Responses_to_Questions_at_Organized_Site_Visit.pdf

PDF 66 KB Posted

Attached to
Lock and Dam no. 2 Dam Feeder Cable Replacement Federal contract opportunity
Solicitation number
W912ES-15-B-0006
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

RESPOSES TO QUESTIONS AT ORGANIZED SITE VISIT (THIS ATTACHMENT IS NOT CONSIDERED AN AMENDMENT.)

View the file

Other files for this federal contract opportunity

Other files attached to Lock and Dam no. 2 Dam Feeder Cable Replacement, newest first.
File Type Posted
B01_15-B-0006_LD2_Feeder_Cables._Abstract_of_Bids.pdf PDF
Amend_0002_15-B-0006.pdf PDF
A22_15-B-0006_LD2_Feeder_Cables_Amendment_0001.pdf PDF
A22_15-B-0006_LD2_Feeders_Solicitation_SF1442_and_Construction_Documents.pdf PDF
A22_15-B-0006_LD2_Feeders_Solicitation_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W912ES‐15‐B‐0006

Responses To Questions Organized Site Visit

March 4, 2015

1. Are splices allowed? Where?

Response: Each conductor is allowed one splice in Manhole #2, as shown on the Contract Drawings.

2. Are closeout documents necessary for As‐builts?

Response: Closeout As‐builts consisting of Annotated Reference drawings would be sufficient.

3. Riverwall transfer from 4" to 3" or 3" to 4": What happens to the concrete on top?

Response: See Contract Drawing M‐L2‐56/003 for design requirements.