This amendment modifies a solicitation for electrical materials to be delivered to the Dworshak Project Powerhouse. The solicitation requires offerors to provide panelboards, power centers, various types and quantities of conductors, conduits, electric heaters, and LED lights. The amendment changes the circuit breaker specification from 30A to 40A and extends the response deadline from September 14th to September 18th. Delivery is required within three weeks of award to the Dworshak Project Powerhouse in Idaho. The solicitation is identified as W912EF23Q0093 and was issued by the Walla Walla District of the US Army Corps of Engineers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EF23Q0093 Amendment 0001.pdf | ||
| W912EF23Q0093.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this solicitation amendment is to change the circuit breakers in section 3.1 of the technical specifications from "30A" to "40A," and extend the offer due date from 1130 PST on 14 September 2023 to 1130 PST on 18 September 2023.
All other terms and conditions of this solicitation remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF23Q0093
X 9B. DATED (SEE ITEM 11)
05-Sep-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2023
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
TIFFANY CHANG 201 N THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF23Q0093
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-Sep-2023 11:30 AM to 18-Sep-2023 11:30 AM.
The following have been modified:
TECHNICAL SPECIFICATIONS
BID ITEM LIST
DWORSHAK ELECTRICAL MATERIALS FOR GARCO BUILDING
ITEM DESCRIPTION QTY UOM PRICE EXT PICE
0001 Panelboard 1 Each 0002 Power center 1 Each 0003 Conductor (250MCM-3C/#4G, XHHW/XHHW-2, 600 VAC, Tray cable)
Feet
0004 Conductor (#10-3C with Ground, THHN/THWN-2, 600 VAC)
Feet
0005 Conduit (2.5-inch RMC with coupler, 10-foot length, Galvanized)
4 Each
0006 Conduit (2.5-inch RMC Coupler, Galvanized)
4 Each
0007 Conduit (2.5-inch RMC LBNEC - 90° Mogul Pulling Elbow Type, Cast aluminum body)
1 Each
0008 Electric Wall/Ceiling Heater 4 Each 0009 LED High Bay Light, UFO style 8 Each
DWORSHAK ELECTRICAL MATERIALS FOR GARCO BUILDING
SPECIFICATION
(CORRECTIONS IN RED, 9/14/23)
1.0 INTENT
The following specifications pertain to the purchase and delivery of electrical materials for delivery to the Dworshak Project Powerhouse.
2.0 SCOPE
The successful Offeror shall be required to provide the materials described in Section 3.0 below and ship the materials to Dworshak Project as required in Section 6.0, Shipment and Delivery. All items delivered under this contract must be new and in original packaging if applicable.
3.0 MATERIALS SPECIFICATION
3.1 Panelboard (1 each)
400 Ampere, 480 VAC (volts alternating current), 3 Phase, 3 Wire, 65 kiloampere SCCR (short-circuit current rating), 30 Circuit, Copper Ground Bus Enclosure NEMA (National Electrical Manufacturers Association) Type 1 Enclosure Main Circuit Breaker (1 each) - 250A, 3 Pole, 480 VAC, 65 kiloampere AIC (ampere interrupting capacity), Bolt-On, LSI Protection, Equipped with Padlockiloampereble Device for Hazardous Energy Control.
Circuit Breaker (2 each) - 30A, 3 Pole, 480 VAC, 35 kiloampere AIC, Bolt-On, Equipped with Padlockiloampereble Device for Hazardous Energy Control.
Circuit Breaker (4 each) - 30A 40A, 3 Pole, 480 VAC, 35 kiloampere AIC, Bolt-On, Equipped with Padlockiloampereble Device for Hazardous Energy Control.
Circuit Breaker (1 each) - 70A, 3 Pole, 480 VAC, 35 kiloampere AIC, Bolt-On, Equipped with Padlockiloampereble Device for Hazardous Energy Control.
100% Factory assembled and furnished with all necessary accessories to meet NEC (National Electrical Code) requirements for panelboards of this voltage class and rating
Shall be UL (underwriters laboratories) Listed, where UL standards are established for those items.
3.2 Power center (1 each)
15 Kilo-volt-amperes, 480:120/240 VAC, 1 Phase, NEMA Type 3R Outdoor Rated, containing minimum 2 taps at +5% voltage & -5% voltage in 2.5% increments
Main Circuit Breaker (1 each) - 70A, 2 Pole, 480VAC, 20 kiloampere AIC, Bolt-On, Equipped with Padlockiloampereble Device for Hazardous Energy Control.
Enclosure NEMA Type 3R Enclosure Circuit Breaker (10 each) – 20A, 1 Pole, 120 VAC, 22 kiloampere AIC, Bolt-On, shall be UL67 listed, Equipped with Padlockiloampereble Device for Hazardous Energy Control Circuit Breaker (1 each) – 30A, 2 Pole, 240 VAC, 22 kiloampere AIC, Bolt-On, shall be UL67 listed, Equipped with Padlockiloampereble Device for Hazardous Energy Control Circuit Breaker (1 each) – 50A, 2 Pole, 240 VAC, 22 kiloampere AIC, Bolt-On, shall be UL67 listed, Equipped with Padlockiloampereble Device for Hazardous Energy Control Shall include circuit breaker blank cover for unused circuits in panel.
100% Factory assembled and furnished with all necessary accessories to meet NEC requirements for panelboards of this voltage class and rating Shall be UL Listed, where UL standards are established for those items.
3.3 Conductor (1000 Feet)
250MCM-3C/#4G, XHHW/XHHW-2, 600 VAC, Tray cable Individual Conductors are to be contained in a single jacket with each conductor being Stranded
Copper Cable Low Smoke Zero Halogen Jacket. UL 1277 standard.
Must include a rip cord the full length Individual jacket color shall be Brown, Orange, Yellow.
Total cable length provided on a single spool
3.4 Conductor (300 Feet)
#10-3C with Ground, THHN/THWN-2, 600 VAC Individual Conductors are to be contained in a single jacket with each conductor being Stranded
Copper Cable Total cable length provided on a single spool
3.5 Conduit (4 Each)
2.5-inch RMC with coupler, 10-foot length, Galvanized
3.6 Conduit (4 Each)
2.5-inch RMC Coupler, Galvanized
3.7 Conduit (1 Each)
2.5-inch RMC LBNEC - 90° Mogul Pulling Elbow Type, Cast aluminum body
3.8 Electric Wall/Ceiling Heater (4 Each)
25 kilowatts, 480VAC, 3 Phase, Shall include a minimum heating capacity of 68,000 BtuH (British thermal unit per hour) Shall have forced air.
Shall include Universal Wall and Ceiling mount Shall include thermostat for temperature control
3.9 LED High Bay Light, UFO style (8 Each)
120/277VAC, 60 hertz 151 Watts Maximum Power Suspended mounting with included eye bolt Minimum brightness of 149 Lumens per Watt Color Temperature 4000 Kilohms Shall include 6 foot power cord.
Mount: Ceiling, suspended
Material – light weight cast aluminum with white powder coating UL Listed Certified for Damp Locations
4.0 SUBMITTALS
The Offeror shall provide with their quote sufficient product information (i.e., brochures, cut sheets, options available and offered, etc.) for the Government to determine whether the products offered meet the salient requirements described herein. Documents should be annotated so that it is clear what options are included and/or excluded.
5.0 WARRANTY
Each item shall be covered by the manufacture’s standard warranty.
6.0 SHIPMENT AND DELIVERY
All items shall be delivered FOB Destination to the locations indicated above not later than three (3) weeks of contract award. The Contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to Dworshak Project. Deliveries will only be accepted during normal Project business hours, Monday–Thursday, 7:00 AM –4:30 PM, excluding federal holidays. The Visitor Center is normally not staffed for receiving deliveries, and the Contractor shall provide advance notice to the designated Project POC at least two full business days (M-Th) prior to delivery.
The materials meeting the salient requirements will be delivered to:
USACE Dworshak Project Powerhouse Attn: USACE Contract Performance Specialist 1428 Northfork Dr Ahsahka, ID 83520
(End of Summary of Changes)