W912HY20R0007_Specifications_02JUL.PDF

PDF 9 MB Posted

Attached to
McAllen Central Processing Center (CPC), McAllen, Texas Federal contract opportunity
Solicitation number
W912HY20R0007
Issued by
Department of the Army Corps of Engineers Engineering District Galveston

About this file

This solicitation requests proposals for a construction project at the McAllen Central Processing Center in McAllen, Texas. The project includes renovating an existing 55,000 square foot building into a central processing center including demolition, offices, holding cells, and mechanical systems upgrades. A second phase will renovate a 22,000 square foot building including holding cell and HVAC replacements. The estimated price range is $10-25 million. Proposals are due August 3rd and award is anticipated in August. The contract will be firm fixed price with performance and payment bonds required within three days of award. Work must begin within five days of notice to proceed and be completed within 14 months if concurrent or 22 months if consecutive. Liquidated damages will apply for delays. The North American Industry Classification code is 236220 and small business size standard is $39.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to McAllen Central Processing Center (CPC), McAllen, Texas, newest first.
File Type Posted
B3 Amendment 0003 Full.pdf PDF
B3 Amendment 0002 McAllen Revised Drawings.pdf PDF
B3 Amendment 0002 After ProjNet.pdf PDF
Sign In Page 2.jpg JPG image
Sign In Page 1.jpg JPG image
B3 Amendment 0001 - Site Visit.pdf PDF
W912HY20R0007_Plans.pdf PDF
W912HY20R0007_FFandE_Interior Design Pkg.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Bid-Build

Request For

Proposal

McALLEN CENTRAL PROCESSING CENTER (CPC)

BUILDING RENOVATION

PN: 481471, FY20

McAllen, Texas

W912HY20R0007

July 2020

US Army Corps of Engineers Fort Worth District

This page was intentionally left blank

Central Processing Facility 55K Renov McAllen BP19CP55K

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 10 00 SOLICITATION, OFFER AND AWARD, SF-1442

00 11 00 CONTRACT LINE ITEM SCHEDULE

00 21 30 SITE VISITS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 73 46 WAGE DETERMINATION SCHEDULE TS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 44 CONSTRUCTION SCHEDULE

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 56 00.00 44 DUST CONTROL

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 57 24.01 44 STORM WATER POLLUTION PREVENTION PLAN (TEXAS)

01 57 25.00 44 SWPP PLAN INSPECTION AND MAINTENANCE REPORT FORM

01 58 00 PROJECT IDENTIFICATION

01 62 35 RECYCLED / RECOVERED MATERIALS

01 72 00.00 44 ALTERATIONS TO EXISTING FACILITIES

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 10 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 85 00.00 20 MOLD REMEDIATION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 MASONRY

04 72 00.00 44 CAST STONE

PROJECT TABLE OF CONTENTS Page 1

00 22 16 PROPOSAL SUBMITTAL AND BASIS OF AWARDS

00 21 00 INSTRUCTIONS

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 19 00 WATER REPELLENTS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 21 16.16 METAL BUILDING INSULATION LINER SYSTEM

07 22 00 ROOF AND DECK INSULATION

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 42 13 METAL WALL PANELS

07 42 33 PHENOLIC WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 81 23.00 44 INTUMESCENT MASTIC FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

07 95 00 RATED EXPANSION JOINT SYSTEM

07 95 13 EXPANSION JOINT SYSTEM

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 33 13 COILING COUNTER DOORS

08 33 23 OVERHEAD COILING DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

PROJECT TABLE OF CONTENTS Page 2

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 CHAIN LINK AND WIRE MESH PARTITIONS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 51 16 HOLDING AREA BENCHES

10 56 13 STEEL SHELVING

10 81 13 BIRD CONTROL DEVICES

DIVISION 11 - EQUIPMENT

11 31 13 ELECTRIC KITCHEN EQUIPMENT

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 01 30.41 HVAC SYSTEM CLEANING

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

PROJECT TABLE OF CONTENTS Page 3

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 15.00 10 NATURAL GAS GENERATOR SET STATIONARY 100-2500 KW, WITH

AUXILIARIES

26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA

CAPACITY

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 11 16.16 BASE COURSE FOR RIGID PAVING

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 17 HOT MIX BITUMINOUS PAVEMENT

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

McAllen Central Processing Center.

Issued under Full and Open Competition. Estimated magnitude for this effort is betw een $10,000,000.00 and $25,000,000.00.

NAICS Code 236220 Commercial and Institutional Building Construction. SB Size Standard is $39.5M for construction

Per AFARS 5132.702(a)(ii)(B) “Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available."

DEBORA L WELLS 409 766 3943

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

02-Jul-2020

(RFP)

(IFB)

X

CALL:

McAllen Central Processing Center

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________420 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time __03 Aug_ 2_0__20____ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS

2000 FORT POINT ROAD

P.O. BOX 1229

GALVESTON TX 77553-1229

W912HY

PAGE OF PAGES

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

481471

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 409 766 3850 TEL: FAX:

W912HY20R0007 1 OF 2

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section: 00 11 00 W912HY20R0007

Building Renovation

Item Unit Line Item No. Description Quantity Unit Price Amount

1 JOB $ *** $

0002 1 JOB $ *** $

All work required for the Construction of the McAllen Central Processing Center (CPC), Building B Renovation (Fac. 55K) including O&M Manuals and Final Record Drawings, Site Work, Utilities, Landscaping, and Local Utility Company connections.

All work required for the construction of the McAllen Central Processing Center (CPC), Building A Renovation (Fac.

22K), including O&M Manuals and Final Record Drawings.

DAYS

Contract Duration in Calendar Days After the Notice to Proceed is received.*

*Note: Contract duration for all work shall NOT exceed the duration specified in Section

01 00 00.00 44 CONSTRUCTION

SCHEDULE

**Note: The Government has the right to exercise one or both CLINS based on availability of funds.

McAllen, Texas

CONTRACT LINE ITEM SCHEDULE

McAllen Central Processing Center (CPC)

FY 20, PN 481471

TOTAL OFFER

OFFER: All work required by the Contract.

W912HY20R0007

Section 00 21 00 - Instructions

L OCAL INSTRUCTIONS

1.1 ESTIMATED CONSTRUCTION PRICE RANGE (APR 1985) (FAR 36.204)

The estimated price range of the proposed construction is between $10,000,000 and $25,000,000.

1.2 AVAILABILITY OF PLANS AND SPECIFICATIONS ON THE FEDERAL BUSINESS

OPPORTUNITIES WEBSITE (FBO) (FAR 5.102(a)(1)

After solicitation issuance, contractors may register to be placed on a plan holders list, view and/or download this solicitation and all amendments at the Federal Business Opportunities (FBO) website at http://www.fbo.gov/

Plans and specifications will not be available in paper format or on compact disc. It is the offeror’s responsibility to monitor the FBO website daily (using the above link) for amendments to the solicitation. You must be registered in the System for Award Management (SAM) to receive a government contract award. The website for SAM h ttps://www.sam.gov/SAM/ .

1.3 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (18 MAR 2013) (UAI 31.105- 100)

In accordance with FAR 31.105(d)(2)(i)(b), equipment ownership and operating cost shall be determined using EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule.

1.4 SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BID SUBMISSION: (FAR 14.302 and 14.304) Bids and a copy of the SF24 Bid Bond must be submitted through the Federal Business Opportunities bid package submission via https://w ww.fbo.gov/ , not later than the response date and time indicated in the solicitation.

Original copies of the Bid Bond shall be submitted to USACE, Galveston District, ATTN: Debora Wells, 2000 Fort Point Road, Galveston, Texas 77553, on or before the response date and time.

S ENDING FILES:

The Federal Business Opportunities bid package submission application can be accessed via https://w ww.fbo.gov/ under the Solicitation Number W912HY-20-R-0007.

• A note will be visible within the "Notice Details" sub-tab. The “Electronic Response” sub-tab indicates that the opportunity allows for electronic responses. Note, a vendor must login to the system to be able to submit electronic responses for opportunities.

• There are two types of electronic response submissions possible:

1. Line Item Builder form (CLIN) - This can serve as a template for the items that vendors are sometimes requested to quote.

2. Document upload. Multiple documents with attachments can be loaded here

a. Choose “Document Upload”

b. The Documents section allows the user to submit files as part of their electronic response to the opportunity.

3. The user can enter a description for every file to be uploaded, note this is optional.

a. To select a file for upload, the user clicks on the Browse button. (Note for files over 10 Mb, please use the large upload (JAVA) button). This will allow the user to select a file located on their computer for upload http://www.fbo.gov/ http://www.sam.gov/SAM/

4. After selecting the file, the user can click and Add New button to select additional files for upload

5. The user can delete any file(s) previously selected for upload by clicking on the Delete button.

6. The user has three options at the bottom of the Response page:

a. Submit saves and electronically submits the response to the government point of contact for that opportunity in the system. Note, the system will send an email to the email address on file for the user confirming the electronic submission

b. Save as Draft saves the response created, but does not submit it to the government point of contact for the opportunity in the system; if selected, the system returns to the Notice Details tab and there is a note at the top indicating that the user has saved a draft response for the opportunity. The user can click on the blue Click here link in the note to review/submit a response.

After clicking the link to review/submit, the system opens the Electronic Response tab and displays the draft response for review. There is a note at the top which will advise the user whether or not the response deadline has passed. If not, the user can click on the blue Click here link to make changes to the draft response and submit if ready.

c. Return does not save the response and takes the user back to the Notice Details tab for the opportunity.

1.5 BIDDER INQUIRY – PROJNET (FAR 14.211)

1. Prospective Offerors should submit questions concerning this solicitation via Bidder Inquiry in ProjNet at w ww.projnet.org/projnet .

A. To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

***Please Note: Offerors shall only submit one question per inquiry. Inquiries containing multiple questions may be rejected.

B. From this page, you may view all bidder inquiries or add inquiry.

C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

D. The Solicitation Number is: W912HY-20-R-0007

The Bidder Inquiry Key is: 7RXZ33-472U3N

2. The Bidder Inquiry System will be unavailable for new inquires fifteen (15) calendar days prior to offer submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

1.6 CONSTRUCTION WAGE RATE REQUIREMENTS (FAR 52.222-6)

Paragraph entitled CONSTRUCTION WAGE RATE REQUIREMENTS of (CONTRACT CLAUSES - Section 00 72 00, FAR 52.222-6) is applicable to this solicitation. Wage Rates will be incorporated by amendment, if they are not included in this solicitation.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.232-13 Notice Of Progress Payments APR 1984 52.232-14 Notice Of Availability Of Progress Payments Exclusively For APR 1984

Small Business Concerns 52.232-38 Submission of Electronic Funds Transfer Information with JUL 2013

Offer

CLAUSES INCORPORATED BY FULL TEXT

52.215-16 FACILITIES CAPITAL COST OF MONEY (JUN 2003)

(a) Facilities capital cost of money will be an allowable cost under the contemplated contract, if the criteria for allowability in FAR 31.205-10(b) are met. One of the allowability criteria requires the prospective Contractor to propose facilities capital cost of money in its offer.

(b) If the prospective Contractor does not propose this cost, the resulting contract will include the clause Waiver of Facilities Capital Cost of Money.

(End of provision)

52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN

CERTIFIED COST OR PRICING DATA (OCT 2010)

(a) Exceptions from certified cost or pricing data. (1) In lieu of submitting certified cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following subparagraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Commercial item exception. For a commercial item exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include--

(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;

(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;

(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation , access does not extend to cost or profit information or other data relevant solely to the offeror's determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for certified cost or pricing data. If the offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(1) The offeror shall prepare and submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.

As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a F irm Fixed Price Construction contract resulting from this solicitation.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade Goals for female participation for each trade

SMSA Hidalgo County 72.8%

6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is SMSA Hidalgo County, Texas.

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Maria E. Rodriguez Contracting Officer and Grants Officer US Army Corps of Engineers, Galveston District PO Box 1229 Galveston, Texas 77553-1229

Submit via email at S WG-CT-protest@usace.army.mil

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters mailto:WG-CT-protest@usace.army.mil are urged and expected to inspect the site where the work will be performed.

(b) There will only be one site visit on 24 June 2020 from 0900 to 1500, no other site visits will be scheduled:

Site visit will be at:

3700 W. Ursula Avenue, McAllen, TX 78503.

Due to the project complexity and site restrictions, it is highly recommended that all contractors interested in submitting a proposal attend the site visit. Site visit will be conducted on 24 June 2020 starting at 0900 through 1500 in McAllen, Texas. All personnel attending the site visit will meet on site at the McAllen Central Processing Center. Do to the sensitive operational requirements, all personnel will have to be vetted (background checks) prior to the site visit. AT NO TIME WILL CONTRACTORS BE ALLOWED TO VISIT THE SITE OUTSIDE THE PRE-DETERMINED SITE VISIT TIME, THIS IS A 24/7 U.S. BORDER PATROL OPERATIONAL FACILITY AND ANY UNAUTHOZED PERSONNEL WILL NOT BE ALLOWED ON SITE. Photos will be allowed with certain restrictions that will be covered during the site visit. The following vetting information is required for all personnel attending the site visit. (Note: this is a U.S. Department of Homeland Security facility and uses different vetting requirements outside of U.S. Department of Defense):

-FULL NAME

-DATE OF BIRTH

-LAST FOUR SOCIAL SECURITY NUMBER

-HOME ADDRESS

-DRIVERS LICENSE NUMBER AND STATE OF ISSUE

Personnel not vetted will not be allowed on the site, all personnel that do not pass the vetting process will not be allowed on site. All vetting information shall be emailed to Richard Bowles (richard.l.bowles@usace.army.mil) and Debora Wells (Debora.L.Wells@usace.army.mil) by 1600 on 17 June 2020. All vetting information will be verified one week prior to the site visit and personnel that DO NOT CLEAR the vetting requirements will be notified at that time.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/content/regulations

END OF SECTION 00 21 00

http://www.acquisition.gov/content/regulations

Document 00 21 30 Page 1

SECTION 00 21 30

SITE VISITS

PART 1 GENERAL

1.1 SITE VISITS

(a) Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," and the Site Visit Clause in Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, prospective bidders will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Bidders are urged and expected to inspect the site where the work will be performed. Site visits will be arranged during normal duty hours.

(b) Site visit information: See Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS.

Advance coordination shall be made with the Area Office at least

(5) working days prior to the site visit to verify the current restrictions.

Restrictions to number of visitors will be subject to change at any time, however the Government will make every effort to confirm the current restrictions and allowed attendees two (2) work days prior to scheduled site visit. Include the following information for all attendees and subcontractors. The first name on the list will indicate: TEAM CHIEF (POC), and this individual will be responsible for all other personnel:

- Offeror's and offeror's subcontractor personnel full names

- Driver's License, including the State Issued

- Firm

Depending on the installation restrictions at the time of the site visit, personnel may be required to wear masks during site visits, and maintain a distance of six (6) feet between individuals, where able.

Contractors must provide their own masks.

NOTE: The U.S. Government will conduct a check of every individual submitted; this will include checking all law enforcement databases.

Persons with questionable criminal records or outstanding warrants will be denied access to the installation.

(c) In no event will a failure to inspect the site constitute grounds for withdrawal of a bid after bid opening or for a claim after award of the contract.

-- End of Document --

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

Central Processing Facility 55K Renov McAllen BP19CP55K file://swf-netapp1/Services/Specs/Specsint/sisgml/SPECS/SPECSINT/SISGML/Jobs/FP20B4295/prntdata/Word/00%2021%2000.docx file://swf-netapp1/Services/Specs/Specsint/sisgml/SPECS/SPECSINT/SISGML/Jobs/FP20B4295/prntdata/Word/00%2021%2000.docx

SECTION 00 22 16

PROPOSAL SUBMITTAL AND BASIS OF AWARD

PART 1 - GENERAL REQUIREMENTS

The intent of this Request for Proposal (RFP) is to solicit proposals for McAllen Central Processing Center (CPC), McAllen, Texas. This is a competitive acquisition for the single award of a Firm Fixed Price Construction contract under NAICS Code 236220 – Commercial and Institutional Building Construction. The requirement will be acquired on a full and open competitive basis utilizing LPTA procedures to obtain best value for the Government. The Government intends to evaluate proposals and award a contract without discussions with offerors, in accordance with FAR 52.215-1, Instructions to Offerors-Competitive Acquisitions. The Government reserves the right to conduct discussions if the Contract Officer later determines them to be necessary. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a technical and cost/price standpoint. Offerors shall organize their proposals as described herein. Proposals may be determined non-responsive for failure to follow this format.

The proposal shall describe the capability of the Offeror to perform the requirements of the Statement of Work (SOW). The proposal should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.

In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government.

Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affects an Offeror's evaluation.

Proposals shall not exceed the page limits described.

1. Disclosure of the Magnitude of Construction Projects (FAR 36.204). The estimated price range of the proposed construction is between $10,000,000.00 and $25,000,000.00.

2. Inquiries. All questions shall be submitted via the bidder inquiry portal in ProjNet at http://www.projnet.org/projnet.

Questions should be submitted no later than 17 July 2020 at 2:00 p.m. Central Time to allow time for a response. On this date and time the portal will be closed. For questions, no other means of communication (e-mail, fax, or telephone) will be accepted. To submit and review inquiries, firms will need to be current registered users of the ProjNet system. To register, go to the link above, click the BID tab, select BIDDER INQUIRY, select agency USACE, enter the Bidder Inquiry Key for this solicitation listed below, and your email address, and then click login. Complete all required information and then click CREATE USER. Verify that information on the next screen is correct and click CONTINUE. From this page you can view all bidder inquiries for this solicitation or add an inquiry. Offerors will receive an acknowledgement of their question via e-mail, followed by a response to their question after it http://www.projnet.org/projnet has been processed by our team.

The Solicitation Number is: W912HY-20-R-0007 The Bidder Inquiry Key is: 7RXZ33-472U3N

Firms are requested to review the Bidder Inquiry Portal for previous questions and responses, prior to submission of a new inquiry on the Portal. Caution: Any inquiry submitted and answered within this system, will be accessible to view by ALL interested FIRMS on this solicitation. The call center for the ProjNet operates weekdays from 8 AM to 5 PM U.S. Central Time Zone. The telephone number is 1-800-428-HELP. To verify your submittal has been delivered, you may e-mail Ms. Debora Wells at debora.l.wells@usace.army.mil. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. For instructions on registering with the SAM, please see the SAM Web site at https://www.sam.gov/portal/public/SAM/.

3. Directions for Submitting Proposals. Interested Offerors having the capabilities to perform this work are invited to submit their proposal to SWG-CT-Supplemental- Proposals@usace.army.mil only, hard copies and CD's will not be accepted.

- Bids and a copy of the SF24 Bid Bond must be submitted by email to: SWG-CT- Supplemental-Proposals@usace.army.mil not later than the response date and time indicated above.

- The Original copies of the Bid Bond shall still be submitted to USACE, Galveston District, ATTN: Debora Wells, 2000 Fort Point Road, Galveston, Texas 77553, on or before the response date and time.

- Include in the email Subject Line the solicitation number, project title, and your firm name, ie: RFQ No. W912HY20R0007 – McAllen Central Processing Center (CPC) - Your Firm Name

4. Proposal Expense and Preaward Costs. The request for Proposal does not commit the

Government to pay any costs incurred in the preparation and submission of the initial and/or any subsequent proposals.

5. Pre-proposal Conference/Site Visit

A Site Visit will be held 9 July 2020. The site visit will be from 0900 through 1600 in McAllen, Texas. All personnel attending the site visit will meet at the McAllen Central Processing Center, 3700 West Ursula Avenue; McAllen, Texas 78503.

Contractors wishing to attend the site visit must provide the name, position and Company name for every person that will be participating no later than 7 July 2020, 1600 (4 pm), Central Time to Richard Bowles at Richard.L.Bowles@usace.army.mil. Persons that have not submitted the information required above and who show up at the site visit will NOT be allowed to participate. USACE must have an accurate record of all participants so there are adequate personnel assigned as escorts.

mailto:SWG-CT-Supplemental-Proposals@usace.army.mil mailto:SWG-CT-Supplemental-Proposals@usace.army.mil mailto:SWG-CT-Supplemental-Proposals@usace.army.mil mailto:SWG-CT-Supplemental-Proposals@usace.army.mil mailto:Richard.L.Bowles@usace.army.mil

This will be the only site visit. All personnel (includes vendors) participating in the site visit must wear an orange or yellow reflective vest and must comply with current CDC and DoD Corona Virus guidelines.

The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.

POC Name: Richard Bowles, Program Manager, (409) 766-3126 or (409) 370-8020.

IMPORTANT NOTES. (1) Remarks and explanations addressed during the conference shall not qualify or alter the terms and conditions of the solicitation. (2) The terms and conditions of the solicitation remain unchanged unless the solicitation is formally amended in writing.

6. Source Selection Evaluation Board Report (Technical). The initial evaluation will determine if proposals meet the minimum technical requirements set forth in the RFP. The resulting report shall document the findings in detail for each factor, and explain the rationale for elimination from further competition/ evaluation. The SSEB Chair will prepare the written report, if a board is convened, or it will be prepared by the individual reviewer. The report will convey the evaluation findings to the SSA. The report must substantiate in language understandable to non-technical personnel that the evaluation has been conducted fairly and in accordance with the evaluation method and criteria specified in the solicitation. Supporting documentation must include individual evaluation worksheets and the consensus evaluation worksheets for each proposal. This documentation will be included in the contract file.

7. Price Evaluation. The Price Proposal corresponding to each technical proposal will be analyzed by the designated Price Evaluation Team, in accordance with FAR 15.404-1.

Technical personnel may be consulted as necessary to ensure that the prices are reasonable, realistic, and adequately reflect the offerors' understanding of the work and their ability to perform the work required in the contract. Generally, after the initial technical report has been completed, the evaluators may be provided with the unedited price proposal information for each offeror: However, release of this information, in whole or in part, and the timing of such release, is totally at the discretion of the SSA. The Price Evaluation Team will rank firms in order of price and will determine if the price is fair and reasonable through comparison with the IGE, other offerors submitting proposals for the same action, or previously proposed prices for same or similar items.

8. Source Selection Decision. Ratings of "ACCEPTABLE"/ "UNACCEPTABLE" are merely guides for decision making. The SSA is responsible for independently determining if the lowest-priced, technically acceptable firm has proposed a fair and reasonable price and is otherwise eligible for award. Trade-offs are not permitted.

Documentation to support the award decision will generally consist of: (1) a final assessment of offers, based on a review of all cost/price and non-cost/technical factors, and (2) a Source Selection Decision Document (SSDD). When possible, this document should be written to include only information that is releasable under the Freedom of Information Act (FOIA) and is suitable for use during debriefings. The documentation must explicitly justify the rationale for the acceptability of the proposal and that the successful offeror's price is considered fair and reasonable to the Government.

9. Debriefing. Release of source selection information after contract award will be handled by Contracting Division in conjunction with Office of Counsel and in accordance with the Freedom of Information Act. Post-award debriefings of offeror’s will be conducted in strict accordance with FAR 15.506 by a contracting personnel with the appropriate support of technical personnel.

These debriefings must not reveal any information prohibited from disclosure or exempt from release, including the names of individuals providing reference information about an offeror's past performance. A memorandum summarizing each debriefing will be included in the contract file.

PART II - SUBMISSIION REQUIREMENTS

Offerors shall organize their proposal as described in this solicitation. Proposals may be determined to be non-responsive for failure to follow the prescribed format.

In order to effectively and equitably evaluate all offers, the Contracting Officer must receive information sufficiently detailed to clearly evaluate factors identified within this solicitation.

Proposal clarity, organization, and cross-referencing are necessary. Failure to submit and organize proposals as requested may adversely affect an Offeror's evaluation. Offerors should provide sufficient detail and clearly define all items required in this section. The Contracting Officer may remove any Offeror from further consideration during any phase of the procurement process if the Offeror fails to meet the submittal requirements of the RFP.

Offerors who include information in their proposals which they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must mark such information in accordance with instructions at FAR 52.215-1, Instructions to Offerors-Competitive Acquisition, paragraph (e), "Restriction on disclosure and use of data."

The Offeror is cautioned to refrain from quoting prices, or other pricing terms of any nature, in the technical portions of the proposal.

1. Requirement for Separate Technical and Price Proposals.

a) The Price Proposal and the Technical Proposal must be submitted as separate electronic files. Ensure that each separate electronic file is clearly marked to indicate its contents;

and the identity of the offeror. The proposals shall be submitted in two separately electronic volumes: "Volume 1, Technical Proposal" and "Volume 2, Price Proposal".

Each volume must be clearly marked as to its content, i.e., project title, solicitation number, "Volume 1, Technical Proposal" or "Volume 2, Price Proposal," name and address of the Offeror, and the time/date specified for receipt of proposals. Information, within each volume, shall be organized sequentially under the specified Tabs to facilitate evaluation.

b) Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for the proposal.

c) No dollar amounts from the Price Proposal are to be included in the Technical

Proposal.

d) All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not merely cross-reference similar material in the Price Proposal or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

e) Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to submission of the offer.

2. General Instructions.

a) Revisions to electronic proposals shall be highlighted or marked in such a way as to be easily identified and shall show the date of revision. The source of the revision, e.g.

Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision.

b) “Confidential” projects cannot be submitted to demonstrate…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .