This modification amends a solicitation from the Department of the Army Corps of Engineers Engineering District St Paul for cable tray repair work at Lock and Dam 2. The scope of work includes repairing approximately 350 feet of failed cable tray supports in the upper riverward wall gallery, reinforcing the entire cable tray support system in the riverward and landward wall galleries through the supply and installation of additional horizontal and vertical stainless steel supports, and reinstalling trays to meet support spacing requirements. The contractor must field verify estimated quantities of 425 horizontal and 138 vertical supports. Submissions are due by October 13, 2023, with work to take place during the winter 2023/2024 dewatering. The contractor must coordinate all work with lock personnel and adhere to safety and quality standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 23B0014 Abstract LD2 Cable Tray Repair.pdf | ||
| Appendix A - Existing Cable Tray and Support Documentation.pdf | ||
| Appendix B - Confined Space Documentation.pdf | ||
| W912ES23B0014 Solicitation_LD2 Cable Trays.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912ES23B0014
W81G6731246379
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to update the scope of w ork to clarify the cable tray support requirement. The term “anti-roll” is removed and additional w ording added to emphasize the requirement that the new tray supports are designed to prevent the tray from being able to slide off the supports.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Oct-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES23B0014
X 9B. DATED (SEE ITEM 11)
13-Sep-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Oct-2023
CODE
CONTRACTING DIVISION
USACE, ST PAUL
332 MINNESOTA STREET
SUITE E1500
SAINT PAUL MN 55101-1323
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
SCOPE OF WORK
SCOPE OF WORK
LOCK AND DAM 2
CABLE TRAY SUPPORT
PART 1 GENERAL
1. 1.1 PROJECT DESCRIPTION
The existing fiberglass cable tray in the riverward wall gallery was installed in 1995 during the Lock and Dam 2, Stage 2 Rehabilitation Project. Recently, it was discovered that approximately 350ft of the cable tray support system in the upper riverward wall gallery has failed, resulting in the cable tray falling to the gallery floor. There does not appear to be any damage to the existing cables or cable tray. Due to water infiltration into the gallery, the ideal time to repair the cable tray is during the Lock and Dam 2 dewatering scheduled for the winter of 2023/2024.
The scope of this project includes the repair of the cable tray and supports in the upper riverward wall gallery as well as reinforcing the entire cable tray support system in the riverward wall and landward wall galleries through the supply and installation of the items listed in Part 2 below and any incidental related work.
2. 1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL ELECTRICAL CODE (NEC)
NEC ARTICLE 392 CABLE TRAYS
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA VE 2 2018; ERTA 1-2 2018)
Cable Tray
Installation Guidelines
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 2023) National Electrical Code
UNITED STATES ARMY CORPS OF ENGINEERS
EM 385-1-1 Corps of Engin eers Safet y and Healt h Requi remen ts Manua l
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.146 Permit-required Confined Spaces
CFR
Safety and Health Regulations for Construction
CPL 2.100
Appl ication of the Permit- Required Confined Spaces
(PRCS)
Standards, 29 CFR 1910.146
3. 1.3 SUBMITTALS
1. 1.3.1 Submittal Requirements Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.
SD-01 Safety Considerations JSA/AHA; G Job Safety Analysis or Activity Hazard Analysis for the work necessary as described by this SOW.
APP; G
Accident Prevention Plan for the work necessary as described by this SOW. SD-02 Preconstruction Submittals Initial Project Schedule; G SD-03 Shop Drawings Cable Tray Supports; G Shop drawings and fabrication drawings provided by the manufacturer or prepared by the Contractor for all items listed in Section 2.2.
Project Schedule Updates; G SD-04 Product Cable Tray Supports; G Manufacturer's literature, including safety data sheets, material, and loading capabilities for supports and auxiliary equipment. Manufacturer's recommended instructions for installing supports and auxiliary items.
2. 1.3.2 Government Review Time Unless otherwise noted elsewhere, the Government is allowed 15 calendar days upon receipt to review a submittal. This applies to all submittals and resubmittals. Typically, the actual review time is shorter.
3. 1.3.3 Submittal Procedure All submittals must be made prior to commencement of applicable work. Submit 1 electronic copy of each submittal (both Government approved and for information only), unless otherwise indicated.
Transmittals returned for resubmission must be resubmitted in their entirety. Coordinate and submit concurrently, submittals covering components of a system or interrelated items.
Submit certifications with the pertinent drawings. Materials fabricated or delivered without Government approval of the shop drawing will be subject to rejection.
4. 1.4 SITE ACCESS
The work to be performed is at the following location:
Lock and Dam No. 2 1350 Lock and Dam Road Hastings, MN 55033
Site POC is Lockmaster Steven Heidbrider at (651) 290-5826.
5. 1.5 PRE-BID SITE VISIT
Potential bidders are encouraged to visit the site prior to placing bids to ensure that they understand the existing site conditions and the potential challenges associated with completing contract work.
The pre-bid site visit will be coordinated through the Lock and Dam 2 Lockmaster, Steve Heidbrider, at 651- 290-5826.
6. 1.6 WORK RESTRICTIONS
1. 1.6.1 Working Hours Regular working hours will consist of an 8 1/2 hour period from 0800-1630 Monday through Friday, excluding Government holidays. Any work outside normal working hours must be coordinated with the Lockmaster. Notify the Lockmaster at least 24 hours before work is to be conducted on overtime, in multiple shifts, on weekends, or on Federal Government holidays.
2. 1.6.2 Utility Outages If a utility outage is required, notify lock staff at least 3 days in advance. Provide written notification with location of the outage, utilities affected, and estimated duration of outage.
3. 1.6.3 Lock and Dam Operations Do not interfere with normal lock and dam operations. Lock and Dam personnel will not accept deliveries, phone calls, or mail or deliver messages for the Contractor.
4. 1.6.4 Other Contracts The Government may undertake, award, or have other on-going contracts and work in the area of this project. The Contractor must coordinate their work with the other Contractors in the area to prevent delays to this project and interferences with other contracts. Minor delays and rescheduling due to other contracts and work are expected but should be coordinated through the Contracting Officers for each project.
7. 1.7 MEASUREMENT AND PAYMENT
The Contractor is responsible to supply these items, without any direct compensation being made other than the payment received for contract line items on the bidding schedule.
8. 1.8 PROJECT SCHEDULE
1. 1.8.1 General A project schedule as described below must be prepared. The scheduling of construction will be the responsibility of the Contractor. Contractor management personnel will actively participate in the development. A Gantt chart must be provided by the contractor spanning the duration of the project including all pre-construction tasks and dates for the critical path.
Subcontractors and suppliers working on the project will contribute to developing and maintaining an accurate project schedule. The approved project schedule will be used to measure the progress of the work, aid in evaluating time extensions, and provide the basis of progress payments.
2. 1.8.2 Basis for Payment The project schedule will be the basis for measuring Contractor progress. The Contracting Officer will use an approved project schedule to evaluate progress for payment purposes. In the case where the project schedule revisions have been directed by the Contracting Officer but have not been included in the project schedule, the Contracting Officer may hold retainage up to the maximum allowed by the contract, each payment period, until the project schedule updates have been accepted.
3. 1.8.3 Software Computer software systems used by the Contractor to produce the project schedule must be capable of providing all requirements of this specification.
1.8.3.1 Use of the Critical Path Method
The project schedule must clearly show the critical path. If a network analysis system is used, the Critical Path Method (CPM) of network calculation will be used to generate the project schedule, provided in either the Precedence Diagram Method (PDM) or the Arrow Diagram Method
(ADM).
1.8.3.2 Level of Detail Required
Include weekly activities in all project schedules.
1.9 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
The Government will use the Resident Management System (RMS) to assist in its monitoring and administration of this contract. The Government accesses the system using the Government Mode of RMS (RMS GM). The Contractor accesses the system using the Contractor Mode of RMS, referred to as the RMS CM, to record, maintain, and submit various information throughout the contract period. The term RMS will be used in the remainder of this section for both RMS GM and RMS CM. The joint Government-Contractor use of RMS facilitates electronic exchange of information and overall management of the contract.
RMS provides the means for the Government and Contractor to input, track, and electronically share information in the following areas:
Administration Finances Quality Control Submittal Monitoring Scheduling Closeout Import/Export of Data
4. 1.9.1 Contract Database – Government The Government will enter the basic contract award data in RMS prior to granting the Contractor access. The Government entries into RMS will generally be related to submittal reviews, correspondence status, and Quality Assurance (QA) comments, as well as other miscellaneous administrative information.
1.9.3 Contract Database – Contractor
Contractor entries into RMS will establish, maintain, and update data throughout the duration of the contract. Contractor entries generally include prime and subcontractor information, daily reports, submittals, RFI's, schedule updates and payment requests. RMS includes the ability to import attachments and export reports in many of the modules, including submittals.
1.9.4 Implementation
Use of RMS as described in the preceding paragraphs is mandatory. Ensure that sufficient resources are available to maintain contract data within the RMS system. RMS is an integral part of the Contractor's required management of quality control.
1.10 CONTRACTOR QUALITY CONTROL
Comply with NEMA VE 2.
Comply with NEC Article 392 for requirements that apply to the construction and installation of cable tray and cable channel systems. Provide products that are UL-classified and labeled with the UL classification mark.
Provide onsite quality control personnel for the construction and installation of the cable tray supports.
PART 2 PRODUCTS
2.1 DELIVERY STORAGE AND HANDLING
Deliver the specified products in containers with manufacturers name, labels, product identification, quantities, and contract award number intact. Store in a secured, dry, weatherproof location. Handle containers to avoid damage to products.
Coordinate delivery with the current Lock 2 Lockmaster Steven Heidbrider at (651) 290-5826.
Provide the Lockmaster with a date and time for the delivery at least 3 days in advance.
2.2 SYSTEM DESCRIPTION
Provide and install stainless steel cable tray supports in between existing supports and on either side of each monolith joint to supplement the existing load carrying capacity and meet NEMA VE 2 support spacing requirements. Provide and install cable tray supports and reinstall cable tray to repair the section of approximately 350ft of the cable tray support system that has failed.
Ensure associated cables are returned to their original trays following support and tray reinstallation. Both new and existing cable tray supports must be designed to prevent the trays from sliding or rolling off. Inspect the existing supports for signs of failure. After the contract is awarded but prior to starting work, the contractor will identify all existing supports that require replacement and submit to COR for approval. Once approved by USACE, a contract modification will be issued for the replacement of failing supports.
The existing cable trays are 10 feet in length and 12 inches in width. The cable tray support spacing ranges from 14 to 18 feet, averaging 16 foot intervals. The estimated quantities of additional supports required are listed below, however, the Contractor must field verify the quantities.
425 horizontal supports
138 vertical supports, 5 feet high on average (ranging from 2-6 feet)
Fasteners for each horizontal supports
Mounting anchors and grout for vertical supports
See Appendix A for existing cable tray layouts and support documentation.
2.3 ASSEMBLY PREPARATION
Before assembly, ensure that the finishes of edges, fittings, and hardware are free from burrs and sharp edges.
2.4 COMPONENTS
2.4.1 Supports
Provide an adequate bearing surface for the tray on the supports and ensure that the surface can accommodate hold-down clamps or fasteners to prevent vertical and horizontal movement of the cable tray. Provide a means, other than friction, for securely fastening cable trays to supports.
Design of the supports must prevent the trays from sliding or rolling off the horizontal bearing surface. Provide support for cable trays at intervals of 10 feet or less. Place supports for horizontal-elbow tray fittings within 2-feet of each fitting extremity and as recommended by the cable tray manufacturer. Place supports within 2-feet on both sides of each monolith joint and as recommended by the manufacturer. Ensure that the supports and fittings have a load-carrying capacity that is equal to or greater than that of straight cable tray sections (see Appendix A, page 5, Loading Requirements for loading details).
2.5 MATERIALS
Provide steel cable trays stainless supports and fasteners made of AISI Type 304 or Type 316 stainless steel.
PART 3 EXECUTION
Comply with NEMA VE 2 for reinstalling existing cable trays that have fallen.
3.1 SAFETY PRECAUTIONS
All work will be performed within the guidelines set forth by EM 385 -1-1 "Corps of Engineers Safety and Health Requirements Manual."
3.1.1 Confined Space
Confined space entry must comply with Section 34 of EM 385 -1-1, OSHA 29 CFR 1926, OSHA 29 CFR 1910, OSHA 29 CFR 1910.146, and OSHA Directive CPL 2.100.
3.1.2 Personal Protective Equipment
PPE is governed in all areas by the nature of the work the employee is performing. Use personal hearing protection at all times in designated noise hazardous areas or when performing noise hazardous tasks. Safety glasses must be worn or carried/available on each person. Mandatory PPE includes:
a. Hard Hat
b. Long Pants
c. Appropriate Safety Shoes
d. Appropriate Class Reflective Vests
3.1.3 Dust
Control dust resulting from demolition or anchoring activities to prevent the spread of dust and avoid creation of a nuisance or hazard in the surrounding area.
3.1.4 Site Safety Notification
If any safety concerns are observed on site such as exposed wiring or damage to conductors, details of condition will be provided to USACE POC.
3.2 INSTALLATION
3.2.1 Manufacturer's Instructions
Submit the manufacturer's instructions for cable tray supports, including special provisions required to install equipment components and system packages.
Ensure that the instructions specify impedances, hazards and safety precautions.
3.1.2 Installation Drawings
No later than 30 calendar days before shipment, submit installation drawings to the Contracting Officer for approval.
4 APPENDICES
Appendix A – Existing Cable Tray and Support Documentation Appendix B – Confined Space Documentation
-- End of Section --