This document is an amendment to a solicitation for the Lock and Dam (LD) 8 Sheet Pile Installation and construction project. The amendment updates plan sheets S-001 and S-201 and specification section 31 32 23. Specifically, it modifies sheet pile requirements, tie rod support details, and permeation grouting experience qualifications. The purpose of the permeation grouting is to create a seepage cutoff between the existing lock sheet pile cutoff and the newly placed sheet pile. Offerors must acknowledge receipt of this amendment by the time and date specified in the solicitation. The solicitation was issued on July 8, 2022 by the Department of the Army Corps of Engineers Engineering District St Paul for sheet pile installation and construction work at Lock and Dam 8.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LD8 Sheet Pile_Bidding Abstract.pdf | ||
| 22B0003 LD8 Amendment 0004.pdf | ||
| 22B0003 LD8 Amendment 0003.pdf | ||
| 22B0003 LD8 Amendment 0002.pdf | ||
| LD 8 Pre-bid Contractor Site Visit Sheet Pile Install.pdf | ||
| LD8 Solicitation and Specifications W912ES22B0003.pdf | ||
| LD8 Plans W912ES22B0003 .pdf | ||
| LD8 Site Visit Meeting Location Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6713232525
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0001 is update plan sheets S-001 & S-201 and specifications section 31 32 23.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jul-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES22B0003
X 9B. DATED (SEE ITEM 11)
08-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jul-2022
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES22B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES
AMENDMENT NO. 1
Summary of Changes:
1. General Structural Note 10.A. on Sheet S-001 is changed:
FROM:
Sheet pile sections used for closure cell construction along existing monoliths (either side of the cell structure) shall have elastic section modulus no less than 80 cubic inches per foot, minimum thickness of 3/8”, and a moment of inertia (I) greater than 1200 IN^4 per foot.
TO:
Sheet pile sections used for closure cell construction along existing monoliths (either side of the cell structure) shall have elastic section modulus no less than 69 cubic inches per foot, minimum thickness of 3/8”, and a moment of inertia (I) greater than 680 IN^4 per foot.
2. General Sheet Note 2. On Sheet S-201 is changed:
FROM:
Tie rods for sheet pile shall be snug tight with sheet pile in vertical position, prior to fi lling of the structure.
Provide temporary support as necessary for the tie rods, and sagging of tie rods shall be no more than 1 inch.
TO:
Tie rods for sheet pile shall be snug tight with sheet pile in vertical position, prior to fi lling of the structure.
Provide support as necessary for the tie rods, and sagging of tie rods shall be no more than 1 inch. Tie rod supports shall be maintained after installation and left in place at the end of the contract.
3. Specification Section 31 32 23, 1.1 Summary is changed:
FROM:
Permeation grouting and tremie grouting are required for this project. Permeation grouting fi lls pores in granular soil, with flowable particulate grouts. Microfine cement grout is injected under pressure either through single port or multiple port pipes placed into the area to be grouted. The grout characteristics and soil void size must be properly matched to permit the microfine cement grout to enter the pores or voids. The foundation area to be grouted is shown on drawing S-101. The purpose of the permeation grouting is to create a seepage cutoff between the existing lock sheet pile cutoff and the newly placed sheet pile. The Contractor is responsible for developing and conducting all aspects of the permeation grouting plan with approval by the Contracting Officer. The Contractor or its subcontractor must demonstrate a minimum of 10 years of experience in permeation grouting for the purpose of creating a seepage barrier.
TO:
W912ES22B0003
Permeation grouting and tremie grouting are required for this project. Permeation grouting fi lls pores in granular soil, with flowable particulate grouts. Microfine cement grout is injected under pressure either through single port or multiple port pipes placed into the area to be grouted. The grout characteristics and soil void size must be properly matched to permit the microfine cement grout to enter the pores or voids. The foundation area to be grouted is shown on drawing S-101. The purpose of the permeation grouting is to create a seepage cutoff between the existing lock sheet pile cutoff and the newly placed sheet pile. The Contractor is responsible for developing and conducting all aspects of the permeation grouting plan with approval by the Contracting Officer. The Contractor or its subcontractor must demonstrate experience in permeation grouting for the purpose of creating a seepage barrier as required in 1.4 QUALIFICATIONS.
(End of Summary of Changes)