CPX_17_Execution_QASP.pdf
PDF 14 KB Posted
- Attached to
- CBRN CPX Execution Federal contract opportunity
- Solicitation number
- W912JB17T2009
About this file
CPX Execution Phase QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CPX_17_Execution_PWS.pdf | ||
| CPX_Execution_Provisions_Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
PWS
Paragraph
Task Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
1.4.8 Attendance
Contractor shall assure that Manager and all SME are available and present at assigned event locations
Complies with stated qualification standards 95% of the time.
5% failure to provide attendance at exercise
100% Inspection
1.4.9 Provide
Contractor
Management
Contractor is required to provide a manager and provide management and supervision of contractor’s personnel
Complies with stated qualification standards 95% of the time.
5% failure to perform contract management functions
Random Inspection
5.1 Provide
Subject Matter Expertise
Qualification and capable of providing technical guidance and mentorship to civilian and military organizations skilled in analyzing scenarios for requirements and solutions that are in compliance with organizational requirements
Complies with stated qualification standards 95% of the time.
5% failure to perform guidance and mentorship at the exercise
Random Inspection
5.2, 5.6, 5.10 Reporting
/Deliverables
SME will provide all reports, technical guidance and mentorship in support of CPX 17as required by MIARNG
Complies with stated qualification standards 95% of the time.
5% failure to provide reports
100% Inspection
5.8 Feedback
Provide first impressions/feedback
Complies with stated qualification standards 95% of the time.
5% failure to provide feedback at Hot Wash
Random Inspection
5.9 Feedback
Provide written After Action Review (AAR) Provides written AAR within 30 days of conclusion of exercise
Complies with stated qualification standards 95% of the time.
5% failure to provide AAR within timeframe
100% Inspection
5.10 Contractor
Manpower Reporting
Complete no later than 31 Oct of the calendar year in which the contract begins
Complies with stated qualification standards 98% of the time.
5% failure to perform reporting by required date
100% Inspection
File details come from the government source that posted it. Updated .