This document is an amendment to a solicitation for maintenance dredging services in the Brunswick Inner Harbor in Georgia. The amendment adds an option CLIN 0008 for dredging in a specific area of the Brunswick River. The overall contract provides for maintenance dredging of up to 835,000 cubic yards from various channels in the Brunswick Inner Harbor, including the East River, South Brunswick River, Brunswick River, and Lower Turtle River. The dredged material is to be placed in the Andrews Island Dredged Material Containment Area. The contract has a 120-day period of performance and is traditionally performed using a hydraulic cutterhead dredge. The amendment does not change any technical specifications or contract drawings. Bidders must provide unit prices for all CLINs, including the new option CLIN, and the total bid price must be rounded to two decimal places.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04 KTR BID ABSTRACT - FY24 Brunswick Inner Harbor (KO signed).pdf | ||
| B.02 - Solicitation - W912HN24B5002 (combined drawings and Specs).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT CHANGES: The purpose of this amendment is to add OPTION CLIN 0008.
2. TECHINCAL SPECIFICATION CHANGES: There are no technical specif ication changes w ith this amendment.
3. CONTRACT DRAWINGS: There are no contract draw ings changes w ith this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN24B5002
X 9B. DATED (SEE ITEM 11)
08-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-May-2024
CODE
SEE SCHEDULE
SEE SCHEDULE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN24B5002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
CLIN 0008 is added as follows:
The following have been modified:
CLIN SCHEDULE
MAINTENANCE DREDGING
INNER HARBOR CHANNELS BRUNSWICK HARBOR, GEORGIA
FOR BID ITEM 0001 – 0008 SEE SECTION 352023
ESTIMATED LINE ITEMS SHALL NOT EXCEED THE ESTIMATED AMOUNT WITHOUT PRIOR
APPROVAL OF THE CONTRACTING OFFICER.
PLEASE NOTE: ATTACHMENT 1 TO SECTION 00 73 00, REQUIRES DREDGE PLANT DATA SHEETS
AND EQUIPMENT SCHEDULE TO BE ATTACHED TO BID FORM.
TOTAL BID ITEMS
TOTAL BASE (Items 0001 through 0004) $_______________________
TOTAL OPTIONS (Items 0005 through 0008) $_______________________
TOTAL BID (Items 0001 through 0008) $_______________________
Enter prices where space is provided for all CLIN items. Pricing must include the UNIT PRICE AND TOTAL AMOUNT per each CLIN. Failure to follow this instruction may render the bid nonresponsive and the bid will not be considered for award.
All bidders are advised materially unbalanced bids may be rejected as non-responsive. See FAR 52.214-19 Contract Award- Sealed Bidding- Construction.
**round all priced line items (0001 through 0008) to two (2) decimal places**
ITEM NO SUPPLIES/SERVICES QUANTITY* UNIT UNIT PRICE AMOUNT
0001 Mobilization and Demobilization
1 Job
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE AMOUNT
0002 Maintenance Dredging, Brunswick Harbor FFP, East River, Station 0+000 to 12+000 (including East River Turning Basin and Transition Areas)
500,000 Cubic Yard
UNIT UNIT PRICE AMOUNT
0003 Maintenance Dredging, Brunswick Harbor FFP, South Brunswick River, Station 0+000 to 7+000
60,000 Cubic
UNIT UNIT PRICE AMOUNT
0004 Maintenance Dredging, Brunswick Harbor FFP, Lower Turtle River, Stations 34+000 to 43+000
10,000 Cubic
UNIT UNIT PRICE AMOUNT
OPTION
Maintenance Dredging, Brunswick Harbor FFP, East River, Station 0+000 to 12+000 (including East River Turning Basin and Transition Areas)
200,000 Cubic
QUANTITY
UNIT UNIT PRICE AMOUNT
OPTION
Maintenance Dredging, Brunswick Harbor FFP, South Brunswick River, Station 0+000 to 7+000
25,000 Cubic
UNIT UNIT PRICE AMOUNT
OPTION
Maintenance Dredging, Brunswick Harbor FFP, Brunswick River, Station 22+000 to 26+000
40,000 Cubic
UNIT UNIT PRICE AMOUNT
OPTION
Move to Station FFP 22+000 to 26+000
1 Each
(End of Summary of Changes)