13R08v1.pdf
PDF 9 MB Posted
- Attached to
- UMCS MATOC Federal contract opportunity
- Solicitation number
- W912HN-13-R-0008
About this file
SPECS Vol 1 Amd 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amd4.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This page was intentionally left blank for duplex printing.
Savannah District Area of Responsibility
(AOR)
Solicitation Number
W912HN-13-R-0008
Volume 1 of 2 MATOC for Utility Monitoring Control System (UMCS) Sections 00010 through 00800 and Technical Provisions - Division 01 March 2013
THIS PROJECT IS 100% SET-ASIDE FOR SMALL BUSINESS FIRMS,
NATIONWIDE, WHICH HAVE 238220 AMONG THEIR APPROVED NAICS CODES
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
W912HN-13-R-0008
W912HN-13-R-0008-0004
MATOC, SMALL BUSINESS SET-ASIDE, COE SAVANNAH DISTRICT'S AREA OF RESPONSIBILITY
INDEFINITE DELIVERY CONTRACT (IDC) FOR UTILITY MONITORING CONTROL SYSTEMS
The proposal of the successful offerors shall be considerd incoporated by reference upon aw ard of the contract.
This procurement is being solicited and procured using a Performance Price Trade-off for Proposal in accordance w ith FAR 15.101-1.
The total estimated amount of the contract shall not exceed $49,000,000.00 over the f ive year period of the contract. This f ive year period includes a 3-year base period, w ith tw o one (1) year option periods. Performance Period w ill be determined on a task order basis.
See Section 00100 Proposal Submission Requirements and Instruction for the number of required copies of the proposal to submit.
The Order Limitation of each task order issued against this MATOC shall not exceed $5M.
This project is 100% Set-Aside for Small Business f irms, Nationw ide, w hich have 238220 among their approved NAICS codes.
The Magnitude of the SEED preoject w ill be betw een $500K and $1M.
Reference block 11 below : 120 day period of performance is for the SEED Task Order. All subsequent projects placed against this MATOC w ill be determined on a task order basis.
MARK A HISCOX 912/652-5030
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
06-Mar-2013
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 Apr 2013 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S. ARMY CORPS OF ENGINEERS, SAVANNAH D
100 WEST OGLETHORPE AVE
SAVANNAH GA 31402
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Lump Sum
Base PeriodFFP UMCS MATOC - 3 Base Year Multiple Award Task Order Contract (MATOC) for Design/Build and/or Construction type Task Orders. Work will predominantly be performed in North Carolina; however, performance may be required at other military locations with the South Atlantic Division Area of Operations (North Carolina, South Carolina, Georgia, Florida, Alabama, and Mississippi).
The following percentage rates will be used for the 3-year base period.
Home Office Overhead _____________% Field Office Overhead _____________% Bonding _____________%
FOB: Destination
MAX
NET AMT
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0002 1 Lump
OPTION Option 1FFP UMCS MATOC, 1st OPTION YEAR - The Period of Performance for this Option Period, if exercised, will be for a period 365 days, contingent upon the remaining capacity of the contract (where total capacity is $49M).
The following percentage rates will be used for the Option Period 1.
Home Office Overhead ____________% Field Office Overhead ____________% Bonding ____________%
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0003 1 Lump
OPTION Option 2FFP UMCS MATOC, 2nd OPTION YEAR - The Period of Performance for this Option Period, if exercised, will be for a period 365 days, contingent upon the remaining capacity of the contract (where total capacity is $49M).
The following percentage rates will be used for the Option Period 2.
Home Office Overhead _____________% Field Office Overhead _____________% Bonding _____________%
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
SCOPE OF WORK (SEED PROJECT)
1. Brief Description of the Scope of Work: Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide Replace Throckmorton Library HVAC & Controls, Bldg. 1-3346, Ft. Bragg, NC. All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes.
Reference Specification Section 01 08 00, Paragraph 1.17. Work performed under this task order shall comply with the latest edition of the publications dated at the time of the task order award.
When a required publication is not referenced in the list found in paragraph 1.17, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.
A. Scope of Work: The site of work is located in Fayetteville, NC, on the Fort Bragg Army Installation. The site is located Throckmorton Library, Bldg. 1-3346, Ft. Bragg, NC.
Summary In general, the work at Bldg 1-3346 under this contract is to cover the replacement of the existing pneumatic controls to direct digital controls (DDC) throughout the building and all related mechanical systems.
Mechanical All existing VAV boxes will be replaced with new VAV boxes with DDC controls and hot water coils as applicable. The existing boiler and two air handlers will be up fitted with new DDC controls. The existing chilled water and hot water pumps will also be up fitted with new DDC controls. New DDC valves, actuators, and sensors will replace the existing pneumatic equipment on all air and hydronic systems. A new split system heat pump will be provided to condition an old archives space which has been converted to a conference room. The two existing server rooms will be provided with new wall mounted mini-ductless split systems. The existing air-cooled chiller will be replaced with a new air-cooled chiller. Minor ductwork changes will be implemented as needed to condition new spaces which are currently inappropriately conditioned.
Electrical Electrical renovations shall be in support of mechanical work. Existing mechanical equipment being replaced with an equivalent shall be disconnected from their associated circuit conductors via existing disconnecting means. All associated feeder circuits, conductors and conduits for equipment being replaced with equivalent shall be preserved for re-use. Existing mechanical equipment being demolished shall be disconnected at the source panel board from which they are fed. All associated conductors and exposed conduit shall be removed back to source panel board complete. Associated circuit breakers no longer in use shall be re-labeled as SPARE in the panel board schedule. All electrical work and installations shall be verified as conforming to the most current release of NECA 1, NFPA 70, and related UFCs.
B. Drawings: G-001 through E-602
C. Specifications: Division 01 08 00 thru 26 20 00
D. Additional Information:
1. Special Situations: N/A
2. List of Government Furnished Equipment: N/A
3. Salvageable Material: N/A
1.1 Offeror Fee Proposal: Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
1.2. Interested participants must submit a price and technical proposal for work detailed in the scope of work, drawings and specifications posted on FedTeDs. To access the full scope of work, specifications and drawings go to the following link:
https://www.fbo.gov/fedteds/W912HN-13-R-0008.
2. Wage Decision NC-25 dated 04 Jan 13 applies to the attached Task Order Pricing Schedule.
Offerors are reminded that wage determinations are subject to change prior to award. All proposed pricing shall include the most current wage rates. All offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals.
3. The contractor shall be assessed the amount of $690.98 liquidated damages per calendar day for failure to complete the prescribed work within the performance period. (Applies to SEED Project Only)
4. Performance Period: (Applies to SEED Project Only)
a. Base Bid – Duration is 120 Calendar Days.
b. Offeror’s bid acceptance period is 90 Calendar days. Offeror’s bid shall be good for
90 Calendar days from the proposal due date.
c. Offerors providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
5. Site Visit.
5.1. In accordance with FAR Clause 52.237-2, Site Visit (Construction), A site visit will be conducted at the Ft. Bragg Area Office, Building 3-1933, Butler Road, Ft. Bragg, NC 28310 on March 14th, 2013 beginning at 1300 hours. The POC for the site visit is Mike Willett and he can be contacted at 910-396-1211 X230.
5.2. Prior to the submission of any proposals, all offerors are required to visit the project site location to become familiar with the project requirements. A proposal will not be rejected only because the offeror fails to visit the project site. Failure to visit the project site will not relieve the bidder from responsibility for performance of the work and compliance with the terms and conditions of any resultant contract. In no event will a failure to inspect the site constitute grounds for a claim after award of the task order.
6. Monthly Anticipated Adverse Weather Delay. In accordance with clause 52.249-4001 I Time Extensions for Unusually Severe Weather (APR 1991 OCE)
Workdays Based on 5-Day Work Week Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
10 9 6 4 4 6 8 7 4 4 5 9
7. Additional Contractor Requirements.
7.1. Project Involves Handling of Asbestos or Lead Base Paint: (Reference Specifications
01 08 00, 01 08 50, 01 35 13 and 01 35 29)
7.2. Occupancy During Construction: (Reference Specifications 01 08 00, 01 35 13, and 01 50 00)
7.3. CQC System Requirements: Reference Specifications 01 45 01
CQC Manager CQC Personnel
Civil Mechanical Electrical Structural Architectural Environmental Submittal Clerk Concrete, Pavements and soils TAB Personnel Design Quality Control Manager
(TAB) – Testing, Adjusting and Balancing Personnel ** Note: The CQC Manager or the Superintendent can do double duty as the Site Safety & Health Officer but at least 2 personnel are required overall for this effort.
7.4. Quality Control System (QCS) Required: Reference Specification 01 45 01.10
7.5. Project Sign Required: Reference Specification 01 35 13: (Reference Attachment 1 to
Specification Section 0800 for sign layout.)
7.6. Submittals are required on all materials: (Specification 01 33 00)
7.7. Site Visit Requirements: (Specification 01 08 00)
Video Tape Digital Pictures
8. After task order award:
Site Safety and Health Plan (Specification 01 35 29) Quality Control Program (Specification 01 45 01)
Design After Award (Specification 01 33 16) Work Plan – Design/Build (Specification 01 08 50). The design requirements are:
a. Complex Submittal – Contractor will submit Full Design (60%, 90%, 100%, and Corrected Final submittals); specifications, rendering, erosion control plan and permits.
b. Medium Submittal - Contractor will submit Full Design (90%, 100%, and Corrected Final submittals); abridge set of specifications with project data, erosion control plan and permits.
c. Light Submittal – Contractor will submit Full Design (100% and Corrected Final submittals); specifications on the drawings, erosion control plan and permits.
d. Distribution of Submittals:
Number Item
½ Size Drawings Full Size Drawings Specifications CDs
Construction Schedule (Specification 01 32 01.00 10)
Bar Chart
CPM
Weekly Progress Report (Specification 01 08 00 & 01 35 13) Telephone Conversation/Correspondence Records (Specification 01 08 50) Site/Project Specific Remediation Report (Specification 01 35 13) As-Built/In Progress Drawings (Specification 01 35 13, 01 70 00, 01 78 00)
9. After construction completion, prior to final payment:
System/Equipment Testing Operation and Maintenance Manuals/Training Videos (Specification 01 70 00) Training Equipment and Construction Warranties List of Standard Equipment and Service Organizations As-Built/Final Drawings
10. Applicable Specifications:
01 34 00 – Survey, Layout, and Other Data 01 35 13 – Special Contract Requirements 01 35 29 – Safety & Occupational Health Requirements
01 42 00 – Sources For Reference Publications 01 50 00 – Temporary Construction Facilities 01 57 20.00 10 – Environmental Protection 01 57 23 – Storm Water Pollution Prevention Measures 01 62 35 – Recycled/Recovered Materials 01 70 00 – Contract Closeout 01 74 19 – Construction & Demolition Waste Management 01 78 00 – Closeout Submittals 01 78 23 – Operation & Maintenance Data Others Specifications: All specifications associated with the seed task order.
11. Excavation Permit: The contractor shall have a completed and approved Excavation Permit prior to any excavation, to include sign or fence-post holes. The Contractor shall schedule an appointment to locate utility lines at least 24 hours prior to any excavation with the DPW. (Reference Specifications 01 35 13 & 01 50 00).
12. Disposal Permits: A permit is required to use the installation land clearing and inert debris and demolition landfills. Landfill permits shall be processed with the Environmental Compliance Branch of the DPW Environmental & Natural Resources Division. Permits are issued for the life of the specific contract only. Only materials produced on the project for which the permits are issued may be disposed of in the land clearing and inert debris and demolition landfills. The Contractor shall keep a copy of the completed permit with the vehicle throughout the contract disposal operation. Copies of the disposal permit forms will be provided at the Prework Conference.
13. Borrow Permits: A permit is required to use the base borrow material pits. Borrow pit permits shall be processed with the Environmental Compliance Branch of the DPW Environmental & Natural Resources Division. Permits are issued for the life of the specific contract only. Borrow materials may only be used on the project for which the permits are issued. The Contractor shall keep a copy of the completed permit with the vehicle throughout the contract borrow operation.
14. Haul Routes: The Contractor is required to obtain approval from the Resident Office for the routes he intends to use for transportation of borrow materials, construction debris, or demolition materials unless otherwise permitted in writing by the Resident. The axle load of earth-hauling equipment operating on paved streets shall not exceed 12,000 pounds. (Reference Specifications 01 35 13 & 01 50 00).
15. Utility Outages and Road Closures: Utility, road and railroad closures require a minimum 10 working days advance written notice and will be subject to Resident Office approval. In the case of a road closures, a sketch shall be provided showing the closure location and all necessary signs and barricades. Necessary signage, barricades, flag persons, lights (including temporary traffic control lights), and markings for the safe movement of the public during construction shall be in accordance with the Manual on Uniform Traffic Control Devices, and shall be provided at no additional expense to the Government. (Reference Specifications 01 35 29, 01 50 00 & 01 35 13).
16. Availability and Use of Utility Services: Utility services required on the job site for the accomplishment of the work
Will be furnished at no cost to the Contractor
Will NOT be furnished at any cost to the Contractor
However, the Government will make no connections or alterations to the existing utility systems for the Contractor. Utilities for offices and/or storage buildings or areas will be billed to the Contractor monthly and will not be furnished free of charge. The Contractor shall be responsible for installing meters or other connections at no cost to the Government. At the conclusion of the contract, the Contractor shall remove all temporary connections, distribution lines, meters and associated paraphernalia unless otherwise directed by the Resident Office. Prior to installing any utility connections at an office/storage site, the plan will be approved by the Resident Office. When utility meters are installed, the Contractor shall notify the Resident Office for the initial meter reading.
Failure to obtain this initial reading will result in the Contractor being charged for the entire amount shown on the meter. (Reference Specification 01 50 00).
17. Contractor Storage and Trailers: The Contractor shall place or paint a sign on all of his storage trailer(s) and building(s) used on this contract. At a minimum, the sign shall contain the name of the Contractor and a telephone number at which the contractor can be reached. The trailer(s) and building(s) shall be completed with gates and/or doors which can be locked. Only material for this project shall be stored in the trailer(s) or building(s).
The Contractor shall remove the storage trailer(s) or building(s) within 30 days after completion of the contract and prior to submitting his final invoice. The area around the storage trailer(s) and building(s) shall be kept clean.
18. Safety: Safety will be in compliance with the Corps of Engineers Safety Manual EM 385-1-1. Use of appropriate safety equipment is mandatory and not limited to hard hats and steel-toed shoes. Contractor is responsible for daily clean up and complete restoration of the area once the contract is complete.
19. Hours of Work: Work shall be accomplished between the hours of 0730 thru 1630 hours daily, Monday through Friday on non-Government holidays. Legal holidays falling on Saturday are observed on the proceeding Friday and those falling on Sunday are observed on the following Monday. Work schedule and facility security to be coordinated with the Resident Office for facility access and security maintenance during duration of work. Contractor shall not work outside of the stated hours of work, without first obtaining approval from the Resident Office.
20. Warranty: The contractor shall provide a minimum of one (1) year warranty on all materials and workmanship from the date of the Government’s acceptance of the work.
End of Scope
General Decision Number: NC130025 01/04/2013 NC25
Superseded General Decision Number: NC20120025
State: North Carolina
Construction Type: Building
County: Cumberland County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 01/04/2013
CARP0312-001 05/01/2011
Rates Fringes
CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 22.85 7.45
IRON0848-005 12/01/2010
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 21.50 8.90
* PLUM0421-001 07/01/2012
Rates Fringes
PLUMBER/PIPEFITTER...............$ 24.40 9:35
SUNC2011-006 08/24/2011
Rates Fringes
BRICKLAYER.......................$ 19.00 0.00
CARPENTER (Drywall Hanging Only)............................$ 13.83 0.00
CARPENTER (Form Work Only).......$ 13.38 1.80
CEMENT MASON/CONCRETE FINISHER...$ 15.80 0.00
ELECTRICIAN......................$ 20.64 6.68
HVAC MECHANIC (HVAC Duct Installation Only)...............$ 17.37 1.82
LABORER: Common or General......$ 10.54 0.52
LABORER: Landscape & Irrigation.......................$ 9.13 0.28
LABORER: Pipelayer..............$ 13.35 2.80
LABORER: Mason Tender-Brick/Cement/Concrete.....$ 12.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.47 2.41
OPERATOR: Bulldozer.............$ 16.00 1.87
OPERATOR: Crane.................$ 19.77 4.48
OPERATOR: Forklift..............$ 13.86 0.00
OPERATOR: Grader/Blade..........$ 15.72 1.49
OPERATOR: Loader................$ 16.17 0.25
PAINTER: Brush, Roller and Spray............................$ 12.35 0.00
ROOFER...........................$ 11.75 1.06
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 15.81 1.40
TRUCK DRIVER.....................$ 13.38 1.48
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
BID SCHEDULE
SCHEDULE A
FA-42003-2P, Replace HVAC & Controls, Throckmorton Library Building 1-3346
Fort Bragg, North Carolina
TOTAL BASE
(ITEMS 0001 THRU 0002) $__________________________
ITEM
No. Description Quantity U/M Unit Price Amount
0001 Primary Facility – 1 LS $__________ $_________
Replace HVAC & Controls, Throckmorton Library Building 1-3346 - Complete.
0002 Mark-ups for 3-year Base Period INFORMATIONAL CLIN
ITEMS
0002a Home Office Overhead ____________%
0002b Field Office Overhead ____________%
0002c Bonding ____________%
**NOTE**
For items in CLINs 0002a, 0002b, and 0002c, please indicate the percent values used for the mark-ups for Replace HVAC & Controls, Throckmorton Library Building 1-3346 ONLY.
These items are for Government Informational purposes only and should be the same as those percent values derived for the Base 3-year Contract.
SCOPE OF WORK
UMCS & MECHANICAL CONTROLS MATOC - SCOPE OF WORK
1. DESCRIPTION OF WORK:
1.1 Multiple Award Task Order Contract (MATOC) for Utility Monitoring Control System (UMCS) and Mechanical Controls is intended to provide rapid response for: New construction, rehabilitation or maintenance and repair for Energy Control Improvement Projects (ECIP) , Digital Control (DDC) Systems, Utility Monitoring Control System (UMCS), HVAC Systems (AHU, Boilers, Chillers), UG Hot and Chilled Water Piping, Fire Protection Sprinkler Systems Ground Source Water transfer Systems, Chilled Water Tanks, Liquid Propane Tanks, Solar Panels and all types of Building Commissioning.
1.2 The scope of the basic contract may include new construction, rehabilitation, maintenance or repair of HVAC systems, equipment and/or components, plumbing systems, waste water drainage systems, fire alarm, fire protection sprinkler systems, fire suppression systems, back flow preventers, to include all devices, equipment and components associated with constructing and installing these systems. Work can also include, but not be limited to: Installation of fire detection systems, DDC Controls systems, underground high temperature lines, medium temperature lines, chill water distribution systems, variable frequency controls on HVAC systems, testing, adjusting, and balancing of HVAC systems, design and installation of computer room HVAC systems, commissioning of building systems and pumping systems.
1.2.1 New construction, rehabilitation or repair of a variety of building HVAC system equipment and their components. This work includes maintenance, repair and/or installation of compressors, blowers, motors, drive assemblies, fans, service valves, dampers, condensers, cooling coils, piping, pumps, purge units, control systems and wiring, duct work, burner assemblies, combustion chambers, thermostats and temperature controls, registers, condensate drips pans and drains, grills, evaporators, air filters, heat/air conditioners and electrical appurtenances in accordance with manufacturer’s manuals.
1.2.2 New construction, rehabilitation or repair of plumbing systems in internal building areas and within the five-foot-line of a building. This includes all common industrial/commercial-level fixtures, water supply piping, and various types of waste water drainage systems, backflow preventions devices, and common fire sprinkler systems. This work shall also include water, waste-water, or fire protection distribution systems or components inside the general footprint of the facility, which may or may not be within the five-foot line of a building.
1.2.3 New construction, rehabilitation or repair of building fire suppression system and associated components. This work includes design, performance, installation, maintenance and/or repair of automatic fire sprinkler systems, fire pumps, fire backflow preventer, building fire water distribution system, site underground distribution system, control valves, fire hydrants, water flow test, meters, test connections, smoke detectors, mass notification system, fire alarm system, building control panel and alarm system connection to base UMCS.
1.2.4 New construction, rehabilitation or repair services of Building Automation System (BAS) Direct Digital Controls (DDC) system. This work includes the design, installation, maintenance and/or repair of the Building Automation System. This includes programming building controls to perform scheduling, alarming, trending, integrating building-level controllers (UNT, VAV, AHU, etc.), installing workstation with LonWorks based software protocols, control hardware components, provide I/O point schedule, tie-in to base-wide UMCS, conduct performance verification testing, and controls commissioning.
1.2.5 The scope of this work may also include all types of Commissioning. The types of Commissioning required may include but is not limited to the following:
1.2.5.1 Total Building Commissioning (Cx)
Total building commissioning includes additional essential buildings systems such as the building's exterior wall, plumbing, acoustical and roofing systems. Commissioning these additional systems can reduce moisture penetration, infiltration and noise problems, and contribute to the building's energy and resource efficiency and occupant productivity.
Successful Cx results in optimal energy efficiency, indoor environmental quality, reduced change orders during construction, extended systems life and reduced operation and maintenance costs, often paying for itself before construction is completed. To be most effective, building commissioning begins in the planning phase and continues through design, construction, startup, acceptance, training and the warranty period, and continues throughout a building's life cycle.
1.2.5.2 Retro-commissioning (RCx), or Existing Building Commissioning
RCx includes an audit of the entire building including a study of past utility bills, interviews with facility personnel. Then diagnostic monitoring and functional tests of building systems are executed and analyzed. Building systems are retested and remonitored to fine-tune improvements. This process helps find and repair operational problems. The identification of more complex problems are presented to the owner as well. A final report, recommissioning plan and schedule are then given to the owner.
1.2.5.3 Recommissioning
Building systems can be purchased from different vendors, installed by different contractors and operated by different facilities staff, who are under pressure to resolve occupant complaints about comfort. Quick fixes may resolve an individual complaint, but can lead to other systems becoming out of balance and losing the persistence of benefits from initial building commissioning or retro-commissioning. Additionally, building systems require periodic analysis and adjustment.
1.2.5.4 Ongoing Commissioning
Ongoing commissioning, also referred to as "retro-commissioning follow-up," is continual retro-commissioning focusing on the persistence of completed improvements.
Ongoing commissioning involves regularly scheduled sessions with the building occupants along with operation and maintenance personnel. This process incorporates monitoring and analysis of building performance data provided by permanently installed metering equipment to verify building performance, the satisfaction of the facilities management and staff, and the extent of actual savings.
1.3 New construction, rehabilitation or repair incidental to the tasks performed in paragraph 1.2.
This work shall include, but is not limited to, carpentry, painting, lighting, and similar minor electrical work that may be required to provide a complete and usable facility during the course of other mechanical or plumbing required by this contract. Construction tasks are not considered incidental to the commissioning tasks stated in paragraph 1.2.5
1.4 All Task Orders issued will be Firm Fixed Price Construction. Work to be performed throughout the South Atlantic Division of the U.S. Army Corps of Engineers. Work may also be performed at other Federal facilities outside the above stated geographical boundary.
1.5 Restrictions: Task orders for design only, demolition only, or commissioning only shall not be placed against the contract.
UTILITY MONITORING CONTROL SYSTEMS MATOC
W912HN-13-R-0008
SECTION 000010 - NOTES TO OFFERORS
ELECTRONIC PROPOSAL SUBMISSION, TO INCLUDE E-MAIL AND FACSIMILE
TRANSMISSIONS, IS NOT AUTHORIZED.
HAND CARRIED PROPOSAL SUBMISSION, except for delivery by Federal Express and United Parcel Service, IS NOT AUTHORIZED.
Proposals must be delivered by U.S. Mail, including U.S. Express Mail, Federal Express or United Parcel Service.
All proposals must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Request For Proposal No: W912HN-13-R-0008 Due Date of Proposal: April 8, 2013 Time by which Proposals are Due: 2:00 P.M. (E.T.)
Title of Project: Utility Monitoring Control Systems MATOC
Proposals must be addressed as indicated below.
U.S. Army Engineer District, Savannah
ATTN: CECT-SAS-E (Mark A. Hiscox) 100 West Oglethorpe Avenue Savannah, Georgia 31401-3640
The date and time of delivery established by commercial carriers is not the official time of receipt by the Government. Security Guards posted at the loading dock entry for the building do not receive proposals and will contact Mailroom personnel. Once Mailroom personnel are available, the proposal will be processed by the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the proposal. Completion of these actions will constitute delivery of the proposal by the date and time designated for receipt of proposals in Block 13 of the SF 1442.
Offerors are responsible for allowing sufficient time for the proposal to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of proposals.
Proposals sent by U.S. Mail or U.S. Express Mail and addressed the street address of 100 West Oglethorpe Avenue may be delivered to the Savannah District Post Office Box and not to the street address. Offerors that use U.S. Mail or U.S. Express Mail must allow sufficient time for proposals to be received by Mailroom personnel by the time specified for receipt of proposals in Block 13 of the SF 1442. Offerors are responsible for allowing sufficient time for the proposal to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of proposals.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the office designated for receipt of proposals. Offerors are responsible for allowing sufficient time for the proposal to be physically received and processed by Mailroom personnel in accordance with the information provided.
time.
QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 01 for additional information.
WAGE DETERMINATIONS: The appropriate wage determination will be incorporated on a task order by task order basis
PRE-PROPOSAL CONFERENCE: A Pre-proposal conference will be held March 14th, 2013 at 1300. This conference will be held at the Ft. Bragg Area Office located at 3-1933 Butner Road, Ft. Bragg, NC 28310-5000.
TECHNICAL MATTERS: Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet All questions regarding this Request for Proposal (RFP) must be submitted in writing via Bidder Inquiry in ProjNet within no less than 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes that the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login.
Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
http://www.projnet.org/projnet
UMCS MATOC
Bidder Inquiry Key: ZS84YS-2358JI
Section 00100 - Bidding Schedule/Instructions to Bidders
SECTION 00100
SECTION V
SECTION 00100
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. OVERVIEW.
1.1 This Request for Proposal (RFP) solicits for a Multiple Award Task Order Contract (MATOC) under which task orders for Utility Monitoring Control Systems (UMCS) & Mechanical Controls are expected to be issued with work primarily in South Atlantic Division (SAD); however, work may also be performed at other Federal Facilities located within the geographic boundaries of the US Army Corps of Engineers SAD (North Carolina, South Carolina, Georgia, Florida, Alabama, Mississippi.) Work may also be performed at other Federal Facilities outside the above-stated geographical boundary on an excepted basis as determined by the Contracting Officer. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either of a Construction or Design/Build nature. A project requiring use of civil funds is not authorized under this contract. (See solicitation section 00010 for the complete scope of the anticipated contract to be awarded under this RFP.)
1.2 The purpose of the Source Selection plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Procuring Contracting Officer (PCO) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). In as much as the proposal shall describe the capability of the Offeror to perform any resulting contract, and task orders issued there under, the proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract and task orders issued thereafter.
1.3 For the purposes of this solicitation, the Government will utilize a Best ValueTrade-off Process. In the Trade-off process, interested Offerors submit certain specified performance and capability proposals in conjunction with a pricing schedule for the seed task order for review and consideration by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.
2. GENERAL INSTRUCTIONS
2.1 Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for performance of this contract, consortia of firms, or any other interested parties may submit proposals. A design firm or construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal.
2.2 Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement. Any narrative provided should be incorporated into the Offeror’s proposal at Tab E.
2.3 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight, if any, of the information to this procurement. Where information about a subcontractor is properly submitted and given significant weight during the evaluation, the failure of the Offeror to actually perform with that subcontractor may be grounds for termination for default. Any narrative provided should be incorporated into the Offeror’s proposal at Tab E.
2.4 Offerors shall submit their proposal to the address shown in Block 7 of Standard Form 1442.
2.5 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
3. GENERAL PROPOSAL FORMAT:
3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one binder is used, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3 Printed Matter Submissions. Written material shall be on 8 ½ x 11 inch paper printed in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated. A single 8 ½ x 11 inch sheet with written material on one side only shall constitute one page. However, if both sides of the sheet bear written material then this single sheet shall be counted as two pages.
3.4 Binders. Proposals shall be submitted in tabbed, three ring binders.
3.5 Number of Copies. Offerors SHALL submit a hard copy of the original Volume I and a hard copy of the original Volume II. Offerors SHALL also submit five (5) additional hard copies of Volume II and one (1) electronic copy of Volume II on a CD. Given the limited time and resources of the evaluation board, failure to provide the requisite number of copies may hinder the board's ability to evaluate the Offeror's proposal. Failure to provide any copies of Volume I or Volume II may result in the Offeror’s proposal being determined ineligible for award.
3.6 Tabs. Proposal shall be organized and tabbed as follows:
VOLUME I
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror.
Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Proposal Pricing Schedule, Section 00010—Schedule A.
TAB C - Section 00600 – Representations and Certifications.
TAB D – Proposal Data Sheet – See Attachment 1 provided at the end of this section. Offerors should ensure telephone number, fax number, e-mail address and DUNS number are all included.
The DUNS number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. A DUNS number shall also be provided for each company identified in any other proposed association of firms or Contractor Team Arrangement. The Offeror should also submit their Tax ID number on the proposal data sheet.
TAB E – Teaming Agreements and Narratives, if applicable. See paragraph 2.2 and 2.3.
TAB F - Bid Bond—The Offeror is not required to submit a bid bond but is required to submit a letter, stamped with an official seal and notarized, from the contractor’s surety validating the Offeror’s…