- Mississippi River Stone Placement Federal contract opportunity
- Solicitation number
- W912EQ19R0001
About this file
This document provides details for a pre-solicitation notice for a multiple award task order contract for Mississippi River stone placement services. The scope of work involves furnishing labor, materials, and equipment for constructing various stone navigation structures including dikes, chevrons, weirs, and other structures along the Mississippi River between miles 954 to 320. Work will be performed through task orders issued over five years at locations in seven Midwestern and Southern states. The daily production rates required vary based on placement method but average 2,000 tons for bank paving and range from 1,000 to 8,000 tons for other methods. The solicitation number is W912EQ-19-R-0001 and up to four IDIQ contracts with a total value between $100-150 million may be awarded. The proposal due date is February 14, 2019 and awards will be made to lowest price technically acceptable offers.
Solicitation(MS River Stone)(MATOC)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A22-MS_RIVER_STONE_MATOC_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mississippi River Stone Placement at Various Locations
The w ork consists of furnishing all plant, labor, materials, and equipment for the construction of various types of stone navigation structures to include all types of dikes, chevrons, bendw ay w eirs, hardpoints, and other river training structures in the Mississippi River w ithin the boundaries of the Mississippi Valley Division. Maintaining the MR&T Channel Improvement Project as authorized requires the construction and maintenance of various types of stone navigation structures, to include all types of dikes, chevrons, bend w ay w eirs, hard points, and other river training structures. Additional w ork may include placement of stone fill and longitudinal peaked stone toe protection in specif ied areas such as dike f ields, revetments, and other locations along the river as w ell as riprap bank paving to include bank clearing, grading and excavation. Since project initiation, over 1,100 stone navigation structures w ith a total length of 334 miles of structures and approximately 700 miles of revetment have been constructed. The assigned NAICS Code is 237990. The total capacity for this (MATOC) is $150M.
This requirement is Unrestricted
JUDY E STALLION 901-544-0776
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
05-Apr-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________06 May 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
167 N. MAIN STREET
MEMPHIS TN 38103-1894
W912EQ
PAGE OF PAGES
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:30 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912EQ19R0001 1 OF 228
See Task Order
See Task Order
FY19 MS River Stone Navigation Structures Construction(MATOC) Page 1 of 228 W912EQ19R0001
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Structures Construction(MATOC) Page 2 of 228 W912EQ19R0001
Section 00010 - SOLICITATION CONTRACT FORM
OFFEROR SCHEDULE
1.1 LINE ITEMS
This Multiple Award Task Order Contract (MATOC) will be awarded on evaluation factors mentioned herein. In accordance with Class DEVIATION
2018-O0006-Evaluation Factors for Certain Multiple-Award Task or
Delivery Order Contracts, the Government intends to make an award to each and all qualifying offerors, therefore, the following offeror schedule is for informational puposes ONLY. Therefore, Items 0001AA-
0001AF, 1001AA-1001AF, 2001AA-2001AF, 3001AA-3001AF and 4001AA-4001AF are for informational purposes of examples of CLINS that could be included on a task order contract. Please DO NOT submit pricing at this time. Price will only be considered during the selection decision for each resulting task order.
ITEM NO SUPPLIES/SERVICES
0001 SCHEDULE A – YEAR ONE (2019)
Multiple Award Task Order Contract (MATOC).
The work consists of furnishing all plant, labor, materials, and equipment for the construction of various types of stone navigation structures to include all types of dikes, chevrons, bendway weirs, hardpoints, and other river training structures in the Mississippi
River within the boundaries of the
Mississippi Valley Division. Other work may include placement of stone fill and longitudinal peaked stone toe protection in specified areas such as dike fields, revetments and other locations along the river as well as riprap bank paving to include bank clearing, grading, and excavation. The total contract ceiling is a Not to Exceed (NTE) amount of
$150,000,000.00.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT
PRICE
0001AA MOBILIZATION/DEMOBILIZATION 1 JA XXX.XX XXX.XX
0001AB GRADED STONE A(QUARRY) 1,000,000 TN XXX.XX XXX.XXXXX.XX XXX.XX
0001AC GRADED STONE C(QUARRY) 300,000 TN XXX.XX XXX.XXXXX.XX XXX.XX
Structures Construction(MATOC) Page 3 of 228 W912EQ19R0001
0001AD 250LB RIPRAP STONE(QUARRY) 100,000 TN XXX.XX XXX.XXXXX.XX XXX.XX
0001AE STONE DELIVERY 1,400,000 TN XXX.XX XXX.XX
0001AF STONE PLACEMENT 1,400,000 TN XXX.XX XXX.XX
ITEM NO SUPPLIES/SERVICES
1001 SCHEDULE B – YEAR 2 (2020)
Multiple Award Task Order Contract (MATOC)
The work consists of furnishing all plant, labor, materials, and equipment for the construction of various types of stone navigation structures to include all types of dikes, chevrons, bendway weirs, hardpoints, and other river training structures in the Mississippi
River within the boundaries of the
Mississippi Valley Division. Other work may include placement of stone fill and longitudinal peaked stone toe protection in specified areas such as dike fields, revetments and other locations along the river as well as riprap bank paving to include bank clearing, grading, and excavation. The total contract ceiling is a Not to Exceed (NTE) amount of
$150,000,000.00.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT
PRICE
1001AA MOBILIZATION/DEMOBILIZATION 1 JA XXX.XX XXX.XX
1001AB GRADED STONE A(QUARRY) 1,000,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
1001AC GRADED STONE C(QUARRY) 300,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
1001AD 250LB RIPRAP STONE(QUARRY) 100,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
1001AE STONE DELIVERY 1,400,000 TN XXX.XX XXX.XXXXX.XX XXX.XX
STONE PLACEMENT1001AF 1,400,000 TN XXX.XX XXX.XX
Structures Construction(MATOC) Page 4 of 228 W912EQ19R0001
XXX.XX XXX.XX
ITEM NO SUPPLIES/SERVICES
2001 SCHEDULE C – YEAR 3 (2021)
Multiple Award Task Order Contract (MATOC).
The work consists of furnishing all plant, labor, materials, and equipment for the construction of various types of stone navigation structures to include all types of dikes, chevrons, bendway weirs, hardpoints, and other river training structures in the Mississippi
River within the boundaries of the
Mississippi Valley Division. Other work may include placement of stone fill and longitudinal peaked stone toe protection in specified areas such as dike fields, revetments and other locations along the river as well as riprap bank paving to include bank clearing, grading, and excavation. The total contract ceiling is a Not to Exceed (NTE) amount of
$150,000,000.00.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT
PRICE
2001AA MOBILIZATION/DEMOBILIZATION 1 JA XXX.XX XXX.XX
2001AB GRADED STONE A(QUARRY) 1,000,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
2001AC GRADED STONE C(QUARRY) 300,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
2001AD 250LB RIPRAP STONE(QUARRY) 100,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
2001AE STONE DELIVERY 1,400,000 TN XXX.XX XXX.XXXXX.XX XXX.XX
2001AF STONE PLACEMENT 1,400,000 TN XXX.XX XXX.XXXXX.XX XXX.XX
Structures Construction(MATOC) Page 5 of 228 W912EQ19R0001
3001 SCHEDULE D - YEAR 4 (2022)
Multiple Award Task Order Contract (MATOC).
The work consists of furnishing all plant, labor, materials, and equipment for the construction of various types of stone navigation structures to include all types of dikes, chevrons, bendway weirs, hardpoints, and other river training structures in the Mississippi
River within the boundaries of the
Mississippi Valley Division. Other work may include placement of stone fill and longitudinal peaked stone toe protection in specified areas such as dike fields, revetments and other locations along the river as well as riprap bank paving to include bank clearing, grading, and excavation. The total contract ceiling is a Not to Exceed (NTE) amount of
$150,000,000.00.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT
PRICE
3001AA MOBILIZATION/DEMOBILIZATION 1 JA XXX.XX XXX.XX
3001AB GRADED STONE A(QUARRY) 1,000,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
3001AC GRADED STONE C(QUARRY) 300,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
3001AD 250LB RIPRAP STONE(QUARRY) 100,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
3001AE STONE DELIVERY 1,400,000 TN XXX.XX XXX.XX
3001AF STONE PLACEMENT 1,400,000 TN XXX.XX XXX.XX
Structures Construction(MATOC) Page 6 of 228 W912EQ19R0001
4001 SCHEDULE E - YEAR 5 (2023)
Multiple Award Task Order Contract (MATOC)
The work consists of furnishing all plant, labor, materials, and equipment for the construction of various types of stone navigation structures to include all types of dikes, chevrons, bendway weirs, hardpoints, and other river training structures in the Mississippi
River within the boundaries of the
Mississippi Valley Division. Other work may include placement of stone fill and longitudinal peaked stone toe protection in specified areas such as dike fields, revetments and other locations along the river as well as riprap bank paving to include bank clearing, grading, and excavation. The total contract ceiling is a Not to Exceed (NTE) amount of
$150,000,000.00.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT
PRICE
4001AA MOBILIZATION/DEMOBILIZATION 1 JA XXX.XX XXX.XX
4001AB GRADED STONE A(QUARRY) 1,000,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
4001AC GRADED STONE C(QUARRY) 300,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
4001AD 250LB RIPRAP STONE(QUARRY) 100,000 TN XXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XXXXX.XX XXX.XX
4001AE STONE DELIVERY 1,400,000 TN XXX.XX XXX.XX
4001AF STONE PLACEMENT 1,400,000 TN XXX.XX XXX.XX
Structures Construction(MATOC) Page 7 of 228 W912EQ19R0001
1.2 NOTES
NOTE 1: The Offeror Schedule shown above will be the basis for a separate Offeror Schedule to be filled out by the Offeror when responding to a Task Order request, which will be used by the Government as a factor in the selection decision for each Task Order placed against this Contract. "Each Task Order issued under the resulting contract will contain a separate Offeror Schedule” which will contain a location specific mobilization/ demobilization line item, a stone delivery line item, a stone placement line item, and one or more additional contract line item numbers, for smaller or larger quantities than those listed above. Each Offeror Schedule will be project specific for each Task
Order.
AC = Acre CF = Cubic Feet CY = Cubic Yard
DH = Miles EA = Each FC = 1000 Cubic Feet
FT = Foot HF = 100 Feet HH = 100 Cubic
Feet HL = 100 Linear Feet HR = Hours
HS = 100 Square Feet
HY = 100 Yards LB = Pound LF = Linear Foot
LH = Labor Hour JA = Job LY = Linear
Yard MO = Months SB = Square Mile SF = Square
Foot
SQ = Square SY = Square Yard TL = 1000 Linear
Feet TN = Net Ton UN = Unit YD = Yard
YL = 100 Linear Yards YM = Cubic Yards Per Mile
NOTE 2: Offerors are cautioned to read Contract Clause entitled "FAR
52.204-7, System for Award Management (MAY 2014) LOCATED IN Section
00100.
-- End of Document --
Structures Construction(MATOC) Page 8 of 228 W912EQ19R0001
Section 00100 - INSTRUCTIONS TO BIDDERS
SECTION 00100
CONDITIONS AND NOTICES TO OFFERORS
A. PROPOSAL MATERIAL – Copies of the Solicitation, Specifications, and drawings forms are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal
Business Opportunity (FedBizOpps) website at: https://www.fbo.gov. Prospective Offerors should submit technical questions concerning this Request for Proposal via Bidder Inquiry in ProjNet at www.projnet.org/projnet. (See Paragraph M Below). All other inquiries should be emailed to the Contract
Specialist, Judy.E.Stallion@usace.army.mil.
PROPOSAL DOCUMENTS: The following documents must be submitted with proposal:
1. Volume I, Technical
2. Volume II, Past Performance
3. All amendments must be acknowledged
B. REQUIRED SYSTEM FOR AWARD MANAGEMENT REGISTRATION - By submission of a proposal, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to proposal submission, during performance, and through final payment of any contract resulting from this solicitation. Lack of registration in the SAM database will make an offeror ineligible for award. Offerors and contractors may obtain information on registration and annual confirmation requirements by calling 1-866-606-8220, or at: http://www.sam.gov
(1) Lack of registration in the SAM database will make a bidder ineligible for award. SEE
CONTRACT CLAUSE 52.204-7 ENTITLED "System for Award Management”.
(2) Attention to offerors: Effective March 22, 2018, you must submit a notarized letter appointing the authorized entity administrator before your registration will be activated. This requirement now applies to both new and existing entities. Make sure your SAM profile includes “all awards” and not just “Federal Assistance Awards” as this option is only for grants and cooperative agreements. Please visit www.sam.gov for more information.
C. CONDITIONS AFFECTING THE WORK - Offerors should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve offerors from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The
Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Request for Proposal, the specifications or related documents. See Section 00700, clause 52.236-3, entitled “Site
Investigation and Conditions Affecting the Work”.
D. OFFEROR'S ADDRESS - Prospective offerors shall indicate in the offer, the address to which payment and/or correspondence should be mailed, if such address is different from that shown for the offeror on Standard Form 1442 Block 14.
FY19 MS River Stone Navigation Structures Construction(MATOC) Page 9 of 228 W912EQ19R0001 https://www.fbo.gov/ http://www.projnet.org/projnet mailto:Judy.E.Stallion@usace.army.mil http://www.sam.gov/
E. AMENDMENTS PRIOR TO DATE SET FOR NEGOTIATION - The right is reserved as the interest of the Government may require revision, or modification to the specifications or drawings or both prior to the date set for receipt of proposals. Such revisions or modifications, if any, will be announced by an amendment or amendments to this Request for Proposal. If the revisions or modifications are of a nature which requires material changes, the date set for receipt of proposals may be postponed by such number of days as in the opinion of the issuing officer will enable offeror to revise their proposal. In such cases, the amendment will include an announcement of the new date for receipt of proposal.
F. NOTICE TO OFFERORS - NINETY DAY OFFER GUARANTEE (See Standard Form 1442 Block
14)
G. EXPLANATION OF PROVISION/CLAUSE NUMBERS UTILIZED IN THIS SOLICITATION
1. Federal Acquisition Regulation (FAR) provisions/clauses are numbered as follows: 52.252-1.
2. Defense Acquisition Regulation Supplement (DFARS) provisions/clauses are numbered as follows:
252.204-7000.
3. Army Federal Acquisition Regulation Supplement (AFARS), provisions/clauses are numbered as follows: 5152.237-9000.
4. USACE Acquisition Instruction (UAI) provisions/clauses are numbered as follows: 5152.249-5000.
H. NOTICE OF BONDS AND INSURANCE - The following proposal/contract information is applicable only to task orders awarded under the contract that exceed one hundred fifty thousand dollars
($150,000) in task order price:
1. PERFORMANCE BONDS. The performance bond shall be required for award of any task order greater than $150,000 in the penal amount equal to one hundred percent (100%) of the task order price. Bonds shall be received with ten (10) days after receipt of task order award. A contractor’s inability to provide a performance bond on a task order may make a contractor ineligible for the award of subsequent task orders. See Section 00700, clause 52.228-15, entitled “Performance and Payment Bonds –
Construction.”
2. PAYMENT BONDS: Within ten (10) days after receipt of a task order award greater than
$150,000, the contractor to whom the task order is awarded shall furnish a payment bond with good sufficient surety or sureties acceptable to the Government; namely a Payment Bond (Standard Form 25A), in the penal amount of the one hundred percent (100%) of the task order price. A contractor’s inability to provide a payment bond on a task order or furnish an agreed-to alternative payment protection may make a contractor ineligible for the award of subsequent task orders. See Section 00700, clause 52.228-15, entitled “Performance and Payment Bonds – Construction”.
3. INSURANCE: The accepted offeror shall provide adequate insurance, within ten (10) days after receipt of task order award. See Section 00 80 00.00 11, Special Contract Requirements --- Additional
Insurance References.
I. POST AWARD SUBMITTAL REQUIREMENTS - Within ten (10) days after receipt of issue of task order, the contractor shall submit an acceptable performance bond, payment bond and certificate of insurance. Offerors are required to submit Bid Bonds with their proposal for each task order. See Section 00700, clause 52.228-1, entitled "Bid Guarantee". The timeframe for providing bid bonds are usually 10 (days) after award. Any compressed timeframe will be provided in the RFP for each individual task order.
Within fifteen (15) days after receipt of notice of award, the contractor shall provide an approved
Accident Prevention Plan, Environmental Protection Plan and Contractor Quality Control Plan. (See
Section 00 80 00.00 11, 01 57 20.00 11, and 01 45 04.00 11) Within ten (10) days prior to commencement
Structures Construction(MATOC) Page 10 of 228 W912EQ19R0001 of work under this contract, the contractor shall submit to the Contracting Officer’s, Chief of Security, a list of all Personnel, Vehicles and Equipment that may be used during the construction work under this contract. (See Sections 00800)
J. PROJNET BIDDER INQUIRY
1. Prospective Offers should submit questions concerning this Request for Proposal in ProjNet at www.projnet.org/projnet.
a. To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry
Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective bidder once the reply is available for viewing.
b. The Solicitation Number is: W912EQ19R0001
The Bidder Inquiry Key is: K2UZ7F-CFSD9U
c. Specific Instructions for First Time ProjNet Bid Inquiry Access:
(1.) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
(2.) Identify the Agency. This should be marked as USACE.
(3.) Key. Enter the Bidder Inquiry Key listed above.
(4.) Email. Enter the email address you would like to use for communication.
(5.) Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
(6.) Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
(7.) Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
d. Specific Instructions for Future ProjNet Bid Inquiry Access:
(1.) For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
(2.) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
(3.) Identify the Agency. This should be marked as USACE.
(4.) Key. Enter the Bidder Inquiry Key listed above.
(5.) Email. Enter the email address you used to register previously in ProjNet.
(6.) Click Continue. A page will then open asking you to enter the answer to your Secret
Question.
(7.) Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
2. The Bidder Inquiry System will be unavailable for new inquires Seven (7) business days prior to bid opening in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
FY19 MS River Stone Navigation Structures Construction(MATOC) Page 11 of 228 W912EQ19R0001 http://www.projnet.org/projnet
3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry
System for answers to questions prior to submission of a new inquiry.
4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
5. Oral explanations or instructions are not binding. Any information given to an offeror which impacts the bid/offer will be given in the form of a written amendment to the solicitation.
Structures Construction(MATOC) Page 12 of 228 W912EQ19R0001
PROPOSAL EVALUATION
A. BASIS FOR AWARD
1) Awards will be made in accordance with Class Deviation 2018-O0006, Evaluation Factors for
Certain Multiple Award Task or Delivery Order Contracts, dated December 13, 2017. The
Government intends to award a contract to each and all qualifying offerors. A qualifying offeror is an offeror who is determined to be a responsible source; who submits a technically acceptable proposal that conforms to the requirements of the solicitation; and whom the Contracting Officer has no reason to believe would likely offer other than fair and reasonable pricing.
a. Responsibility: Offerors will be determined to be a responsible source by completing and submitting the responsibility determination included in the solicitation (See attached
Responsibility Determination Form). The Contracting Officer will review the information submitted and utilize it to make a responsibility determination for each offeror.
b. Technical Acceptance: The Contracting Officer will review the technical submissions of each offeror to make a determination as to the technical acceptability of each offeror.
c. Fair and Reasonable Pricing: Pricing shall not be included as an evaluation factor for the contract awards, but shall be one of the factors in the selection decision for each task order under the contract, in accordance with FAR 16.505. The Contracting Officer may utilize historical and/or past performance information to make a determination that there is no reason to believe that an offeror will offer other than fair and reasonable pricing
2) The Government intends to make award without holding discussions with offerors. However, the
Government reserves the right to conduct discussions if the Sources Selection Authority (SSA) determines them to be necessary. Therefore, offerors are encouraged to include their best terms and conditions in the initial offer.
3) The source selection process will be conducted in accordance with FAR Subpart 15, Source
Selection procedures and Class Deviation 2018-O0006). Offers will be evaluated using the evaluation criteria listed below in paragraph B. Noncompliance with the solicitation requirements may raise serious questions regarding an offeror’s technical ability or past performance and may be grounds to eliminate the proposal from consideration for contract awards. Failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the solicitation will be considered unacceptable.
4) The Contracting Officer will begin the evaluation process by conducting a proposal compliance review for all timely-received proposals to determine basic proposal adequacy prior to providing the proposals to the evaluators (the Source Selection Team). Failure to provide a complete proposal may result in the proposal being removed from further consideration for award. Failure to address any factor shall be grounds for elimination from evaluation and consideration for award.
Structures Construction(MATOC) Page 13 of 228 W912EQ19R0001
B. EVALUATION FACTORS
1) The following evaluation factors will be used to evaluate each technical proposal:
Factor 1 – Key Personnel
Factor 2 – Demonstrated Experience
Factor 3 – Management Approach
Factor 4 – Small Business Participation
Factor 5 – Past Performance
2) Factors 1-4 will receive one of two ratings: Acceptable or Unacceptable.
Adjectival Rating Description
Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
3) Factor 5 will receive one of two ratings: Acceptable or Unacceptable.
Adjectival Rating Description
Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
The solicitation evaluation provisions attached (see attached Responsibility Determination
Form) describe the details of this source selection’s evaluation factors that offerors must achieve in order to demonstrate a technical proposal that meets the requirements of this solicitation. The offeror’s proposal must receive an Acceptable rating on all factors to be determined technically qualified. Offerors receiving an Unacceptable rating on any single factor will be deemed overall Unacceptable and will not be considered for award.
Structures Construction(MATOC) Page 14 of 228 W912EQ19R0001
C. PROPOSAL SUBMISSION
1) Introduction: The offeror’s proposal shall be submitted in hard copy, with accompanying digital copies, as set forth below. The RFP shall provide the Government address and receipt date for proposal submittal.
2) The offeror’s proposal shall consist of two (2) volumes: Volume I – Technical and Volume II –
Past Performance. The proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited. Offerors are cautioned that merely restating, paraphrasing, or
“parroting” the technical requirements and specifications, combined with a statement of offeror’s intent to perform them, does not constitute an understanding of the requirement or capability to perform and will be evaluated unfavorably. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each portion of the proposal.
Proprietary information shall be clearly marked as such.
3) Each volume shall be submitted in a separate three-ring binder. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated. Each binder shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 5).
4) Printing should be single spaced. Each paragraph shall be separated by at least one blank line.
Text shall be in Arial or New Times Roman, 12-point font. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape. Do not include links to information on websites in lieu of incorporating the information physically into the proposal.
For submission with page limitations, the pages will be counted as follows: Each page containing text or information shall be counted as one page, double-sided printing and all pages containing text or information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, a foldout sheet will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are excluded from page limitations.
5) The following volumes of material shall be submitted:
Printed Digital Maximum Volume I Copies Copies Page
Factor 1 - Key Personnel Original+4 1 40
Factor 2 - Demonstrated Experience Original+4 1 40
Factor 3 - Management Approach Original+4 1 45
Factor 4 - Small Business Participation Original+4 1 30
Volume II
30 Factor 5 – Past Performance Original+4 1
Note: Pages that exceed the maximum page limitations will not be evaluated.
Structures Construction(MATOC) Page 15 of 228 W912EQ19R0001
D. PROPOSAL FILES
a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1”
Gutter – 0”
From Edge – Header, Footer 0.5”
Page Size, Width – 8.5”
Page Size, Height – 11”
Note: 11x17 folded pages are acceptable for tables, charts or graphic representations.
b. File Packaging All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, (i.e.
doc, xls, ppt, etc.), and provided on CDs or DVDs. Zip disks are not permitted. Files shall be in read-only format, using PDF files. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. **Please note – Self extracting .exe files are not acceptable and will not be considered. ** If the hard-copy proposal differs from the electronic version, the hard copy will govern.
c. Content. All proposals shall contain the information stated below. Proposal clarity, organization
(as defined in this solicitation) and cross-referencing is mandatory. No material (information not included with the proposal) shall be incorporated by reference, and any material incorporated by reference will not be evaluated. Material not specifically identified below will not be evaluated.
Offeror must clearly mark as proprietary any data contained in the proposal that it does not want disclosed by the Government. Portions of the selected proposal will be incorporated into the contract and are subject to disclosure notwithstanding restrictive markings. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the
Narrative discussion. The Summary Section shall contain a brief abstract of the file. The following shall be included in the Narrative discussion:
The proposal shall be submitted as summarized below and as required by the specifications:
Structures Construction(MATOC) Page 16 of 228 W912EQ19R0001
E. EVALUATION FACTORS AND RATING CRITERIA
(1) TAB A – VOLUME 1, FACTOR 1 - KEY PERSONNEL
A. Submission Requirements
The offeror must submit resumes of key personnel to include: Site Superintendent(s), Engineer(s)/Surveyor(s), Quality Control Manager and Safety Officer. At a minimum, resumes are limited to two (2) pages and should include the following for all listed personnel:
Name
Position- Resumes of key personnel shall either state that the individual is a full-time employee of the offeror or shall have attached a signed letter of commitment from the sub-contractor. To demonstrate compliance with relevant training, license or certifications, Offerors must enclose a copy of the certification, license, or training completion certificate with their Offer.
Experience (a minimum of 3 years required for all positions) - Must include dates (month and year), position(s) held, and responsibilities (with most recent experience listed first) directly related to performing the applicable position. The information provided should detail the individual’s applicable construction/management experience on construction projects similar in size, scope, and complexity to those listed in the RFP such as dike, bendway weir, stone bank paving, and other stone navigation structure construction on the Mississippi River or other substantially similar rivers. Experience unrelated to the requirements in this RFP should not be included. NOTE: Should staffing issues prevent the offeror from utilizing the person(s) identified in the performance of the contract task order(s), the offeror shall submit for Contracting Officer Approval the name and relevant documentation showing that the replacement(s) also meets the minimum requirements of the RFP. Failure to receive the Contracting Officer
Approval for any such replacement may constitute a breach of the contract and make an offeror ineligible for the award of a subsequent Task Order.
In addition, the following information is required to be demonstrated for each key position:
Site Superintendent(s) – The Site Superintendent must have completed the Construction
Quality Management for Contractors (CQM) course within the past 5 years. NOTE: The site superintendent can have dual roles as Quality Control Manager on this project as long as all related contract requirements are met.
Engineer(s)/Surveyor(s) – Each Engineer/Surveyor shall maintain any necessary license and meet the minimum educational/professional requirements set by the relevant licensing agency for the jurisdiction in which the work is to be performed. Each resume listed should provide evidence of all professional licenses held, such as Professional Engineering (P.E.)
or Registered Land Surveyor (RLS), degrees held, applicable training (Hypack, etc) or certifications in hydrographic and topographic surveying.
Structures Construction(MATOC) Page 17 of 228 W912EQ19R0001
NOTE: Some task orders areanticipated to require a RLS to perform applicable surveys and as such, will require proof of proper licensing/certification to be submitted with the task order proposal.
Quality Control Manager – The Quality Control Manager must have completed the Construction Quality Management for Contractors (CQM) course within the past 5 years and the QCM’s resume must demonstrate at least 3 years experience with use of
Corps Resident Management System (RMS) software.
Safety Officer – The Safety Officer must have completed an approved 30-hour
OSHA safety course, and a professionally certified CPR/First Aid course within the past
5 years.
B. Evaluation Criteria
Key Personnel Acceptable/Unacceptable Rating Method
Adjectival Rating Description
Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
Acceptable: Proposal meets the requirements of the solicitation.
Resumes are included for all required key personnel that demonstrate acceptable detailed construction/management experience (minimum 3 years for all positions) related to
Mississippi River Stone Structure or substantially similar river construction projects. All required information concerning licenses and certifications for each position are provided.
Unacceptable: Proposal does not meet the requirements of the solicitation. Resumes are not included for all required key personnel and/or resumes provided do not adequately demonstrate acceptable detailed construction management experience (minimum 3 years’ experience) related to Mississippi River Stone Placement or substantially similar river construction projects. Required information for each position is not provided.
TAB B – VOLUME 1, FACTOR 2 – DEMONSTRATED EXPERIENCE
C. Submission Requirements
The Offeror shall submit information describing a minimum of three and a maximum of five examples of relevant experience related to Mississippi River Stone Structure construction or substantially similar river construction projects completed within the last five (5) years that the Offeror self-performed or directly managed. The information must identify which entity
(Offeror or subcontractor) performed the work, and describe how the work is relevant to this project.
The Government will review the sample construction projects provided by the Offeror and evaluate the recent (physically completed within the last 5 years)/relevant (related to
Mississippi River Stone Placement or substantially similar river construction projects) specialized experience of the Offeror on projects similar in scope, size, and complexity to the projects identified in the solicitation to include dike, bendway weir, stone bank paving, and other stone navigation structure construction.
Structures Construction(MATOC) Page 18 of 228 W912EQ19R0001
Offerors are encouraged to choose sample construction projects that closely resemble the scope, size, and complexity of the projects identified in this solicitation and listed above and must include the following criteria for each project listed:
1. The value of projects included must be a minimum of $1M.
2. Depth of stone placement must meet required minimum depth of 20 feet.
3. Average stone placement rates per day with average overall placement rate of 2,000 tons per day over the life of the contract.
In addition, the Offeror shall provide the following information for each project listed:
4. Location of previous river work (Upper Mississippi, Lower Mississippi, other substantially similar rivers)
5. River Current velocities encountered on these jobs (if known)
6. Method of stone placement (dragline, hydraulic excavator, trucks/land-based equipment)
7. Sizes and types of stone placed and total amounts placed for each
8. Any work delays due to equipment availability or breakdowns or stone availability on-site
D. Evaluation Criteria
Demonstrated Experience Acceptable/Unacceptable Rating Method
Adjectival Rating Description
Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
Acceptable: Proposal meets the requirements of the solicitation. The Offeror has demonstrated experience with 3 or more projects that address and meet the required criteria for project value, minimum depths for stone placement and average daily production rates listed and are similar in size, scope, and complexity to those on the main channel of the Mississippi River or other substantially similar rivers.
Unacceptable: Proposal does not meet the requirements of the solicitation. The Offeror does not provide demonstrated experience listing at least 3 projects that address and meet the required criteria for project value, minimum depths for stone placement, and average daily production rates listed that are similar in size, scope, and complexity to those on the main channel of the Mississippi River or other substantially similar rivers.
TAB C – VOLUME 1, FACTOR 3 –MANAGEMENT APPROACH
E. Submission Requirements
The Offeror shall describe or provide a general plan for responding to and managing multiple contract task orders of varying size and complexity issued simultaneously.
Specifically, the proposal shall describe the overall corporate structure and how project teams are organized to support multiple and concurrent task orders, and the respective levels of authority. The narrative shall include a description of how your company will support the geographic boundaries of the MATOC. The plan must demonstrate discipline coordination responsibility is at an appropriate level within the organization to be successful.
Structures Construction(MATOC) Page 19 of 228 W912EQ19R0001
The Offeror must provide a complete, organized and detailed plan, showing what work will be subcontracted and what work will be done by the offeror’s own forces.
(Prime must perform at least 50% of the cost of each Task Order a under the contract, not including the cost of materials, with its own employees.)
The proposal should provide detailed information regarding how the contractor will coordinate multiple crews and subcontractors working on concurrent multiple task orders to meet project schedule requirements and maintain adequate quality to include scheduling of resources for personnel, equipment, and stone supply.
F. Evaluation Criteria
Management Approach Acceptable/Unacceptable Rating Method
Adjectival Rating Description
Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
Acceptable: Proposal meets the requirements of the solicitation. The proposal complies with the criteria in the Submission Requirements above and the requirements of the RFP
Statement of Work, providing sufficient detail to demonstrate the likelihood of the Offeror’s approach successfully execute the work, coordinate work on multiple task orders, meet schedule requirements, and provide adequate quality construction (both in general and also for the required scenarios listed in this solicitation).
Unacceptable: Proposal does not meet the requirements of the solicitation. The proposal does not comply with all of the criteria in the Submission Requirements above and the requirements of the RFP Statement of Work, providing insufficient detail to demonstrate the likelihood of the Offeror’s approach to successfully execute the work, coordinate work on multiple task orders, meet schedule requirements, or provide adequate quality construction
(both in general or for the required scenarios listed in this solicitation).
(2) TAB D – VOLUME 1, FACTOR 4 – SMALL BUSINESS PARTICIPATION
All offerors (both other than small businesses and small businesses) will be evaluated on the extent of proposed participation/commitment to use of U.S. small businesses in the performance of this acquisition (as small business prime offerors or small business subcontractors) relative to the objectives and requirements established herein. Note: Binding commitments will become enforceable contractual requirements. The Government will evaluate the following to determine if the offeror met or exceeded the requirements.
a. The extent to which firms as defined in FAR Part 19, are specifically identified in proposals
b. The extent to which offerors demonstrate substantive commitment to small business firms, such as, letters of commitment, Joint Ventures, mentor/protégé agreements, or other demonstrations of commitment.
c. Identification of the type and variety of the work small firms are to perform.
d. The extent of participation of small business prime offerors and small business subcontractors in terms of the value of the total acquisition (total contract value).
e. The extent to which the offeror provides detailed explanations/documentation supporting the proposed quantitative participation.
f. Extent to which the offeror complied with requirements of FAR 52.219-8, Utilization of Small Business Concerns.
Structures Construction(MATOC) Page 20 of 228 W912EQ19R0001
At the base contract level, the Government will evaluate the proposal to determine which offeror is acceptable in terms of Small Business Participation. The work to be performed directly by a small business prime offeror will also be evaluated as Small Business
Participation. The Small Business Participation Commitment Document will become part of the resultant contract. The prime will submit listing of proposed subcontractors. The listing shall include: Sub’s Name, Socioeconomic Category and Specialty.
At the Task Order level, the Government shall evaluate the offeror’s proposal against this
Minimum Quantitative Requirement (MQR) - Small Business Participation: Overall Small
Business (SB) -23%; Small Disadvantage Business (SDB) 0%; Service Disabled Veteran
Owned Small Business (SDVOSB) 0%; Woman Owned Small Business (WOSB) 0%;
HUBZone SB 0%], to determine whether the proposal is acceptable or unacceptable, using the ratings and descriptions outlined in the below table and Attachment 2. Each offeror must make a reasonable effort to achieve each MQR GOAL. The offeror shall insert their
“reasonable effort” goals percentages for each socioeconomic categories listed and submit with Task Order proposal. Provide your goals percentages for each socioeconomic categories (Attachment 2, Small Business Participation Commitment Document).
If the goal(s) are unachievable, the offeror must provide an acceptable explanation and documentation as to why they were unable to achieve QMR goals(s). The Government shall validate each exception through the SBA and internal market research.
(3) TAB E – VOLUME 2, FACTOR 5 - PAST PERFORMANCE
A. Submission Requirements
The past performance evaluation will be based on the Offeror’s record of relevant (based on the list of 3 criteria listed in Volume 1, Factor 2 – Demonstrated Experience) and recent
(100% complete within 5 years of the issue date of the RFP) past performance information that pertain to the construction services outlined in this RFP. For the projects listed under
Volume 1, Factor 2 – Demonstrated Experience, submit the Past Performance evaluation given for the project. The Government will also query the Contractor Performance
Assessment Reporting System (CPARS) to validate past performance information the
Government deems necessary to evaluate a contractor’s past performance. Firms without a history of relevant past performance will be given a “Neutral” rating.
Adjectival Rating Description
Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
Small Business Acceptable/Unacceptable Rating Method
Structures Construction(MATOC) Page 21 of 228 W912EQ19R0001
For each project submitted under Volume 1, Factor 2 – Demonstrated Experience without a CPARS evaluation, the offeror shall provide a Past Performance Questionnaire. Each offeror shall provide a minimum of three (3) acceptable past performance ratings within the past 5 years.
This is the start of the file's text. The full file is on GovTribe.