This is a request for proposal for an indefinite delivery/indefinite quantity, multiple award task order contract for rapid response pipeline dredging services. The U.S. Army Corps of Engineers, Galveston District seeks to award a minimum of five contracts to provide dredging services on an as-needed basis for unanticipated shoaling in eight deep draft and eight shallow draft navigation channels along the Texas Gulf Coast. The requirement includes pipeline dredging, transport, processing, hauling and disposal of dredged materials. The contract term is five years with a maximum value of $45 million across all contracts. Proposals are due by July 29, 2019, with contract awards anticipated within 14 days thereafter. The solicitation utilizes a technically acceptable low-price evaluation methodology and is partially set aside for small businesses.
SOLICITATION- REQUEST FOR PROPOSAL
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0002.pdf | ||
| amend_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 2019
RFP No. W912HY19R0007
U.S. Army Corps of Engineers Galveston District
U.S. ARMY ENGINEER DISTRICT,
GALVESTON
CORPS OF ENGINEERS
GALVESTON, TEXAS
Request For Proposal
Multiple Award Task Order Contracts (MATOC) for Rapid Response Pipeline Dredging for Unanticipated Shoaling for Deep and Shallow Draft Navigation Channels Within the Galveston District, Texas
This project was designed by the Galveston District of the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
ROBERT C. THOMAS, P.E.
CHIEF, ENGINEERING AND CONSTRUCTION DIVISION
SWG FILE NO.: GEN 2000-232 RFP NO.: W912HY19R0007
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 00 00 SOLICITATION, OFFER AND AWARD, SF-1442
00 11 00.00 45 BID SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND
BASIS OF AWARD
00 45 00 REPRESENTATION AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD
00 73 46 WAGE RATES
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 50 SCOPE OF WORK
01 10 00.01 45 NON-REGULATED SPECIAL CONTRACT REQUIREMENTS
01 22 00.10 MEASUREMENT AND PAYMENT
01 32 01.01 45 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.01 45 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 01.00 QUALITY CONTROL
01 57 20.00 45 ENVIRONMENTAL PROTECTION
01 58 13.04 45 BULLETIN BOARD
01 78 00.00 45 CLOSEOUT SUBMITTALS
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 23.16 45 PIPELINE DREDGING
35 20 23.33 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE
HYDRAULIC DREDGE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 2
W45VAK90531084
THIS SOLICITATION IS BEING ISSUED AS AN UNRESTRICTED REQUEST FOR PROPOSAL (RFP) FOR AN INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ), MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR RAPID RESPONSE PIPELINE DREDGING DUE TO UNANTICIPATED SHOALING FOR DEEP DRAFT AND SHALLOW DRAFT NAVIGATION CHANNELS WITHIN THE GALVESTON DISTRICT.
UNRESTRICTED PROCUREMENT WITH A PARTIAL SMALL BUSINESS SET-ASIDE.
The Government intends to award a minimum of three (3) MATOC IDIQ contracts to Other than Small Business firm and a minimum of two (2) MATOC IDIQ contracts to Small Business Firms. The maximum value of all task orders to be awarded under the MATOC pool is $45,000,000 ($45M), all contracts combined. Each MATOC will consist of a five (5) year ordering period. The maximum value of $45M is for the entire five year period. The minimum guaranteed amount is $3000.00 per MATOC for the entire duration of the contract.
Check SBA Designated size of your firm:
____ Small Business ____ Other than Small Business
BLOCK 11: Performance period(s) shall be stated on each individual task order.
BLOCK 12 A & B: Performance & Payment Bonds will be required for each individual task order awarded BLOCK 13B: An offer guarantee will be required to accompany each proposal for all task orders.
PER AFARS 5132.702 (a)(ii)(B) “FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE
UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE."
ESTIMATED CONSTRUCTION RANGE (FAR 36.204) - THE ESTIMATED PRICE RANGE OF THE PROPOSED CONSTRUCTION IS BETWEEN
$40,000,000 AND $50,000,000.
WILLIAM A BONDURANT 409 766 3944
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Aug-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and ____0______ copies to perform the w ork required are due at the place specif ied in Item 8 by 2:00 PM local time 1 Oct 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USAED, GALVESTON
CONTRACTING DIVISION
2000 FORT POINT ROAD
GALVESTON TX 77553-1229
W912HY
PAGE OF PAGES
3 OF x242
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 409 766 3850 TEL: FAX:
W912HY19R0007
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
USAED, Finance Center
ATTN: CEFC-AO-P 5722
Integrity Drive Millington, TN 38054-5000
US Army Corps of Engineers Galveston District Office PO Box 1229 Galveston, TX 77553-1229
Document 00 11 00.00 45 - Page 1
Section Supplies or Services and Price
ITEM NO SUPPLIES/SERVICE
S
MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Job SUM $45,000,000.00 5 Year Ordering Period
FFP
Galveston District MATOC for Rapid Response Pipeline Dredging for Unanticipated Shoaling at Six (6) Deep Draft Navigation Entrance Channels: This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), for a 5 (Five) year Ordering Period. The Government will obligate a guaranteed minimum amount of $3,000 for the entire duration of the contract. This acquisition is Unrestricted with a Small Business Set- Aside.
This MATOC is for Rapid Response Pipeline Dredging for Unanticipated shoaling in the Galveston District's areas of responsibility along the Texas Gulf Coast. The estimated MATOC workload is $45 million, with a maximum task order of $3 million. Refer to SECTION 01 00 50 – SCOPE OF WORK for a description of the work under this MATOC. The North American Industry Classification System (NAICS) code for the work is 237990, Other Heavy and Civil Engineering Construction.
Any work executed under the MATOC is limited to the geographic boundaries of the Galveston District.
The Contractor shall furnish all labor, equipment, materials, and transportation necessary to complete the work under this MATOC.
The Contractor shall perform the work in accordance with the Scope of Work of each Task Order and within strict accordance of the terms and conditions specified herein.
PURCHASE REQUEST NUMBER: W45VAK90460972
MAX
NET
AMT
$45,000,000.00
Section 00 21 00 - Page 1
Section 00 21 00 - Instructions, Conditions and Notices to Offerors
1.0 SOLICITATION AND CONTRACT AWARD. The Government intends to issue this solicitation as an Unrestricted Request for Proposal (RFP) and to award a minimum of three (3) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC’s) from the Unrestricted pool and a minimum of two (2) from the Small Business set-aside pool. The maximum number of contract awards will be dependent upon the number of Offerors whose proposals the Source Selection Authority determines to meet the requirements of acceptability as set forth herein.
1.1 The Solicitation number is W912HY19R0007.
(a) A pre-proposal conference will be held September 3, 2019 at 2;00 CST at the Galveston District Headquarters Building at:
Jadwin Building 2000 Fort Point Road Galveston, TX 77553
Please ensure that each attendee bring a valid driver’s license to gain access to the facility. Although all interested parties are highly encouraged to attend in person, the conference can be attended via WEBEX. Go to the site and logon for the conference at: https://usace.webex.com/meet/aron.s.edwards or by Conference Call:
1-888-557-8511 Access Code: 6218268 Security: 1234
(b) Contractors interested in being considered for a MATOC award will be required to submit a proposal in accordance with the instructions contained herein.
1.3 Contractors will be required to submit proposals in accordance with Section 00 22 10.01 45 PROPOSAL SUBMITTAL AND EVALUATION INSTRUCTIONS TO MATOC OFFERORS. In addition, Contractors will be required to submit a "fair and reasonable" price proposal for the “Sample” task order that will be provided by amendment; this requirement is in accordance with FAR 15.304(c)(1), which states that price or cost to the Government shall be evaluated in every source selection.
1.4 Contractors submitting an offer as a joint venture must provide a written copy of the joint venture agreement with the initial proposal.
The joint venture agreement must be signed by both parties and will be subject to review by Office of Counsel. Also, if the joint venture involves an 8(a) small business, approval by the Small Business Administration will also be required. The joint venture must be registered in the System for Award Management (SAM) as a joint venture in order for an award to be made. In addition, the SF 1442 as well as all future documents (task orders, bonds, etc.) must be signed by both parties. No task orders will be awarded to a joint venture unless the basic MATOC has been awarded to the joint venture.
https://usace.webex.com/meet/aron.s.edwards
Section 00 21 00 - Page 2
1.5 The total maximum value of all task orders to be awarded under the MATOC pool is $45,000,000.00 ($45M), all contracts combined. Each MATOC will consist of a 5 year ordering period. The maximum value of $45M is for the not obligated to will share this total value through a competitive task order award process.
1.6 The Government does not guarantee an awardee will receive more than the contract minimum guarantee. The minimum guarantee for each MATOC is $3,000.00 and covers the base year and all option periods. This minimum guarantee is the amount a Contractor may receive if they have NOT been successful in obtaining a task order by the end of the contract duration.
However, a Contractor that has not submitted ANY proposals for ANY task orders after the award of the MATOC would not be considered eligible to receive this minimum guarantee due to lack of participation. This minimum guarantee is NOT to be construed as the total amount of any individual task order. All task orders will substantially exceed this minimum guarantee amount. This minimum guarantee will be obligated on Task Order under each contract awarded as a result of this solicitation.
1.7 Any required changes to the contract clauses contained in this solicitation shall be executed as a modification to any and all contracts awarded as a result of the solicitation. Any modifications to the basic MATOC awards shall be executed by the Galveston District Contracting Officer; including the exercise of any and all Option Years.
1.8 ESTIMATED CONSTRUCTION PRICE RANGE (FAR 36.204)
The estimated price range of the proposed construction is “to be determined by Task Order”.
AVAILABILITY OF PLANS AND SPECIFICATIONS ON THE FEDERAL BUSINESS
OPPORTUNITIES WEBSITE ((FBO)
After solicitation issuance, contractors may register to be placed on a plan holders list, view and/or download this solicitation and all amendments at the following internet addresses: http://www.fbo.gov/
Plans and specifications will not be available in paper format or on compact disc. It is the offeror’s responsibility to monitor the FBO website daily (using the above links) for amendments to the solicitation. You must be registered in the System for Award Management (SAM) to receive a government contract award.
You may register with SAM at https://www.sam.gov
1.9 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (18 MAR 2013)
(UAI 31.105-100)
In accordance with FAR 31.105(d)(2)(i)(b), equipment ownership and operating cost shall be determined using EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule.
(a) The Contractor [ ] shall [X] shall not be permitted to use self-propelled hopper dredges to perform the work specified herein.
1.10 REMINDER TO BIDDERS
Acknowledge all Amendments on the reverse side of SF 1442, Item 19, Solicitation, Offer, and Award.
http://www.fbo.gov/ http://www.sam.gov/
Section 00 21 00 - Page 3
1.12 SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BID SUBMISSION: (FAR
14.302 and 14.304)
Bids and a copy of the SF24 Bid Bond must be submitted through the Federal Business Opportunities bid package submission via https://www.fbo.gov/ , not later than the response date and time indicated in the solicitation.
Original copies of the Bid Bond shall be submitted to USACE, Galveston District, ATTN: William (Bill) Bondurant, 2000 Fort Point Road, Galveston, Texas 77553, on or before the response date and time.
SENDING FILES:
The Federal Business Opportunities bid package submission application can be accessed via https://www.fbo.gov/ under the Solicitation Number
W912HY19R0007.
• A note will be visible within the "Notice Details" sub-tab. The “Electronic Response” sub-tab indicates that the opportunity allows for electronic responses. Note, a vendor must login to the system to be able to submit electronic responses for opportunities.
• There are two types of electronic response submissions possible:
1. Line Item Builder form (CLIN) - This can serve as a template for the items that vendors are sometimes requested to quote.
2. Document upload. Multiple documents with attachments can be loaded here.
• Choose “Document Upload”
• The Documents section allows the user to submit files as part of their electronic response to the opportunity.
a. The user can enter a description for every file to be uploaded, note this is optional.
b. To select a file for upload, the user clicks on the Browse button.
(Note for files over 10 Mb, please use the large upload (JAVA) button). This will allow the user to select a file located on their computer for upload.
3. After selecting the file, the user can click and Add New button to select additional files for upload.
4. The user can delete any file(s) previously selected for upload by clicking on the Delete button.
5. The user has three options at the bottom of the Response page:
a. Submit saves and electronically submits the response to the government point of contact for that opportunity in the system.
Note, the system will send an email to the email address on file for the user confirming the electronic submission;
b. Save as Draft saves the response created, but does not submit it to the government point of contact for the opportunity in the system;
if selected, the system returns to the Notice Details tab and there is a note at the top indicating that the user has saved a draft response for the opportunity. The user can click on the blue Click here link in the note to review/submit a response.
After clicking the link to review/submit, the system opens the Electronic Response tab and displays the draft response for review.
There is a note at the top which will advise the user whether or not the response deadline has passed. If not, the user can click on the
Section 00 21 00 - Page 4 blue Click here link to make changes to the draft response and submit if ready.
c. Return does not save the response and takes the user back to the Notice Details tab for the opportunity.
1.13 BIDDER INQUIRY – PROJNET
1. Prospective Offerors should submit questions concerning this solicitation via Bidder Inquiry in ProjNet at www.projnet.org/projnet .
A. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on the BID tab.
Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user.
Verify that information on next screen is correct and click continue.
***Please Note: Offerors shall only submit one question per inquiry.
Inquiries containing multiple questions may be rejected.
B. From this page, you may view all bidder inquiries or add inquiry.
C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
D. The Solicitation Number is: W912HY19R0007 The Bidder Inquiry Key is: EIMDG2-RR84XQ
2. The Bidder Inquiry System will be unavailable for new inquires ten
(10) calendar days prior to offer submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-
HELP.
5. Offers will be publicly opened at the date/time stated in the solicitation.
1.14 CONSTRUCTION WAGE RATE REQUIREMENTS (FAR 52.222-6)
Paragraph entitled CONSTRUCTION WAGE RATE REQUIREMENTS of (CONTRACT CLAUSES - Section 00 72 00, FAR 52.222-6) is applicable to this solicitation. Wage Rates will be incorporated by amendment, if they are not included in this solicitation.
http://www.projnet.org/projnet
Section 00 21 00 - Page 5
2.0 TASK ORDER PROCEDURES
2.1 All MATOC contracts and subsequent task orders will be awarded in accordance with FAR Subpart 15, Contracting by Negotiation. The basic MATOC contracts will be evaluated in accordance with the evaluation criteria contained in Section 00 22 10.01 45 PROPOSAL SUBMITTAL AND EVALUATION INSTRUCTION TO MATOC OFFERORS. It is anticipated that subsequent (future) task orders will be awarded on the basis of Lowest Price, Technically Acceptable (LPTA) in accordance with FAR 15.101-2. The government reserves the right to utilize any selection method consistent with FAR 16.505(b) Fair Opportunity Principle.
2.2 Issuance of the Request for Proposal for Task Orders
(a)FAR Part 15 and 16.505(b) will be followed when issuing task orders under the Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOCS).
(b)A Request for Proposal (RFP) will be issued by the Contracting Office to the Contractors within the MATOC pool. Contractors that have been awarded a MATOC will be invited to submit proposals for task orders in accordance with the RFP for each task order. Contractors are not obligated to submit a proposal on each and every RFP.
In accordance with FAR 16.505(b)(3), price or cost under each order shall be considered as one of the factors in the selection decision. Also, in accordance with FAR 16.505(b)(1)(v), the Government should also consider past performance (including quality, timeliness and cost control) on earlier orders placed under the same MATOC. In addition, equipment availability and equipment capability may also be considered at the discretion of the Contracting Officer. The Government may also include any of the following as additional evaluation factors: (1) potential impact on other orders placed with the Contractor, (2) minimum order requirements, and (3) urgency of need. Any and all evaluation factors will be provided to the Contractors at the time the RFP is issued. It is anticipated that all task orders will be awarded on the basis of Lowest Price, Technically Acceptable (LPTA) in accordance with FAR 15.101-2. The Government reserves the right to utilize any selection method consistent with FAR 16.505(b) Fair Opportunity Principles.
(c)All Contractors awarded a contract will be invited to submit a proposal on all future task orders. However, the Government reserves the right to limit competition in accordance with the Federal Acquisition Streamlining Act (see FAR 16.505(b), subparagraph (2), Exceptions to the fair opportunity process).
(d)The RFP will also provide, at a minimum, the following items:
(1) The time and place for the submittal of said proposal
(2) Point of Contact.
(3) Any and all required “fill-ins” for the contract clauses, including, but not limited to:
- Details regarding Commencement, Prosecution, and Completion of Work (FAR 52.211-10)
Section 00 21 00 - Page 6
- The amount of Liquidated Damages (FAR 52.211-12)
- Applicable Davis-Bacon Wage Decisions
- Details regarding the number of days after award that Performance & Payment Bonds are required to be submitted
- Details regarding the number of days after award that the Notice to Proceed will be Issued and the number of days from NTP to Commencement of Work
2.4 Competitive Proposal Submissions and Evaluation
The base award will be made on the basis of Lowest Price Technically Acceptable (LPTA) source selection process (See Federal Acquisition Regulation 15.101-2). In the lowest price technically acceptable selection process interested Offerors submit certain specified performance and capability proposals in conjunction with price proposals for a Sample Task Order for review and consideration by the Government. The Government will follow the procedures outlined in FAR 16.505(b), Orders under multiple award contracts, when issuing the RFP’s and subsequent task orders. The Contracting Officer should keep proposal submission requirements to a minimum. In most cases, the Government will evaluate task order proposals on a lowest price, technically acceptable basis in accordance with FAR 15.101-2. The government reserves the right to utilize any selection method consistent with FAR 16.505(b) Fair Opportunity Principles.
(a) Each RFP shall contain a Pricing Schedule pertaining to the specific individual task order. The Government reserves the right to obtain cost breakdowns of the proposals if required in order to determine fair and reasonableness of pricing. Such cost breakdowns will not be included in any subsequent release of best and final prices as discussed in paragraph 2.8 below.
(b) Each proposal submission will be in accordance with the individual request for proposal. In addition, a bid bond will be required with each task order proposal submitted in accordance with FAR 52.228-1 in Section 00 72 00. (See bonding requirements).
2.5 Price Proposal Submissions and Evaluation
(a) Contractors may be required to provide copies of their proposed subcontractors’ proposals or quotes when detailed cost breakdowns are requested. The Government reserves the right to require a detailed breakdown of a proposed subcontract proposal or quote, if necessary to determine its reasonableness.
(b)The contractor must support its proposal by any necessary documentation and in adequate detail for the Government to analyze the proposal to determine fair and reasonable price in accordance with FAR 15.4, Contract Pricing.
(c) In accordance with FAR Subpart 15.4, the contractor’s proposal for any task order exceeding $2,000,000.00 is subject to the requirements of the Truth in Negotiations Act (TINA). Therefore, if cost and pricing data has been requested and submitted, the contractor shall be required to submit a Certificate of Current Cost or Pricing Data immediately prior to award of the task order.
Section 00 21 00 - Page 7
(d) When and if it becomes necessary to award task orders on a sole source basis, the contractor may be required to submit detailed cost breakdowns in the same format as described for modifications under FAR clause 52.215-21.
These cost breakdowns will not be included in any subsequent release of best and final prices as discussed in paragraph below.
2.6 Notification to the Apparent Successful Offeror
(a) Within five (5) working days of receipt of proposals Offeror’s will be notified of the apparent successful Offeror. However, the Contracting Officer reserves the right to extend this notice period, if at the time of initial Review, it cannot be determined as to the successful Offeror. Task Orders will be awarded within 14 days from receipt of proposals, unless otherwise stated in the task order RFP.
(b) Offeror’s will also be notified within three (3) working days of receipt of proposals if additional review and/or discussions will be required.
(c) Offerors may withdraw (in writing) their proposal for any Task Order at any time prior to award of the task order in accordance with FAR 15.208(e).
2.7 Award of the Task Order
(a) Task orders will be issued on a firm-fixed price basis using the DD Form 1155, Order for Supplies or Services.
Task order numbering will be in accordance with DFARS 204.7005. The Galveston District is the responsible party for solicitation issuance and awarding the contracts. The Minimum Guarantee Task Order will be identified as Task Order No. (TBD).
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-18 Commercial and Government Entity Code
Maintenance
JUL 2016
52.215-1 Instructions to Offerors--Competitive Acquisition
JAN 2017
52.215-16 Facilities Capital Cost of Money JUN 2003 52.215-20 Requirements for Certified Cost or
Pricing Data or Information Other Than Certified Cost or Pricing Data
OCT 2010
52.232-13 Notice Of Progress Payments APR 1984 52.232-14 Notice Of Availability Of Progress
Payments Exclusively For Small Business Concerns
APR 1984
52.232-38 Submission of Electronic Funds Transfer Information with Offer
JUL 2013
Section 00 21 00 - Page 8
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price Contract and resulting Task Orders contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
Brazoria County, TX 27.3%
Galveston County, TX 28.9%
Nueces County, TX 41.7%
Cameron County, TX 71.0%
Jefferson County, TX 22.6%
Calhoun County, TX 27.4%
Cameron Parish, LA 17.8%
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees
Section 00 21 00 - Page 9 from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is SMSA counties of Brazoria, Galveston, Nueces, Cameron and Jefferson Counties, Texas. NON-SMSA counties of Calhoun County, Texas and Cameron Parish, Louisiana.
(End of provision)
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY
2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at
FAR 52.225-9.
Section 00 21 00 - Page 10
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based
Section 00 21 00 - Page 11 on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-- CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE II (JUN 2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act-- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
Section 00 21 00 - Page 12
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain, Mexico, or Oman that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Maria Rodriguez, Contracting Officer, US Army Corps of Engineers, Galveston District, PO Box 1229, Galveston, Texas, 77553-1229, submitting the protest at SWG-CT Protests@usace.army.mil.
Section 00 21 00 - Page 13
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address http://farsite.hill.af.mil/
(End of provision) http://farsite.hill.af.mil/
Document 00 22 11 Page 1
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD
PART I – GENERAL INFORMATION
A. OVERVIEW
This Request for Proposal (RFP) solicits offers for a Multiple Award Task Order Contract (MATOC) for pipeline dredging due to unanticipated shoaling from a tropical storm, flood, hurricane event or other event which results in unanticipated shoaling resulting in identifiable “Draft Restricting” shoals that impede navigation and must be cleared expeditiously. The work under this contract will be accomplished by pipeline dredge for the six (6) Deep Draft Channels within the Galveston District boundary.
B. BASIS FOR AWARD
The award will be made using a Best Value source selection process authorized by Class Deviation No. 2018-O0006, Evaluation Factors for Certain Multiple-Award Task or Delivery Order Contract to identify the best overall proposals that are determined to be the most beneficial to the Government.
Evaluation methodology for the instant procurement consists of four (4) factors: Specialized Experience, Plant and Equipment, Organization and Past Performance. The failure of a proposal to meet all of the requirements under any one of the evaluated areas, will render the proposal as technically unacceptable overall, and the offer will be removed from further consideration for award. Price proposals will be evaluated per Task Order.
The Government will evaluate these performance capability proposals in accordance with the criteria described herein.
The Contracting Officer intends to award three (3) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC’s) from the Unrestricted pool and a minimum of two (2) from the Small Business set-aside pool. The maximum number of contract awards will be dependent upon the number of Offerors whose proposals the Source Selection Authority determines to meet the requirements of acceptability as set forth herein.
Awards of the MATOCs will be made on the basis of proposals meeting the acceptability standards.
The Government intends to make award without holding discussions with Offerors. However, the Government reserves the right to conduct discussions if the Source Selection Authority or the Contracting Officer determines them to be necessary. Therefore, Offerors are encouraged to include their best performance and technical capability requirements.
C. PROPOSAL SUBMISSION REQUIREMENTS AND FORMAT
Offerors shall organize their proposal as described in this solicitation. Proposals may be determined to be non-responsive for failure to follow the prescribed format. In order to effectively and equitably evaluate all offers, the Contracting Officer must receive information sufficiently detailed to clearly evaluate factors identified within this solicitation. Proposal clarity, organization, and cross referencing are necessary. Failure to submit and organize proposals as requested may
Document 00 22 11 Page 2 adversely affect an Offeror’s evaluation. Offerors shall provide sufficient detail and clearly define all items required in this Section.
Table of Contents. Each volume of the proposal shall contain a detailed table of contents (Cover Sheets for use as the Table of Contents are provided at the end of this Section). Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices. Files shall not contain classified data.
Electronic Submission of Proposals. Offerors shall submit their proposal through electronic submission in the Federal Business Opportunities website at www.fbo.gov. Proposals shall be submitted in electronic format.
Reference Section 00 21 00, Para. 1.11 for further instructions.
Content Requirements. All information shall be confined to the appropriate volume. The Offeror shall confine submissions to essential matters, sufficient to define the proposal and provide adequate basis for evaluation.
Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each proposal.
Narrative portions of the proposal shall be in electronic 8-1/2 x 11-inch format using no more than 7 vertical lines per inch, with page margins at least 1-inch wide. Font size shall not be less than 11pt. 11x17-inch sheets will be counted as four single-sided pages. Include a Table of Contents for each volume. The first page of each identified Tab shall begin with the number “1” with succeeding pages consecutively numbered at the bottom of each page to the end of the Tab.
Offerors who include information in their proposals which they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must mark such information in accordance with instructions contained in FAR 52.215-1, Instructions to Offerors-Competitive Acquisition, paragraph (e), “Restriction on disclosure and use of data.”
PART II – PROPOSAL SUBMITTAL REQUIREMENT AND INSTRUCTIONS
VOLUME I – PROPOSAL/SF 1442/DATA – Volume I shall be comprised of Tabs A through F only.
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must provide a written copy of the joint venture agreement with the proposal. The joint venture agreement must be signed by both parties and will be subject to review by Office of Counsel. Also, if the joint venture involves an 8(a) small business, approval by the Small Business Administration will also be required. The joint venture must be registered in CCR as a joint venture in order for an award to be made. In addition, the SF 1442 as well as all future documents (task orders, bonds, etc.) must be signed by both parties.
No task orders will be awarded to a joint venture unless the basic MATOC has been awarded to the joint venture. Failure to do so may result in rejection of an Offeror’s proposal.
TAB B – Section 00 45 00, Representations and Certifications
Document 00 22 11 Page 3
TAB C - Determination of Responsibility, including the firm’s latest Financial Statements.
TAB D – Evidence of Bonding Capacity. A bid bond guarantee is not required, however, for evaluation of bonding capacity on future task orders submit a letter of commitment from a surety, signed by an officer or agent authorized to bond, that identifies the Offeror’s available bonding capacity and limits that the surety will bond the Offeror, as the successful awardee for this project.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .