SOW_Bldg_355)__.docx
DOCX document 44 KB Posted
- Attached to
- SIAD Construction Project - Group C Federal contract opportunity
- Solicitation number
- W912GY-17-R-0018
About this file
SOW - 355
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_Bldg_364_.docx | DOCX document | |
| SOW_-_311.docx | DOCX document | |
| SOW_-_308.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/27/2017
STATEMENT OF WORK
PR No: 355- 17-04567 RPR REN/RPR Siding, Floors, Etc.
1.0 PART I – GENERAL:
1.1 GENERAL: The contractor shall provide all labor, materials, equipment and supervision necessary to implement Scope of Work Items listed below at SIERRA ARMY DEPOT (SIAD), Herlong , CA. 96113
1.2 Minimum Requirements: All work shall be done within the specifications and in accordance with all Federal, State and local regulations. Work shall be done is a professional workman like manner and to industrial standards. It is highly suggested a PRE-BID SITE VISIT take place to afford the opportunity to get familiarized with all the deferent aspects of this project.
1.2.1 Location: SIAD
1.2.2 Refer to any attached plan for details and locations of work to be performed.
1.3 Scope of Work Items: RPR REN/RPR Siding, Floors, Etc.
1.3.1 Remove and retain termination bar at top of gutters.
1.3.2 Remove and retain of gutters and all downspouts, and store for re-installation.
1.3.3 Temporarily secure roofing membrane to fascia during siding installation.
1.3.4 Install new z-flashing as needed and reinstall gutters and downspouts.
1.3.5 Repair roof along edge of gutters.
1.3.6 Re-install roof termination bar, secure roof over flashing and apply new sealant as needed.
1.3.7 Abate non-friable asbestos transite siding from the exterior of the building. All work must comply with Federal EPA and CA EPA regulations. All workers must be trained and certified in accordance with EPA regulations.
1.3.8 Siding material shall be removed down to the wood substrate along with the non-asbestos tar paper and nails
1.3.9 Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.
1.3.10 Remove and re-install after new siding all building signage.
1.3.11 Repair broken or dry rot and re-nail, as needed, existing wood sheathing on exterior walls;
1.3.12 Remove wood bumper system from perimeter of building.
1.3.13 Install TYVEK or equivalent moisture barrier to exterior of warehouse building.
1.3.14 Install j-channel and trim accessories as needed around doors, eaves, starter strips and corners.
1.3.15 Install 3/8” fanfold insulation to all exterior walls.
1.3.16 Provide and Install new Crane Market Square Double 5 Inch lap vinyl siding per manufacturer’s specifications and in accordance with ANSI standards with regard to normal expansion and contraction. Color of siding and trim to match building 305.
1.3.17 Provide 50 year siding warranty to SIAD.
1.3.18 Provide and install vinyl trim accessories as needed around doors, eaves, starter strips, and corners.
1.3.19 Provide and Install factory painted aluminum Metal Cladding over all exposed wood surfaces. Color to match Building 305.
1.3.20 Apply sealant calking as needed.
1.3.21 Enclose wall where penetrations are no longer needed.
1.3.22 Remove existing wood bumpers on the exterior walls. Install a metal stand off guard rail system on all four sides of the building (match system on Bldg. 352). Galvanized Posts shall be installed at 6’3” OC and shall be a minimum of ¼” thick W6x8.5 28-1/8” tall welded to ½” thick 6”x10” base plate will ¼” fillet welds on exterior flange sides. These posts shall be anchored to the existing concrete using 4 - 1” diameter bolts with washer, epoxy into concrete. Guard rail shall be galvanized 12 gauge W-beam rail, 12-1/4” in height, and 3-1/4” in width.
1.3.23 Remove and replace old damaged exterior perimeter concrete. No new ramps shall be replaced.
1.3.24 New concrete shall extend from building wall outward to new saw cut in asphalt.
1.3.25 Perform a full depth saw cut 12” out from the existing perimeter concrete in the existing asphalt.
1.3.26 Perform a full depth saw cut on all three sides of the fire riser rooms. Make the cut as close as possible to the brick walls without damaging them.
1.3.27 Perform a full depth saw cut where ever needed to relive or isolate electrical, gas or water risers.
1.3.28 Demo and remove existing old perimeter concrete and 12” swath of asphalt. Depose of demoed concrete and asphalt in separated rubble piles at SIAD’s deposal site approx. 1.5 miles away.
1.3.29 Excavate as needed to accept 4” of class 2 base and 6” of concrete.
1.3.30 Compact native soil to 90% and add base and compact it to 90%.
1.3.31 Drill 5/8” x 8” deep min. holes into all adjacent concrete 16” OC to accept #4 rebar slip dowels (do not epoxy in place).
1.3.32 Install felt expansion joint material with a ½”top cap strip to acuminate joint fill on all existing adjacent concrete and asphalt.
1.3.33 Set up forms to provide slopping away from building. 1/8” per foot is desirable, but maintain a 1” gap between concrete surface and building siding.
1.3.34 Install #4 grade 60 rebar at 16” OC running in both direction. Support rebar off bottom 2” to 3” with cement dobby’s or chairs.
1.3.35 Install a 12” x 12” concrete beam running the full length of the building (including in front of the new ramps). Install four #4 bars (2 top & 2 Bottom) with min. 2” of concrete coverage on all sides.
1.3.36 Place 4,000 PSI air entrained concrete (see COE specs.) 6” thick at slab and 12” thick at beam.
1.3.37 Install a tooled or saw cut expansion joint in all field areas 12’ OC min. 2” deep across the width of the new concrete.
1.3.38 Fill all joints with an exterior grade flexible joint fill product.
1.3.39 Install a top coating over the 10” +/- concrete strip along the building. Use Mapei Mapecem 202, this is good from 1/4” to 2” in thickness. Clean pea gravel may be added to increase thickness.
1.3.40 The gas utility provider will remove and reinstall the gas manifold to remove it from possible damage during the demo and/or concrete placement.
1.3.41 Extreme caution and care shall be taken to prevent damage to any utility risers or bollards.
1.3.42 Any vale access lids (i.e. gas valve) shall be raised and reset to new grade.
1.3.43 Ceiling and wall insulation: Install R-21 foil faced insulation in-between roof rafters at bottom of rafters and R-19 foil faced insulation in walls. Rafters are 24” O.C.
1.3.44 Structural repairs:
1.3.45 Install engineered bracing on North and South ends of building as per attached COE drawings. Shear sheathing shall be place horizontally (when more than 8’ tall) with 2’ min. staggered butt joints.
1.3.46 Install anchor bolts on all exterior walls as per the attached COE drawing, detail 1. Anchor bolts on East and West side walls shall be spaced at 4ft O.C. access for installation can be made with the removal of the exterior sheathing. Removed sheathing may be replaced with like size plywood. Replace any disturbed insulation with same R rating.
1.3.47 Prep existing interior concrete to accepted epoxy broadcast coating system. See attached “Exhibit A
1.3.48 Dispose of concrete and asphalt in separated rubble piles at SIAD’s deposal site approx. 1.5 miles away.
1.3.49 Install ⅝” purple high performance drywall on the first 8 ft. of wall height on the interior walls of the building. Attach drywall with 1⅝” drywall screws.
1.3.50 Install (2) Thermo-Cycler GTC-480 or approved equal heaters (4 units total) on the east side of building 351 as shown in the Appendices
1.3.51 Units shall be 120v-208v 3ph
1.3.52 Provide and install medium or low pressure gas piping and hook-ups per manufacturer’s requirements
1.3.53 Run gas lines from a Government-provided regulator from the location noted in the Appendices
1.3.54 Install the unit’s flue pipes to the existing side wall fittings/hood
1.3.55 Provide and install two bolt down 6” bollards at each unit
1.3.56 8. Set the heaters to maintain a room temperature of 68°
1.3.57 Contractor to supply start-ups and provide operation and PM training.
1.3.58 MDP: Contractor shall remove existing safety switches, subpanels and risers then install Main Distribution Panels (MDPs) and subpanels. MDPs and subpanels shall be Square D or equivalent. MDPs shall be I line 400a, MBO, 14kA fully rated, NEMA 1, commercial, 208Y/120v, 3 phase, 4w, 400a buss, 400a main breaker, 8 circuit-3 pole 225a breaker, standard solid neutral and ground bar, standard mains and feeders mechanically restrained. . MDP box will be large enough for 500MCM cable to be attached to the 225a sub-breakers. On any new circuit, voltage drop shall not exceed 3%. Install grounding plate per drawings.
1.3.59 Subpanels: Subpanels shall be 208Y/120v, 3 phase, 4w, 225a buss, 225a main breaker, 42 circuit, NEMA 1. This subpanel shall be fed from the MDP using a 3 pole 225a breaker.
1.3.60 New LED Fixtures Warehouse: Contractor will remove approximately XXX old fluorescent light fixtures and install approximately XXX new LED fixtures in warehouses and XXX LED troffer fixtures in offices. LED fixtures in warehouse bays shall be Type: M1, Catalog # 75L-8-L100/840-A12125-DIM-UNV, made by H.E. Williams Inc. or equivalent. Hanger systems are optional. Light fixtures must hang level and in the correct position after an earthquake or being bumped by a forklift. LED shall be clear lens with 4000K color temperature. Light fixture shall be dimmable and shall –for task lighting- give 60 foot candles minimum illumination, 36inches above finished floor (AFF) with bottom of fixture mounted 13feet or 13feet 6inches AFF. If the drivers are dimmed via a Programmer, the Government will retain the Programmer at the conclusion of the project. If the drivers are dimmed via a resistor, the Government will install the resistor. For task lighting, no candle power between two parallel fixtures mounted 20feet apart shall be less than 30 candle power measured 36inches AFF. For general area lighting, candle power shall be minimum 40 candle measured 36inches AFF. Drivers shall have silent & flicker free operation. Do not remove or replace existing LED task lighting.
1.3.61 New LED Fixtures Offices: Number of old fluorescent fixtures to be removed are in the above removal count. New LED troffer lights shall be: Philips Day-Brite #2TG48L830-4-FS-02F-UNV, or equivalent, 3000K color temperature. These fixtures will be mounted into existing T-bar ceiling or mounted to ceiling drywall. In T-bar ceilings where an old light fixture was removed and no new fixture will take its place, the contractor shall install a new acoustical ceiling tile.
1.3.62 Rafter and Fixture Mounting height: Projects 306 thru 311, bottom of rafters are approximately 16feet 6inches AFF. Bottom of light fixtures shall be 13feet AFF. Projects 355 thru 358, bottom of rafters are approximately 22feet 6inches AFF. Bottom of light fixtures shall be 13feet 6inches AFF.
1.3.63 Fixture Wiring: Contractor shall reuse the existing lighting circuits. Contractor may loop 2 to 4 fixtures from 1 junction box. Contractor shall not be allowed to loop 5 or more fixtures together. Install EMT, no smaller than ¾inch, from the existing run, for more than 4 fixtures. In a group of 4 fixtures, on the same circuit, the Contractor may run EMT to the center of the group, run MC down to the second fixture then back up and across to above the 1st fixture then down to fixture. Same process for fixtures 3&4 of that group. No more than 2 fixtures on 1 MC cable. On any light circuit, voltage drop shall not exceed 3%. No circuit shall be loaded more than 17amps on a single pole breaker. If an existing lighting circuit is not sufficient to remain under 17 amps with new fixtures installed, the contractor will install a new lighting circuit to split the load.
1.3.64 Exterior Light Fixtures: Where required per plans/drawings or SoW, Contractor shall install exterior LED light fixtures, 8feet AFF. LED fixtures shall be: Wallpack C, model # HEX-021-A-CW-MT-OS-PC2-WPC made by Noribachi or equivalent.
1.3.65 PVC Strip Door: Per plans/drawings or SoW Contractor shall install clear, ribbed PVC air curtains/strip doors. Each strip will be a minimum of 16inches wide by .229inches thick. Each strip will overlap by 66% minimum. All mounting hardware will be galvanized. Curtain will cover the entire door opening and come within 1.5inches of the floor. A source of supply is www.Aleco.com.
1.3.66 Receptacles: All receptacles shall be 120v, 20amp, Spec Grade, Heavy Duty Service, no color preference.
1.3.67 All MDPs and new/replaced subpanels shall be permanently marked and identified. This includes all branch circuits from the subpanels to the loads. Receptacles shall be marked with a tape printed label i.e.: PNL A bkr 12.
1.3.68 Each MDP shall have the existing grounding supplemented per attached drawing. Ground rods shall be 5/8inch by 10feet copper. All connections to rods shall be exothermic.
1.3.69 Each subpanel located more than 100feet from the MDP shall have a supplemental ground rod (1ea) attached.
1.3.70 Per drawing, the Contractor shall install a copper ground plate near each MDP and ground water, gas and fire sprinkler systems to this copper ground plate.
1.3.71 On any new circuit, to include feeds going to subpanels, voltage drop shall not exceed 3%. All electrical wire on this project shall be THHN stranded copper. No de-rating of neutral shall be allowed. Contractor shall submit voltage drop calculations prior to installation.
1.3.72 Recyclable material: Any recyclable material can deposited in Government recycle containers for that type of material. The Government will provide the Contractor with cardboard tubes for the old fluorescent light tubes and will dispose of these light bulbs. The Government will provide the Contractor with containers for old light ballasts and tombstones. The Contractor shall remove the ballasts and tombstones and deposit them in provided containers. The metal shell shall go into a metal recycle container. The Government will provide the Contractor with a copper wire container for all old/excess copper wire.
1.3.73 On the southeast corner of warehouse remove disconnects A, B, and 3 fire disconnects. Install new 400 amp MDP as listed above at location noted on plans approximately 70 feet north of the southeast corner. New MDP will be fed by existing 400 amp main breaker panel that is on exterior of warehouse. Remove existing subpanels A and B and in their place install above listed subpanel, conduit and wires. Subpanel B is approximately 380 feet from MDP location. Subpanel A is approximately 50 feet from MDP location. Reroute old conduit and wires from old subpanels into the new subpanels. Connect existing fire alarm loads to subpanel A or new MDP. Install two (2) dedicated 20 amp/120 volt 4 plex receptacle circuits to pole designated on plans. Total Warehouse Lighting: The Contractor shall remove approximately 130 old fluorescent light fixtures and install approximately 218 warehouse LED fixtures and approximately 1 office LED fixture. Contractor will replace acoustic tiles in place of removed fluorescent troffer fixtures. See plan for location of task lighting.
1.4 Applicable Documents:
1.4.1 SIAD Regulation 420-7 (Fire Prevention and Protection)
1.4.2 COE regulation 385-1-1 (Safety) and CESPK PAM 415-1-2 Construction Control Manual, Sampling & Testing Construction Materials.
1.4.3 All local, state and federal laws, codes and regulations.
1.4.4 NEC Electrical Code
1.4.5 IBC Building Codes
1.4.6 UFC 3-600-01 & 4-010-01 Codes
1.4.7 NFPA Fire Codes
1.5 Material Approval: All materials shall be approved by the Technical POC prior to installation.
1.5.1 Submittals required: (2 weeks prior to construction): Designs, drawings, special materials, material colors, and material safety data sheets (MSDS), certifications and Safety plan.
1.5.2 Timeline Plan: Complete construction time line plan. The plan shall be updated weekly and a copy presented to the POC.
1.5.3 Operations and Maintenance Manual: One (1) hard copy and two (2) writeable disks of manufacturer Operation and Maintenance manuals describing capabilities, and maintenance of the proposed improvements, if applicable, to be submitted before final invoice.
1.6 Pre-Commencement Meeting: Prior to the commencement of work, a meeting will be held with the Contractor and the Government Representatives to discuss matters of mutual interest concerning the contract. General conditions, work schedules and phasing, security, safety, depot siren, operations during lightning/thunderstorm, character of work, operations & storage areas, housekeeping and clean-up, days of work, equipment, fire prevention, smoking areas, accidents, local rules and regulations, delays, quality assurance, inspections, digging permits, hazardous waste, debris disposal and other matters pertinent to work accomplishments will be discussed at this time. At this time the Contractor shall submit their Safety and Quality assurance plans, forecasted Gantt chart time line plan and other submittals.
1.7 Drawings: Drawings may be available upon request. A copy of the as built drawing shall be on site and updated on a regular bases to be reviewed by the POC & COR. Upon the completion of the project a clean new set shall be turned over to SIAD for their retention.
1.8 Point of Contact (POC): The Technical Point of Contact (TPOC) for this action will be Mr. Jason Colbert 530-827-4293. The Administrative Contracting Officers Representative (COR) shall be determined, who is responsible for verifying that services have been rendered.
1.9 Work Coordination: All work shall be coordinated with the TPOC.
1.10 Work Commencement: Contractor shall commence within the first 10 days, after receiving their Notice to Proceed (NTP) and shall complete the work within (00) days unless otherwise stated per the COE Contract. This may change for the convenience of the government and after notification to the Contractor.
1.11 Smoking Areas: Smoking will be permitted only at locations designated by the TPOC.
1.12 Safety:
1.12.1 Regulations: All installation safety regulations shall be followed. Contractor shall submit a Safety Plan.
1.12.2 Signage: Appropriate signs designated by Fire, Safety & Security shall be provided by the Contractor and placed as indicated in work areas.
1.12.3 Work Area Closures: The work areas shall be closed off to unauthorized personnel.
1.12.4 Accidents: All accidents shall be reported to the Safety Office through the TPOC. This is to be accomplished within the same shift, preferably as soon after the accident as is practical. An Occupational Safety and Health Administration (OSHA) Form 101 shall be submitted within three (3) working days after the accident. In the event of serious injury or damage, work will stop and everything will be left in place exactly as it was at the time of the accident, excepting when the possibility of more damage or injury exists.
1.13 Housekeeping and Cleanup: The Contractor shall at the end of each work day leave all work areas in a neat, clean and workmanlike condition satisfactory to the TPOC. After completion of the entire job, the Contractor shall remove from the premises all tools, equipment, and materials.
1.14 Unscheduled Interruptions: Work operations are subject to unscheduled interruptions and contractor personnel may be required to immediately leave the designated work area or be denied access due to security operations. Mission requirements may necessitate suspension or cancellation of custodial operations for that period. All incomplete work shall be rescheduled for completion at a later time/date mutually agreed upon by the COR, TPOC, QA personnel and Contractor (See 1.20 Delays).
1.15 Working Area Verification: The Contractor shall be responsible for the coordination and proper relationship of this work to the building premises, and thoroughly familiarize himself with all details of the Scope of Work and working conditions, to verify all dimensions in the field, and advise the TPOC/COR of any discrepancies before performing any work.
1.16 Quality Assurance: While performing this work the Contractor shall be subject to on-site inspections by the TPOC, COR and QA personnel. The Contractor shall provide a manager to conduct and oversee daily QA and safety issues if any work is found to be in violation of a specification requirement, the COR will issue a stop work order until the violation is resolved. Standby time and expenses require resolving the violation shall be at the contractor expense.
1.16.1 There shall be announced and unannounced spot checks.
1.16.2 QA visual observations may be performed by the TPOC, COR & QA personnel.
1.16.3 Evaluation of customer’s complaints and/or comments shall be reviewed jointly by the TPOC and COR.
1.16.4 Communication with users (persons requesting the project) shall be done through the TPOC.
1.17 Debris:
1.17.1 Non-Hazardous Waste: All scrap, solid waste and non-hazardous materials shall be disposed of off the Depot and in accordance with applicable laws and regulations at Contractor's expense, unless otherwise specified in the contract.
1.17.2 Hazardous Waste: Hazardous waste generated by Contractors on SIAD shall be disposed of in accordance with SIAD Policy. Contact the Environmental Office, 530-827-4318, for proper disposal instructions. Government receptacles or containers shall not be used for disposal, unless previously arranged for by the TPOC. Contractor shall submit an abatement plan where and when applicable to the TPOC.
1.18 Delays: The Government is not liable for any delay caused by the occupant, security inspections at any entrance gates or any security measures imposed by the Installation Commander and/or higher authority.
1.19 Damages: The Contractor shall be responsible for repairing damage caused by construction and or repair activities. Any damages incurred as a result of Contractor’s actions shall be repaired or replaced at no additional cost to the Government.
1.20 Materials and Equipment Stored on Depot: The Government shall not assume any responsibility for the security or protection of any materials or equipment stored on SIAD by the Contractor.
1.21 Environmental Notification:
Sec. 1- Compliance with Environmental Laws and Regulations:
Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and Sierra Army Depot (SIAD) regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).
Sec. 2 - Compliance with Green Procurement Requirements:
Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.
Sec. 3 - Compliance with License and Certification Requirements:
Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.
Sec. 4 - Notification of Federal and State Regulators:
Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site of any Federal, State, local and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from above mentioned environmental regulatory agencies.
Sec. 5 - Inspections of Work Sites:
Contractor shall submit to potential Federal, State, Local, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.
Sec. 6 - Reporting Noncompliance:
Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR.
Sec. 7 - Verification of National Environmental Policy Act Documents:
Contractor shall obtain and comply with AMC's National Environmental Policy Act Policy and 32 CFR 651 which addresses actions to be taken by contractor (copies available from the COR or DGR). These documents include but is not limited to the analysis-associated decision document of an Environmental Impact Statement and Record of Decision; Environmental Assessment and Finding of No Significant Impact or Notice to Proceed; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions.
Sec. 8 - Conformance with Environmental Management System (EMS):
Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment. SIAD currently operates and maintains an International Organization of Standards (ISO) 14001 certified program, “Fence to Fence”. Contractor shall comply with all EMS program requirements.
Sec. 9 - Assignment of Environmental Compliance Designee (ECD):
Contractor shall appoint a primary and alternate ECD for all contract work periods exceeding 180 consecutive days and for each production, shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes. Contractor ECDs shall monitor implementation of all environmental regulatory requirements, report all environmental noncompliance to the work site supervisor, correct all environmental noncompliance, and verify implementation of directed actions to correct identified environmental noncompliance. Contractor shall have at least one ECD on duty at all times at each shop or work area. Contractor shall require all personnel designated as ECDs to complete the initial ECD training through the installation or Major Subordinate Command (MSC) environmental compliance point of contact within 15 days of the start of contract performance. Contractor personnel appointed as ECDs may perform other duties provided they do not prevent the performance of ECD duties. Contractors may request a waiver of this requirement through the COR and DGR, if using and/or storing very small quantities of hazardous materials.
Sec. 10 - Competency Training for Contractor Personnel:
Contractor shall not allow personnel to perform any activities and/or tasks on AMC installations (SIAD) without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.
Sec. 11 - Generation of Solid Waste:
Contractor shall dispose of all solid waste generated, which cannot be recycled, into the appropriately marked solid waste containers and roll-offs provided. Contractor shall comply with the SIAD Integrated Solid Waste Management Plan.
11.1. Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.
11.2. The Contractor shall coordinate with the installation Qualified Recycling Program (QRP) and Solid Waste Managers, DGR, and COR to arrange for recyclable materials to be removed and diverted from the waste stream.
11. 3. Submit in writing the quantities of waste removed and recycled to the DGR and/or COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight or volume.
11. 4. The Contractor shall promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.
11. 5. The Contractor shall make maximum effort to reduce and prevent waste.
Sec. 12 - Generation of Hazardous Waste:
Contractor shall assign all hazardous waste management responsibilities to the appointed ECD or designated personnel. Contractor shall contact the DGR and/or COR to obtain technical assistance from the Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. Contractor shall properly identify all waste and how generated as part of this contract to determine if any waste is hazardous waste as defined by both Federal and State EPA (40 CFR and Title 22 CCR). Contractor shall accumulate and properly manage hazardous waste in a satellite accumulation point at or near the point of generation or in a less-than-90-day site, in accordance with Federal, State, Local, Army, and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement or Status-of-Forces Agreement. The Contractor shall properly package all hazardous waste. The contractor shall arrange for pickup or deliver, all hazardous waste generated by contract activities from the installation, to the Hazardous Waste Storage facility, B. 380 as required by SIAD. The DGR and Environmental Office shall assist contractors with hazardous waste generators training and on-site management of their waste upon request.
Sec. 13. - Use of Hazardous Materials:
Contractor shall assign all hazardous materials management responsibilities to the appointed ECD or designated personnel. Contractor shall contact the DGR or COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. Contractor shall submit to the COR and/or DGR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list (33/50 Program - AKA 17 List) without prior written approval from DGR and/or COR.
Sec. 14. - Prevention of Storm Water Pollution:
The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the National Pollutant Discharge Elimination System (NPDES) general permit requirements. Applicable permits may include, but not limited to:
1) The installation’s Small Municipal Separate Storm Sewer System (MS4) Permit;
2) The Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activities (MSGP); and,
3) All Construction Activity Storm Water permits minimum control measures include, but not limited to:
• Public Education and Outreach on Storm Water Impacts
• Public Involvement and Participation
• Illicit Discharge Detection and Elimination
• Construction Site Storm Water Run-off Control
• Post Construction Storm Water Management in New Development and Redevelopment
• Pollution Prevention/Good Housekeeping for Municipal Operations Contractors will comply with the MSGP permit when the activity is identified as a permitted industrial activity. BMPs include, but are not limited to:
• Practicing spill prevention and good housekeeping.
• Installing and managing erosion and sediment control.
• Meeting the requirements of the MS4 permit.
• Contractors will comply with obtaining permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). BMPs include, but are not limited to:
• Preparing and implementing a site-specific Storm Water Pollution Prevention Plan (SWPPP) as outlined in the permit and prior to any soil disturbance.
• Installing and managing erosion and sediment control.
• Make available, upon request, permit associated documentation.
• Practicing spill prevention and good housekeeping.
• Meeting the requirements of the MS4 permit.
• Schedule inspections and provide corrective actions for noted deficiencies.
Sec. 15 - Storm Water Management Low Impact Design/Development (LID):
The Contractor shall perform, track, participate, implement, and comply with Section 438 of the Energy Independence and Security Act; Executive Order 13514; and the DOA memorandum (2010) for full implementation of low impact design/development (LID) techniques to restore predevelopment hydrology to the maximum extent technically feasible for both new and renovation construction projects regardless of size. In support of LID, Contractors will adhere to installation landscape codes and the guidance found in the Installation Design Guide concerning Low Impact Design/Development for storm water management. The following LID practices include, but are not limited to:
• Restoring predevelopment hydrology to the maximum extent technically feasible
• Promoting natural removal of pollutants such as nutrients, oil and grease, and sediments from storm water
• Managing rainfall at the point where it falls
• Meeting the requirements of the MS4 permit
• Important Note: Utilization of permanent retention/detention ponds is prohibited without authorization from the Installation Planning Division.
Sec. 16 - Use of Pesticides:
The Contractor shall not apply any pesticides without the expressed written permission from the DGR and/or COR in consultation with the Installation Pesticide Management Coordinator (IPMC). The Contractor shall utilize Integrated Pest Management (IPM) technology and procedures in strict compliance with all applicable Federal, State, local, Army, and SIAD regulations, to include the installation's Integrated Pest Management Plan as guidance. The Contractor shall not contract out any pesticide services without the expressed written permission from the DGR and/or COR in consultation with the Installation Pesticide Management Coordinator (IPMC).
Sec. 17 - Protection of Work Site Resources:
Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times. Prior to site clearing and grubbing, the Contractor shall coordinate with the DGR and/or COR. Contractor shall notify the DGR and/or COR if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless permission has been granted in writing by the DGR or COR.
Sec. 18 - Prevention of Spills:
Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).
Sec. 19 - Protection of Sensitive Areas:
Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements:
19.1. Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource.
19.2 Endangered Species Habitats: Do not initiate any action that may disturb, endanger, or damage to any degree the habitat of a threatened and endangered species.
19.3 Wetlands: Do not excavate or take any action that could fill or damage any wetland unless working under a project specific Corps of Engineers 404 permit. Wetlands include streams, riparian areas, bogs, marshes, and swamps.
Sec. 20 - Corrective Action for Noncompliance:
Contractor shall, when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.
Sec. 21 - Noise:
Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times. Pile-driving operations shall be coordinated through the DGR and COR.
Sec. 22 - Mercury:
Mercury is prohibited, unless specified otherwise, and with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition to the Hazardous Waste Storage facility, B. 380 as required by SIAD. Immediately report to the DGR and COR instances of breakage or mercury spillage. Clean mercury spill area to the satisfaction of the Contracting Officer and Environmental Office. Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.
Sec. 23 - Universal Waste / e-Waste Management:
Universal waste including but not limited to some mercury containing building products such florescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and SIAD Hazardous Waste Management Plan. Consult the Environmental Office for assistance.
Sec. 24 - Pollution Prevention / Hazardous Waste Minimization:
Minimize the use of hazardous materials and the generation of hazardous waste. Consult with the Environmental Office for suggestions from the installation's pollution prevention/hazardous waste minimization plan for supporting waste minimization goals.
1.22 Dimensions: All dimension supplied to Contractor in any form shall be verified by the Contractor.
1.23 Contract Additions and Deletions: The Government reserves the right to add or delete items from the contract, subject to their change in use. Resulting contract price adjustments will be negotiated based upon costs in place at that time and are identical per contract performance period. The Authorized Contracting Officer (ACO) is the only person that can make any changes (scope, costs or time) to the contract. Any changes made will be affective only after both the Contractor and the Government sign the revised contract.
2.0 PART II - PRODUCTS:
2.1 Contractor Supplied Materials: The Contractor shall supply normal industry standard domestic approved materials.
2.2 Minimum Requirements: All items shall be per code (1.4), as per plans, specifications and manufactures recommendations. All products shall be in conformance with the Buy in America Act, unless otherwise authorized by the TPOC or COR. Workmanship installation standards shall be that of a high quality commercial/industrial standard.
2.3 Government Supplied Materials: The Government shall supply any items described as “Gov. supplied” in the Scope of Work in a timely manner to coincide with Contractors time line.
3.0 PART III - EXECUTION:
3.1 Performance Notification: The Contractor or their manager shall provide the TPOC by 0630 of each working day a Daily Project Report to verify the project status, time delays, and percent of overall completion, task completion status, adjusted completion date and any other issues directly related to the project completion. The information will be compared to the submitted Contractors schedule. Upon completion a Gantt chart shall be provided showing the original performance time line verses the actual time line concurrently under one another.
3.2 Demolition: The Contractor shall identify and contact TPOC prior to any demolition necessary. TPOC will approve any demolition required.
3.3 Installation: The work will be done in a timely, workman like manner with a professional looking appearance and function.
3.4 Completion: The Contractor shall contact the TPOC to inspect installation of all components of this project.
3.5 Contractor Manpower Reporting: Contractor Manpower Reporting in accordance with Clause 52.237-4000. The CMR is a Government requirement for all service contracts that include labor. The Contractor is required to log into the CMR website after completion of the contract and record labor hours worked in support of the contract. Contractors shall complete the report by 31 October of the period of performance expiration.
3.6 Warranties: The Contractor shall provide a minimum of a one (1) year warranty on all work unless otherwise stated in the Scope of Work Items. Any manufacturer warranties shall be passed on to SIAD.
File details come from the government source that posted it. Updated .