SANDBLAST & PAINT MOTOR VESSELS Federal contract opportunity
Solicitation number
W912EQ-17-T-0004
Issued by
Department of the Army Corps of Engineers Engineering District Memphis

About this file

Solicitation Document

View the file

Other files for this federal contract opportunity

Other files attached to SANDBLAST & PAINT MOTOR VESSELS, newest first.
File Type Posted
PPF_Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912EQ-17-T-0004 18-Nov-2016

b. TELEPHONE NUMBER

901-544-3619

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 29 Nov 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EQ9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

VALERIE MARSHALL

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W38XGR63091594

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY ENGINEER DISTRICT, MEMPHIS

VALERIE MARSHALL

167 N. MAIN STREET

VALERIE.MARSHALL@USACE.ARMY.MIL

MEMPHIS TN 38103-1894

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W38XGR 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

W2R9 ENDIST MEMPHIS

USACE ENSLEY ENGINEER YARD

2915 RIVERPORT ROAD

MEMPHIS TN 38109-3018

TEL: 901-785-6355 FAX:

901-544-3710FAX:

TEL: 901-544-3619 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$14.0 MIL

NAICS:

238320

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF64

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912EQ-17-T-0004

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

SANDBLASTING & PAINTING OF

MOTOR VESSEL DREDGE GOETZ.

SEE PERFORMANCE WORK STATEMENT

FOR ALL MOTOR VESSELS

FFP

FOB: Destination

MILSTRIP: W38XGR63091594

PURCHASE REQUEST NUMBER: W38XGR63091594

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

SANDBLASTING & PAINTING OF

FFP

MOTOR VESSEL WARREN

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Job

SANDBLASTING & PAINTING OF

FFP

MOTOR VESSEL QUARTERS TAGGATZ

FOB: Destination

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 29-NOV-2016 TO

31-JAN-2017

N/A W2R9 ENDIST MEMPHIS

USACE ENSLEY ENGINEER YARD

2915 RIVERPORT ROAD

MEMPHIS TN 38109-3018

901-785-6355 FOB: Destination

W38XGR

0002 POP 29-NOV-2016 TO

31-JAN-2017

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination

W38XGR

0003 POP 29-NOV-2016 TO

31-JAN-2017

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination

W38XGR

NOTICE TO BIDDERS

NOTICE TO BIDDERS

A. The following documentation must be submitted with your quote for evaluation.

1. SF 1449, Solicitation, Offer and Award

2. Schedule of prices

3. Representations and Certifications

4. All amendments must be acknowledged

5. Past Performance Questionnaire

B. Offerors ADDRESS - Prospective Offerors should indicate in the offer, the address to which payment and/or correspondence should be mailed, if such address is different from that shown for the bidder on Standard Form 1449 Block 17a.

C. System for Award Management - By submission of a quote, the Offerors acknowledges the requirement that prospective awardees must be registered in the System for Award Management (SAM) database prior to award, during performance, and through final payment of any contract resulting from this quote. Lack of registration in the SAM database will make an Offeror ineligible for award. Contractors may obtain information on registration and annual confirmation requirements by calling 1-888-227-2423, or at: http://www.sam.gov.

D. Basis of Award - The Government will award a contract, from this solicitation to the responsible Offerors whose offer conforming to the solicitation will be most advantageous to the Government specifications and price.

Requesting two past performance questionnaires demonstrating performance of relevant work, to be completed and returned with solicitation. (Past Performance Questionnaire is attached). See FAR Clause 52.212-2. Multiple Awards may be made from this solicitation.

This order will be evaluated to assure that orders are not provided to debarred contractors. In addition, contractors with known performance issues identified in determining the contractor's responsibility per FAR Part 9 will be brought to the attention of the Contracting Officer and may be considered in making the awards. FAR Part 9, Contractor Qualification, requires that purchases shall be made from, and contracts shall be awarded to, responsible contractors. Past failures to perform, apply sufficient tenacity to performance, failure to meet quality requirements, terminations for default and less than satisfactory ratings by the customer will be a significant factor in a determination of unsatisfactory performance. If offeror has no past performance of this nature, a neutral rating will be given per FAR 15.305(a)(2)(iv).

E. Delivery Times - The following delivery times are established for contactors:

0700-4:00pm, M-F (Monday thru Friday) 0700-3:00pm, Friday

(UNLESS OTHERWISE INSTRUCTED)

No deliveries will be accepted on Federal holidays.

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Sandblasting and Painting of 4 MVP Vessels

1. GENERAL: This is a non-personal services contract to provide for the sandblasting and painting of the of vessels located at USACE Ensley EngineerYard (EEY), 2915 Riverport Road, Memphis, TN 38109 as defined in this Performance Work Statement. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government. Multiple Awards may be made from this solicitation.

It is highly recommended that contractors attend the scheduled site visit prior to submitting a quote. Site visit is scheduled for Tuesday, November 22, 2016 @ 10:00 a.m. CST, USACE Ensley Engineer Yard, 2915, Riverport Road, Memphis, TN 38109. Interested parties may e-mail their name and company information to Valerie Marshall

(901) 544-3619 at valerie.marshall@usace.army.mil, no later than 2:00 P.M. CST on Monday, November 21, 2016.

All contractors and government personnel will meet at the EEY Administration Building.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform sandblasting and painting of primarily metal substrates as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: Ensley Engineer Yard, 2915 Riverport Road, Memphis, TN 38109, frequently dry docks vessels that require some level of sandblast and painting.

1.3 Objectives: The Contractor shall perform sandblasting and painting of the hull, sides (including bow and stern), and draft marks.

1.4 Scope: See Section 5.

1.5 Period of Performance: The period of performance for this project November 2016 – January 12, 2017.

Normal business hours at Ensley Engineer Yard are 0700 – 1530 Monday through Friday. Contractor hours may be adjusted. If alternate hours are requested, this must be agreed upon by Contracting Officer’s Representative (COR) and contractor.

1.6 General Information

1.6.1 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.2 Recognized Holidays: The service provided will not be required to work on Federal holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.6.3 Hours of Operation: Normal business hours at Ensley Engineer Yard are 0700 – 1530 Monday through Friday during daylight savings time and 0630-1700 Monday through Thursday the remainder of the year.

Contractor hours may be adjusted. If alternate hours are requested, this must be agreed upon by Contracting Officer’s Representative (COR) and contractor.

1.6.4 Place of Performance: The work will be performed at Ensley Engineer Yard, 2915 Riverport Road, Memphis, TN 38109. The vessels will be in dry dock during sandblasting and painting operations as necessary but may be placed in the water for work that can be done in the dry.

1.6.5 Site Visit: See Section item number 1 entitled “General” above.

1.6.6 Type of Contract: The government will award a Firm Fixed Price purchase order.

1.6.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use, if needed.

1.6.7.2 Key Control N/A

1.6.7.2.1. N/A

1.6.7.2.2. N/A

1.6.7.3 N/A

1.6.8 Special Qualifications: None.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.10 Contracting Officer Representative (COR): The (COR) will be Andrea Williams, Chief of Plant Section, Civil Engineer. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: ensure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Key Personnel: The following personnel are considered key personnel by the government: Andrea Williams, Chief Plant Section and COR and Billy Manley, Chief Yards and Docks. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30 p.m., Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons.

1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. The name and contact information of the supervisor/foreman that will be on-site must be provided to the COR at the commencement of work. Should this information change the COR is to be notified immediately.

1.6.13 Contractor Travel: N/A

1.6.14 Other Direct Costs: None

1.6.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract.

All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.17 PHASE IN /PHASE OUT PERIOD: N/A

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement

AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial Off the Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: At project completion the Contractor and COR will make a joint visual inspection of the project and needed repairs for contractor damage, if found, will be noted and made immediately by the contractor at no additional cost to the Government.

3.2 Facilities: N/A

3.3 Utilities: The Government will provide reasonable utilities at its discretion.

3.4 Equipment: The Government may provide minimal assistance to the contractor with placing contractor’s equipment on the government’s dry docks.

3.5 Materials: N/A

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: Contractor is to provide all labor and material for the entire scope of work. No government equipment will be available for contractor use other than as specified in Section 3. Contractor is to provide an on- site supervisor on the job site for the duration of the job. The contractor will be responsible for damages and repairs to any Corps of Engineers equipment associated with the project.

4.2 Secret Facility Clearance: N/A

4.3. Materials: Any “Or Equal” material proposed by the contractor will be submitted for prior approval by the Contracting Officer’s Representative.

4.4. Equipment: All contractor equipment and debris, including sandblast mediat, will be removed immediately from government property at job completion.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1 Vessels to be Sandblasted and Painted

VESSEL SIZE Areas to be blasted & Painted

Dredge Goetz 225’ x 39’ x 7’ Entire Hull, sides, draft marks, and cutterhead ladder

MV Warren 124’ x 33’-10” x 11’ Entire Hull, sides & draft marks

Quarters Taggatz 160’ x 40’ x 11’ Entire Hull, sides & draft marks

5.2 General Instructions for Application of Materials

The following General Instructions for application of materials will be adhered to at all times:

Manufacturer’s instructions for application, curing and drying time between coats shall be followed. Painting practices shall comply with applicable federal, state, and local laws enacted to ensure compliance with Federal Clean Air Standards.

Paints that have exceeded the closed shelf life or pot life recommended by the manufacturer shall not be used.

At the time of application paint shall show no signs of deterioration. Paint that has deteriorated in any manner shall not be used and shall be removed from the site.

Within 8 [eight] hours after cleaning and prior to the deposition of any detectable moisture, contaminants, or corrosion, all surfaces blast cleaned to SSPC SP 7 shall be cleaned of dust and abrasive particle by brush, vacuum cleaner, and/or blown down with clean, dry, compressed air, and given the first coat of paint.

Paint may be applied by spray, roller, or brush. However, any area subject to over-sprays must be fully protected.

No over-spray will be tolerated.

Painting in the vicinity of mechanical or electrical equipment shall be applied by brush if there is a possibility of over-sprays on critical components. All equipment, deck, and bulkhead fixtures must be fully protected. No paint is allowed on the anodes or keel coolers.

Uniform suspension of pigments shall be maintained during application. Each coat of paint shall be applied so dry film shall be of uniform thickness and free from holidays, bubbles, blisters, laps, excessive or unsightly brush marks, runs, drops, ridges, waves, pinholes, or other voids, and variations in color, texture, and finish. Special attention shall be given to ensure that all edges, corners, crevices, seams, junctions of joining members, interior angles, corrosion pits, welds, bolts, rivets, and similar surface irregularities receive a film thickness equal to that of adjacent painted surfaces.

All coats of all painted surfaces shall be unscarred and completely integral at the time of application of succeeding coats.

All painting shall be accomplished before launching the vessel. The vessel shall not be launched before inspection and acceptance by the government.

The contractor is responsible for submitting to the Contracting Officer’s Representative a report of the quantity of sandblast media used and quantity of paint used for the project.

No sandblasting or spray painting is to take place until the Corps of Engineers representative has approved the preventative measures for blast and paint over-spray.

All areas of the vessel subject to damage from sandblasting, dust accumulation, or over-spray are to be sealed prior to sandblasting and/or painting. No blast media is allowed in the vessel or any equipment mounted on the vessel. All glass is to be covered and 100% protected from blast media and over-sprays.

5.3 Sandblast/Surface Preparation Standards

The Contractor shall clean the vessels in accordance with SSPC-SP-7, Brush-Off Blast Cleaning including the hull exterior from the top edge of the deck down to and including the hull, bow, stern, sides.

The Contractor shall clean in accordance with SSPC-SP-10, near white metal blast, all rusted surfaces and areas where any existing paint has insufficient coverage.

SSPC-SP7 / NACE 4 Brush-Off Blast Cleaning When viewed without magnification, the surface shall be free of all visible oil, grease, dirt, dust, loose mill scale, loose rust, and loose coating. Tightly adherent mill scale, rust, and coating may remain on the surface. Mill scale, rust, and coating are considered tightly adherent if they cannot be removed by lifting with a dull putty knife.

SSPC-SP10 / NACE 2 Near-White Blast Cleaning When viewed without magnification shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products and other foreign matter of at least 95% of each unit area. Staining shall be limited to no more than 5 percent of each unit area, and may consist of light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coatings. Unit area shall be approximately 3 in. x 3 in. (9 sq. in.).

5.4 Paint

For painting underwater surfaces of steel hulls anticorrosive, antifouling and boot-topping paints of approved proprietary brands may be specified. The COR will approve all paint submittals. “Or equal” brands may be submitted for acceptance.

Steel surfaces to be painted shall be carefully and thoroughly cleaned as dictated by the level of surface preparation requested in the order and shall be thoroughly dry before any preservative coating is applied.

The coating system composed of the coating types and dry film thicknesses identified below, or equal, are required.

Base Coat [self-priming---] Sherwin Williams, Black # 17038, Duraplate 2235, 6-8 MIL DFT entire bottom and sides from the deck down and including the hull

Top Coat Sherwin Williams, Black #17038, Acrolon Ultra, 2-3 MIL DFT, waterline up to deck

Top Coat ------ Sherwin Williams, Black #17038, Copper Bottom Anti-Fouling #45, 2-2.5 MIL DFT, waterline down on sides, hull, and entire bottom

Top Coat on Draft Marks----Sherwin Williams, White # FS595 fade resistant urethane, 4 MIL DFT.

SUSTAINABILITY GUIDANCE

Paints to be used - Sherwin Williams, Black # 17038 TarGuard Coal Tar Epoxy Sherwin Williams, Black # 17038, TarGuard Coal Tar Epoxy Sherwin Williams, White # FS595 fade resistant urethane

Recommended Recovered Materials Content Ranges:

EPA's Recovered Materials Advisory Notice (RMAN) recommends recycled-content levels for purchasing reprocessed and consolidated latex paint for specified uses as shown in the table below.

EPA's Recommended Recovered Materials Content Levels for Reprocessed and

Consolidated Latex Paints ¹

1EPA's recommendation does not preclude agencies from purchasing paints manufactured from other, non-latex materials, such as oil-based paints. It simply recommends that procuring agencies, when purchasing latex paints, purchase these items made from postconsumer recovered materials when these items meet applicable specifications and performance requirements.

The Contractor shall comply with the clause FAR 52.223-17, Affirmative Procurement of EPA designated Items in Service and Construction Contracts.

Upon completion provide COR with quantities of Sandblast media, paint thinner and paint used.

The U.S. Environmental Protection Agency’s (EPA’s) Comprehensive Procurement Guideline (CPG) list of designated products that must contain recovered/recycled material (http://www3.epa.gov/epawaste/conserve/tools/cpg/products/).

5.5 Other Contractor Requirements

ENVIRONMENTAL CONSIDERATIONS

Contractors must ensure containment and disposal of all waste generated during the project. Waste must be disposed of in accordance with EPA regulations. Some blast material may contain lead or chromium. The contractor must account for the disposal of this hazardous material.

No waste of any kind is to enter the lake. If contamination occurs, it will be the contractor’s responsibility for immediate remediation.

The contractor and the Corps of Engineers representative will agree upon a bi-weekly clean-up day. All waste will be removed from the dry dock and immediate area. Waste and blast media will be removed from Government property on a bi-weekly basis.

Product Post Consumer Total Recovered Content (%) Materials Content (%)

Reprocessed Latex Paint:

- White, Off-White, Pastel Colors 20 20

- Grey, Brown, Earthtones, and Other Dark Colors 50-99 50-99 Consolidated Latex Paint 100 100

Fuel storage tanks must be double wall or stored in a spill containment pan capable of holding at least 10% of the tank volume.

All paints/thinners or similar materials must be stored in a spill containment pan capable of holding at least 10% of the on hand volume.

Paint and thinner inventory will be maintained by the contractor and available for the corps representative upon request

Material Safety Data Sheets for all materials will be maintained on site and a copy will be provided to the COR.

Empty paint/thinner buckets will be removed from the job site daily.

Contractor will be responsible for performing lab analysis on paint/blast media waste within 10 days of the first day of sandblasting. Copies of these documents will be submitted to the Corps representative at that time.

Sandblast media and paint quantities used must be submitted to the COR upon project completion.

SAFETY REQUIREMENTS

Contractors are required to adhere to Corps of Engineers safety policies. Safety information can be obtained from Rob Shover, Safety Officer, at 901-544-3601.

ACCIDENT PREVENTION PROGRAM: Prior to work commencement, the contractor’s site-specific accident prevention plan is to be reviewed and found acceptable by the designated Government personnel. The US Army Corps of Engineers, Safety and Health Requirements Manual, EM 385-1-1, 15 Nov 2014, Appendix A provides a Minimum Basic Outline for Accident Prevention Plan for accident prevention plans. Prior to the project beginning, a safety conference with the Corps’ representative and safety officer will be held with the contractor’s employees.

At a minimum, fall, respirator, eye protection, confined space requirements per 29 CFR 1910.120 and 1910.146, and the contractor’s site-specific accident prevention plan will be discussed in a pre-start up conference.

ACCIDENT INVESTIGATIONS AND REPORTING: Report all accidents immediately to the Contracting Officer or Contracting Officer’s Representative (COR). Additionally, the contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the Contracting Officer, on ENG Form 3394, as soon as possible but no later than two [2] working days following the accident. Implement corrective actions as soon as reasonably possible.

Supervisor’s Responsibilities: For job related injuries which require medical treatment, a supervisor of the injured employee shall accompany the injured employee to the medical treatment facility and explain the employee’s regular duties and the availability of “Light Duty” so the injured employee can return to work as soon as medically possible.

MACHINERY AND MECHANIZED EQUIPMENT: All equipment shall be inspected prior to use on this contract. All equipment shall be re-inspected prior to use any time it is removed and subsequently returned to the contract site for use. Documentation of equipment inspections shall be made available to the Contracting Officer upon request. All equipment shall be properly guarded.

FIRST AID/CPR REQUIREMENTS: Two employees shall be certified in CPR and first-aid per shift/per site. Proof of certification shall be provided to the COR.

GOVERNMENT RESPONSIBILITIES

The Government is responsible for providing the following:

At project completion the Contractor and the COR, Andrea Williams, 901-544-3937 will make a joint visual inspection of the project location and needed repairs will be noted and made by the contractor immediately at no additional cost to the Government.

The Government will provide reasonable utilities at its discretion.

CONTRACTOR RESPONSIBILITIES

The successful offeror will be responsible for the following requirements:

Contractor is to provide all labor and material for the entire scope of work. No government equipment will be available for contractor use. Contractor is to provide an onsite supervisor on the job site for the duration of the job.

The contractor will be responsible for damages and repairs to any Corps of Engineers equipment associated with the project.

Contractor must contact Andrea Williams, 901-544-3937 or Billy Manley, 901-785-6058 to arrange for placement of contractor equipment.

All contractor equipment and waste will be removed immediately from government property at job completion.

Any “Or Equal” material proposed by the contractor will be submitted for prior approval by the Contracting Officer’s Representative.

CONTRACTOR SUBMITTALS

The following list of submittals will be provided to the Contracting Officer’s Representative as required.

Title

Accident Prevention Plan Activity Hazard Analysis CPR Certifications SDS Submissions Lab Analysis, Paint Blast Media, as required Accident Investigation Forms, as required Quantity of Sandblast media used upon completion Quantity of Paint used

CONTRACTING OFFICER /CONTRACTING OFFICER’S REPRESENTATIVE

CONTRACTING OFFICER’S REPRESENTATIVE:

The Contracting Officer’s Representative, or COR, is appointed by the Contracting Officer as the representative overseeing contractor operations. No instructions of the Contracting Officer's Representative or lack thereof will at any time relieve the Contractor from the responsibility of complying fully with all requirements of statement of work and the contract. The Contracting Officer's Representative is not authorized to waive or alter in any respect any of the terms or requirements of the contract, or to make additional requirements.

CONTRACTING OFFICER:

The Contracting Officer is the only Government representative with the authority to bind the Government and make changes to the contract. Any changes to the contract involving an increase or decrease in funds or performance period will be issued by formal contract modification.

FINAL INSPECTION

All painting shall be jointly inspected by the Contractor and the Contracting Officer’s Representative. Any defects or damage in the coating system shall be repaired by the Contractor as necessary before acceptance by the government.

WARRANTY OF WORK

The Contractor shall warranty the coating system for one calendar year, commencing at final inspection. The Contractor shall repair any coating failures during this time period at his cost.

CONTRACTOR MANAGEMENT REPORTING (CMR) : The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract.

The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also know as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub- Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement.

Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.

SECURITY REQUIREMENTS

ANTITERRORISM/OPERATIONS SECURITY:

All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. COMPLIANCE DOCUMENTS

The Contractor shall be aware of the following list of Compliance Documents, necessary for successful completion of this requirement.

EM-385-1-1 -- Army Corp of Engineers, Safety and Health Requirements Manual, Nov 2014 Accident Prevention Plan Accident Investigation Forms, as required CPR Certifications Training Certifications for 29 CFR 1910.120 and 1910.146.

SDS Submissions

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard Performance Threshold

Method of Surveillance

PRS # 1.

The Contractor shall sandblast and paint the hull, sides (including the stern and bow), and draft marks of 3 motor vessels.

The contractor shall sandblast and paint in accordance with the specification listed in the statement of work.

Full Government Acceptance.

Government Representatives to perform 100 Percent inspection.

CLAUSES INCORPORATED BY REFERENCE

52.204-13 System for Award Management Maintenance JUL 2013 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.212-1 Instructions to Offerors--Commercial Items OCT 2015 52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.223-4 Recovered Material Certification MAY 2008 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons.

JUN 2016

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting.

DEC 2015

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.213-7000 Notice to Prospective Suppliers on Use of Past Performance Information Retrieval System--Statistical Reporting in Past Performance Evaluations

JUN 2015

252.223-7001 Hazard Warning Labels DEC 1991 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Aug 2016)

AUG 2016

252.225-7002 Qualifying Country Sources As Subcontractors AUG 2016 252.225-7048 Export-Controlled Items JUN 2013 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7002 Obstruction of Navigable Waterways DEC 1991 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7001 Contractor Purchasing System Administration MAY 2014 252.247-7023 Transportation of Supplies by Sea APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;

or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.

(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:

Immediate owner CAGE code:

Immediate owner legal name: ___

(Do not use a ``doing business as'' name)

Is the immediate owner owned or controlled by another entity?:

[ ___ ] Yes or [ ___ ] No.

(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:

Highest-level owner CAGE code:

Highest-level owner legal name:

(Do not use a ``doing business as'' name)

(End of provision)

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

1. Past Performance

a. Requesting two past performance questionnaires demonstrating performance of relevant work, to be completed and returned with solicitation. (Past Performance Questionnaire is attached). If offeror has no past performance of this nature, a neutral rating will be given per FAR 15.305(a)(2)(iv).

2. Price

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.