Responses_to_Questions_at_Organized_Site_Visit.pdf
PDF 66 KB Posted
- Attached to
- Lock and Dam no. 2 Dam Feeder Cable Replacement Federal contract opportunity
- Solicitation number
- W912ES-15-B-0006
About this file
RESPOSES TO QUESTIONS AT ORGANIZED SITE VISIT (THIS ATTACHMENT IS NOT CONSIDERED AN AMENDMENT.)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B01_15-B-0006_LD2_Feeder_Cables._Abstract_of_Bids.pdf | ||
| Amend_0002_15-B-0006.pdf | ||
| A22_15-B-0006_LD2_Feeder_Cables_Amendment_0001.pdf | ||
| A22_15-B-0006_LD2_Feeders_Solicitation_SF1442_and_Construction_Documents.pdf | ||
| A22_15-B-0006_LD2_Feeders_Solicitation_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation W912ES‐15‐B‐0006
Responses To Questions Organized Site Visit
March 4, 2015
1. Are splices allowed? Where?
Response: Each conductor is allowed one splice in Manhole #2, as shown on the Contract Drawings.
2. Are closeout documents necessary for As‐builts?
Response: Closeout As‐builts consisting of Annotated Reference drawings would be sufficient.
3. Riverwall transfer from 4" to 3" or 3" to 4": What happens to the concrete on top?
Response: See Contract Drawing M‐L2‐56/003 for design requirements.