Lake Red Rock Project Playground Installation Federal contract opportunity
Solicitation number
W912EK-16-T-0036
Issued by
Department of the Army Corps of Engineers Engineering District Rock Island

About this file

Solicitation for Lake Red Rock Project Playground Installation

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

PLEASE RETURN TO:

US Army Corps of Engineers

US Army Corps of Engineers Lake Red Rock Project Playground Install

W912EK-16-T-0036

Attn: Elizabeth Dennison 1500 Rock Island Drive Rock Island, Illinois 61201 Email: elizabeth.a.dennsion@usace.army.mil

PLEASE INCLUDE THE FOLLOWING INFORMATION:

1. Complete Block 17a on the SF1449 - Enter Name, Address, and Current Phone Number of Person to

Contact Regarding Proposal

2. Complete and sign Blocks 30a, 30b, and 30c on the SF1449

3. Complete Offeror Representations and Certifications (Clause 52.212-3) if your company has not completed the Representations and Certifications located with your company’s SAM record (https://www.sam.gov).

4. Complete and submit the SF1449, Bid Schedule.

5. Please fill out the the below information completely and include this cover page with your offer, along with the above items that need to be filled out.

6. Include the Solicitation Number on the outside of your envelope, cover sheet, or as subject line if submitting by email pdf format. It is the responsibility of the offeror to verify that their offer has been received and is legible when using a method other than ASFI to submit an offer.

7. Technical questions must be submitted via the Projnet or directly to the Contract Specialist listed above.

8. Complete and submit Representation by Corporations Regarding Delinquent Tax Liabaility or a Felony

Conviction under and Federal Law (Clause 52.209-11).

Contractors must be current in their registration in the System for Award Management (SAM) Database before a Government Contract award can be made.https://www.sam.gov/

Please provide: Taxpayer ID Number: ____________________________ CAGE Code (SAM):_______________________________ Point of Contact: _________________________________ Phone & Email: __________________________________

FOR ADDITIONAL INFORMATION, CONTACT:

Elizabeth Dennison Phone: 309-794-5293 or Email: elizabeth.a.dennison@usace.army.mil

SEE ADDENDUM

(No Collect Calls)

W912EK-16-T-0036 16-Mar-2016

b. TELEPHONE NUMBER

309-794-5293

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 30 Mar 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EK9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ELIZABETH A DENNISON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

96514753272936

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE B5R0600 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

LAKE RED ROCK PROJECT OFFICE

US ARMY CORPS OF ENGINEERS

1105 HIGHWAY T15

KNOXVILLE IA 50138-8820

TEL: 641-828-7522 FAX:

--- --- ---- REF BLOCK 18A)FAX:

TEL: 309-794-5613 (INVOICES SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$15 Million

NAICS:

238990

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF54

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

LAKE RED ROCK PROJECT

PLAYGROUND INSTALLATION CONTRACT

KNOXVILLE,

IOWA

SECTION A

1. BID SCHEDULE (LINE ITEMS/CLINS): Offerors must provide pricing on all items and entire quantities contained in the bid schedule to be considered for award. Quotes received not complying with this requirement will be considered non-responsive and will be rejected.

Award will be made to the lowest priced technically acceptable quote. Refer to clause 52.212-2, Evaluation- Commercial Items, for quote evaluation factors and technical requirements.

・ Complete and return first page of solicitation, including offeror’s complete mailing address, telephone number, offeror’s name, title, and signature.

・ Complete and return “Bid Schedule (CLINs)”.

・ Submit information requested in Clause 52.212-2.

・ Technical Capability Statement (Technical Exhibit #2) ・ Past Performance Questionnaire (Technical Exhibit #3)

Offeror must complete all fill-ins and assure all return pages are received by the due date and time shown on page 1 of the solicitation, at the address indicated. Completed quotation packages may be e-mailed to elizabeth.a.dennison@usace.army.mil. If mailed, mark envelope “Quote for Solicitation W912EK-16-T- 0036”.

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

CLOCK TOWER BUILDING

1500 Rock Island Drive

ROCK ISLAND, IL 61201‐

3. QUANTITIES: The number of playgrounds to install will be two (2). The installation locations are at Howell Station Campground and Whitebreast Campground.

4. WAGE RATES: Prevailing Wage Rates will apply for any award resulting from this solicitation for quotes.

See the included Wage Determination, and contract clauses 52.222-41, Service Contract Act of 1965 for details.

5. SITE VISIT: Offerors who wish a site visit should contact the Project Office at (641) 828-7522 to schedule an appointment. Prospective offerors are encouraged to visit and fully inspect all areas, accesses, locations, terrain, etc. prior to bidding. The point of contact is Joseph C. Laird, telephone extension #6420 or e-mail joseph.c.laird@usace.army.mil.

2. DOCUMENTS TO RETURN: In order to be considered responsive, bidders must complete and return all of the following:

SECTION B

BID

SCHEDULE

ITEM NO SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1 Whitebreast Playground Installation

1 Each

Howell Station Playground Installation

Each

Total:

SECTION C

PERFORMANCE WORK STATEMENT

INSTALLATION OF PLAYGROUND EQUIPMENT, FALL SURFACE MATERIAL, AND

PLAYGROUND BORDERS AT

WHITEBREAST CAMPGROUND & HOWELL STATION CAMPGROUND,

LAKE RED ROCK PROJECT, IOWA

SECTION TITLE

C-1 GENERAL INFORMATION

C-2 SPECIFIC TASKS

C-3 GOVERNMENT SUPPLIED ITEMS

TECHNICAL EXHIBIT #1 “QUALITY ASSURANCE SURVEILLANCE PLAN” (QASP)

TECHNICAL EXHIBIT #2 “TECHNICAL CAPABILITY STATEMENT”

TECHNICAL EXHIBIT #3 “USACE PAST PERFORMANCE QUESTIONAIRE” (PPQ)

TECHNICAL EXHIBIT #4 “PLAYGROUND COMPONENTS (PLAYWORLD PLAY STRUCTURE),

PLAYGROUND LAYOUT, AND PLASTIC PLAYGROUND BORDERS”

SECTION 1: GENERAL INFORMATION

C.1.1 BACKGROUND. Lake Red Rock is a flood control reservoir in Iowa, with numerous parks and lake access areas managed by or leased from the U.S. Army Corps of Engineers. Recreational areas at Lake Red Rock Project offer a wide variety of facilities including boat launching ramps, campgrounds, a full service marina, picnic areas, and sand swimming beaches. Two (2) Playworld play structures have been purchased by the Lake Red Rock Project, and the Lake Red Rock Project is accepting bids from properly licensed professionals to install the units at the Lake Red Rock Project. Award will be a Firm-Fixed-Price (FFP), performance-based service contract.

C.1.2 SCOPE OF WORK. The Contractor shall provide all manpower, labor, equipment, materials/supplies, transportation, fuel, tools, supervision, and other items and services necessary (except those items specified in Section 3 as Government supplied) to install two (2) Playworld play structures as shown in Technical Exhibit 4, plastic playground borders as shown in Technical Exhibit #4, and engineered wood fiber fall surface material as defined in this Performance Work Statement (PWS) and elsewhere within the contract.

Services also consist of attending a pre-work conference and work meetings as necessary. A map of Lake Red Rock can be found on the Internet at: http://www.mvr.usace.army.mil/redrock/maps/default.htm

C.1.3 PERIOD OF PERFORMANCE. The work for the contract shall be completed within 60 days after award of contract.

C.1.4 LOCATION. The sites of the work are located at Whitebreast Campground and Howell Station Campground at the Lake Red Rock Project.

C.1.5 REQUIRED INSURANCE. In accordance with the FAR Clause 52.228-5 titled “Insurance-Work on a Government Installation” the Contractor shall obtain and maintain during the period of performance under this contract the following types and minimum amounts of insurance*:

Workmen’s Compensation . . . . . . Coverage complying with applicable State statute** Employer’s Liability . . . . . . . . . . . Minimum $100,000 General Liability/Bodily Injury. . . Minimum $500,000 per occurrence Automobile Liability . . . . . . . . . . . Minimum $200,000 per person

$500,000 per occurrence $ 20,000 property per occurrence

* Reference FAR 28.307-2 Liability, subparagraphs (a), (b), and (c).

** Iowa Division of Insurance, telephone # (515) 281-5705

Division of Workers Compensation, telephone # (800) 775-2667

C.1.6 PRE-WORK CONFERENCE. Prior to start of services, the Contractor will contact the Contracting Officers Representative (COR) to arrange a Pre-Work conference to be held at the Lake Red Rock Project Office. The purpose of the conference is to discuss contract requirements and details of contract performance, in order to develop a mutual understanding of both.

C.1.7 DOCUMENTS AND CORRESPONDENCE. After award, all documents and related correspondence shall be routed through the Contracting Officer’s Representative (COR) located at the Lake Red Rock Project Office.

C.1.8 CONTRACTORPERSONNEL.

C.1.8.1 MANPOWER REQUIREMENT: The contractor and employees/staff shall personally perform, or provide personal superintendence of the performance of, duties under this contract.

C.1.8.2 SECURITY REQUIREMENTS:

C.1.8.2.1 ACCESS AND GENERAL PROTECTION POLICY & PROCEDURES:

All Contractors and sub-contractor employees shall comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor shall submit background checks that have been conducted by a bonded third party within the last 6 months of Notice to Proceed date and authorize reports to be provided to the Rock Island District Security and Law Enforcement Office by the third party. The background check will cover, at a minimum, the last seven years covering States the contractor has lived in, National Crime Information Center – Interstate Identification Index (NCIC – III) check, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name working for.

As employees are added or deleted from the submitted and approved on-site employee list, this information must be reported immediately to the Contracting Officer. Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

(1) Criminal conduct, in particular violent crime and sex offenders;

(2) Habitual use of intoxicating beverages to excess as evidenced by DUI or public intoxication records; or

(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g. drug trafficking or procurement fraud) In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on one of its contracts based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee or unforeseen change in work site condition, the Contractor shall immediately contact the Contracting Officer to obtain written approval for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Form and will receive written authorization from the KO prior to bringing new personnel on site, and will ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. Rock Island reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:

1) Employee will be on site a total of 15 days or less, for the duration of the project.

2) Employee is added to the ACL as a short term employee.

3) Employee is escorted while on site. This is defined as being in the line of sight of an identified prime contractor employee who has a background check on file with the Rock Island District (as noted on the ACL).

4) Each prime contractor employee can sponsor only five short term employees at a time.

Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island District Security Office NLT 30 days prior to arrival on site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:

1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.

2) Foreign national employee will comply with E-verify requirements (see AT/OPSEC E-verify paragraph).

3) Approved and identified prime contractor employee shall escort the foreign national employee at ALL times while on site.

4) Each prime contractor employee can sponsor only one short term foreign national at a time.

For all projects located at the Clock Tower and Annex Building, all personnel will receive an identification badge or pass for access to either building. This must be accomplished prior to start of work and will be coordinated with the Contractor, COR and local security office.

C.1.8.2.2 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM.

The Contractor must pre-screen Candidates using the E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. Documentation of company enrollment in E-verify, via a print screen of the company profile within the E-verify system, must be submitted to the Security Office no later than 3 business days after the initial notice to proceed.

Foreign national employees must submit an I-9 form with documentation from Column A (page two of the I-9 form) as proof of authorization to work in the United States. Failure to present proper documentation may result in exclusion from the Access Control List.

*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.

**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK-15-C-XXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mailed to:

Security Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, IL 61201

C.1.9 SAFETY

C.1.9.1 Appropriate measures shall be taken to protect the general public, Government and contractor employees from accidental injury. All services shall be performed in accordance with applicable safety requirements set forth in Corps of Engineers Manual EM-385-1-1, “Safety and Health Requirements Manual” and supplements thereto (copies are available from the Project Office or http://www.usace.army.mil/publications/eng-manuals/em385-1-1/entire.pdf). ANY

EQUIPMENT OR MATERIALS NOT IN CONFORMITY WITH THE SAFETY MANUAL

SHALL BE REMOVED FROM GOVERNMENT PROPERTY IMMEDIATELY.

C.1.9.2 Prior to beginning work on this contract, the contractor Safety/Accident Prevention Plan must be submitted and approved. This plan shall be in accordance with the most recent EM 385-1-1. The plan shall address policies and procedures that will be used to maintain a safe environment for contractor personnel, Government employees, and facility users during contractor performance.

The Contractor will be expected to take a vital interest in safety, hazards, and educate their employees to work and plan their work safely. Proper driving techniques and defensive driving will be practiced to prevent vehicle accidents and property damage.

C.1.9.3 Any injury, property damage or safety hazard observed by the contractor shall be immediately reported to the COR.

C.1.10 SUSTAINABILITY

Playground Installation

The contractor shall meet the recycled content requirements set forth by EPA. The link is provided. The list is periodically updated; reviewers should check EPA’s website (http://www3.epa.gov/epawaste/conserve/tools/cpg/products/) for updates.

The contractor shall ensure that individual products contain recycled-content (e.g., playground installation supplies, etc) for all contractor-furnished supplies.

The contractor shall meet the BioPreferred Program requirements set forth by USDA. The following list is current as of 1 Jan 2016. The list is periodically updated, so reviewers should check USDA’s website (http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml) for updates.

The contractor shall use biobased products for equipment maintenance

The contractor shall assure that all deliverables be printed double sided on paper that contains post-consumer fiber.

The contractor shall us low or no toxic or hazardous chemicals.

The contractor shall use energy efficient equipment. The list is periodically updated, so reviewers should check DOE’s website (http://energy.gov/eere/femp/find-product-categories-covered-efficiency-programs) for updates.

C-2

SPECIFIC TASKS

C.2.1 General:

C.2.1.1 STORAGE OF EQUIPMENT AND SUPPLIES. When storage of contractor's equipment and supplies is necessary on U S Government property, they will be stored only in the areas designated by the Contracting Officer's Representative. The Government will assume no responsibility or liability for contractor equipment or supplies stored on Government property. The contractor will ensure that all fence gates are locked and secured when property is stored within such enclosures.

C.2.1.2 HOURS OF OPERATION. The contractor shall perform work Monday-Friday from 8:00 am to

6:00 pm. Work will not be permitted on weekends or Federal Holidays.

C.2.1.3 SITE PREPARATION. The contractor shall not be required to perform any site preparation work at the playground installation site locations. All site preparation work will be performed by the Government.

C.2.1.4 UTILITY LOCATES. The contractor shall coordinate with the Government to ensure all utilities at the playground installation site locations are properly marked prior to the start of work.

C.2.1.5 DAMAGES. The contractor shall take care not to damage any recreation area facilities during playground installation work. Any damages caused by the contractor to recreation area facilities shall be repaired by the contractor at no cost to the Government.

C.2.2 Playground Installation.

C.2.2.1 The playground equipment, plastic playground borders, and engineered wood fiber fall surface material shall be installed in accordance with the manufacturer’s instructions and the guidelines shown in the 2008 Consumer Product Safety Commission (CPSC) “Handbook for Public Playground Safety.” Installation must adhere to American with Disabilities Act (ADA) requirements.

C.2.2.2 The playground equipment and plastic playground borders shall be installed as per the layout shown in Technical Exhibit #4.

C.2.2.3 The engineered wood fiber fall surface material shall be installed at a depth of 9 inches.

C.2.2.4 The contractor shall transport the Government supplied items (playground equipment components, plastic playground borders, and engineered wood fiber fall surface material) from the storage locations on the project to the playground installation site locations. The storage locations for the Government supplied items are listed in section C-3 Supplied Items. The distance from the Lake Red Rock maintenance compound storage location to Howell Station Campground is approx. four (4) miles and the distance from the Lake Red Rock maintenance compound storage location to the Whitebreast Campground is approx. six (6) miles. The storage locations for the engineered wood fiber fall surface material in Howell Station Campground and Whitebreast Campground are in close proximity to the playground installation site locations.

C-3

SUPPLIED ITEMS

C.3.1 General:

C.3.1.1 Two (2) Playworld play structures as shown in Technical Exhibit #4. The play structures are stored at the Lake Red Rock maintenance compound, 1106 North Hwy T-15, Knoxville, IA 50138.

C.3.1.2 The required quantity of plastic playground borders for both playgrounds per the layout shown in Technical Exhibit #4. The type of plastic playground borders are shown in Technical Exhibit #4. The playground borders are stored at the Lake Red Rock maintenance compound, 1106 North Hwy T-15, Knoxville, IA 50138.

C.3.1.3 The required quantity of engineered wood fiber fall surface material for both playgrounds per the layout shown in Technical Exhibit #4. The engineered wood fiber fall surface material is located at Whitebreast Campground and Howell Station Campground.

TECHNICAL EXHIBIT #1

QUALITY ASSURANCE SURVEILLANCE PLAN

Purpose: This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract, and that the Government only pays for the acceptable level of services received.

1. Critical performance processes and requirements. Critical to the performance of the contract, the contractor shall provide all personnel equipment, tools, materials, supervision, transportation, other items and services necessary to perform as defined in this Performance Work Statement (PWS). The contractor shall provide accurate transaction processing to ensure that material accountability comply with safety and security requirements, in accordance with this PWS. Additionally, the contractor shall be accountable for all auditable documents, establish/maintain effective quality, and perform required within prescribed timeframes. The performance process is the timely, accurate, and thorough completion of all contract requirements.

2. Performance Standards

a. Schedule. The dates for services and the actual accomplishment of the services in accordance with the schedule will be assessed against original dates of services and milestones established for the contract.

b. Service. The services required to be performed will be assessed against the PWS detailed in the contract, for the required content, quality, timeliness, and accuracy.

c. Past Performance. In addition to schedule and services, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.

3. Surveillance methods. The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to: random or planned sampling, periodic inspection, Contractor Self Reporting, and validated customer complaints.

a. Random/Scheduled Monitoring. Random and/or scheduled monitoring will be conducted if and when deemed necessary by the COR to ensure compliance with the terms of the contract. Using the attached matrix the COR will determine whether the contractor is in compliance with the terms of the contract.

b. Contractor Self-Reporting. The contractor shall provide as needed status reports that document significant problems/issues and potential resolutions.

c. Customer Feedback. Customer feedback will be obtained from valid customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint;

must be signed and must be forwarded to the COR by the contractor. The contractor shall maintain a log of all customer complaints as well as a copy of each complaint in a documentation file. The COR may request to review the log and/or documentation file at any time.

4. Performance Measurement. Performance will be measured in accordance with the following table:

Performance-Based Matrix, Attachment A

Performance Element

Performance Requirement

Surveillance Method

Frequency

Acceptable Quality Level

Contract Services

Contract Services furnished as prescribed in the PWS as applicable.

Inspection by the

COR

Random inspection of all sampling of contract services.

>95% of services inspected performed timely and without rework required.

Overall Contract Performance

Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on contractor performance

Assessment by the

COR

Annual All service elements rated Satisfactory (or higher) Satisfactory = 95% or above average contract acceptable random sampling

Contractor Self Reporting

Contract Services furnished as prescribed in the PWS as applicable.

Contractor Self Reports

Monthly >95% of services reported performed timely and without rework required.

Customer Feedback

Customer complaints reviewed by COR

Inspection by the

COR

Per Occurrence 100% of valid customer complaints resolved

Invoicing Invoices per contract procedures are timely and accurate.

Review & acceptance of the invoice by COR

Completion of Work

100% accuracy

Incentives/Disincentives:

For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR).

CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.

In accordance with the inspection of services provisions of the contract (52.212-4 (a) Inspection/Acceptance), the contractor will provide quality products and services that conform to the requirements of the contract. Otherwise, the Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. Furthermore, if repair, replacement, or reperformance will not correct the defects or is not possible, the Government may seek a price reduction or adequate consideration for acceptance of nonconforming supplies or services.

TECHNICAL EXHIBIT #2

TECHNICAL CAPABILTY STATEMENT

(OFFERORS MUST COMPLETE)

The Offeror SHALL submit evidence of the capability to meet the minimum requirements as specified in this solicitation and the attached performance work statement. The contractor shall provide sufficient documentation of their technical capability. The documentation required is either, 1) a National Playground Safety Institute (NPSI) certified Playground Inspector, that has been trained on proper installation techniques; or 2) a contractor with a minimum of 5 years of playground installation experience with sufficient knowledge and skills to install the equipment. .

TECHNICAL EXHIBIT # 3 - USACE PAST PERFORMANCE QUESTIONNAIRE (PPQ)

(OFFERORS MUST COMPLETE)

AGENCY/COMPANY THAT WORK WAS PERFORMED FOR:

POINT OF CONTACT & TELEPHONE NUMBER:

DATES SERVICES PROVIDED:

BRIEF DESCRIPTION OF SERVICES PROVIDED:

W912EK-16-T-0036

TECHNICAL EXHIBIT #4

PLAYGROUND COMPONENTS (PLAYWORLD PLAY STRUCTURE), PLAYGROUND LAYOUT, &

PLASTIC PLAYGROUND BORDERS

Plastic Playground Borders

Timber is 4 feet 4 inches long, 9 inches high, and 4 inches wide Center to center of stake hole is 4 feet Each timber includes 30 inch long stake Stake is 3/4 inches x 30 inches with 1-1/2 inches diameter flattened head Recessed area to hide stake Black in color

See Attached Technical Exhibit #4 for the Playground Install Layout Pages.

CLAUSES INCORPORATED BY FULL TEXT

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)

(a) Definitions. As used in this clause--

Postconsumer fiber means—

(1) Paper, paperboard, and fibrous materials from retail stores, office buildings, homes, and so forth, after they have passed through their end-usage as a consumer item, including: used corrugated boxes; old newspapers; old magazines; mixed waste paper; tabulating cards; and used cordage; or

(2) All paper, paperboard, and fibrous materials that enter and are collected from municipal solid waste; but not

(3) Fiber derived from printers' over-runs, converters' scrap, and over-issue publications.

(b) The Contractor is required to submit paper documents, such as offers, letters, or reports that are printed or copied double-sided on paper containing at least 30 percent postconsumer fiber, whenever practicable, when not using electronic commerce methods to submit information or data to the Government.

(End of clause)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.

(b) The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:

(1) When no longer needed for contract performance.

(2) Upon completion of the Contractor employee's employment.

(3) Upon contract completion or termination.

(c) The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.

(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the subcontractor`s employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.

(End of Clause)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(OCT 2015)

(a) Definitions. As used in this clause:

Executive means officers, managing partners, or any other employees in management positions.

First-tier subcontract means a subcontract awarded directly by the Contractor for the purpose of acquiring supplies or services (including construction) for performance of a prime contract. It does not include the Contractor's supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a Contractor's general and administrative expenses or indirect costs.

Month of award means the month in which a contract is signed by the Contracting Officer or the month in which a first-tier subcontract is signed by the Contractor.

Total compensation means the cash and noncash dollar value earned by the executive during the Contractor's preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Financial Accounting Standards Board's Accounting Standards Codification (FASB ASC) 718, Compensation- Stock Compensation.

(3) Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property) for the executive exceeds $10,000.

(b) Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L.

110-252), requires the Contractor to report information on subcontract awards. The law requires all reported information be made public, therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.

(c) Nothing in this clause requires the disclosure of classified information.

(d)(1) Executive compensation of the prime contractor. As a part of its annual registration requirement in the System for Award Management (SAM) database (FAR provision 52.204-7), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for its preceding completed fiscal year, if—

(i) In the Contractor's preceding fiscal year, the Contractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.).

(2) First-tier subcontract information. Unless otherwise directed by the contracting officer, or as provided in paragraph (g) of this clause, by the end of the month following the month of award of a first-tier subcontract with a value of $30,000 or more, the Contractor shall report the following information at http://www.fsrs.gov for that first-tier subcontract. (The Contractor shall follow the instructions at http://www.fsrs.gov to report the data.)

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(vi) Subcontract number (the subcontract number assigned by the Contractor).

(vii) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(viii) Subcontractor's primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(ix) The prime contract number, and order number if applicable.

(x) Awarding agency name and code.

(xi) Funding agency name and code.

(xii) Government contracting office code.

(xiii) Treasury account symbol (TAS) as reported in FPDS.

(xiv) The applicable North American Industry Classification System code (NAICS).

(3) Executive compensation of the first-tier subcontractor.

Unless otherwise directed by the Contracting Officer, by the end of the month following the month of award of a first-tier subcontract with a value of $30,000 or more, and annually thereafter (calculated from the prime contract award date), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for that first-tier subcontractor for the first-tier subcontractor's preceding completed fiscal year at http://www.fsrs.gov, if—

(i) In the subcontractor's preceding fiscal year, the subcontractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)

(e) The Contractor shall not split or break down first-tier subcontract awards to a value less than $30,000 to avoid the reporting requirements in paragraph (d) of this clause.

(f) The Contractor is required to report information on a first-tier subcontract covered by paragraph (d) when the subcontract is awarded. Continued reporting on the same subcontract is not required unless one of the reported data elements changes during the performance of the subcontract. The Contractor is not required to make further reports after the first-tier subcontract expires.

(g)(1) If the Contractor in the previous tax year had gross income, from all sources, under $300,000, the Contractor is exempt from the requirement to report subcontractor awards.

(2) If a subcontractor in the previous tax year had gross income from all sources under $300,000, the Contractor does not need to report awards for that subcontractor.

(h) The FSRS database at http://www.fsrs.gov will be prepopulated with some information from SAM and FPDS databases. If FPDS information is incorrect, the contractor should notify the contracting officer. If the SAM database information is incorrect, the contractor is responsible for correcting this information.

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)

Data Universal Numbering System (DUNS) number means the 9-digit number assigned by Dun and Bradstreet, Inc.

(D&B) to identify unique business entities, which is used as the identification number for Federal Contractors.

Data Universal Numbering System+4 (DUNS+4) number means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.)

This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at subpart 32.11) for the same concern.

Registered in the System for Award Management (SAM) database means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the SAM database;

(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

System for Award Management (SAM) means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—

(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;

(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR subpart 4.12;

and

(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.

(b) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(c)(1)(i) If a Contractor has legally changed its business name, doing business as name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to—

(A) Change the name in the SAM database;

(B) Comply with the requirements of subpart 42.12 of the FAR; and

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (c)(1)(i) of this clause, or fails to perform the agreement at paragraph (c)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the EFT clause of this contract.

(3) The Contractor shall ensure that the DUNS number is maintained with Dun & Bradstreet throughout the life of the contract. The Contractor shall communicate any change to the DUNS number to the Contracting Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the DUNS number does not necessarily require a novation be accomplished. Dun & Bradstreet may be contacted—

(i) Via the internet at http://fedgov.dnb.com/webform or if the Contractor does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

(d) Contractors may obtain additional information on registration and annual confirmation requirements at https://www.acquisition.gov.

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination…

This is the start of the file's text. The full file is on GovTribe.