SOLIC_LD-8_ROOF_REPLACEMENT_CONTRACT_DWG_SECURED.pdf

PDF 2 MB Posted

Attached to
Replace EPDM Roof LD 8 Federal contract opportunity
Solicitation number
w912ES-17-T-0033
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Replace EPDM Roof LD 8, newest first.
File Type Posted
17-T-0033_LD_8_Amendment_2.pdf PDF
Amendment_1_Photo.jpg JPG image
17-T-0033_Amendment.pdf PDF
SOLIC_LD-8_W912ES-17-T-0033_SPECIFICATION.pdf PDF
SOLIC_LD-8_ROOF_REPLACEMENT_CONTRACT_DWG_SECURED_updated_03April2017.pdf PDF
SOLIC_LD-8_W912ES_17-T-0033_Construction_DWGs_11x17_SECURED.pdf PDF
SOLIC_LD-8_W912ES-17-T-0033_SPECIFICATION.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CENTRAL CONTROL STATION

AND COMFORT STATION ROOFS REPLACEMENT

FOR

LOCK AND DAM 8 – VERNON COUNTY, WISCONSIN

W912ES-17-T-0033

CONTRACT DRAWINGS

FOR

TABLE OF CONTENTS

DESCRIPTION PAGE

LD 8 - SITE ACCESS 3

LD 8 - STAGING AREAS 5

LD 8 - SITE PHOTOS 7

LD 8 - CONSTRUCTION DRAWINGS 21

FOR

LOCK AND DAM NO. 8

SITE ACCESS

B6ECDSAT

Callout

SITE ACCESS

B6ECDSAT

Callout

RAILROAD CROSSING

B6ECDSAT

Callout

RAILROAD CROSSING

B6ECDSAT

Callout

SECURITY GATE

REQUIRES

APPROVED

ACCESS

B6ECDSAT

Callout

SECURITY GATE

REQUIRES APPROVED

ACCESS

B6ECDSAT

Callout

COMFORT STATION

B6ECDSAT

Callout

PUBLIC LOT

B6ECDSAT

Text Box CONTRACTOR PARKING IN PUBLIC LOT OR IN SECURE LOT ON NORTH SIDE OF BUILDING AS INDICATED

FOR

STAGING AREAS

B6ECDSAT

Callout

APPROX. LOCATION OF

BALLAST AND PAVER STOCKPILE

B6ECDSAT

Callout

TEMPORARY DUMPSTER LOCATION

B6ECDSAT

Callout

ROOF ACCESS

B6ECDSAT

Callout

PUBLIC RESTROOM

FACILITIES

B6ECDSAT

Polygon

B6ECDSAT

Polygon

B6ECDSAT

Callout

MATERIAL STAGING AND CONTRACTOR PARKING

B6ECDSAT

Callout

MATERIAL STAGING AND CONTRACTOR PARKING

FOR

SITE PHOTOS

FOR

Figure 1: Exterior staircase provides access to 2nd floor of CCS.

Figure 2: Ballast and Concrete Pavers to be removed and stockpiled.

FOR

Figure 3: Roof Access. Government to remove and replace conduits and outlets.

Figure 4: Roof access door sill of 2nd Floor of Central Control Station entrance.

FOR

Figure 5: Standing just off of the stairs looking toward the Northwest corner.

Figure 6: Standing on the stairs looking toward the East corner.

FOR

Figure 7: Standing in the Northwest corner looking toward the Northeast corner

Figure 8: Standing in the Northwest corner looking toward the roof access stairs.

FOR

Figure 9: Standing in the Northeast corner looking toward the Southeast corner.

Figure 10: Standing in the Northeast corner looking toward the Northwest corner.

FOR

Figure 11: Standing in the Southeast corner looking toward the Southwest corner.

Figure 12: Standing in the Southeast corner looking toward the Northeast corner.

FOR

Figure 13: Standing in the Southwest corner looking toward the North.

Figure 14: Standing in the Southwest corner looking toward the Southeast corner.

FOR

Figure 15: Standing in SW corner of the 2nd Floor CCS looking to the SE.

Figure 16: Standing in SW corner of the 2nd Floor CCS looking to the South.

FOR

Figure 17: Access hazard.

Figure 18: Parking and dumpster location.

FOR

Figure 19: Access road to approximate location for ballast and concrete paver stockpile.

Figure 20: Typical detail of handrail bracing. Government to remove and replace conduits and outlets.

FOR

Figure 21: Regarding unistrut supports for the A/C lines; adjust height if necessary and provide base in accordance with the EPDM manufacturer’s recommendations and as approved by the Contracting Officer.

Figure 22: A/C Base 3 feet by 3 feet.

FOR

Figure 23: Penetration test measured 11” away from the scupper openings.

Figure 24: Measured depth from top of EPDM to top of metal decking web.

FOR

Figure 25: Prior to construction, the two (2) VHF antennas mounted to the 2nd floor CCS wall will be raised by the Lock staff so that the bottom of the pipe is above the metal counterflashing.

FOR

CONSTRUCTION DRAWINGS

CONTRACT DRAWINGS
TABLE OF CONTENTS
SITE ACCESS
STAGING AREAS
SITE PHOTOS
Figure 1:
Figure 2:
Figure 3:
Figure 4:
Figure 5:
Figure 6:
Figure 7:
Figure 8:
Figure 9:
Figure 10:
Figure 11:
Figure 12:
Figure 13:
Figure 14:
Figure 15:
Figure 16:
Figure 16:
Figure 17
Figure 18:
Figure 19:
Figure 20:
Figure 21:
Figure 22:
Figure 23:
Figure 24:
Figure 25:

CONSTRUCTION DRAWINGS

File details come from the government source that posted it. Updated .