi nal Dur at i ons ( OD) gr eat er t han 20 wor k days or 30 cal endar days.

3. 3. 3 Pr ocur ement Act i v i t i es

I ncl ude act i v i t i es associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.

3. 3. 4 Mandat or y Tasks

I ncl ude t he f ol l owi ng act i v i t i es/ t asks i n t he i ni t i al pr oj ect schedul e and al l updat es.

a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .

b. Long pr ocur ement act i v i t i es

c. Submi ssi on and appr oval of as- bui l t dr awi ngs.

d. Submi ssi on and appr oval of DD1354 dat a and i nst al l ed equi pment l i s t s.

e. Cont r ol s t est i ng.

f . Per f or mance Ver i f i cat i on t est i ng.

g. Ot her syst ems t est i ng, i f r equi r ed.

h. Cont r act or ' s pr e- f i nal i nspect i on.

i . Cor r ect i on of punch l i s t f r om Cont r act or ' s pr e- f i nal i nspect i on.

j . Gover nment ' s pr e- f i nal i nspect i on.

k. Cor r ect i on of punch l i s t f r om Gover nment ' s pr e- f i nal i nspect i on.

l . Fi nal i nspect i on.

3. 3. 5 Gover nment Act i v i t i es

Show Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess.

SECTI ON 01 32 01. 00 10 Page 3

These act i v i t i es i ncl ude, but ar e not l i mi t ed t o: approvals, acceptance, envi r onment al per mi t appr oval s by St at e r egul at or s, i nspect i ons, ut i l i t y t i e- i n, Gover nment Fur ni shed Equi pment ( GFE) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.

3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y

Use t he act i v i t y codi ng st r uct ur e def i ned i n t he St andar d Dat a Exchange For mat ( SDEF) i n ER 1- 1- 11. Thi s exact st r uct ur e i s mandat or y. Devel op and assi gn al l Act i v i t y Codes t o act i v i t i es as det ai l ed her ei n. A t empl at e SDEF compat i bl e schedul e backup f i l e i s avai l abl e on t he QCS web si t e:

http://rms.usace.army.mil .

The SDEF f or mat i s as f ol l ows:

Field Act i v i t y Code Length Description

1 WRKP 3 Wor ker s per day

2 RESP 4 Responsi bl e par t y

3 AREA 4 Ar ea of wor k

4 MODF 6 Modi f i cat i on Number

5 BIDI 6 Bi d I t em ( CLI N)

6 PHAS 2 Phase of wor k

7 CATW 1 Cat egor y of wor k

8 FOW 20 Feat ur e of wor k*

* Some syst ems r equi r e t hat FEATURE OF WORK val ues be pl aced i n sever al act i v i t y code f i el ds. The not at i on shown i s f or Pr i maver a P6. Ref er t o t he speci f i c sof t war e gui del i nes wi t h r espect t o t he FEATURE OF WORK f i el d r equi r ement s.

3. 3. 6. 1 Wor ker s Per Day ( WRKP)

Assi gn Wor ker s per Day f or al l f i el d const r uct i on or di r ect wor k act i v i t i es, i f di r ect ed by t he Cont r act i ng Of f i cer . Wor ker s per day i s based on t he aver age number of wor ker s expect ed each day t o per f or m a t ask f or t he dur at i on of t hat act i v i t y .

3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)

Assi gn r esponsi bi l i t y code f or al l act i v i t i es t o t he Pr i me Cont r act or , Subcont r act or ( s) or Gover nment agency( i es) r esponsi bl e f or per f or mi ng t he activity.

a. Act i v i t i es coded wi t h a Gover nment Responsi bi l i t y code i ncl ude, but ar e not l i mi t ed t o: Gover nment appr oval s, Gover nment desi gn r evi ews, envi r onment al per mi t appr oval s by St at e r egul at or s, Gover nment Fur ni shed Pr oper t y/ Equi pment ( GFP) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.

SECTI ON 01 32 01. 00 10 Page 4

b. Act i v i t i es cannot have mor e t han one Responsi bi l i t y Code. Exampl es of accept abl e act i v i t y code val ues ar e: DOR ( f or t he desi gner of r ecor d) ;

ELEC ( f or t he el ect r i cal subcont r act or ) ; MECH ( f or t he mechani cal subcont r act or ) ; and GOVT ( f or USACE) .

3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)

Assi gn Wor k Ar ea code t o act i v i t i es based upon t he wor k ar ea i n whi ch t he act i v i t y occur s. Def i ne wor k ar eas based on r esour ce const r ai nt s or space const r ai nt s t hat woul d pr ecl ude a r esour ce, such as a par t i cul ar t r ade or cr af t wor k cr ew f r om wor ki ng i n mor e t han one wor k ar ea at a t i me due t o r est r ai nt s on r esour ces or space. Exampl es of Wor k Ar ea Codi ng i nc l ude di f f er ent ar eas wi t hi n a f l oor of a bui l di ng, di f f er ent f l oor s wi t hi n a bui l di ng, and di f f er ent bui l di ngs wi t hi n a compl ex of bui l di ngs.

Act i v i t i es cannot have mor e t han one Wor k Ar ea Code.

Not al l act i v i t i es ar e r equi r ed t o be Wor k Ar ea coded. A l ack of Wor k Ar ea codi ng i ndi cat es t he act i v i t y i s not r esour ce or space const r ai ned.

3. 3. 6. 4 Modi f i cat i on Number ( MODF)

Assi gn a Modi f i cat i on Number Code t o any act i v i t y or sequence of act i v i t i es added t o t he schedul e as a r esul t of a Cont r act Modi f i cat i on, when appr oved by Cont r act i ng Of f i cer . Key al l Code val ues t o t he Gover nment ' s modi f i cat i on number i ng syst em. An act i v i t y can have onl y one Modi f i cat i on Number Code.

3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )

Assi gn a Bi d I t em Code t o al l act i v i t i es usi ng t he Cont r act Li ne I t em Schedul e ( CLI N) t o whi ch t he act i v i t y bel ongs, even when an act i v i t y i s not cost l oaded. An act i v i t y can have onl y one BI DI Code.

3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)

Assi gn Phase of Wor k Code t o al l act i v i t i es. Exampl es of phase of wor k ar e pr ocur ement phase and const r uct i on phase. Each act i v i t y can have onl y one Phase of Wor k code.

a. I f t he cont r act speci f i es phasi ng wi t h separ at el y def i ned per f or mance per i ods, i dent i f y a Phase Code t o al l ow f i l t er i ng and or gani z i ng t he schedul e accor di ngl y.

3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)

Assi gn a Cat egor y of Wor k Code t o al l act i v i t i es. Cat egor y of Wor k Codes i ncl ude, but ar e not l i mi t ed t o const r uct i on submi t t al , pr ocur ement , f abr i cat i on, weat her sensi t i ve i nst al l at i on, non- weat her sensi t i ve i nst al l at i on, st ar t - up, and t est i ng act i v i t i es. Each act i v i t y can have no mor e t han one Cat egor y of Wor k Code.

3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)

Assi gn a Feat ur e of Wor k Code t o appr opr i at e act i v i t i es based on t he Def i nabl e Feat ur e of Wor k t o whi ch t he act i v i t y bel ongs based on t he appr oved QC pl an.

Def i nabl e Feat ur e of Wor k i s def i ned i n Sect i on 01 45 00. 00 10 QUALI TY

SECTI ON 01 32 01. 00 10 Page 5

CONTROL. An act i v i t y can have onl y one Feat ur e of Wor k Code.

3. 3. 7 Cont r act Mi l est ones and Const r ai nt s

Mi l est one act i v i t i es ar e t o be used f or s i gni f i cant pr oj ect event s i ncl udi ng, but not l i mi t ed t o, pr oj ect phasi ng, pr oj ect st ar t and end act i v i t i es, or i nt er i m compl et i on dat es. The use of ar t i f i c i al f l oat const r ai nt s such as " zer o f r ee f l oat " or " zer o t ot al f l oat " ar e pr ohi bi t ed.

Mandat or y const r ai nt s t hat i gnor e or ef f ect net wor k l ogi c ar e pr ohi bi t ed.

No const r ai ned dat es ar e al l owed i n t he schedul e ot her t han t hose speci f i ed her ei n. Submi t addi t i onal const r ai nt s t o t he Cont r act i ng Of f i cer f or appr oval on a case by case basi s.

3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt

The f i r st act i v i t y i n t he pr oj ect schedul e must be a st ar t mi l est one t i t l ed " NTP Acknowl edged, " whi ch must have a " St ar t On" const r ai nt dat e equal t o t he dat e t hat t he NTP i s acknowl edged.

3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt

The l ast act i v i t y i n t he schedul e must be a f i ni sh mi l est one t i t l ed " End Project."

Const r ai n t he pr oj ect schedul e t o t he Cont r act Compl et i on Dat e i n such a way t hat i f t he schedul e cal cul at es an ear l y f i ni sh, t hen t he f l oat cal cul at i on f or " End Pr oj ect " mi l est one r ef l ect s posi t i ve f l oat on t he l ongest pat h. I f t he pr oj ect schedul e cal cul at es a l at e f i ni sh, t hen t he " End Pr oj ect " mi l est one f l oat cal cul at i on r ef l ect s negat i ve f l oat on t he l ongest pat h. The Gover nment i s under no obl i gat i on t o accel er at e Gover nment act i v i t i es t o suppor t a Cont r act or ' s ear l y compl et i on.

3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s

Const r ai n cont r act ual l y speci f i ed i nt er i m compl et i on dat es t o show negat i ve f l oat when t he cal cul at ed l at e f i ni sh dat e of t he l ast act i v i t y i n t hat phase i s l at er t han t he speci f i ed i nt er i m compl et i on dat e.

3. 3. 7. 3. 1 St ar t Phase

Use a st ar t mi l est one as t he f i r s t act i v i t y f or a pr oj ect phase. Cal l t he st ar t mi l est one " St ar t Phase X" wher e " X" r ef er s t o t he phase of wor k.

3. 3. 7. 3. 2 End Phase

Use a f i ni sh mi l est one as t he l ast act i v i t y f or a pr oj ect phase. Cal l t he f i ni sh mi l est one " End Phase X" wher e " X" r ef er s t o t he phase of wor k.

3. 3. 8 Calendars

Schedul e act i v i t i es on a Cal endar t o whi ch t he act i v i t y l ogi cal l y bel ongs.

Devel op cal endar s t o accommodat e any cont r act def i ned wor k per i od such as a 7- day cal endar f or Gover nment Accept ance act i v i t i es, concr et e cur e t i mes, et c. Devel op t he def aul t Cal endar t o mat ch t he physi cal wor k pl an wi t h non- wor k per i ods i dent i f i ed i ncl udi ng weekends and hol i days. Devel op sSeasonal Cal endar ( s) and assi gn t o seasonal l y af f ect ed act i v i t i es as applicable.

SECTI ON 01 32 01. 00 10 Page 6

I f an act i v i t y i s weat her sensi t i ve i t shoul d be assi gned t o a cal endar showi ng non- wor k days on a mont hl y basi s, wi t h t he non- wor k days sel ect ed at r andom acr oss t he weeks of t he cal endar , usi ng t he ant i c i pat ed adver se weat her del ay wor k days pr ovi ded i n t he Speci al Cont r act Cl auses. Assi gn non- wor k days over a seven- day week as weat her r ecor ds ar e compi l ed on seven- day weeks, whi ch may cause some of t he weat her r el at ed non- wor k days t o f al l on weekends.

3. 3. 9 Open Ended Logi c

Onl y t wo open ended act i v i t i es ar e al l owed: t he f i r st act i v i t y " NTP Acknowl edged" may have no pr edecessor l ogi c, and t he l ast act i v i t y - " End Pr oj ect " may have no successor l ogi c.

Pr edecessor open ended l ogi c may be al l owed i n a t i me i mpact anal yses upon t he Cont r act i ng Of f i cer ' s appr oval .

3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed

Act ual St ar t and Fi ni sh dat es must not aut omat i cal l y updat e wi t h def aul t mechani sms i ncl uded i n t he schedul i ng sof t war e. Updat i ng of t he per cent compl et e and t he r emai ni ng dur at i on of any act i v i t y must be i ndependent f unct i ons. Di sabl e pr ogr am f eat ur es t hat cal cul at e one of t hese par amet er s f r om t he ot her . Act i v i t y Act ual St ar t ( AS) and Act ual Fi ni sh ( AF) dat es assi gned dur i ng t he updat i ng pr ocess must mat ch t hose dat es pr ovi ded i n t he Cont r act or Qual i t y Cont r ol Repor t s. Fai l ur e t o document t he AS and AF dat es i n t he Dai l y Qual i t y Cont r ol r epor t wi l l r esul t i n di sappr oval of t he Cont r act or ' s schedul e.

3. 3. 11 Out - of - Sequence Pr ogr ess

Act i v i t i es t hat have pr ogr essed bef or e al l pr ecedi ng l ogi c has been sat i sf i ed ( Out - of - Sequence Pr ogr ess) wi l l be al l owed onl y on a case- by- case basi s subj ect t o appr oval by t he Cont r act i ng Of f i cer . Pr opose l ogi c cor r ect i ons t o el i mi nat e out of sequence pr ogr ess or j ust i f y not changi ng t he sequenci ng f or appr oval pr i or t o submi t t i ng an updat ed pr oj ect schedul e. Addr ess out of sequence pr ogr ess or l ogi c changes i n t he Nar r at i ve Repor t and i n t he per i odi c schedul e updat e meet i ngs.

3. 3. 12 Added and Del et ed Act i v i t i es

Do not del et e act i v i t i es f r om t he pr oj ect schedul e or add new act i v i t i es t o t he schedul e wi t hout appr oval f r om t he Cont r act i ng Of f i cer . Act i v i t y I D and descr i pt i on changes ar e consi der ed new act i v i t i es and cannot be changed wi t hout Cont r act i ng Of f i cer appr oval .

3. 3. 13 Or i gi nal Dur at i ons

Act i v i t y Or i gi nal Dur at i ons ( OD) must be r easonabl e t o per f or m t he wor k i t em. OD changes ar e pr ohi bi t ed unl ess j ust i f i cat i on i s pr ovi ded and appr oved by t he Cont r act i ng Of f i cer .

3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps

Lags must be r easonabl e as det er mi ned by t he Gover nment and not used i n pl ace of r eal i st i c or i gi nal dur at i ons, must not be i n pl ace t o ar t i f i c i al l y absor b f l oat , or t o r epl ace pr oper schedul e l ogi c.

a. Leads ( negat i ve l ags) ar e pr ohi bi t ed.

SECTI ON 01 32 01. 00 10 Page 7

b. St ar t t o Fi ni sh ( SF) r el at i onshi ps ar e pr ohi bi t ed.

3. 3. 15 Ret ai ned Logi c

Schedul e cal cul at i ons must r et ai n t he l ogi c bet ween pr edecessor s and successor s ( " r et ai ned l ogi c" mode) even when t he successor act i v i t y( s) st ar t s and t he pr edecessor act i v i t y( s) has not f i ni shed ( out - of - sequence pr ogr ess) . Sof t war e f eat ur es t hat i n ef f ect sever t he t i e bet ween pr edecessor and successor act i v i t i es when t he successor has st ar t ed and t he pr edecessor l ogi c i s not sat i sf i ed ( " pr ogr ess over r i de" ) ar e not be al l owed.

3. 3. 16 Per cent Compl et e

Updat e t he per cent compl et e f or each act i v i t y st ar t ed, based on t he r eal i st i c assessment of ear ned val ue. Act i v i t i es whi ch ar e compl et e but f or r emai ni ng mi nor punch l i s t wor k and whi ch do not r est r ai n t he i ni t i at i on of successor act i v i t i es may be decl ar ed 100 per cent compl et e t o al l ow f or pr oper schedul e management .

3. 3. 17 Remai ni ng Dur at i on

Updat e t he r emai ni ng dur at i on f or each act i v i t y based on t he number of est i mat ed wor k days i t wi l l t ake t o compl et e t he act i v i t y. Remai ni ng dur at i on may not mat hemat i cal l y cor r el at e wi t h per cent age f ound under par agr aph ent i t l ed Per cent Compl et e.

3. 3. 18 Cost Loadi ng of Cl oseout Act i v i t i es

Cost l oad t he " Cor r ect i on of punch l i s t f r om Gover nment pr e- f i nal i nspect i on" act i v i t y( i es) not l ess t han 1 per cent of t he pr esent cont r act val ue. Act i v i t y( i es) may be decl ar ed 100 per cent compl et e upon t he Gover nment ' s ver i f i cat i on of compl et i on and cor r ect i on of al l punch l i s t wor k i dent i f i ed dur i ng Gover nment pr e- f i nal i nspect i on( s) .

3. 3. 18. 1 As- Bui l t Dr awi ngs

I f t her e i s no separ at e cont r act l i ne i t em ( CLI N) f or as- bui l t dr awi ngs, cost l oad t he " Submi ssi on and appr oval of as- bui l t dr awi ngs" act i v i t y not l ess t han $35, 000 or 1 per cent of t he pr esent cont r act val ue, whi ch ever i s gr eat er , up t o $200, 000. Act i v i t y wi l l be decl ar ed 100 per cent compl et e upon t he Gover nment ' s appr oval .

3. 3. 19 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y

An Ear l y Compl et i on Schedul e i s an I ni t i al Pr oj ect Schedul e ( I PS) t hat i ndi cat es al l scope of t he r equi r ed cont r act wor k wi l l be compl et ed bef or e t he cont r act ual l y r equi r ed compl et i on dat e.

a. No I PS i ndi cat i ng an Ear l y Compl et i on wi l l be accept ed wi t hout bei ng f ul l y r esour ce- l oaded ( i ncl udi ng cr ew si zes and manhour s) and t he Gover nment agr eei ng t hat t he schedul e i s r easonabl e and achi evabl e.

b. The Gover nment i s under no obl i gat i on t o accel er at e wor k i t ems i t i s r esponsi bl e f or t o ensur e t hat t he ear l y compl et i on i s met nor i s i t r esponsi bl e t o modi f y i ncr ement al f undi ng ( i f appl i cabl e) f or t he pr oj ect t o meet t he cont r act or ' s accel er at ed wor k.

SECTI ON 01 32 01. 00 10 Page 8

3. 4 PROJECT SCHEDULE SUBMI SSI ONS

Pr ovi de t he submi ssi ons as descr i bed bel ow. The dat a CD/ DVD, r epor t s, and net wor k di agr ams r equi r ed f or each submi ssi on ar e cont ai ned i n par agr aph SUBMI SSI ON REQUI REMENTS. I f t he Cont r act or f ai l s or r ef uses t o f ur ni sh t he i nf or mat i on and schedul e updat es as set f or t h her ei n, t hen t he Cont r act or wi l l be deemed not t o have pr ovi ded an est i mat e upon whi ch a pr ogr ess payment can be made.

Revi ew comment s made by t he Gover nment on t he schedul e( s) do not r el i eve t he Cont r act or f r om compl i ance wi t h r equi r ement s of t he Cont r act Document s.

3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on

Wi t hi n 15 cal endar days af t er t he NTP i s acknowl edged submi t t he Pr el i mi nar y Pr oj ect Schedul e def i ni ng t he pl anned oper at i ons det ai l ed f or t he f i r st 90 cal endar days f or appr oval . The appr oved Pr el i mi nar y Pr oj ect Schedul e wi l l be used f or payment pur poses not t o exceed 90 cal endar days af t er NTP. Compl et el y cost l oad t he Pr el i mi nar y Pr oj ect Schedul e t o bal ance t he cont r act awar d CLI NS shown on t he Pr i ce Schedul e. The Pr el i mi nar y Pr oj ect Schedul e may be summar y i n nat ur e f or t he r emai ni ng per f or mance per i od. I t must be ear l y st ar t and l at e f i ni sh const r ai ned and l ogi cal l y t i ed as speci f i ed. The Pr el i mi nar y Pr oj ect Schedul e f or ms t he basi s f or t he I ni t i al Pr oj ect Schedul e speci f i ed her ei n and must i ncl ude al l of t he r equi r ed pl an and pr ogr am pr epar at i ons, submi ssi ons and appr oval s i dent i f i ed i n t he cont r act ( f or exampl e, Qual i t y Cont r ol Pl an, Saf et y Pl an, and Envi r onment al Pr ot ect i on Pl an) as wel l as desi gn act i v i t i es, pl anned submi ssi ons of al l ear l y desi gn packages, per mi t t i ng act i v i t i es, desi gn r evi ew conf er ence act i v i t i es, and ot her non- const r uct i on act i v i t i es i nt ended t o occur wi t hi n t he f i r st 90 cal endar days. Gover nment accept ance of t he associ at ed desi gn package( s) and al l ot her speci f i ed Pr ogr am and Pl an appr oval s must occur pr i or t o any pl anned const r uct i on act i v i t i es. Act i v i t y code any act i v i t i es t hat ar e summar y i n nat ur e af t er t he f i r st 90 cal endar days wi t h Bi d I t em ( CLI N) code ( BI DI ) , Responsi bi l i t y Code ( RESP) and Feat ur e of Wor k code ( FOW) .

3. 4. 2 I ni t i al Pr oj ect Schedul e Submi ssi on

Submi t t he I ni t i al Pr oj ect Schedul e f or appr oval wi t hi n 42 cal endar days af t er not i ce t o pr oceed i s i ssued. The schedul e must demonst r at e a r easonabl e and r eal i st i c sequence of act i v i t i es whi ch r epr esent al l wor k t hr ough t he ent i r e cont r act per f or mance per i od. No payment wi l l be made f or wor k i t ems not f ul l y det ai l ed i n t he Pr oj ect Schedul e.

3. 4. 3 Per i odi c Schedul e Updat es

Updat e t he Pr oj ect Schedul e on a r egul ar basi s, mont hl y at a mi ni mum.

Pr ovi de a dr af t Per i odi c Schedul e Updat e f or r evi ew at t he schedul e updat e meet i ngs as pr escr i bed i n t he par agr aph PERI ODI C SCHEDULE UPDATE MEETI NGS.

These updat es wi l l enabl e t he Gover nment t o assess Cont r act or ' s pr ogr ess.

a. Updat e i nf or mat i on i ncl udi ng Act ual St ar t Dat es ( AS) , Act ual Fi ni sh Dat es ( AF) , Remai ni ng Dur at i ons ( RD) , and Per cent Compl et e i s subj ect t o t he appr oval of t he Gover nment at t he meet i ng.

b. AS and AF dat es must mat ch t he dat e( s) r epor t ed on t he Cont r act or ' s Qual i t y Cont r ol Repor t f or an act i v i t y st ar t or f i ni sh.

SECTI ON 01 32 01. 00 10 Page 9

3. 5 SUBMI SSI ON REQUI REMENTS

Submi t t he f ol l owi ng i t ems f or t he Pr el i mi nar y Schedul e, I ni t i al Schedul e, and ever y Per i odi c Schedul e Updat e t hr oughout t he l i f e of t he pr oj ect :

3. 5. 1 Dat a CD/ DVDs

Pr ovi de t wo set s of dat a CD/ DVDs cont ai ni ng t he cur r ent pr oj ect schedul e and al l pr evi ousl y submi t t ed schedul es i n t he f or mat of t he schedul i ng sof t war e ( e. g. . xer ) . Al so i ncl ude on t he dat a CD/ DVDs t he Nar r at i ve Repor t and al l r equi r ed Schedul e Repor t s. Label each CD/ DVD i ndi cat i ng t he t ype of schedul e ( Pr el i mi nar y, I ni t i al , Updat e) , f ul l cont r act number , Dat a Dat e and f i l e name. Each schedul e must have a uni que f i l e name and use pr oj ect speci f i c set t i ngs.

3. 5. 2 Nar r at i ve Repor t

Pr ovi de a Nar r at i ve Repor t wi t h each schedul e submi ssi on. The Nar r at i ve Repor t i s expect ed t o communi cat e t o t he Gover nment t he t hor ough anal ysi s of t he schedul e out put and t he pl ans t o compensat e f or any pr obl ems, ei t her cur r ent or pot ent i al , whi ch ar e r eveal ed t hr ough t hat anal ysi s. I ncl ude t he f ol l owi ng i nf or mat i on as mi ni mum i n t he Nar r at i ve Repor t :

a. I dent i f y and di scuss t he wor k schedul ed t o st ar t i n t he next updat e period.

b. A descr i pt i on of act i v i t i es al ong t he t wo most cr i t i cal pat hs wher e t he t ot al f l oat i s l ess t han or equal t o 20 wor k days.

c. A descr i pt i on of cur r ent and ant i c i pat ed pr obl em ar eas or del ayi ng f act or s and t hei r i mpact and an expl anat i on of cor r ect i ve act i ons t aken or r equi r ed t o be t aken.

d. I dent i f y and expl ai n why act i v i t i es based on t hei r cal cul at ed l at e dat es shoul d have ei t her st ar t ed or f i ni shed dur i ng t he updat e per i od but di d not .

e. I dent i f y and di scuss al l schedul e changes by act i v i t y I D and act i v i t y name i ncl udi ng what speci f i cal l y was changed and why t he change was needed. I ncl ude at a mi ni mum new and del et ed act i v i t i es, l ogi c changes, dur at i on changes, cal endar changes, l ag changes, r esour ce changes, and act ual st ar t and f i ni sh dat e changes.

f . I dent i f y and di scuss out - of - sequence wor k.

3. 5. 3 Schedul e Repor t s

The f or mat , f i l t er i ng, or gani z i ng and sor t i ng f or each schedul e r epor t wi l l be as di r ect ed by t he Cont r act i ng Of f i cer . Typi cal l y , r epor t s cont ai n Act i v i t y Number s, Act i v i t y Descr i pt i on, Or i gi nal Dur at i on, Remai ni ng Dur at i on, Ear l y St ar t Dat e, Ear l y Fi ni sh Dat e, Lat e St ar t Dat e, Lat e Fi ni sh Dat e, Tot al Fl oat , Act ual St ar t Dat e, Act ual Fi ni sh Dat e, and Per cent Compl et e. Pr ovi de t he r epor t s el ect r oni cal l y i n . pdf f or mat . Pr ovi de 3 set ( s) of har dcopy r epor t s. The f ol l owi ng l i s t s t ypi cal r epor t s t hat wi l l be r equest ed:

3. 5. 3. 1 Act i v i t y Repor t

Li st of al l act i v i t i es sor t ed accor di ng t o act i v i t y number .

SECTI ON 01 32 01. 00 10 Page 10

3. 5. 3. 2 Logi c Repor t

Li st of det ai l ed pr edecessor and successor act i v i t i es f or ever y act i v i t y i n ascendi ng or der by act i v i t y number .

3. 5. 3. 3 Tot al Fl oat Repor t

A l i s t of al l i ncompl et e act i v i t i es sor t ed i n ascendi ng or der of t ot al f l oat . Li st act i v i t i es whi ch have t he same amount of t ot al f l oat i n ascendi ng or der of Ear l y St ar t Dat es. Do not show compl et ed act i v i t i es on t hi s r epor t .

3. 5. 3. 4 Ear ni ngs Repor t by CLI N

A compi l at i on of t he Tot al Ear ni ngs on t he pr oj ect f r om t he NTP t o t he dat a dat e, whi ch r ef l ect s t he ear ni ngs of act i v i t i es based on t he agr eement s made i n t he schedul e updat e meet i ng def i ned her ei n. Pr ovi ded a compl et e schedul e updat e has been f ur ni shed, t hi s r epor t ser ves as t he basi s of det er mi ni ng pr ogr ess payment s. Gr oup act i v i t i es by CLI N number and sor t by act i v i t y number . Pr ovi de a t ot al CLI N per cent ear ned val ue, CLI N per cent compl et e, and pr oj ect per cent compl et e. The pr i nt ed r epor t must cont ai n t he f ol l owi ng f or each act i v i t y: t he Act i v i t y Number , Act i v i t y Descr i pt i on, Or i gi nal Budget ed Amount , Ear ni ngs t o Dat e, Ear ni ngs t hi s per i od, Tot al Quant i t y, Quant i t y t o Dat e, and Per cent Compl et e ( based on cost ) .

3. 5. 3. 5 Schedul e Log

Pr ovi de a Schedul i ng/ Level i ng Repor t gener at ed f r om t he cur r ent pr oj ect schedul e bei ng submi t t ed.

3. 5. 4 Net wor k Di agr am

The Net wor k Di agr am i s r equi r ed f or t he Pr el i mi nar y, I ni t i al and Per i odi c Updat es. Depi ct and di spl ay t he or der and i nt er dependence of act i v i t i es and t he sequence i n whi ch t he wor k i s t o be accompl i shed. The Cont r act i ng Of f i cer wi l l use, but i s not l i mi t ed t o, t he f ol l owi ng condi t i ons t o r evi ew compl i ance wi t h t hi s par agr aph:

3. 5. 4. 1 Cont i nuous Fl ow

Show a cont i nuous f l ow f r om l ef t t o r i ght wi t h no ar r ows f r om r i ght t o l ef t .