SEE SCHEDULE
LD 3, LD 4, LD 5 & LD5A Joint Repair - The Contractor shall provide all labor and material and perform all operations necessary to route out and replace all existing exterior f lexible joint sealant material betw een building panels and around all doors, w indow s and louvers on the exterior of the Central Control Station, Low er Control Stand, and Pump House at Lock and Dam 3 and the Central Control Station and Low er Control Stand at Lock and Dam 4. The Central Control Station, Low er Control Stand, Pump House, and Comfort Station at Lock and Dam 5.
Similar operations w ill be performed at the Central Control Station, Low er Control Stand, Minnesota-Side Pump house, and Wisconsin-Side Pump House of Lock and Dam 5A.
THIS IS A REQUEST FOR QUOTATIONS, NOT AN IFB OR RFP
The magnitude of ths project is estimated to be betw een $100,000.00 and $250,000.00
In accordance w ith FAR 28.102-1(b); payment protection is required for any resultant contract greater than $35,000. If contract aw ard is for under $35,000, no payment protection is required.
TERRY G ZENKER 651-290-5407
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
10-Sep-2020
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10 Alt
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
USACE - ST. PAUL
180 5TH STREET E SUITE 700
ST. PAUL MN 55101-1678
W912ES
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912ES20Q0010 85
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Bonds (Performance and Payment)
FFP
FOB: Destination
MILSTRIP: W81G6701509635
PURCHASE REQUEST NUMBER: W81G6701509635
PSC CD: Z1AZ
NET AMT
JOINT SEALANT LOCK & DAM 3
FFP
0002AA 1,000 Linear
Foot
Removal and Replacement of Existing Joint Sealant, First 1,000 LF - Per the scope of Work FOB: Destination
MILSTRIP: W81G6701509635
0002AB 337 Linear
Removal and Replacement of Existing Joint Sealant, over 1,000 LF - Per the scope of Work FOB: Destination
MILSTRIP: W81G6701509635
JOINT SEALANT LOCK & DAM 4
0003AA 800 Linear
Removal and Replacement of Existing Joint Sealant, First 800 LF - per the scope of work FOB: Destination
MILSTRIP: W81G6701509635
0003AB 305 Linear
Removal and Replacement of Existing Joint Sealant, over 800 LF - per the scope of work FOB: Destination
MILSTRIP: W81G6701509635
JOINT SEALANT LOCK & DAM 5
0004AA 2,300 Linear
Removal and Replacement of Existing Joint Sealant, First 2,300 LF - per scope of work
FOB: Destination
MILSTRIP: W81G6701509636
PURCHASE REQUEST NUMBER: W81G6701509636
0004AB 648 Linear
Removal and Replacement of Existing Joint Sealant, Over 2,300 LF - per scope of work
FOB: Destination
MILSTRIP: W81G6701509636
JOINT SEALANT LOCK & DAM 5A
0005AA 3,700 Linear
Removal and Replacement of Existing Joint Sealant, First 3,700 LF - per scope of work
FOB: Destination
MILSTRIP: W81G6701509636
0005AB 955 Linear
Removal and Replacement of Existing Joint Sealant, Over 3,700 LF - per scope of work
FOB: Destination
MILSTRIP: W81G6701509636
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 10 dys. ADC 1 N/A
FOB: Destination
0002 N/A N/A N/A N/A
0002AA POP 01-OCT-2020 TO
31-MAY-2021
N/A LOCK & DAM #3
LOCKMASTER
USACE - LOCK & DAM 3
4330 LOCK & DAM ROAD
WELCH MN 55089-9644
W912ES
0002AB POP 01-OCT-2020 TO
31-MAY-2021
N/A (SAME AS PREVIOUS LOCATION)
0003 N/A N/A N/A N/A
0003AA POP 01-OCT-2020 TO
31-MAY-2021
N/A LOCK & DAM #4
LOCKMASTER
USACE - LOCK & DAM 4
PO BOX 325
ALMA WI 54610-0325
0003AB POP 01-OCT-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 N/A N/A N/A N/A
0004AA POP 01-OCT-2020 TO
31-MAY-2021
N/A LOCK & DAM #5
LOCKMASTER
USACE - LOCK & DAM 5
12554 HIGHWAY 61
MINNESOTA CITY MN 55959-9756
507-689-2101
0004AB POP 01-OCT-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 N/A N/A N/A N/A
0005AA POP 01-OCT-2020 TO
31-MAY-2021
N/A LOCK & DAM #5A
JOSEPH HEFFNER
USACE - LOCK & DAM 5A
W679 STATE ROAD 35
FOUNTAIN CITY WI 54629-7214
651-290-5069
965601
0005AB POP 01-OCT-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
965601
SCOPE OF WORK
U.S. Army Corps of Engineers St. Paul District
LOCK AND DAM 3, 4, 5, and 5A
Joint Sealant Replacement
SCOPE OF WORK
Solicitation: W912ES20-Q-0010
August 2020
Lock and Dam 3, 4, 5, and 5A Joint Sealant Replacement
Bid Schedule L&D 3 CLIN Description Quantity Unit Unit Price Amount
Bonds (Performance & Payment)
JOB
Removal and Replacement of Existing Joint Sealant
0002AA
Existing Joint Sealant, First 1,000 LF
1,000
LF
0002AB
Existing Joint Sealant, Over 1,000 LF
TOTAL
L&D 4
0003AA
Existing Joint Sealant, First 800 LF
0003AB
Existing Joint Sealant, Over 800 LF
L&D 5
Bonds (Performance & Payment)
JOB
0002AA
Existing Joint Sealant, First 2,300 LF
2,300
0002AB
Existing Joint Sealant, Over 2,300 LF
L&D 5A
0003AA
Existing Joint Sealant, First 3,700 LF
3,700
0003AB
Existing Joint Sealant, Over 3,700 LF
LOCK AND DAM 3, 4, 5, and 5A
JOINT SEALANT REPLACEMENT
SOLICITATION NO. W912ES20-Q-0010
TABLE OF CONTENTS
PARAGRAPH DESCRIPTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTAL PROCEDURES
1.3 SAFETY
1.4 WORK RESTRICTIONS
1.5 COORDINATION
1.6 PHYSICAL LOCATION & CONTACT INFORMATION
1.7 MEASUREMENT AND PAYMENT
1.8 TEMPORARY CONSTRUCTION FACILITIES
1.9 STAGING AREA
1.10 ENVIRONMENTAL PROTECTION
1.11 SCHEDULE
PART 2 PRODUCTS
2.1 BACKER ROD
2.2 JOINT SEALANT
PART 3 EXECTUION
3.1 DEMOLITION
3.2 JOINT SEALANT AND BACKER ROD INSTALLATION
3.3 WORKMANSHIP
LIST OF ATTACHMENTS:
LD3, LD4, LD5, LD5A Photos
LD4, LD5, LD5A CCS Building Plans
Sample Submittal Register USACE Form 4025
PART 1
1. GENERAL. The Contractor shall provide all labor and material and perform all operations necessary to route out and replace all existing exterior flexible joint sealant material between building panels and around all doors, windows and louvers on the exterior of the following:
The Central Control Station, Lower Control Stand, and Pump House at Lock and Dam 3 The Central Control Station and Lower Control Stand at Lock and Dam 4 The Central Control Station, Lower Control Stand, Pump House, and Comfort Station at Lock and Dam 5 The Central Control Station, Lower Control Stand, Minnesota-Side Pump House, and Wisconsin-Side Pump House at Lock and Dam 5A.
1.1 REFERENCES. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic Designation Only.
ASTM INTERNATIONAL (ASTM)
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
U.S. ARMY CORPS OF ENGINEERS
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA) 40
CFR 261 Identification and Listing of Hazardous Waste 49 CFR 171-178 Hazardous Materials Regulations
1.2 SUBMITTAL PROCEDURES. The Contractor shall submit all required pre-construction submittals to the Contracting Officer prior to ordering any material or commencing any construction operations.
The Contractor shall allow 10 working days for Government review of all submittals. Submittals coded with a, “G” in the submittal list shall be submitted for Government Approval (GA). All other submittals shall be submitted to the Government For Information Only (FIO). All submittals shall be submitted in an electronic .pdf format, and shall be submitted with a complete USACE Form 4025. All submittals shall be submitted to the Contracting Officer, or their designated representative, via email. The Contractor shall allow seven working days for review of any resubmittals which are submitted as the result of the initial submittal being disapproved.
1.2.1 PRE-CONSTRUCTION SUBMITTAL LIST:
Abbreviated Accident Prevention Plan (APP); G Activity Hazard Analysis (AHA); G Submittal Register; G Pre-Project Staging Area and Work Area Survey Report (Photos); FIO Safety Data Sheets, FIO Solid Waste Disposal Facility; FIO Joint Sealant Material; G Joint Sealant Material Color; G Backer Rod Material; FIO
Joint Sealant Manufacturer’s Installation Instructions; FIO
1.2.2 SUBMITTAL CONTROL. Within 7 calendar days after contract award date, the Contractor shall submit to the Contracting Officer for review and approval, a submittal register in electronic format listing and scheduling all items required to be furnished for review by the Government. A sample submittal register is included in Attachment 3. Primary responsibility for submittals shall rest with the Contractor. The Contractor shall furnish submittals for all deviations from the specifications.
1.3 SAFETY. The Contractor shall follow all applicable OSHA, state, and local laws and regulations relating to workplace safety. In addition, the Contractor shall compare OSHA, state, and local laws and regulations to the requirements found in USACE EM 385-1-1 and ensure all activities and operations conform to the most stringent requirement. No separate payment will be made for the work required in this paragraph.
1.3.1 ACCIDENT PREVENTION PLAN. The Contractor shall prepare a written Accident Prevention Plan (APP) for Government approval. The APP shall conform to the requirements of the abbreviated accident prevention plan described in Appendix A of EM 385-1-1 as a minimum.
The APP must be site specific. The Government considers the Prime Contractor to be the “controlling authority” for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for non-compliance. The APP must be signed by an officer of the firm (Prime Contractor senior person), the individual preparing the APP, and the on-site superintendent.
1.3.2 ACTIVITY HAZARD ANALYSIS. Before beginning each activity, task or definable feature of work involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor performing that work activity must prepare an Activity Hazard Analysis (AHA). AHAs shall be signed by the on-site superintendent and the foreman performing the work. Format the AHA in accordance with EM 385-1-1, Section 1. Submit the AHA for review and approval at least 10 days prior to the start of each activity. The Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented.
1.4 WORK RESTRICTIONS. The Contractor shall work only during Lock and Dam 3, 4, 5, and 5A regular business hours of 0700-1700, Monday through Friday, excluding Federal Holidays. If the Contractor wishes to work outside these hours a request must be submitted to the Contracting Officer to do so at least 3 days in advance. The Contractor shall only work on one face of the building at a time.
The Contractor shall not block all building entrances at once. Anytime the Contractor expects to block Lock 3, 4, 5, and 5A Central Control Station entrances, they shall coordinate with the lockmaster no less than 3 days prior. The Contractor shall stage their operation so only a minimum amount of joints are exposed at one given time.
1.5 COORDINATION.
1.5.1 OTHER CONTRACTS. The contractor shall coordinate with any other contractors that have ongoing work at Lock and Dam 3, 4, 5, and 5A.
1.6 PHYSICAL LOCATION AND CONTACT INFORMATION. Lock and Dam 3 is located near Red Wing, Minnesota in Goodhue County, Minnesota. It is on the right descending bank of the Upper Mississippi River at the decimal degree coordinate location -92.609317, 44.609937. The Lockmaster is Tim Tabery (ph. 651-290-5060).
Lock and Dam 4 is located in Alma, Wisconsin in Buffalo County, Wisconsin. It is on the left descending bank of the Upper Mississippi River at the decimal degree coordinate location - 91.919042, 44.325369. The Lockmaster is Judy Denzer (ph. 651-290-5949).
Lock and Dam 5 is located 4 miles south of Minneiska, Minnesota in Winona County, Minnesota. It is on the right descending bank of the Upper Mississippi River at the decimal degree coordinate location -91.811635, 44.159951. The Lockmaster is Kriss Zeller (ph. 651-290-5941).
Lock and Dam 5A is located 4 miles south of Fountain City, Wisconsin in Buffalo County, Wisconsin.
Note that while parking is on the left descending bank of the Mississippi River, the central control station is on the right descending bank at the decimal degree coordinate location -91.669757,
44.087216. There is no land access to the Central Control Station and Lower Control Stand at Lock 5A.
The Lock 5A CCS and lower control stand are only accessible by boat or by traversing the service bridge over the dam. The service bridge cannot accommodate any sort of vehicular traffic. It is suitable for pedestrian traffic only. The Lockmaster is Joe Heffner (ph. 651-290-5069).
The mailing address is:
Lock and Dam No. 3 Lock and Dam No. 4
4330 Lock and Dam Road P.O. Box 325 Welch, MN 55089 Alma, WI 54610
Lock and Dam No. 5 Lock and Dam No. 5A 12554 Highway 61 W679 State Highway 35 Minnesota City, MN 55959-9756 Fountain City, WI 54629-7214
The street address is:
Lock and Dam No. 3 Lock and Dam No. 4 4330 Lock and Dam Road 420 N. Main St.
Welch, MN 55089 Alma, WI 54610
Lock and Dam No. 5 Lock and Dam No. 5A 12554 Highway 61 W679 State Highway 35 Minnesota City, MN 55959-9756 Fountain City, WI 54629-7214
1.7 MEASUREMENT AND PAYMENT. The payment provided for in the contract shall constitute full compensation for furnishing all materials and for performing all work required under the contract in a complete and acceptable manner. The contract work shall include providing equipment, tools, supplies, labor, supervision, incidental materials, quality control, environmental protection, meeting safety requirements, and performing all work required for which separate payment is not otherwise provided. Compensation for all work shown, specified, or essential to completion of the project (whether or not the specific material or operation is indicated) shall be included in the price. The payment provided for in the contract includes compensation for all risk, loss, damage, and expense arising out of the nature of the work or its prosecution, subject to conditions of the contract. Payment for each contract line item will constitute full compensation for furnishing the materials and constructing the work complete in place as specified.
1.7.1 JOB PAYMENT ITEMS. Payment items for the work of this contract for which contract job payments will be made are listed in the BID SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for performing all work required for which separate payment is not otherwise provided.
1.7.1.1 BONDS (Performance and Payment). Payment will be made for Performance and Payment Bonds required by this contract in accordance with CONTRACT CLAUSE 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS. Contract line item for Bonds shall be paid for on a per job basis.
1.7.2 UNIT PRICE PAYMENT ITEMS. Payment for work of this contract on which the contract unit price payments will be made are listed in the attached BID SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, equipment, and performing any associated quality control, environmental protection, meeting safety requirements, tests and reports and for performing all work required for each of the unit price items.
1.7.2.1 REMOVAL AND REPLACEMENT OF EXISTING JOINT SEALANT. Payment will be made for furnishing all materials, equipment and labor and performing all operations necessary for the removal and replacement of the existing joint sealant as specified. The removal and replacement of joint sealant shall be measured in linear feet. Access equipment is incidental to this payment item.
1.7.3 INVOICING PROCEDURE. The Contractor shall send copies of all project related invoices to Tony Horacek (see 1.6 for contact information) as well as the U.S.A.C.E. Finance Center at the address seen below.
U.S.A.C.E Finance Center 5722 Integrity Dr.
Millington, TN 38053
1.8 TEMPORARY CONSTRUCTION FACILITIES. The Contractor shall provide temporary field sanitation facilities to include toilets, hand washing facilities, and drinking water. Contractor personnel will not be allowed to use restroom facilities in the lock house. The Contractor shall provide their own temporary electrical service, if required, and haul away any waste or debris generated from the project. The Contractor may use the existing Government water service for use in constructing the project features. The Contractor shall coordinate with the Lockmaster for hydrant and hose bib locations after contract award. The Government makes no guarantee that the available water pressure will be sufficient for the Contractor’s operation. No Contractor parking will be allowed on the grass. A bulletin board will not be required. A contractor job trailer and government field office are not required.
1.9 STANGING AREA
Lock and Dam 3: the contractor can use 4 parking spots next to the lock chamber up by the building for parking and staging. This area is circled in red in red in Figure 1 below.
Figure 1
Lock and Dam 4: there are 4 parking stalls available for the contractor at the north end of the building. If necessary, an additional parking area is available on the south end of the entrance road. Some staging room is available on the north end of the building. Additional staging room is available on the south end of the building by the garage if the contractor does not block any equipment from getting out of the garage. The north parking and staging area is circled in Figure 2 below. The additional south parking area is indicated by the large star and the additional staging area is indicated by the small star.
Figure 2
Lock and Dam 5: the Contractor will be allowed to use the parking lot indicated by the red x in Figure 3 below.
Figure 3
As noted in section 1.6, while parking at Lock and Dam 5A is on the left descending bank of the Mississippi River, the central control station is on the right descending bank. All supplies, equipment and waste materials will have to be carried across the dam by the contractor, both to and from the central control station. It is approximately 1200’ to ascend and descend the dam with stairs. There should be room to park inside the fence next to the dam. If more room is needed, the contractor can park outside the fenced area. Both areas are marked with blue stars in Figure 4 below.
Figure 4
1.10 ENVIRONMENTAL PROTECTION. The Contractor shall minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of the contract. The Contractor shall be responsible for any delays resulting in failure to comply with any Federal, State, or Local environmental laws and regulations. No separate payment will be made for work relating to environmental protection.
The Contractor is responsible for payment of all fines/fees for violations or non-compliance with Federal, State, regional, and local laws and regulations.
1.11 ENVIRONMENTAL PROTECTION. The Contractor shall minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of the contract. The Contractor shall be responsible for any delays resulting in failure to comply with any Federal, State, or Local environmental laws and regulations. No separate payment will be made for work relating to environmental protection.
The Contractor is responsible for payment of all fines/fees for violations or non-compliance with Federal, State, regional, and local laws and regulations.
1.11.1 DEFINITIONS.
1.11.1.1 Environmental pollution and damage is defined as the presence of chemical, physical or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.
1.11.1.2 Environmental Protection is defined as the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid chemical, gaseous, and liquid waste; as well as other pollutants.
1.11.1.3 Contractor Generated Hazardous Waste is defined as material that if abandoned or disposed may meet the definition of hazardous waste. These waste streams would typically consist of materials brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners, waste thinners, excess paints, excess solvents, or waste solvent.
1.11.2 SAFETY DATA SHEETS. In accordance with EM 385-1-1, a copy of the Safety Data Sheets (SDS) and the maximum quantity of each hazardous material to be on site at any given time shall be submitted to the Contracting Officer for information only.
1.11.3 PROTECTION OF FEATURES. This paragraph supplements the Contract Clause 52.236-
9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS. Prior to start of any onsite construction activities, the Contractor and the Contracting Officer shall make a joint condition survey and take pre-project photographs of the Contractor’s Staging area and the Contractor’s work area.
Immediately following the survey, the Contractor shall prepare a brief report including the pre-project photos along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. This survey report shall be signed by both the Contractor and the Contracting Officer upon mutual agreement as to its accuracy and completeness. The Contractor shall protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference which their preservation may cause to the Contractor's work under the contract.
1.11.4 CONTRACTOR FACILITIES AND WORK AREAS. The Contractor's staging areas shall be placed in areas designated in Figures 1 through 4. Temporary movement or relocation of Contractor facilities shall be made only when approved.
1.11.5 SOLID WASTES. Solid wastes shall be placed in containers which are emptied on a regular schedule. Handling, storage, and disposal shall be conducted to prevent contamination. Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste. The Contractor shall transport solid waste off the construction site and dispose of it in compliance with Federal, State, and local requirements for solid waste disposal. A Subtitle D RCRA permitted landfill shall be the minimum acceptable off-site solid waste disposal option. The Contractor shall verify that the selected transporters and disposal facilities have the necessary permits and licenses to operate. The Contractor shall submit the name and location of the solid waste disposal facility to the Contracting Officer for information only.
1.11.6 CHEMICALS AND CHEMICAL WASTES. Chemicals shall be dispensed ensuring no spillage to the ground or water. Periodic inspections of dispensing areas to identify leakage and initiate corrective action shall be performed. Chemical waste shall be collected in corrosion resistant, compatible containers. Collection drums shall be monitored and removed to a staging or storage area when contents are within 6 inches of the top.
Wastes shall be classified, managed, stored, and disposed in accordance with Federal, State, and local laws and regulations.
1.11.7 CONTRACTOR GENERATED HAZARDOUS WASTES/EXCESS HAZARDOUS MATERIALS.
Hazardous wastes are defined in 40 CFR 261, or are as defined by applicable State and local regulations. Hazardous materials are defined in 49 CFR 171 - 178. The Contractor shall, at a minimum, manage and store hazardous waste in compliance with 40 CFR 262.
The Contractor shall take sufficient measures to prevent spillage of hazardous and toxic materials during dispensing. The Contractor shall segregate hazardous waste from other materials and wastes, shall protect it from the weather by placing it in a safe covered location, and shall take precautionary measures against accidental spillage. The Contractor shall be responsible for storage, describing, packaging, labeling, marking, and placarding of hazardous waste and hazardous material in accordance with 49 CFR 171 - 178, State, and local laws and regulations. The Contractor shall transport Contractor generated hazardous waste off the construction site in accordance with the Environmental Protection Agency and the Department of Transportation laws and regulations. The Contractor shall dispose of hazardous waste in compliance with Federal, State and local laws and regulations. Spills of hazardous or toxic materials shall be immediately reported to the Contracting Officer. Cleanup and cleanup costs due to spills shall be the Contractor's responsibility. The disposition of Contractor generated hazardous waste and excess hazardous materials are the Contractor's responsibility.
1.11.8 POST CONSTRUCTION CLEANUP. The Contractor shall clean up all areas used for construction in accordance with Contract Clause 52.236-12 CLEANING UP. The Contractor shall, unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work.
1.12 SCHEDULE. The Contractor shall complete the required demolition and installation of the joint sealant no later than 30 Jun 2021.
PART 2
2. PRODUCTS.
2.1 BACKER ROD.
2.1.1 The contractor shall use backer rods of the appropriate size for the gap between panels or rough opening and door, window, or louver frame. The backer rod should be 25 to 50 percent larger than the joint. The Contractor shall submit a catalog cut to the Contracting Officer for information only.
2.2 JOINT SEALANT.
2.2.1 The contractor shall use a joint sealant product that is compatible with masonry construction. The product shall conform to ASTM C920 Class 25. The sealant shall provide movement between concrete verticals panels or brick exterior façade of +/- 25%. The joint sealant shall be non-shrink and non-sag appropriate for its intended application (horizontal or vertical). The color of the new joint sealant shall match the color of the existing joint sealant. Surface preparation and installation requirements shall follow the manufacturer’s recommendations and include backer rod type, size and placement depth, conditions that warrant the use of a primer, and temperature range for optimum application.
2.2.2 The contractor shall submit documentation from the sealant manufacturer showing compliance with ASTM C920 Class 25.
2.2.3 The contractor shall submit documentation indicating the final cured color of the joint sealant for Government Approval.
2.2.4 The contractor shall submit the installation instructions from joint sealant manufacturer for information only.
PART 3
3. EXECUTION.
3.1 DEMOLITION. The Contractor shall route out and replace any existing flexible vertical surface joint material between building panels and around all windows and doors and louvers, as well as the vertical control and expansion joints at Locks 3, 4, 5, and 5A. The Contractor shall take any necessary precautions to avoid damage to existing items that are to remain in place, to be reused, or to remain the property of the government. The Contractor shall sufficiently clean and resurface the joint according to the join sealant manufacturer’s instructions.
3.2 WORKMANSHIP.
3.2.1 Installation. Do not use sealant that has exceeded its shelf life or has jelled and cannot be discharged in a continuous flow from the sealant gun. Apply sealants in accordance with the manufacturer’s written instructions with a gun having a nozzle that fits the joint width.
Work sealants into the joint so as to fill the joints solidly without air pockets. Tool sealant after application to ensure adhesion. Apply sealant uniformly smooth and free of wrinkles.
Upon completion of sealant application, roughen partially filled or unfilled joints, apply additional sealant, and tool smooth. Apply sealer over sealants in accordance with the sealant manufacturer’s written instructions.
3.2.2 Protection and Cleaning. Protect areas adjacent to joints from sealant smears. Masking tape may be used for this purpose if removed 5 to 10 minutes after the joint is filled and no residual tape marks remain.
3.2.3 Final Cleaning. Upon completion of sealant application remove remaining smears and stains and leave the work in a clean and neat condition. Immediately remove fresh sealant that has been smeared on adjacent masonry, rub clean with solvent, and remove solvent residue in accordance with sealant/solvent manufacturer’s printed instructions. Allow excess sealant to cure for 24 hours then remove by wire brushing or sanding. Remove resulting debris.
3.2.4 Final Appearance. Each joint shall be tooled to a neat and smooth visual appearance.
The Contracting Officer reserves the right to reject acceptance of portions of sealant filled joints or entire sealant filled joints if they do not meet a reasonable level of workmanship.
Joint sealant that appears rough, is not neatly tooled, appears wrinkled, is not completely adhered to the masonry, or if pinholes are present, will not be measured for payment and shall be completely removed and re-installed at the Contractor’s expense.
3.2.5 Weeps. Existing weeps around window sills or as part of a masonry cavity wall shall be replaced in kind, if present. In no case will open voids be allowed in lieu of providing a fiber weep material. Replacement weeps shall match existing.
− END OF SECTION -
SAMPLE SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
Lock 3, 4, 5, and 5A Joint Sealant Replacement
CONTRACTOR
A C T I V I T Y
N O
R A N S M I T T
L
S P E
S
DESCRIPTION
ITEM SUBMITTED
R A G R A
H
L A S S I F I O C R A T A I /
O E N
R G E O V V W T R
CONTRACTOR
SCHEDULE DATES
ACTION
APPROVING AUTHORITY
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED BY
T I
D
DATE OF
ACTION
DATE
FWD
TO
APPR
AUTH/
DATE
RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
(a) (b) (c ) (d) (e ) (f) (g) (h) (i) (j) (k) (l) (m) Accident Prevention Plan; G
Activity Hazard Analysis; G
Submittal Register; G
Safety Data Sheets; FIO
Pre-Project Staging Area and Work Area Survey Report; FIO
Solid Waste Disposal Facility; FIO
Joint Sealant Material; G
Backer Rod Material; FIO
Joint Sealant Color; G
Joint Sealant Manufacturer's Installation Instructions; FIO
U.S. Army Corps of Engineers (USACE)
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.
DATE TRANSMITTAL NO.
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor
TO: FROM: CONTRACT NO. CHECK ONE:
THIS IS A
THIS IS A RESUBMITTAL OF
TRANSMITTAL
SPECIFICATION SEC. NO. (Cover only one section with each transmittal) PROJECT TITLE AND LOCATION THIS TRANSMITTAL IS FOR: (
FIO GA DA
ITEM
NO.
(See
Note 3)
DESCRIPTION OF SUBMITTAL ITEM
(Type size, model number/etc.)
SUBMITTAL
TYPE CODE
(See Note 8)
NO.
OF
COPIES
CONTRACT DOCUMENT
REFERENCE
REVIEW
CODESPEC.
PARA. NO.
DRAWING
SHEET NO.
a. b. c. d. e. f.
REMARKS I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and
NAME OF CONTRACTOR
SECTION II - APPROVAL ACTION
ENCLOSURES RETURNED (List by item No.) NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY
ENG FORM 4025, MAY 2017 PREVIOUS EDITIONS ARE
OBSOLETE. Page 1 of 2
INSTRUCTIONS
1. Section I will be initiated by the Contractor in the required number of copies.
2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.
3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.
4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.
5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.
6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.
7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.
8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.
Submittal types are the following:
SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports
SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout
9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal
Action Codes in column i of Section I. The Submittal Action Codes are:
A -- Approved as submitted.
B -- Approved, except as noted on drawings. Resubmission not required.
C -- Approved, except as noted on drawings. Refer to attached comments.
Resubmission required.
D -- Will be returned by separate correspondence.
E -- Disapproved. Refer to attached comments.
F -- Receipt acknowledged.
X -- Receipt acknowledged, does not comply with contract requirements, as noted.
G -- Other action required (Specify) K -- Government concurs with intermediate design. (For D-B contracts)
R -- Design submittal is acceptable for release for construction. (For D-B contracts)
W912ES20Q0010
10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.
Section 00 21 00 - Instructions
NOTES TO OFFERORS
1. OFFEROR INQUIRIES. Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit their questions in writing to
Terry.g.zenker@usace.army.mil
Or Mailed to:
U.S. Army Corps of Engineers Attn: Contracting (Terry Zenker) 180 5th Street East, STE 700 St. Paul, MN 55101-1678
Offerors shall submit inquiries not later than 10 days prior to receipt of offers in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
PRICING PER LINEAR FOOT SHALL BE IN WHOLE PENNIES
2. RESPONSIBILITY DETERMINATION. In accordance with Federal Acquisition Regulation (FAR) Subpart 9.1, the apparent awardee will be requested to provide the following information:
a. A detailed description of the work to be self-performed and resources available to demonstrate the firm is capable of complying with: 52.219-14, Limitations on Subcontracting.
b. Financial Statements, including balance sheets that identify major categories of assets, liabilities, and owner’s equity; and profit and loss statements for the past three (3) years.
c. A Bank Certification of Financial Capability (line of credit).
Offeror qualification information: Before a proposal is considered for award, the offeror may be requested by the Government to submit a statement regarding their previous experience in performing comparable work, their business and technical organization, financial resources, and plant available to be used in performing the work. This information (if requested) must be received by the Contracting Officer within two (2) business days and will be treated as confidential commercial or financial information to the extent permitted by law under exemption 4 to the Freedom of Information Act, 5 U.S.C. § 552(b)(4). The financial statements should be not over 60 days old. If over 60 days old, a certification should be attached stating that the financial condition of the firm is substantially the same or, if not the same, the changes that have taken place.
3. All extensions of the unit prices shown will be subject to verification by the Government. In case of a discrepancy between the unit price and the extension, the unit price will govern.
(a) For the purpose of initial evaluation of offers, the following will be utilized in resolving arithmetic discrepancies found on the face of pricing schedule as submitted by the offeror:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump sum and extended prices will be corrected.
(b) For the purpose of proposal evaluation, the Government will proceed on the assumption that the offeror intends its proposals price to be evaluated on the basis of the unit pricing, the totals arrived at by resolution of arithmetic discrepancies as provided above and the offer will be so treated for establishing any competitive range and evaluation their proposal.
CLAUSES INCORPORATED BY REFERENCE
52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.228-1 Bid Guarantee SEP 1996 52.252-5 Authorized Deviations In Provisions APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.
(End of Provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
6.9% 0.6%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Lock and Dam 3 Lock and Dam 4 4330 Lock and Dam Road 420 N. Main St.
Welch, MN 55089 Alma, WI 54610
Lock and Dam No. 5 Lock and Dam No. 5A 12554 Highway 61 W679 State Highway 35 Minnesota City, MN 55959-9756 Fountain City, WI 54629-7214
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Tony Horacek Address:
Telephone: 651-290-5871
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect…