SOLICITATION FOR GENERATOR REPLACEMENT
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912EQ-16-T-0022 29-Aug-2016
b. TELEPHONE NUMBER
901-544-3619
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 07 Sep 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912EQ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
VALERIE MARSHALL
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W38XGR60906117
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
VALERIE MARSHALL
167 N. MAIN STREET
VALERIE.MARSHALL@USACE.ARMY.MIL
MEMPHIS TN 38103-1894
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W38XGR 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
W2R9 ENDIST MEMPHIS
SEE SCHEDULE
167 NORTH MAIN ST, RM B202
MEMPHIS TN 38103-1894
TEL: 901 544-4125 FAX:
901-544-3710FAX:
TEL: 901-544-3619 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
NAICS:
335312
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF82
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912EQ-16-T-0022
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
DD17 GENERATOR-REPLACEMENT
FFP
ONE (1) 250KW 480V 3PH GENERATOR.
SEE SPECIFICATIONS BELOW
FOB: Destination
MILSTRIP: W38XGR60906117
PURCHASE REQUEST NUMBER: W38XGR60906117
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 31-OCT-2016 1 W2R9 ENDIST MEMPHIS
SEE SCHEDULE
167 NORTH MAIN ST, RM B202
MEMPHIS TN 38103-1894
901 544-4125 FOB: Destination
W38XGR
SPECIFICATIONS
SPECIFICATIONS FOR
ARMY CORPS OF ENGINEERS
DD17 PUMPING STATION GENERATOR
MISSISSIPPI COUNTY, AR
TABLE OF CONTENTS
SECTION C – WORK STATEMENT/DESCRIPTION/SPECIFICATIONS
C-1 GENERAL
C-1.1 DESCRIPTION OF WORK
C-1.2 ENGINEERING SERVICES
C-1.3 PROJECT TIMING
C-2 DESCRIPTION
C-2.1 WARRANTY
C-2.2 SUBMITTALS
C-2.2.1 EXPERIENCE
C-2.2.1.1 DURABILITY CERTIFICATION
C-2.2.1.2 AUXILIARIES AND ATTACHMENTS
C-2.2.2 CERTIFICATES OF COMPLIANCE
C-2.2.3 CERTIFICATES OF FUEL CONSUMPTION
C-2.2.4 SHOP DRAWINGS
C-2.2.5 SPARE PARTS DATA
C-2.2.6 SPECIAL TOOLS
C-2.2.7 OPERATING AND MAINTENANCE INSTRUCTIONS
C-2.2.8 SEQUENCE OF SUBMITTALS
C-2.2.9 TRANSMITTALS AND DELIVERY DESTINATION
C-2.3 RESPONSIBILITY OF THE CONTRACTOR
C-2.3.1 SERVICES AND SUPPLIES ON THE DIESEL ENGINE-
GENERATORS
C-2.4 SAFETY-RELATED SPECIAL REQUIREMENTS
C-2.5 DEFINITIONS
C-2.6 HOURS OF WORK
C-2.7 RELEASE FROM LIABILITY
C-2.8 BUY AMERICAN ACT
C-2.9 SECURITY REQUIRMENTS
C-3 SPECIFICATIONS
C-3.1 APPLICABLE PUBLICATIONS
C-3.1.1 FEDERAL SPECIFICATIONS
C-3.1.2 MILITARY SPECIFICATIONS
C-3.1.3 AMERICAN NATIONAL STANDARDS INSTITUTE, INC. (ANSI)
STANDARDS
C-3.1.4 AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
PUBLICATIONS
C-3.1.5 INSTITUTE FO ELECTRICAL AND ELECTRONICS ENGINEERS
(IEEE) STANDARDS
C-3.1.6 MANUFACTURES STANDARDIZATION SOCIETY OF THE VALVE
AND FITTING INDUSTRY (MSS)
C-3.1.7 NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
(NEMA) STANDARDS
C-3.1.8 NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
STANDARDS
C-3.2 GENERAL REQUIREMENTS
C-3.2.1 NAMEPLATES
C-3.2.2 PERSONAL SAFETY DEVICES
C-3.2.3 FIELD ENGINEERING SERVICES
C-3.3 MATERIALS
C-3.3.1 AIR CLEANER
C-3.3.2 ELECTRICAL INSTRUMENTS
C-3.3.3 FUEL OIL FILTER ELEMENTS
C-3.3.4 LUBRICATING OIL FILTER ELEMENTS
C-3.3.5 GENERATOR AND EXCITER
C-3.3.6 INSTRUMENT TRANSFORMER
C-3.3.7 PRESERVATIVE OIL
C-3.3.8 FLANGES AND FLANGED FITTINGS
C-3.3.9 WELDING FITTINGS
C-3.3.10 THREADED FITTINGS
C-3.3.11 PRESSURE GAUGES
C-3.3.12 RELAYS, CONTROL AND PROTECTIVE
C-3.3.13 SHEET STEEL
C-3.3.14 THERMOMETERS
C-3.3.15 CHECK, GATE AND GLOBE VALVES
C-3.4 ELECTRICAL WORK
C-3.5 ENGINE-GENERATOR SET RATING
C-3.5.1 GENERAL
C-3.5.2 RATING
C-3.6 ENGINE
C-3.6.1 GENERAL REQUIREMENTS
C-3.6.2 LIMITATIONS ON VIBRATION
C-3.6.3 VIBRATION ISOLATION SYSTEM
C-3.7 FUEL SYSTEM
C-3.7.1 STAINER AND FILTER
C-3.7.2 FUEL PUMP
C-3.8 LUBRICATION SYSTEM
C-3.9 COOLING SYSTEM
C-3.9.1 CONVENTIONAL COOLING SYSTEM
C-3.9.2 RADIATOR-WATER PUMP
C-3.10 AIR INTAKE EQUIPMENT
C-3.10.1 AIR FILTER
C-3.10.2 SILENCER
C-3.10.3 EXHAUST SYSTEM
C-3.11 EXHAUST SYSTEM
C-3.11.1 PIPING
C-3.11.2 EXPANSION JOINTS
C-3.11.3 EXHAUST MUFFLERS
C-3.11.4 PYROMETER
C-3.11.5 CATALYTIC REDUCTION
C-3.12 STARTING SYSTEM
C-3.12.1 BATTERY STARTING SYSTEM
C-3.12.2 COLD-STARTING
C-3.13 INSTRUMENTATION
C-3.13.1 LOCAL INSTRUMENT PANEL
C-3.13.2 SENDING UNITS
C-3.14 SAFETY CIRCUIT
C-3.15 GOVERNOR
C-3.16 FLYWHEEL
C-3.17 GENERATOR
C-3.17.1 VOLTAGE BALANCE
C-3.17.2 WAVEFORM
C-3.17.3 CURRENT BALANCE
C-3.17.4 PARALLEL OPERATIONS
C-3.18 EXCITATION SYSTEM
C-3.18.1 ROTATING BRUSHLESS EXCITER
C-3.18.2 VOLTAGE REGULATOR
C-3.18.3 PERFORMANCE
C-3.18.3.1 STEADY STATE VOLTAGE REGULATION
C-3.18.3.2 TRANSIENT VOLTAGE DIP
C-3.18.3.3 VOLTAGE RECOVERY
C-3.18.3.4 EXCITATION
C-3.19 ENGINE AND GENERATOR PAINTING AND FINISH
C-3.20 ENGINE AND GENERATOR INSPECTION AND TESTS
C-3.20.1 INSPECTION CHECKLIST
C-3.20.2 CORRECTIONS PRIOR TO ACCEPTANCE TEST
C-3.20.3 FINAL ACCEPTANCE
C-3.20.4 FACTORY TESTING
C-3.20.4.1 ENGINE TESTING
C-3.20.4.2 GENERATOR TEST
C-3.20.4.3 PROTOTYPE TEST
C-3.20.4.4 PRODUCTION LINE TEST
C-3.20.5 FIELD TESTS
C-3.20.5.1 CRANKSHAFT DEFLECTION TEST
C-3.20.5.2 GENERATOR ROTOR AIR GAP
C-3.20.5.3 STATOR AND FIELD INSULATION RESISTANCE
C-3.20.5.4 PRE-STARTING CHECKS
C-3.20.6 CHECKS DURING FIELD TESTING
C-3.20.7 INSPECTION
C-3.20.8 ENGINE INSPECTION
C-3.20.9 FINAL INSPECTION
C-3.21 OPERATION
C-3.22 TYPE OF SERVICE
C-3.23 MAINTENANCE MANUALS
SECTION D – CONTRACT ADMINISTRATION DATA
D-1 PAYMENT
D-2 RENDITION OF INVOICES OR VOUCHERS
D-3 DESIGNATED BILLING OFFICE
SECTION E – INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
E-1 GENERAL
E-1.1 SITE VISIT
E-2 DOCUMENTS
SECTION F – SPECIAL CONTRACT REQUIREMENTS
F-1 REFERENCES
F-2 EXCLUSION PERIODS IN COMPUTING COMPLETION SCHEDULES
F-3 SAFETY RELATED SPECIAL REQUIREMENTS
F-4 CERTIFICATES OF COMPLIANCE
F-5 SHOP DRAWINGS
F-6 DAMAGE TO WORK
F-7 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
F-8 HOURS OF WORK
F-9 COMMERCIAL WARRANTY
F-10 FLOOD EMERGENCY
F-11 PROTECTION OF MATERIALS AND WORK
APPENDICES
APPENDIX A – CONTRACT DRAWINGS
SPECIFICATIONS FOR
U.S. ARMY CORPS OF ENGINEERS
DD17 PUMPING STATION GENERATOR
MISSISSIPPI COUNTY, AR
NOTES
Any bid price for item indicated which is unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
Award will be made as a whole to one bidder.
NOTE 2: If a bid or modification to a bid based on unit prices is submitted and provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price, including lump sum units, in bid schedule must be stated, or, if it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
SECTION C – WORK STATEMENT/DESCRIPTION/SPECIFICATIONS
C-1 GENERAL
C-1.1 DESCRIPTION OF WORK
The contractor shall remove the existing generator and install the following generator as described below. The equipment to be furnished and installed under these specifications consists of one (1) tier 3 250 kW,480Y/277-volt diesel engine-generator sets, radiator and any accessories necessary to provide emergency electrical power for DD17 Pumping Station, Mississippi County, Arkansas. The equipment shall be suitable in all respects for use as the emergency source of power for the pumping plant. All equipment provided shall be standard products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship.
C-1.2 ENGINEERING SERVICES
The Contractor shall provide the services of one or more qualified Field Engineer(s) to inspect the completed, permanent installation and perform field testing of the diesel engine-generator sets and all mechanical and electrical connections required.
C-1.6 PROJECT TIMING
The critical function of flood control mandates the installation of the Generators shall be conducted during a time period when the water level is low and pumping station is not operating.
This is typically during the months of June through October.
C-2 DESCRIPTION
C-2.1WARRANTY
All items furnished under this contract shall be covered by the most favorable commercial warranties the Contractor' and involved manufacturers give to any customer for these items. The Contractor shall furnish all such warranties directly to the Government. In addition, the Contractor shall guarantee all equipment against defective materials, design, parts and workmanship for a period of one (1) year from date of acceptance. During the warranty period, any failure from the above stated causes shall be promptly repaired by the Contractor at no additional cost to the Government. The rights and remedies provided herein are in addition to and do not limit any rights afforded the Government by any other clause of this contract.
C-2.2 SUBMITTALS
C-2.2.1 EXPERIENCE
C-2.2.1.1DURABILITY CERTIFICATION
A durability certification is required from the engine manufacturing company that the engine is capable of delivering the specified full load kw on a standby/backup rated, diesel-electric generator set, which is capable of operating at full load generating power continuously as the sole source of electric power, using 60-70 percent load factor for mean time between engine overhauls of 15,000 hours. One diesel engine of the same model, speed, bore, stroke, number of cylinders, and cylinder configuration as the engines specified hereunder and operating at the same output (kw, rating) as the engine-generator set specified hereunder shall have performed satisfactorily in a diesel engine-generator set, independent and separate from the physical location of the Contractor's facilities, for a minimum of 4000 hours of actual operation. For at least 200 hours of these 4000 hours, engines shall be certified at 90 percent availability for a minimum of 80 percent of full load. The load carried by engine-generator sets shall be equal to or in excess of the full load rating required under this contract. This operating experience, for 200 hours operation, shall have been accumulated within a consecutive calendar period of 2 years. Operation during the 2 year period described above will not be considered satisfactory if:
(1) Any failure of engine or engine auxiliaries resulted in a downtime for repairs in excess of 72 hours.
(2) Any failure of the engine or engine auxiliaries resulted from over heating.
C-2.2.1.2 AUXILIARIES AND ATTACHMENTS
Auxiliaries and attachments furnished with the engine such as cooling system, lube system, fuel system, exhaust system, governor, turbo charger, turbocharger with after cooler, super charger, pumps, filters, etc., shall be the original items tested with the engine to meet experience submittal requirements. These auxiliary items may be manufactured or purchased by the engine manufacturing company for the originally tested and approved engines which meet experience requirements. These parts or systems may be substituted if approved and certified by the engine manufacturing company in writing that the parts or systems are equal or superior to the original parts or systems and that they will provide equal or better durability and reliability in service.
C-2.2.2 CERTIFICATES OF COMPLIANCE
Where materials or equipment are specified to comply with requirements of the UL or ASME, proof of such compliance shall be submitted. The label or listing of the specified agency will be acceptable evidence. In lieu of the label or listing, a written certificate may be submitted from an approved, nationally recognized testing organization equipped to perform such services, stating that the items have been tested and conform to the requirements and testing methods of the specified agency. Where equipment is specified to conform to requirements of the ASME Boiler and Pressure Vessel Code, the design, fabrication, and installation shall conform to the code.
C-2.2.3 CERTIFICATES OF FUEL CONSUMPTION
Certification shall be submitted guaranteeing that engine fuel consumption does not exceed a maximum of 0.575 pounds per kilowatt hour for full and 3/4 load and 0.600 pounds per kilowatt hour for 1/2 load on the basis of:
(1) Net kW of the set corrected for engine auxiliaries that are electrically driven.
(2) 19,350 Btu per pound high-heat value for fuel used.
(3) Sea level operation.
(4) Intake-air temperature not over 90 degrees F.
(5) Barometric pressure of intake air not less than 28.25 inches of mercury.
C-2.2.4 SHOP DRAWINGS
Shop drawings shall be submitted within five (5) calendar days after receipt of notice of award and shall consist of assembly drawings, catalog cuts, illustrations, schedules, performance charts, instructions, brochures, diagrams, and other information required to demonstrate fully that all equipment will conform to the requirements of these specifications. The drawings shall also fully illustrate the installation and operation of the generating units, their associated equipment, and for piping, wiring, devices, and foundations related thereto. Shop drawings shall include:
a. Engine-generator set complete, with base and all attachments including anchor bolt template.
b. Compressed-air starting system components.
c. Fuel system components.
d. Radiator water cooling system components.
e. Exhaust system.
f. Electric wiring interconnections between new generator sets and existing station control center.
g. Lubrication system complete, including engine-driven pump, strainers, filters, shell and tube heat exchangers for lube oil and turbocharger cooling, controls and wiring.
h. Safety circuits wiring diagrams, drawings, schematics, and safety devices giving normal ranges, alarm and shutdown valves to operation parameters such as pressures, temperatures voltages, currents, and speeds.
i. One-line, schematic and wiring diagrams of the generator, exciter, regulator, governor, and engine-generator instrumentation system, including alarm and annunciation systems.
The above drawings shall be to scale with clear cut lines and legible dimensions and lettering.
Each drawing shall have a title of suitable size in the lower right-hand corner containing the name of the Contractor, name of drawing, scale, contract number and date.
C-2.2.5 SPARE PARTS DATA
After approval of shop drawings, and not later than one (1) week prior to the date of installation, the Contractor shall furnish spare parts data for each different item of material and equipment specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of the spare parts recommended by the manufacturer to be replaced after 1 year and 3 years of service.
C-2.2.6 SPECIAL TOOLS
A complete set of the special tools required for routine maintenance shall be furnished for the plant. Special tools are those that only the manufacturer provides, to reach otherwise inaccessible parts of his engines. The tools and wrenches shall be supplied in a suitable tool box.
C-2.2.7 OPERATING AND MAINTENANCE INSTRUCTIONS
The Contractor shall furnish to the Contracting Officer six (6) complete copies of operating and maintenance instructions. The operating instructions portion shall outline the step-by-step procedures required for system start-up, operation and shutdown. The maintenance instructions portion shall list routine maintenance procedures, possible breakdowns and repair, and troubleshooting gauges. The instructions shall include, but not be limited to, the manufacture name, model number, service manual, parts list, simplified schematic diagrams for the system, and brief description of all equipment and their basic operating features.
C-2.2.8 SEQUENCE OF SUBMITTALS
All drawings of which prints are submitted will form a part of the contract. The sequence of submission of drawings shall be such that all information is available for checking each drawing when it is received.
C-2.2.9 TRANSMITTALS AND DELIVERY DESTINATION
All materials and equipment to be delivered by the Contractor shall be delivered F.O.B.
destination the DD17 Pumping Station Mississippi County Arkansas.
The Contractor shall notify the Contracting Officer at least five days in advance of any shipment to be made under this contract, and on the date of shipment, a copy of the bill of lading and packing list shall be forwarded to the following address:
Christopher Burroughs, Area Engineer USACE Caruthersville, MO Area Office 706 Harry S Truman Blvd Caruthersville, MO 63830 Phone: (573) 333-1043.
C-2.3 RESPONSIBILITY OF THE CONTRACTOR
The Contractor shall be responsible for complying with all referenced standards. Each diesel engine generator set shall be furnished complete with all special attachments and tools as specified in C-1.1 above and to meet the performance requirements listed in these specifications.
The Field Engineer(s) provided by the Contractor shall arrive on the site after installation of the equipment and shall conduct all testing as specified in C-3.2.3 below.
C-2.3.1 SERVICES AND SUPPLIES ON THE DIESEL ENGINE-GENERATORS
The Contractor shall furnish at the applicable prices stated in the payment schedule for Item No.
0001, all labor, new materials, and equipment necessary for the installation of one (1) diesel engine generator sets and the inspection/tests of the unit. This Work shall be performed as specified in C-1.1 and C-1.2 above, at DD17 Pumping Plant, Mississippi County, Arkansas.
Upon completion of the installation, the services of the Field Engineer(s) shall be provided to perform all tests and inspections required by these specifications. All equipment and materials shall be delivered and all labor shall be performed as specified in the section entitled
DELIVERIES OR PERFORMANCE.
C-2.4 SAFETY-RELATED SPECIAL REQUIREMENTS
a. All work performed under this contract at DD17 Pumping Plant or on any Government-owned property shall comply with all pertinent provisions of the Safety and Health Requirements Manual, EM 385-1-1, dated September 2008 and these special requirements.
b. No separate payment will be made for compliance with EM 385-1-1 nor for compliance with any other safety-related special requirements.
C-2.5 DEFINITIONS
Wherever in the specifications the letters COR are used they shall be construed to mean "Contracting Officer's Representative" and words "directed," "required," "ordered," "designated," "prescribed," or words of like import are used, it shall be understood that the direction, permission, order, designation or prescription of the Contracting Officer is intended, and similarly the words "approved," "acceptable," "satisfactory" or words of like import shall mean approved by, acceptable to, or satisfactory to the Contracting Officer, unless otherwise expressly stated.
C-2.6 HOURS OF WORK
Any work by the Contractor will be confined to the working hours of DD17 Pumping Plant, which are 7:00 a.m. to 5:00 p.m., Monday through Thursday, excluding national and/or federal holidays. Additional work hours shall be subject to the prior approval of the Contracting Officer or COR.
C-2.7 RELEASE FROM LIABILITY
The work will be accepted as a whole when the work under this contract has been satisfactorily completed; however, when the Contractor has satisfactorily completed the work, his liability with respect to the completed work for damage not induced by faulty methods of operations shall terminate.
C-2.8 BUY AMERICAN ACT
(See Contract Clause entitled "Buy American Act- Supplies.") Specific information as to articles, materials, and supplies exempted from the Buy American Act will be furnished upon request.
C-2.9 SECURITY REQUIREMENTS
No later than 5 days prior to arrival of the Field Engineer(s) on the job site, the Contractor shall submit to the Contracting Officer's Chief of Security, a list of the Field Engineer(s), that will be conducting the inspection and testing procedures under this contract. The Contractor shall also submit any other information required by Chief of Security. Chief of Security office is located in Room B-314, Clifford Davis Federal Building, Memphis, TN 38103-1894, Telephone (901)521-
4007. COLLECT CALLS WILL NOT BE ACCEPTED.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190- 13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
C-3 SPECIFICATIONS
C-3.1 APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only, forms a part of these specifications to the extent indicated by the reference there to:
C-3.1.1 FEDERAL SPECIFICATIONS (FED. SPEC.)
F-F-351D Filters and Filter Elements, Fluid Pressure: Lubricating Oil, Bypass and Full Flow
WW-P-521G Pipe Fittings, Flange Fittings, and Flanges: Steel and malleable
Iron (Threaded and Butt-Welding) Class 150
C-3.1.2 MILITARY SPECIFICATIONS (MIL. SPEC.)
MIL-A-13488C Air Cleaner, Engine, Heavy Duty, Oil Bath & Am-1 Type (For Internal Combustion Engines)
MIL-C-52980A Compressors, Reciprocating and Rotary Gasoline-Engine-Driven, Air
MIL-T-19646 Thermometers, Remote Reading, Self-Indicating Dial, Gas & Suppl 1 Actuated & Am-7
MIL-F-20627B Filter Assembly and Filter Elements, Fluid, Pressure (for & Am-3 Engines with Liquid Fuel Injection Systems)
MIL-L-21260C Lubricating Oil, Internal Combustion Engine, Preservative and
Break-in
MIL-A-52363B Air Cleaners, Intake: Dry-type (for Internal-Combustion Engine)
MIL-STD-705B Generator Sets, Engine-Driven, methods of Tests and & Notices Instructions.
1, 2 & 3
C-3.1.3 AMERICAN NATIONAL STANDARDS INSTITUTE, INC. (ANSI) STANDARDS
B16.5-1981 Pipe Flanges and Flanged Fittings
B16.11-1980 Forged Steel Fittings, Socket-welding and Threaded
B40.1-1985 Gauges - Pressure Indicating Dial Type - Elastic Element
C37.17-1979 Trip Devices for AC and General-Purpose DC Low-Voltage Power
Circuit Breakers
C37.90-1978 Relays and Relay Systems Associated with Electric Power (R 1982) Apparatus
C39.1-1981 Electrical Analog Indicating Instruments
C57.13-1978 Instrument Transformers
C-3.1.4 AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
PUBLICATIONS
A 181-1985a Forgings, Carbon Steel, for General Purpose Piping
A 527-1985 Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip Process, Lock-Forming Quality
D 975-1981 Diesel Fuel Oils
C-3.1.5 INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
No. 115-1983 Test Procedures for Synchronous Machines
C-3.1.6 MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND
FITTINGS INDUSTRY (MSS) STANDARDS
SP-80-1987 Bronze Gate, Globe, Angle and Check Valves
C-3.1.7 NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ICS 6-1983 Enclosures for Industrial Controls and Systems Incl Rev 1 thru 3
MG 1-1978 Motors and Generators (R 1981) Incl Rev 1 thru 8
WC-7-1982 Cross-Linked-Thermosetting-Polyethylene Insulated
Wire and Cable for the Transmission and Distribution of Electrical Energy
C-3.1.8 NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARDS
30-1987 Flammable and Combustible Liquids Code 37-1984 Installation and Use of Stationary Engines and Gas Turbines
70-1987 National Electrical Code & Errata & lnt Am 70-87-2
C-3.2 GENERAL REQUIREMENTS
C-3.2.1 NAMEPLATES
Each major component of equipment shall have the manufacturer's name, address, type or style, model or serial number and catalog number on a plate secured to the equipment. Nameplates shall be provided for:
(a) Engines
(b) Generators
(c) Exciters
(d) Regulators
(e) Pumps and pump motors
(f) Governors
C-3.2.2 PERSONNEL SAFETY DEVICES
Exposed moving parts, parts that produce high operating temperatures, parts which may be electrically energized, and parts that are of such a nature or are so located as to be a hazard to operating personnel shall be insulated, fully enclosed, guarded, or fitted with other types of safety devices. The safety devices shall be installed in such manner that proper operation of the equipment is not impaired.
C-3.2.3 FIELD ENGINEERING SERVICES
The manufacturer(s) of the engine-generator sets shall provide the services of one or more Field Engineer(s) at the installation site (Mississippi County, Arkansas) to inspect the installation of the equipment and to perform the field tests required by these specifications. The Field Engineer(s) shall have extensive knowledge of the products involved and at least two years' experience conducting installation inspections and adjustments on similar systems. All start-up engineering work shall be conducted under the direction of the Field Engineer(s). The Field Engineer(s) shall be available for consultation with the Contracting Officer or his representative.
The Field Engineer(s) shall conduct quality checks and tests prior to energization of equipment to assure that all interconnections and external connections are correct and that all devices function properly. Additionally, upon initial energization of equipment, the Field Engineer(s) shall assure that all equipment operates properly and that all adjustments and calibrations are properly made and that all parameters are properly set. The responsibilities of the Field Engineer(s) shall include, but not be limited to:
(a) Check all interconnection wiring against the drawings for all connections between the products, equipments, remote devices that function in the system. Report to the Contracting Officer conditions that need correction.
(b) Test insulation of all power and control wiring to ground with a suitable megohmmeter and report to the Contracting Officer conditions that must be corrected.
(c) Test the operation of remote devices to assure that the functions are in accordance with design criteria.
(d) Check for lubrication, vibration and rotation as engine-generators are initially run. Test protective and safety circuits and assure that they disconnect the engine-generator when appropriate.
(e) Assure that the feedback control loops function properly.
(f) Inspect the generating sets and auxiliary equipment; report to the Contracting Officer any installation or shipping damage, loose material, shipping blocks, contamination or unfavorable environmental conditions that must be corrected.
(g) Check generator field exciter, excitation power, proper connection of generator fields.
(h) Assure all fault stop features function properly.
(i) Verify that engine governors operate properly.
(j) Instruct Government personnel on proper start-up, adjustment, fault diagnosis and operation of equipment.
The Field Engineer(s) shall provide all instruments necessary to conduct tests and make adjustments.
C-3.3 MATERIALS
Materials and equipment shall conform to the respective publications and other requirements specified herein.
C-3.3.1 AIR CLEANER
Mil. Spec. MIL-A-13488, MIL-A-52363, Class I, or manufacturer's standard shall meet engine manufacturer recommendations. Type II, or Mil. Spec. Rated air flow capacity shall meet engine manufacturer recommendations.
C-3.3.2 ELECTRICAL INSTRUMENTS
ANSI C39.1, 250 degree scale, covered instrumentation switchboard type, semi-flush.
C-3.3.3 FUEL OIL FILTER ELEMENTS
Mil. Spec. MIL-F-20627, size as modified to suit the application or manufacturer's standard.
C-3.3.4 LUBRICATING OIL FILTER ELEMENTS
Fed. Spec. F-F-351, Type III or IV, class as required or manufacturer's standard.
C-3.3.5 GENERATOR AND EXCITER
NEMA MG 1.
C-3.3.6 INSTRUMENT TRANSFORMER
ANSI C57.13.
C-3.3.7 PRESERVATIVE OIL
l1il. Spec. MIL-L-21260.
C-3.3.8 FLANGES AND FLANGED FITTINGS
ASTI1 A 181, Class 60, and AIISI B16.5, Class 150 socket welding type.
C-3.3.9 WELDING FITTINGS
ANSI B16.11, 3000 lb. forged steel, socket welding type, for oil piping.
C-3.3.10 THREADED FITTINGS
Fed. Spec. WW-P-521.
C-3.3.11 PRESSURE GAGES
Digital type or Fed. Spec. GG-G-76, Type I, Class I, style, dial, size and range e.s standard with equipment manufacturer.
C-3.3.12 RELAYS, CONTROL AND PROTECTIVE
ANSI C37.9C.
C-3.3.13 SHEET STEEL
ASTH A 527, G go coating designation.
C-3.3.14 THERMOMETERS
Digital type or Mil. Spec. MIL-T-19646, Class C, 4-1/2 inch flush-mounted dial with range to suit the service encountered, and capillary tube of length required.
C-3.3.15 CHECK, GATE AND GLOBE VALVES
HSS SP-80, Class 150.
C-3.4 ELECTRICAL WORK
Electrical work shall include disconnecting power and control connections at each existing generator and making temporary power and control connections from new generators to existing circuits. Contractor shall furnish all wiring, connectors and supplies to make complete, temporary installation. Electrical work shall comply with NFPA 70.
C-3.5 ENGINE-GENERATOR SET RATING
C-3.5.1 GENERAL
The generator set shall consist of one engine, one exciter and one generator mounted on one steel base. The cooling system, air intake system and exhaust system may be mounted separately. The generator set shall be factory assembled and aligned on a structural steel base not exceeding 44 inches in width. For generator sets with a base wider than 44 inches offers are ask to schedule a site visit as referenced in section E-1.1 SITE VISIT. The base shall be strong and rigid enough to ensure permanent alignment of all rotating units and prevent vibration build up. The base shall permit skidding in any direction during installation and shall be provided with suitable holes for foundation bolts. Equipment shall be environmentally suitable for the location shown.
C-3.5.2 Rating
Ratings shall be as follows:
(1) Number of sets required 1
(2) Output rating 250 kW stanby/backup
(3) Power factor, lagging 0.8
(4) Brake mean effective pressure 180 psi (max)
(5) Generator rating (each generator) 250 kW
(6) Rotative speed 1800 rpm maximum
(7) Frequency 60 Hz
(8) Voltage 480/277
(9) Phase 3 phase, 4 wire
(10) Overload capability 10 percent for 2 hours in 24 hours
(11) Type of excitation brushless
(12) Engine coolant flow rate (minimum) 180 gallon per minute (gpm)
(13) Able to start and assume 50 percent of full load within 8 seconds
(14) Elevation of installation 212 feet (approx.)
(15) Maximum summer outdoor temp 95 degrees F
(16) Maximum winter outdoor temp 65 degrees F
(17) Maximum summer indoor temp 95 degrees F
(18) Minimum winter outdoor temp 18 degrees F
(19) Minimum winter indoor temp 60 degrees F
C-3.6 ENGINE
C-3.6.1 GENERAL REQUIREMENTS
The engine shall be of the general purpose, stationary, solid-injection, compression-ignition diesel type, radiator-cooled, 2- or 4-cycle, in-line or V-type either with solid cast block or with individually cast cylinders. Cylinders may have removable cylinder liners. The engine may be either naturally aspirated, turbocharged, turbocharged after-cooled or supercharged and shall be provided with shielded exhaust manifolds. The engine shall be suitable for driving the generator specified herein. The engine shall operate without excessive smoke limited to 20% of visible emissions, overheating, or mechanical damage when driving the generator under the specified conditions. The engine shall develop the required kW when operating on diesel fuel that does not exceed sulfur content of 0.006 weight percent and with lubricating oil conforming to the type and grade as recommended by both the engine and catalyst manufacturer. The engine shall have a standard published net available electrical kW rating which, when corrected for specified operating conditions, generator efficiency and after subtracting power for engine and electric driven accessories, auxiliaries and other losses shall be not less than that required to drive the generator continuously at 100 percent of specified prime power output rating and 110 percent of prime power output rating for 2 hours out of any 24 consecutive hours of operation. The 100 percent full load rating of the engine shall be the kW that the engine will deliver continuously at its coupling or flywheel. A governor shall regulate engine speed as specified herein.
C-3.6.2 LIMITATIONS ON VIBRATION
The engine-generator set shall not create a vibratory stress exceeding 5000 psi at a critical speed between 10 percent above and 10 percent below synchronous speed. Calculations on critical speed and vibratory stress shall be submitted for approval within 5 days of contract award in lieu of performing the critical speed and torsiographic factory tests where an identical diesel-engine generator set has been previously tested as specified hereinafter. If the calculated vibratory stress shows critical, a speed within the speed zone of synchronous speed plus or minus 10 percent exceeds 4500 psi, a torsio-graphic test shall be run to verify the calculations.
C-3.6.3 VIBRATION ISOLATION SYSTEM
The isolation system shall reduce the vibration transmitted to the adjacent structure to a maximum of 0.0015 inch total amplitude throughout the frequency range down to 65 CPS. The manufacturer shall certify that the vibration isolation system will reduce the vibration to the limits specified.
C-3.7 FUEL SYSTEM
The fuel system components supplied shall conform to the applicable portions of NFPA Nos. 30 and 37 and ABS Sections 34 and 36.
C-3.7.1 STRAINER AND FILTER
One (1) full-flow strainers and one (1) full-flow filter shall be provided for engine. The strainer shall be located on the suction side of the fuel pump and the filter on the discharge side. When the pump and high pressure injector equipment are contained in a common housing, the fuel filter may be located between the strainer and the engine fuel pump. The strainer shall be metal-edge or screen type with a maximum opening of 0.007 inch (SO mesh). The filter case shall be compatible with the filter element, which shall conform to Mil. Spec. IL-F-20627. The strainer and filter shall have inlet and outlet connections plainly marked. Strainer and filter elements shall be designed to be changed without disconnecting the piping or disturbing other engine components.
C-3.7.2 FUEL PUMP
The fuel pump shall be a positive-displacement engine-driven type, and shall supply an adequate quantity of fuel to the engine under all conditions of operation. A relief valve shall prevent the buildup of excessive pressure in the discharge line. The pump arrangement shall allow excess fuel to be piped to return to the day tank.
C-3.8 LUBRICATION SYSTEM
The lubrication system components supplied shall conform to the applicable portions of NFPA Nos. 30 and 37. The system shall be pressurized by one or more engine-driven lube-oil pumps.
Pressure shall be regulated by an appropriate relief valve or other approved means. Means for pressure adjustments shall be provided. Pipe connections shall be provided for draining the engine. Each engine shall have a gage or bayonet for oil-level indication with engine running.
The engine shall be furnished with a wet sump. One shell-and-tube or plate-type oil cooler, arranged for utilizing cooling system coolant as the oil-cooling medium, shall be furnished for each engine. Oil entering pressurized parts of the engine shall pass through a full-flow filtering system consisting of a strainer, lube-oil pumps and a filter, connected in series and in the order listed. The lube oil system shall permit addition of lubricating oil with the engine operating. The strainer shall be metal-edge or screen type with maximum openings of 0.027 inch (24 mesh) and shall be accessible. Filter elements shall be compatible with the filter case. A pressure-relief valve shall bypass lube oil to the engine when the filter attains the maximum pressure differential recommended by the filter manufacturer.
C-3.9 COOLING SYSTEM
Radiator-water system shall circulate radiator-water through the engine, aftercooler (on turbocharged engines), and oil cooler at the temperature and flow rate as specified by the engine manufacturer.
C-3.9.1 CONVENTIONAL COOLING SYSTEM
System thermostats shall maintain temperatures between 195 and 165 degrees F during engine operation under the conditions specified. Cooling system coolant shall be a combination of water and ethylene-glycol. Solution shall be of sufficient strength to protect against freezing down to - 20 degrees F. Cooling system operation shall be fully automatic while the engine is running.
Water temperature differential across engine block shall be not more than 15 degrees F at full load. Failure of the cooling system resulting in over temperature shall stop the engine.
C-3.9.2 RADIATOR-WATER PUMP
The Radiator-water circulating pump for the engine shall be engine driven. The pump capacity shall be adequate for the application.
C-3.10 AIR INTAKE EQUIPMENT
Air intake equipment shall include an air filter. A combined filter-silencer unit meeting requirements for the separate filter and silencer items may be provided. Expansion elements in air intake lines shall be rubber.
C-3.10.1 AIR FILTER
The air filter shall have ample capacity and be suitable for connection to the engine air-intake opening element. One spare filter element shall be provided for each replaceable element at time of shipment. Special tools and other equipment necessary for cleaning the screens, removing the sludge, replacing the filter elements or performing other servicing requirements shall be provided. Filters shall be dry type and conform to Mil. Spec. MIL-A-52363, Class III or manufacturer's standard.
C-3.10.2 SILENCER
The silencer shall be of the high frequency filter type, located in the air intake system as recommended by the engine manufacturer. The silencer shall be capable of reducing the noise level at the air intake to a point below the maximum acceptable industrial levels specified for exhaust muffler as specified in C-3.11.
C-3.11 EXHAUST SYSTEM
The system shall be separate and complete for each engine. Where a V-type engine is provided, a V-type connector, with all necessary flexible sections and hardware, shall connect the engine exhaust outlets to a single exhaust pipe sized to reduce gas velocity to less than 5000 fpm.
C-3.11.1 PIPING
All pipe and fittings for the exhaust system shall be schedule 10 steel with sufficient flanged fittings so that the system may be entirely dismantled in sections. Fittings shall be flanged or welded. Bends shall be long-radius type, or long radius bend pipe showing no kinks or wrinkles.
Horizontal sections of exhaust lines shall be sloped downward away from the engine to a condensate trap and drain valve. Exhaust piping and muffler installed in building shall be covered with suitable insulation to protect personnel and reduce room temperature.
C-3.11.2 EXPANSION JOINTS
Expansion joints shall be bellows type with flanged connections. Flanges shall be 125 pound type, plain-faced, drilled, and of dimensions to match the flanged exhaust outlet of the diesel engine. Expansion elements shall be stainless steel suitable for exhaust gas at 1000 degrees F.
Expansion joints shall be suitable for relieving stress caused by thermal expansion and contraction and shall be suitable for vibration isolation service.
C-3.11.3 EXHAUST MUFFLERS
Chamber type exhaust mufflers shall be supplied for each engine and shall be welded steel designed for outside vertical mounting. Eyebolts, lugs, flanges, or other items shall be provided as necessary for support in the location and position indicated. Pressure drop through the muffler shall not exceed the recommendations of the engine manufacturer. The mufflers shall be zinc coated or painted with high temperature 1200 degrees F. resisting paint. The mufflers shall reduce the generated sound spectrum to the following maximum listed levels, as measured by ANSI sound level meter, when noise is measured 75 feet from the silencer with only one engine operating at full-load condition:
FREQUENCY BAND SOUND LEVEL
CYCLES/SECONDS DECIBELS (dBA)
20-75 87 75-150 78 150-300 70 300-600 64 600-1200 58 1200-2400 54 2400-4800 52 4800-10 kc 51
C-3.11.4 Pyrometer
Pyrometer shall conform to Nil. Spec. HIL-T-15377. Multi-point collector switch and calibrated leads with individual thermocouples shall show the combined exhaust temperature. For a supercharged engine, additional points, thermocouples and leads shall be provided to show the temperature in the combustion air discharge passages. Pyrometer shall be the damped milli-voltmeter type, vibration isolation mounted, and equipped with an internal, automatic, cold end compensator calibrated for use with the mean length of lead wire actually installed. Minimum internal resistance shall be 100 ohms. Graduated scale length shall be not less than 6 inches.
Selector switch shall be double-pole, with an "off" position, one set of points for each thermocouple, and suitable indicating dial. The pyrometer and selector switch shall be of rugged construction, with a flush mounting, dust-and moisture-tight case. Thermocouples shall be of iron-constant wire encased in seamless steel tubes with bushings threaded for 1/2-inch standard pipe and a junction box with knockout openings for conduit connections. Thermocouple leads shall be braid covered, No. 14 gauge, duplex alloy pyrometer wire of the same materials as the thermocouple elements. Alloy leads shall extend from the thermocouples to the pyrometer terminals on the engine control panel. Pyrometer, thermocouples, leads and compensating devices shall be calibrated to show true exhaust temperature within plus or minus 1 percent above the highest temperature encountered in the exhaust and turbo charger at 110 percent load conditions.
C-3.12 STARTING SYSTEM
The system shall be arranged for auto or manual starting. The starting system shall be battery start.
C-3.12.1 BATTERY STARTING SYSTEM
Starting shall be completed by battery starting system.
C-3.12.2 COLD-STARTING
The engine shall be fully equipped for reliable cold-starting at an ambient temperature of 60 degrees F. Cold-starting aid shall be an engine jacket-water heater.
C-3.13 INSTRUMENTATION
C-3.13.1 LOCAL INSTRUMENT PANEL
Instrument panel instruments shall be digital or analog, back-connected semiflush mounted.
Temperature and pressure gages shall have plus or minus 2 percent accuracy over the full range.
Gages shall be a minimum of 3-1/2 inches in diameter, 3 inches square or 1-inch by 2-inch.
Pressure gages shall be graduated in 2-pound increments in the normal working range. Gages for temperatures below 250 degrees F. shall be graduated in 2-degree increments in the normal working range. Instruments subject to rapid pressure surges shall be provided with dampening devices to give steady readings. The panel shall be furnished with vibration and shock-absorbing mounting fittings. The following engine monitoring and control instruments shall be panel-mounted on each diesel-electric set:
(1) Pressure-gage, fuel-oil.
(2) Pressure-gage, lubricating-oil.
(3) Temperature indicator, coolant out.
(4) Emergency stop switch or pushbutton.
(5) Running-time meter.
(6) DC control voltage.
(7) Horn alarm with cut off switch and fault indicating lights for excessive coolant temperature, low oil pressure, and overspeed.
C-3.13.2 SENDING UNITS
All sending units necessary for sensing specified engine operating conditions shall be furnished by the Contractor. Where any engine alarm condition is indicated on both the local instrument panel and the switchboard alarm signaling system, the sending unit for that condition shall serve both systems.
C-3.14 SAFETY CIRCUIT
Devices and wiring shall be provided and arranged to stop the unit and simultaneously open the generator circuit breaker under the conditions of overspeed, excessive coolant temperature, or dangerously low lubricating-oil pressure. The shunt trip element in the generator main breaker shall have a voltage rating compatible with voltage of the battery which supplies power to the safety system. The stop switch on the engine instrument board may be connected to this circuit if so recommended by the manufacturer. An audible alarm shall be sounded upon either a high coolant temperature or low lubricating-oil pressure approximately 10 degrees F. and 10 psi before safety shutdown. At the same time a visual signal shall indicate the cause of alarm. If the emergency device stops the engine, the visual signal shall remain on to indicate the cause of failure, such as temperature, pressure or speed. A means shall be provided to test these visual indicators. Equipment that may be damaged if one of the devices is tripped shall be connected into the safety circuit. Rectifiers shall be protected against overload currents and overvoltages.
C-3.15 GOVERNOR
The governor shall be an adjustable speed droop unit of the hydraulic or electronic type. The governor shall be controlled electrically from the associated generator switchboard equipment by the governor control switch. Governor shall provide adjustable speed setting from 58 to 62 Hz, adjustable speed regulation from zero to 7 percent, adjustable load limit from 100 to 110 percent of unit rating. The governor shall permit parallel operation and load-sharing among all other Generating units provided under this contract. Paralleled generators shall share load nearly equally, so that the maximum kw load difference between generator units of equal nameplate rating will not exceed 10 percent of the rating of a single unit. The governor shall maintain the frequency constant within plus or minus 0.25 percent for any constant load between 1/4 and 4/4 generator rating. After any sudden load change of not more than 25 percent of rated load, frequency deviation shall not exceed 3.6 Hz. The governor shall reestablish stable operating conditions in not more than 1-1/2 seconds.
Stable operation is defined as operation at a frequency that is constant within the band of plus or minus 0.5 Hz. An over-speed stop device for each engine shall automatically shut off the fuel or other-wise stop the engine when speed exceeds 115 percent of rated speed. Over-speed device shall be separate and independent from the regular governing mechanism.
C-3.16 FLYWHEEL
The flywheel shall be statically and dynamically balanced and capable of being rotated at 125 percent of rated speed without damage. An appropriate means shall be provided for barring. The necessary barring tools or cranks will be supplied.
C-3.17 GENERATOR
Generator shall be…