CPX_17_Execution_QASP.pdf

PDF 14 KB Posted

Attached to
CBRN CPX Execution Federal contract opportunity
Solicitation number
W912JB17T2009
Issued by
Department of the Army Michigan Army National Guard

About this file

CPX Execution Phase QASP

View the file

Other files for this federal contract opportunity

Other files attached to CBRN CPX Execution, newest first.
File Type Posted
CPX_17_Execution_PWS.pdf PDF
CPX_Execution_Provisions_Clauses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

Performance Requirements Summary

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

PWS

Paragraph

Task Performance Standard

Acceptable Quality Levels (AQL)

Surveillance Method / By Whom

1.4.8 Attendance

Contractor shall assure that Manager and all SME are available and present at assigned event locations

Complies with stated qualification standards 95% of the time.

5% failure to provide attendance at exercise

100% Inspection

1.4.9 Provide

Contractor

Management

Contractor is required to provide a manager and provide management and supervision of contractor’s personnel

Complies with stated qualification standards 95% of the time.

5% failure to perform contract management functions

Random Inspection

5.1 Provide

Subject Matter Expertise

Qualification and capable of providing technical guidance and mentorship to civilian and military organizations skilled in analyzing scenarios for requirements and solutions that are in compliance with organizational requirements

Complies with stated qualification standards 95% of the time.

5% failure to perform guidance and mentorship at the exercise

Random Inspection

5.2, 5.6, 5.10 Reporting

/Deliverables

SME will provide all reports, technical guidance and mentorship in support of CPX 17as required by MIARNG

Complies with stated qualification standards 95% of the time.

5% failure to provide reports

100% Inspection

5.8 Feedback

Provide first impressions/feedback

Complies with stated qualification standards 95% of the time.

5% failure to provide feedback at Hot Wash

Random Inspection

5.9 Feedback

Provide written After Action Review (AAR) Provides written AAR within 30 days of conclusion of exercise

Complies with stated qualification standards 95% of the time.

5% failure to provide AAR within timeframe

100% Inspection

5.10 Contractor

Manpower Reporting

Complete no later than 31 Oct of the calendar year in which the contract begins

Complies with stated qualification standards 98% of the time.

5% failure to perform reporting by required date

100% Inspection

File details come from the government source that posted it. Updated .