A07D-SPECIFICATIONS.pdf
PDF 394 KB Posted
- Attached to
- NASH, MO PARCEL 5 RELIEF WELLS Federal contract opportunity
- Solicitation number
- W912EQ-17-B-0003
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract.pdf | ||
| A07E_Nash_17B0003__Amendment_0002.pdf | ||
| A07E_NASH_17B0003_Solicitation_Amendment.pdf | ||
| A07D-DRAWINGS.pdf | ||
| A07D-SOLICITATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NASH, MO PARCEL 5 RELIEF WELLS W912EQ-17-B-0003
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 11 SUMMARY OF WORK
01 22 00.00 11 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 04.00 11 CONTRACTOR QUALITY CONTROL
01 57 20.00 11 ENVIRONMENTAL PROTECTION
01 57 25.00 11 STORM WATER POLLUTION PREVENTION PLAN
01 58 01.00 11 PROJECT SIGNS
DIVISION 31 - EARTHWORK
31 05 19.00 11 GEOTEXTILE (FILTER FABRIC)
31 23 00.00 12 EXCAVATION
31 24 00.00 12 EMBANKMENT
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 32.01 11 ESTABLISHMENT OF TURF
DIVISION 33 - UTILITIES
33 26 00.00 11 RELIEF WELLS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19.00 11 STONE PROTECTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00.00 11
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
1.2 EXISTING WORK
1.3 LOCATION OF UNDERGROUND FACILITIES
1.4 UAI SUBPART 22.13 - EQUAL OPPORTUNITY FOR VETERANS (NOV 2014)
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 11 00.00 11 Page 1
SECTION 01 11 00.00 11
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work consists of furnishing all plant, labor and materials for the construction of 42 new relief wells to include drilling, installation and testing of new relief wells and related equipment; drilling and sampling of 42 pilot holes and performing laboratory soil sieve tests; constructing new collector ditches to convey the well discharge flows; constructing well benches; modifying existing ditches; proper placement of excess material in the excavated material disposal areas; establishment of turf; and environmental protection. The project limits are from levee baseline Station 2/41+00 to 5/0+00 as shown on the plans. The estimated value of the work is between $1,000,000 and $5,000,000.
1.1.2 Location
The work shall be located at Cape Girardeau County, Missouri. The exact location will be indicated on the contract drawings. The Contracting Officer's Representative will be available to show the exact location of the work at the two organized site visits.
1.2 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.3 LOCATION OF UNDERGROUND FACILITIES
Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated to be installed or removed, but indicated or discovered during work to be conducted or installed. For further instructions and details, see the paragraph entitled, "OBSTRUCTIONS" in Section 00 80 00.00 11 SPECIAL CONTRACT REQUIREMENTS.
1.4 UAI SUBPART 22.13 - EQUAL OPPORTUNITY FOR VETERANS (NOV 2014)
In addition to complying with the requirements outlined in FAR Part 22.13, SECTION 01 11 00.00 11 Page 2
FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS
222.13 and Department of Labor Regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information-https://www.fedshirevets.gov/index.aspx
Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/
Department of Veterans Affairs-VOW to Hire Heroes Act http://benefits.va.gov/vow/
Army Wounded Warrior Program http://wtc.army.mil/modules/employers/index.html
U.S. Chamber of Commerce Foundation-Hiring Our Heroes https://www.uschamberfoundation.org/hiring-our-heroes
Guide to Hiring Veterans - Reference Material https://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-_guide_
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 11 00.00 11 Page 3
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 11
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Mobilization and Demobilization
1.1.2 Environmental Protection
1.1.3 Earthwork
1.1.4 Establishment of Turf
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Storm Water Pollution Prevention
1.2.1.1 Write or Amend SWPPP and Maintain
1.2.1.2 Erosion Control Berm / Silt Fence
1.2.1.3 Check Dam
1.2.2 Relief Wells: 8-Inch
1.2.3 Pilot Hole Borings
1.2.4 Relief Well Pump Testing
1.2.5 Additional Step Pumping Tests
1.2.6 Relief Well Guard Posts
1.2.7 Geotextile Filter Fabric
1.2.8 Riprap R-90
1.2.9 Riprap R-200
1.2.10 Filter Material
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 22 00.00 11 Page 1
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 11
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Mobilization and Demobilization
1.1.2 Environmental Protection
1.1.3 Earthwork
1.1.4 Establishment of Turf
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Storm Water Pollution Prevention
1.2.1.1 Write or Amend SWPPP and Maintain
1.2.1.2 Erosion Control Berm / Silt Fence
1.2.1.3 Check Dam
1.2.2 Relief Wells: 8-Inch
1.2.3 Pilot Hole Borings
1.2.4 Relief Well Pump Testing
1.2.5 Additional Step Pumping Tests
1.2.6 Relief Well Guard Posts
1.2.7 Geotextile Filter Fabric
1.2.8 Riprap R-90
1.2.9 Riprap R-200
1.2.10 Filter Material
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 22 00.00 11 Page 1
SECTION 01 22 00.00 11
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract Job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular Job or unit price payment item, shall be included in the listed Job item most closely associated with the work involved. The Job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Mobilization and Demobilization
a. Measurement
No measurement will be made for Mobilization and Demobilization.
b. Payment
Payment will be made for costs associated with mobilization and demobilization, as defined in Section 00 70 00.00 11, Paragraph 1.17 -
DFARS 252.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION.
c. Unit of measure: Job: JA
1.1.2 Environmental Protection
a. Measurement
No measurement will be made for Environmental Protection.
b. Payment
Payment will be made for costs associated with operations necessary for environmental protection as specified in Section 01 57 20.00 11 ENVIRONMENTAL PROTECTION. This price and payment shall be considered full compensation for furnishing all plant, labor, materials, and equipment and for performing all operations necessary for "Environmental Protection." This price and payment does not include those items covered under "Storm Water Pollution Prevention;" however, it does include items incidental thereto. The Contractor shall be responsible for payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor. The Contractor shall be responsible for payment of all fines/fees arriving from
SECTION 01 22 00.00 11 Page 2 violation or non-compliance with Federal, State, Regional, and local laws or regulations. The Government will not provide any compensation for payments of fines/fees, in the event that fines/fees are incurred by the Contractor.
c. Unit of measure: Job: JA
1.1.3 Earthwork
a. Measurement
No measurement will be made for Earthwork.
b. Payment
Payment for Earthwork as specified in this section will be made at the contract Job price for "Earthwork", which price and payment shall constitute full compensation for excavation of collector ditches and relief well benches, construction of earthen relif well pads, grading required around relief wells and excavated material disposal areas and all other operations incidental thereto; all as specified in SECTIONS 31 23 00.00 12 and 31 24 00.00 12 and in the plans as applicable to the ditches, benches and earthen embankments.
c. Unit of measure: Job: JA
1.1.4 Establishment of Turf
a. Measurement
No measurement will be made for Establishment of Turf.
b. Payment
Payment for Establishment of Turf as specified in SECTION 32 92 32.01 11 -ESTABLISHMENT OF TURF will be made at the contract job price for Establishment of Turf. Such price and payment shall constitute full compensation for furnishing all materials, equipment and labor, and manufacturing, transporting, placing, preparation of ground surface, furnishing and distributing fertilizer, seed and mulch. This includes all other operations incidental thereto, to include mulching, compaction, and maintenance (e.g. watering and mowing). No payment for turfing will be made until final acceptance by the Contracting Officer.
After 1 year,if acceptable turf has not been established, the Contracting Officer may terminate the contract under the Default Clause.
c. Unit of measure: Job: JA
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract for which unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, meeting safety requirements, tests and reports, and for performing all related work required for which separate payment is not otherwise provided.
SECTION 01 22 00.00 11 Page 3
1.2.1 Storm Water Pollution Prevention
No separate measurement or payment will be made for the work Storm Water Pollution Prevention required by Section 01 57 25.00 11 STORM WATER POLLUTION PREVENTION PLAN except as described in the paragraphs SILT FENCE, WRITE OR AMEND SWPPP AND MAINTAIN and EROSION CONTROL BERM below. Any additional costs associated with Storm Water Pollution Prevention, other than these listed below, shall be included in the contract price under Environmental Protection.
1.2.1.1 Write or Amend SWPPP and Maintain
a. Measurement
Measurement for NPDES application preparation, submission, and obtaining a general permit from Missouri Department of Natural Resources (MODNR) as well as preparing and maintaining the SWPPP will be per each NPDES application accepted to include an acceptable SWPPP and maintaining same.
b. Payment
Payment for development of the SWPPP, amending as required, and maintaining; and obtaining a construction general permit for erosion prevention and sediment control will be made at the contract unit price for Write or Amend SWPPP and Maintain. Price and payment shall constitute full compensation for furnishing all plant, labor, equipment, and material to complete the work of writing and maintaining the SWPPP, submitting the NPDES application to MODNR, and obtaining a construction general permit for erosion prevention and sediment control from MODNR. Payment will not be made for any permit application rejected by MODNR or revision of the SWPPP required by MODNR. SWPPP will be written in accordance with all rules and regulations outlined by MODNR.
c. Unit of measure: Each: EA
1.2.1.2 Erosion Control Berm / Silt Fence
a. Measurement
Measurement for erosion control berm / silt fence satisfactorily placed will be made by the linear foot.
b. Payment
Payment for Erosion Control Berm and silt fence as specified herein will be made at the contract unit price per linear foot for Erosion Control Berm / Silt Fence. Price and payment shall constitute full compensation for furnishing all plant, labor, materials and equipment, including geotextile fabric, post and staples, and performing all operations necessary for the placement and maintenance of Erosion Control Berm and silt fence as either indicated on the drawings, developed by the contractor in the updated SWPPP, and/or specified in Section 01 57 25.00 11 Storm Water Pollution Prevention Plan throughout the contract period, including any/all repair or replacement of installed features that are no longer functioning or servicable and ultimately final dressing and cleanup.
SECTION 01 22 00.00 11 Page 4
c. Unit of Measure: Linear Foot: LF
1.2.1.3 Check Dam
a. Measurement
Measurement for Check Dams shall be made according to the total linear feet of completed temporary check dams installed as shown on the plans.
b. Payment
Payment for Temporary Check Dams as specified herein will be made at the contract unit price per linear foot for Check Dam. Price and payment shall constitute full compensation for furnishing all plant, labor, materials and equipment, and performing all operations necessary for the placement and maintenance of Check Dam as specified in Section 01 57 25.00 11 Storm Water Pollution Prevention Plan and shown on the drawings throughout the contract period.
c. Unit of Measure: Linear Foot: LF
1.2.2 Relief Wells: 8-Inch
a. Measurement
Measurement for Relief Wells: 8-Inch shall be made by the linear foot of completed well between the ground surface and the elevation at the bottom of the well screen.
b. Payment
Payment for Relief Wells: 8-Inch as specified in this section will be made at the contract unit price per linear foot for "Relief Wells:
8-Inch", which price and payment shall constitute full compensation for construction of relief wells all as specified in SECTION 33 26 00.00 11-RELIEF WELLS. Wells ordered abandoned by the Contracting Officer before installation of well screen and riser, due to no fault of the Contractor, will be paid at 50 percent of the applicable contract unit price per linear foot, for "Relief Wells:
8-Inch". Wells ordered abandoned by the Contracting Officer after installation of well screen and riser, due to no fault of the Contractor, will be paid for at the full applicable contract unit price per linear foot, for "Relief Wells: 8-Inch". No payment will be made for placement or replacement of temporary drilling casings or repair of damage resulting from Contractor operations. No separate payment will be made for relief well screen, risers, gravel pack, grout, development, sand and concrete backfill, concrete pads, or discharge or outlet discharge assembly. No payment will be made for any wells or drilled holes that, in the opinion of the Contracting Officer, are abandoned due to Contractor fault or neglect.
c. Unit of measure: Linear Foot: LF.
1.2.3 Pilot Hole Borings
a. Measurement
Pilot Hole Borings will be measured for payment by the linear foot.
SECTION 01 22 00.00 11 Page 5
b. Payment
Payment will be made at the contract unit price per linear foot for "Pilot Hole Borings", which price and payment shall constitute full compensation for drilling of the pilot hole borings, taking of samples, sieve analysis tests, and the maintaining of a field log as specified in SECTION 33 26 00.00 11 RELIEF WELLS.
c. Unit of measure: Linear Foot: LF.
1.2.4 Relief Well Pump Testing
a. Measurement
Pumping tests will be measured for payment for each hour, measured to the nearest 15 minutes, of pumping test successfully performed as specified in SECTION 33 26 00.00 11 - RELIEF WELLS, Subparts 3.9.4.2 and 3.11. Testing time will not include time required to place and remove testing and pumping equipment.
b. Payment
Payment for Relief Well Pump Testing will be made at the applicable contract unit price per hour for "Pump Testing: First 210 Hours" or "Pump Testing: All over 210 Hours", which price and payment shall constitute full compensation for performing satisfactory pumping tests as specified in SECTION 33 26 00.00 11 - RELIEF WELLS. No payment will be made for pumping tests not successfully completed.
c. Unit of measure: Hours: HR.
1.2.5 Additional Step Pumping Tests
a. Measurement
Pumping tests will be measured for payment for each half hour, measured to the nearest 15 minutes, of pumping test successfully performed as specified in SECTION 33 26 00.00 11 - RELIEF WELLS, Subpart 3.11.6.
Testing time will not include time required to place and remove testing and pumping equipment.
b. Payment
Payment for pumping test will be made at the applicable contract unit price per hour for "Additional Step Pumping Tests", which price and payment shall constitute full compensation for performing satisfactory pumping tests as specified in SECTION 33 26 00.00 11 - RELIEF WELLS, Subpart 3.11.6. No payment will be made for pumping tests not successfully completed.
c. Unit of measure: Hours: HR.
1.2.6 Relief Well Guard Posts
a. Measurement
SECTION 01 22 00.00 11 Page 6
Measurement for Relief Wells Guard Posts placed in a satisfactory manner will be made per each new guard post.
b. Payment
Payment for Relief Well Guard Posts will be made at the contract unit price for "Relief Well Guard Posts" which price and payment shall constitute full compensation for furnishing all plant, labor, material (including concrete), and equipment for performing all operations necessary to build and install the guard posts as shown on the drawings and/or specified in the paragraph entitled "RELIEF WELL GUARD POSTS" of
SECTION 33 26 00.00 11 - RELIEF WELLS.
c. Unit of measure: Each: EA.
1.2.7 Geotextile Filter Fabric
a. Measurement
Measurement for Geotextile Filter Fabric shall be made per square yard of geotextile in place. Note that this does not include the geotextile filter fabric used to construct the concrete washout trenches, which are covered under Paragraph 1.2.22 "Concrete Washout Trenches".
b. Payment
Payment for Geotextile Filter Fabric will be made at the contract unit price per square yard for "Geotextile Filter Fabric" which price and payment shall constitute full compensation to the Contractor for providing all plant, labor, material, and equipment and performing all operations necessary for the complete and satisfactory installation of the geotextile. Payment for the items listed below in the contract unit price for "Geotextile Filter Fabric" and shall not be counted a second time in the process of determining the extent of geotextile placed:
(1) Material and associated equipment and operation used in laps, seams, or extra length.
(2) Securing pins and associated material, equipment, and operations;
no payment shall be made for geotextiles replaced because of contamination or damage due to Contractor fault or negligence.
c. Unit of measure: Square Yards: SY.
1.2.8 Riprap R-90
a. Measurement
If the riprap material is delivered by railroad, weights as acceptable to the railroad for freight charge purposes will be accepted as measurement of the riprap material. Copies of freight bills or certifications of weights acceptable to the railroad for freight charge purposes shall be furnished. If not delivered by railroad, but delivered by truck, the riprap material will be measured for payment, in the presence of a Government Inspector unless waived by the Contracting Officer, by being weighed on approved, accurately calibrated scales furnished by and at the expense of the Contractor.
Weight certificates furnished by a public weighmaster where available will be accepted in lieu of such procedure when authorized by the Contracting Officer. Individual weight tickets shall be furnished to the Government Inspector at the time of delivery. The tickets are to
SECTION 01 22 00.00 11 Page 7 show contract number and/or project name, truck I.D., empty weight of truck, gross weight, and net weight of load.
b. Payment
Payment for Riprap: R-90 as specified in this section will be made at the contract unit price per ton (2,000 pounds) for "Riprap: R-90", which price and payment shall constitute full compensation for furnishing, hauling, handling, placing, and maintaining the riprap, all as specified in SECTION 35 31 19.00 11 STONE PROTECTION.
c. Unit of measurement: Ton: TN.
1.2.9 Riprap R-200
a. Measurement
If the riprap material is delivered by railroad, weights as acceptable to the railroad for freight charge purposes will be accepted as measurement of the riprap material. Copies of freight bills or certifications of weights acceptable to the railroad for freight charge purposes shall be furnished. If not delivered by railroad, but delivered by truck, the riprap material will be measured for payment, in the presence of a Government Inspector unless waived by the Contracting Officer, by being weighed on approved, accurately calibrated scales furnished by and at the expense of the Contractor.
Weight certificates furnished by a public weighmaster where available will be accepted in lieu of such procedure when authorized by the Contracting Officer. Individual weight tickets shall be furnished to the Government Inspector at the time of delivery. The tickets are to show contract number and/or project name, truck I.D., empty weight of truck, gross weight, and net weight of load.
b. Payment
Payment for Riprap: R-200 as specified in this section will be made at the contract unit price per ton (2,000 pounds) for "Riprap: R-200", which price and payment shall constitute full compensation for furnishing, hauling, handling, placing, and maintaining the riprap, all as specified in SECTION 35 31 19.00 11 STONE PROTECTION
c. Unit of measurement: Ton: TN
1.2.10 Filter Material
a. Measurement
If the filter material is delivered by railroad, weights as acceptable to the railroad for freight charge purposes will be accepted as measurement of the filter material. Copies of freight bills or certifications of weights acceptable to the railroad for freight charge purposes shall be furnished. If not delivered by railroad, but delivered by truck, the filter material will be measured for payment, in the presence of a Government Inspector unless waived by the Contracting Officer, by being weighed on approved, accurately calibrated scales furnished by and at the expense of the Contractor.
Weight certificates furnished by a public weighmaster where available will be accepted in lieu of such procedure when authorized by the Contracting Officer. Individual weight tickets shall be furnished to
SECTION 01 22 00.00 11 Page 8 the Government Inspector at the time of delivery. The tickets are to show contract number and/or project name, truck I.D., empty weight of truck, gross weight, and net weight of load.
b. Payment
Payment for Filter Material as specified in this section will be made at the contract unit price per ton (2,000 pounds) for "Filter Material", which price and payment shall constitute full compensation for furnishing, hauling, handling, placing, and maintaining the filter material, all as specified in SECTION 35 31 19.00 11 STONE PROTECTION
c. Unit of measurement: Ton: TN
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION(Not Used)
SECTION 01 22 00.00 11 Page 9
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal
1.1.2 Submittal Descriptions (SD)
1.1.3 Approving Authority
1.1.4 Work
1.2 SUBMITTALS
1.3 SUBMITTAL REGISTER
1.4 CONTRACTOR USE OF SUBMITTAL REGISTER
1.5 APPROVING AUTHORITY USE OF SUBMITTAL REGISTER
1.6 COPIES DELIVERED TO THE GOVERNMENT
1.7 PROCEDURES FOR SUBMITTALS
1.7.1 Reviewing, Certifying, Approving Authority
1.7.2 Constraints
1.7.3 Scheduling
1.7.4 Variations
1.7.4.1 Considering Variations
1.7.4.2 Proposing Variations
1.7.4.3 Warranting That Variations Are Compatible
1.7.4.4 Review Schedule Is Modified
1.8 CONTRACTOR'S RESPONSIBILITIES
1.9 GOVERNMENT'S RESPONSIBILITIES
1.10 FORMAT OF SUBMITTALS
1.10.1 Transmittal Sheet
1.10.2 Identifying Submittals
1.11 SUBMISSION AND CONTROL OF SUBMITTALS
1.11.1 Submittals Required from the Contractor
1.11.1.1 Submittal Procedures and Deviations
1.11.1.2 Control of Submittals
1.11.1.3 O&M Data
1.12 SUBMITTAL CLASSIFICATION
1.12.1 Government Approved
1.12.2 Information Only
1.13 APPROVED SUBMITTALS
1.14 DISAPPROVED SUBMITTALS
1.15 WITHHOLDING OF PAYMENT
1.16 GENERAL
1.17 SUBMITTAL REGISTER
1.18 SCHEDULING
1.19 TRANSMITTAL SHEET (ENG FORM 4025)
1.20 GOVERNMENT APPROVED SUBMITTALS
1.21 INFORMATION ONLY SUBMITTALS
1.22 STAMPS
PART 2 PRODUCTS (Not Used)
SECTION 01 33 00 Page 1
PART 3 EXECUTION (Not Used)
SECTION 01 33 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal
Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."
1.1.2 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by SD numbers and titles as follows.
SD-01 Preconstruction Submittals
Certificates of Insurance.
Surety Bonds.
Construction Progress Schedule.
Work Plan.
Submittal Register.
Schedule of Prices.
Accident Prevention Program.
Quality Control Plan.
Environmental Protection Plan.
Updated Stormwater Pollution Prevention Plan List of Proposed Subcontractors.
List of Proposed Products.
List of Barges.
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials or equipment for some portion of the work.
SECTION 01 33 00 Page 3
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
SECTION 01 33 00 Page 4
Confined space entry permits.
Text of posted operating instructions.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
1.1.3 Approving Authority
Approving authority rests with the Contracting Officer and his/her Authorized Representative(s). Approval actions and correspondence with the Contractor shall be made through the Caruthersville Area Office.
1.1.4 Work
As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submittal register.; G
1.3 SUBMITTAL REGISTER
Submit the submittal register at least seven days prior to the prework conference. Verify that all submittals required for the project are listed and add any missing submittals. Complete the following on the register:
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
1.4 CONTRACTOR USE OF SUBMITTAL REGISTER
Update the following fields.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to Area Engineer.
Column (l) List date of submittal transmission.
SECTION 01 33 00 Page 5
Column (q) List date approval received.
1.5 APPROVING AUTHORITY USE OF SUBMITTAL REGISTER
Update the following fields.
Column (b).
Column (l) List date of submittal receipt.
Column (m) through (p).
Column (q) List date returned to Contractor.
1.6 COPIES DELIVERED TO THE GOVERNMENT
Deliver one copy of submittal register updated by Contractor to Government with each invoice request.
1.7 PROCEDURES FOR SUBMITTALS
1.7.1 Reviewing, Certifying, Approving Authority
The Contractor Quality Control (CQC) organization shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals ultimately rests with the Contracting Officer, and his/her Authorized Representative(s). Approval of all submittals will be made through the Caruthersville Area Office.
1.7.2 Constraints
a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.
b. Submittals shall be complete for each definable feature of work;
components of definable feature interrelated as a system shall be submitted at same time.
c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.
d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.
1.7.3 Scheduling
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.
b. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 15 working days for submittals for Contracting Officer's Authorized Representative approval and 20 working days for submittals for Contracting Officer approval. Period of review for submittals with Contracting Officer approval begins when Government receives submittal from CQC organization. Period of review for each
SECTION 01 33 00 Page 6 resubmittal is the same as for initial submittal.
1.7.4 Variations
Variations from contract requirements require Government approval pursuant to contract Clause entitled "FAR 52.236-21, Specifications and Drawings for Construction" and will be considered where advantageous to Government.
1.7.4.1 Considering Variations
Discussion with Caruthersville Area Office prior to submission, will help ensure functional and quality requirements are met and minimize rejections and resubmittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).
1.7.4.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost saving. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
1.7.4.3 Warranting That Variations Are Compatible
When delivering a variation for approval, Contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.7.4.4 Review Schedule Is Modified
In addition to normal submittal review period, a period of 15 working days will be allowed for consideration by the Government of submittals with variations.
1.8 CONTRACTOR'S RESPONSIBILITIES
a. Determine and verify field measurements, materials, field construction criteria; review each submittal; and check and coordinate each submittal with requirements of the work and contract documents.
b. Transmit submittals to the Government in accordance with the approved Submittal Register. To prevent delays in the work, delays to Government, or delays to separate Contractors transmit submittals using ENG FORM 4025 (Transmittal Sheet).
c. Stamp submittal data to certify that the submittal meets contract requirements.
d. Advise Contracting Officer of variation, as required by paragraph entitled "Variations."
e. Correct and resubmit submittal as directed by approving authority. When resubmitting disapproved transmittals or transmittals noted for resubmittal, the Contractor shall provide copy of that previously submitted transmittal including all
SECTION 01 33 00 Page 7 reviewer comments for use by approving authority. Direct specific attention in writing or on resubmitted submittal, to revisions not requested by approving authority on previous submissions.
f. Furnish additional copies of submittal when requested by Contracting Officer, to a limit of 20 copies per submittal.
g. Complete work which must be accomplished as basis of a submittal in time to allow submittal to occur as scheduled.
h. Ensure no work has begun until submittals for that work have been returned as "Approved as submitted" or "Approved, except as noted...", except to the extent that a portion of work must be accomplished as basis of submittal.
1.9 GOVERNMENT'S RESPONSIBILITIES
a. Note date on which submittal was received from Contractor on each submittal.
b. Review each submittal; and check and coordinate each submittal with requirements of work and contract documents.
c. Review submittals for conformance with project design concepts and compliance with contract documents.
d. Act on submittals, determining appropriate action.
(1) When the Contracting Officer's Authorized Representative is the approving authority, take appropriate action on submittal.
(2) When Contracting Officer is approving authority or when variation has been proposed, forward submittal to Memphis District Office, care of the Construction Branch, with the necessary certifying statement.
e. Ensure that material is clearly legible.
f. When approving authority is Contracting Officer, Caruthersville Area Office will certify submittals forwarded to Contracting Officer with the following certifying statement:
"I hereby certify that the (equipment) (material) (article) shown and marked in this submittal is that proposed to be incorporated with contract No. W912EQ-__-C-____, is in compliance with the contract drawings and specification, can be installed in the allocated spaces, and is submitted for Contracting Officer approval.
Certified by Submittal Reviewer _____________________, Date _______ (Signature when applicable)
Certified by Area Engineer __________________________, Date ______" (Signature)
Stamp each sheet of each submittal with certifying statement, except that data submitted in bound volume or on one sheet printed on two sides may be stamped on the front of the first sheet only.
SECTION 01 33 00 Page 8
g. When approving authority is the Contracting Officer's Authorized Representative, the Area Engineer will take approval action on ENG FORM 4025 (Transmittal Sheet).
h. Sign certifying statement or ENG FORM 4025 (Transmittal Sheet).
i. Update submittal register as submittal actions occur and maintain the submittal register at project site until final acceptance of all work by Contracting Officer.
j. Retain a copy of approved submittals at project site, including Contractor's copy of approved samples.
k. When approving authority is Contracting Officer, the Government will:
(1) Note date on which submittal was received by Contracting Officer, on each submittal for which the Contracting Officer is approving authority.
(2) Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
(3) Returned submittals with appropriate action indicated.
1.10 FORMAT OF SUBMITTALS
1.10.1 Transmittal Sheet
Transmit each submittal, except sample installations and sample panels, to office of approving authority. Transmit submittals on ENG FORM 4025 (Transmittal Sheet) located at the following website:
http://www.mvm.usace.army.mil/BusinessWithUs/Contracting/Forms.aspx. The transmittal sheet shall identify Contractor, indicate date of submittal, and include information prescribed by transmittal sheet and required in paragraph entitled "Identifying Submittals." Process transmittal sheets to record actions regarding sample panels and sample installations.
1.10.2 Identifying Submittals
Identify submittals, except sample panel and sample installation, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal sheet. Mark each copy of each submittal identically, with the following:
a. Project title and location.
b. Construction contract number.
c. Section number of the specification section by which submittal is required.
d. Submittal description (SD) number of each component of submittal.
e. When a resubmission, add alphabetic suffix on submittal description, for example, SD-10A, to indicate resubmission.
f. Name, address, and telephone number of subcontractor, supplier, SECTION 01 33 00 Page 9 manufacturer and any other second tier Contractor associated with submittal.
g. Product identification and location in project.
1.11 SUBMISSION AND CONTROL OF SUBMITTALS
1.11.1 Submittals Required from the Contractor
Within 15 calendar days after receipt of notice to proceed, the Contractor shall complete and submit to Mr. Stephen Shankle, Acting Area Engineer, Caruthersville Area Office, 706 Harry S. Truman Blvd., Caruthersville, Missouri 63830-1268 submittals required in the technical sections of this specification, including shop drawings, product data and samples.
1.11.1.1 Submittal Procedures and Deviations
The Government will further discuss detailed submittal procedures with the Contractor at the Preconstruction Conference. For submittals which include proposed deviations requested by the Contractor, the column "variation" of ENG Form 4025 shall be checked. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.11.1.2 Control of Submittals
The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.11.1.3 O&M Data
Contracting Officer will review and approve the O&M Data to verify the submittals comply with the contract requirements; submit data specified for a given item within 30 calendar days after the item is delivered to the contract site. In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data are applicable.
1.12 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.12.1 Government Approved
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.
Within the terms of the Contract Clause entitled "Specifications and Drawings for Construction," they are considered to be "shop drawings."
1.12.2 Information Only
All submittals not requiring Government approval will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
SECTION 01 33 00 Page 10
1.13 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory.
Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the CQC requirements of this contract is responsible for design, dimensions, all design extensions, such as the design of adequate connections and details, etc., and the satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.14 DISAPPROVED SUBMITTALS
The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" shall be given promptly to the Contracting Officer.
1.15 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.16 GENERAL
The Contractor shall make submittals as required by the specifications.
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items shall be checked and approved by the CQC System Manager and each item shall be stamped, signed, and dated by the CQC System Manager indicating action taken. Proposed deviations from the contract requirements shall be clearly identified. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings;
descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders;
samples; O&M manuals (including parts list); certifications; warranties;
and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby. Samples remaining upon completion of the work shall be picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
1.17 SUBMITTAL REGISTER
At the end of this section is a submittal register showing items of equipment and materials for which submittals are required by the specifications; this list may not be all inclusive and additional submittals may be required. The Government will provide the initial submittal register in electronic format. Thereafter, the Contractor shall
SECTION 01 33 00 Page 11 maintain a complete list of all submittals, including completion of all data columns. Dates on which submittals are received and returned by the Government will be tracked. The Contractor shall monitor the progress of all submittals.
1.18 SCHEDULING
Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time (a minimum of 21 calendar days exclusive of mailing time) shall be allowed and shown on the register for review and approval. No delay damages or time extensions will be allowed for time lost in late submittals.
1.19 TRANSMITTAL SHEET (ENG FORM 4025)
A sample transmittal sheet (ENG Form 4025), which can be found at http://www.mvm.usace.army.mil/BusinessWithUs/Contracting/Forms.aspx shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. Additionally, these forms are included in the QCS software that is available for Contractor use. The transmittal sheet shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.
1.20 GOVERNMENT APPROVED SUBMITTALS
Upon completion of review of submittals requiring Government approval, the submittals will be identified as having received approval by being so stamped and dated. Three copies of the submittal will be retained by the Contracting Officer and three copies of the submittal will be returned to the Contractor.
1.21 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.22 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:
SECTION 01 33 00 Page 12
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s). |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
Stamps used by the Contracting Officer's Authorized Representative on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:
| I hereby certify that the (equipment)(material)(article)shown | | and marked in this submittal is that proposed to be incorporated | | with contract No. W912EQ-__-C-____, is in compliance with the | | contract drawings and specification, can be installed in the | | allocated spaces, and is submitted for Contracting Officer approval. | | Certified by Submittal Reviewer ____________________, Date _______ | | (Signature when applicable) | | Certified by Area Engineer _________________________, Date ______ | | (Signature) |
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 33 00 Page 13
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
(Read instructions on the reverse side prior to initiating this form)
DATE TRANSMITTAL NO.
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)
TO: FROM: CONTRACT NO. CHECK ONE:
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL
SPECIFICATION SEC. NO. (Cover only one section with each transmittal)
PROJECT TITLE AND LOCATION CHECK ONE: THIS TRANSMITTAL IS
FOR FIO GOV'T. APPROVAL
ITEM
NO.
a.
DESCRIPTION OF ITEM SUBMITTED
(Type size, model number/etc.)
b.
MFG OR CONTR.
CAT., CURVE
DRAWING OR
BROCHURE NO.
(See instruction no. 8) c.
NO.
OF
COPIES
d.
CONTRACT REFERENCE
DOCUMENT
SPEC.
PARA. NO.
e.
DRAWING
SHEET NO.
f.
FOR
CONTRACTOR
USE CODE
g.
VARIATION
(See instruction No. 6) h.
FOR
CE
USE
CODE
i.
REMARKS I certify that the above submitted items have…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .