Capability_Statement.docx

DOCX document 83 KB Posted

Attached to
Construction - Peace Vector (PV) VII Package C in Cairo, Egypt Federal contract opportunity
Solicitation number
W912ER-17-R-0011
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

You may use the attached Capability Statement Document to respond to this Sources Sought but it is not required.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Capability Statement

W912ER-17-R-0011

SECTION 1. GENERAL

1. Business Name: (Insert Business Name)

2. Business Address: (Insert Business Address)

3. Cage Code: (Insert Cage Code)

4. NAICS Codes: (Insert all applicable NAICS Codes)

5. Responsible Point of Contact:

Name:(Insert Name)
Telephone:(Insert Telephone Number) Email:(Insert Email Address)

6. Check All That Apply: Our firm is:

A U.S.-owned business An Egyptian-owned business A Small business: [Insert type (i.e. 8(a), SDVOSB, etc.)] Contemplating a Joint Venture: (Insert potential JV partner & CAGE Code) None of the above (Specify)

SECTION 2. CONTRACTOR ARRANGEMENT

1. Our firm may be interested in proposing on this requirement as a:

Sole contractor Prime contractor performing at least 50% of the work with subcontractor(s) Joint venture with (Insert business name, business size, and cage code).

SECTION 3. CAPABILITY

1. If awarded a contract, the maximum capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds for any single contract is (Insert maximum capacity, in dollars).

2. Our firm has performed work in Egypt:

Yes No

3. Our firm has the necessary licenses/permits/certifications required to perform work in Egypt:

Yes No

4. Our firm has constructed the following facility types/projects:

Check All That Apply
Construction Project

All of the below projects

Housing/Barracks

Dining Facility

Equipment/Vehicle Maintenance Facility

Operations Facility

Administrative/Headquarters Facility

Command and Control Facility

Communications Center

Fire Station

Waste Management Complex

Training Facility

Medical Facility (Clinic/Hospital)

Fuel Storage Facility

Fuel Distribution and Storage System

Munitions Storage

Power Plant

Utilities Infrastructure

RSOI Facilities/Areas

Entry/Access Control Points

Cargo Handling Areas Perimeter Fence and Guard Towers Road Construction Airfields: (Runways/Taxiways/Aprons/Ramps) Airfield Support Facilities: (Hangars/Control Towers/etc.) Passenger/Cargo Terminals Drainage System Projects Water Treatment Facility

5. If awarded a contract, our firm is/ is not capable to perform at least 20% of the cost of the construction and related services.

6. Based on your previous experience, identify the percent work effort you would expect to subcontract:____%

7. Our firm is performing, or has successfully performed construction of facilities and associated services for the following US or Foreign military commands/facilities/projects:

Provide name of project location, type of work performed, role of firm (prime, joint venture, sub, team member), dollar value of work performed by your firm, percentage of total contract value performed by your firm, and date work was performed.

8. Our firm is/ is not experienced in obtaining Defense Base Act (DBA) insurance for our personnel.

9. Our firm is/ is not experienced with operating under SPOT requirements.

SECTION 4. RETURN INSTRUCTIONS

Please refer to the Sources Sought posting.

File details come from the government source that posted it. Updated .