Please see that RFI questions and answers and updated specifications have been attached. Quotes are due 30 July 2019 at 2:00PM.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

POC: Chandra Crow ; 509-527-7202; Chandra.d.crow @usace.army.mil

The purpose of this amendment is to address questions posed by potential offerors and address changes or updates in the performance w ork statement.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF19R0011

X 9B. DATED (SEE ITEM 11)

18-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jul-2019

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

CHANDRA D. CROW

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF19R0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 26-Jul-2019 10:00 AM to 30-Jul-2019 02:00 PM.

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Performance Work

Statement

128 11-JUN-2019

Attachment 2 Offeror Experience & PPQ Forms

9 03-JUN-2019

Attachment 3 Wage Determinations 58 03-JUN-2019 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 2 Offeror Experience &

PPQ Forms

9 03-JUN-2019

Attachment 3 Wage Determinations 58 03-JUN-2019 Attachment 4 TechSpec - Amend 0002 148 25-JUL-2019 Attachment 5 Amend-0002_Summary 4 25-JUL-2019

(End of Summary of Changes)

Summary of changes for Amend - 0002

NWW Projects Main Unit Lubrication Oil System Flushing

W912EF19R0011

Due to text length limitations of the bidder inquiry system key excerpts from the bidder inquiry attachments along with the Government responses are included here in this summary:

Inquiry ID: 8094644

1. Is flushing the fill lines from the tank truck point of delivery to the tank room required for each location?

Government Response: No, the fill/drain lines will not be flushed - see paragraph 3.2.2 in SECTION 48 13

13.20 26.

2. Do the oil storage tanks fill from the top or the bottom?

Government Response: Tanks are typically filled through the top - see reference drawings.

3. Provide the PCB test results (PPM levels) for each of the tanks that tested positive and if possible provide more accurate quantities.

Government Response: PCB test results will be provided in a forthcoming amendment.

4. If the contractor conducts independent PCB testing using a certified third party lab and levels are lower than prior

USACE test results, may the contractor adjust their disposal plan accordingly?

Government Response: The Contractor will be responsible for disposal of oil in accordance with applicable regulations per specification SECTION 01 57 20.00 28 ENVIRONMENTAL PROTECTION.

5. For each dam provide the distance from the closest THREE 480V power drops …

Government Response: Paragraph 3.1 of SECTION 48 12 12.20 26 states “Before starting any work, the

Contractor must examine the reference drawings and perform a site visit to field-verify all details needed for the work…submit for approval…a site visit report for each powerhouse.

6. … Would the contractor be allowed to set up on the turbine deck…?

Government Response: See paragraph 3.1 of SECTION 48 12 12.20 26. Part of a required submittal for approval is the Contractor’s “proposed location of flushing equipment skid….” Depending on the specifics of this submittal the turbine deck would very likely be an approved location.

7. … Please confirm if outside [crane] operators are required ….

Government Response: The Government will operate its own cranes at Lower Granite and Lower

Monumental to load/unload KTR equipment provided that the Contractor request this support 24 hrs in advance and provided that the Contractor properly coordinates this support through the Contracting

Officer. At Little Goose the contractor may be required to provide a crane operator with qualifications to be provided in SECTION 01 35 29.10 28, Paragraph 1.5.1.3 Crane Operators/Riggers in a forthcoming amendment.

8. Please provide length and width of any hatch openings equipment must be lowered through.

Government Response: Access at all sites is sufficient for up to a 6’ x 6’ x 6’ skid, See#5

9. Confirm the pre-work kickoff meeting which is 15 days prior to start will be face to face instead of by telephone.

Will this meeting be in Walla Walla or will each site be visited?

Government Response: Pre-Work meeting will be onsite at each project site, 01 11 01.00 28 Paragraph

1.18.1.

10. Confirm that 24 hour operation, 7 days per week will be authorized.

Government Response: Confirmed, see example in SECTION 48 13 13.20 26 Paragraph 3.1 GENERAL

PROCEDURE AND SEQUENCE OF WORK - Per Each Powerhouse.

11. Is there any restriction in the quantity of diesel fuel for the generator that can be onsite if it is in approved tanks?

Government Response: While there is no limit on the amount of fuel stored onsite, it should not exceed what is expected to be use by more than 10%. It Must comply with proper fuel storage requirements and refueling the tank must be done off site, see forthcoming amendment of SECTION 01 57 20.00 28, Paragraph 3.1.5 Fuel and Lubricants. Must be included in the Environmental Protection Plan, see SECTION 01 57 20.00 28, Paragraph 1.6.

12. … Are there special certifications for [an electrician to make connections and remove them at the end of the project] or [just any] electrician from a licensed company?

Government Response: Electricians making and breaking connections with the power provided by the projects are required to be state certified electricians, see SECTION 01 35 29.10 28, Paragraph 3.4.2

Electrician Qualifications.

13. At LoMo, please confirm the pipe from the header tie-in point at the drainage pumps to the tank room do not need to be flushed.

Government Response: Confirmed, at Lower Monumental and Little Goose the tie-in point is at the flowmeters in the supply and drainage lines. The contractor is expected to remove the flowmeter, make connections to the complete the flushing loop, and cap the other open end to prevent dirt intrusion and oil leakage. When flushing is complete the flowmeters are to be re-installed. See forthcoming amendment of

SECTION 48 13 13.20 26, Paragraph 3.2.2 General.

14. Please list any crew training that will be required other than the USACE on-line HECP course.

Government Response: Contractor is required to complete all applicable specified training including training specified in the following sections:

SECTION 01 35 29.10 28, Paragraph 1.5.1.1 Site Safety and Health Officer (SSHO), SECTION 01 35 29.10 28, Paragraph 1.6.2.1 Confined Space, SECTION 01 35 29.10 28, Paragraph 1.8 Safe Clearance Training or HECP, SECTION 01 35 29.10 28, Paragraph 3.2.1 [Fall Protection] Training, SECTION 01 57 20.00 28, Paragraph 3.1.2.f. Hazardous Waste Handling

15. Provide the oil delivery schedule and any known dates when the flushing and tank cleaning can or cannot be done?

Government Response: Tank cleaning and flushing will take priority over oil delivery.

16. Are there any requirements in the USACE schedule that will prohibit the contractor from doing the three flushes sequentially without delay or should the contractor expect gap of time between flushes when equipment and crew would need to demobilize?

Government Response: Pending successful submittals by the Contractor, no delays in work are anticipated between the three project sites.

17. … Please confirm the 8 day flushing duration does not include set up and tear down...

Government Response: Confirmed – 8 day flushing duration does NOT include set up and tear down.

18. How many LOTO days should bidders allow for in their bids?

Government Response: 2 days, see forthcoming amendment to SECTION 01 35 29.10 28, Paragraph 1.6.2.6

Hazardous Energy Control Program (HECP).

19. Should the contractor plan on bringing clean empty oil totes and containment to allow for USACE to top off any turbines during flush operations?

Government Response: Empty totes are NOT required.

Inquiry ID: 8096429 (16-Questions)

1. Are the Tank Fill lines required to be flushed under contract?

Government Response: No, the fill/drain lines will not be flushed - see paragraph 3.2.2 General in 13 13.02

26.

2. Can the flushing equipment be set up on turbine deck at all three locations?

Government Response: See paragraph 3.1 of SECTION 48 12 12.20 26. Part of a required submittal for approval is the Contractor’s “proposed location of flushing equipment skid….” Depending on the specifics of this submittal the turbine deck would very likely be an approved location.

3. Will the dam provide limited crane lifts to lower equipment to turbine deck?

Government Response: The Government will operate its own cranes at Lower Granite and Lower

Monumental to load/unload KTR equipment provided that the Contractor request this support 24 hrs in advance and provided that the Contractor properly coordinates this support through the Contracting

Officer. At Little Goose the contractor may be required to provide a crane operator with qualifications to be provided in SECTION 01 35 29.10 28, Paragraph 1.5.1.3 Crane Operators/Riggers in a forthcoming amendment.

4. Can you provide latest oil sample report of NEW and USED lube oil product?

Government Response: PCB test results will be provided in a forthcoming amendment to SECTION 01 11

00.00 26 SUMMARY OF WORK. The winning bidder will be provided with samples of actual in-service oil from each plant as needed to perform compatibility tests at the qualified independent lab per SECTION 48

13 13.20 26.

5. What lube oil product is used at each location, brand? Product name? Manufacture?

Government Response: It is not possible to guarantee exact formulation of turbine oils in service at each plant over decades. New oil yet to be provided is Mobil DTE. These are the reasons for the flushing oil requirements in paragraph 1.6 FLUSHING OIL in SECTION 48 13 13.20 26.

6. Is the product special formulation, if so can you please provide product data sheet?

Government Response: The new Mobil DTE oil is not a special formulation; The product data sheet (PDS) is available from the ExxonMobil website.

7. Is there a test requirement to show removal of all flush oil?

Government Response: Yes, see “Flushing Oil Removal Report – Per Each Powerhouse” submittal in

SECTION 48 13 13.20 26, paragraph 3.2.2 General.

8. Can we use a lower viscosity flush Base Oil with NO ADDITIVES so it will not contaminate system?

Government Response: Yes, as specified in paragraph 1.6 FLUSHING OIL of SECTION 48 13 13.20 26.

9. Is a compatibility lab test required for flushing oil and product being used at each location?

Government Response: Yes, as specified in paragraph 1.6 FLUSHING OIL of SECTION 48 13 13.20 26.

10. Can Contractor invoice partial CLIN items as work is completed?

Government Response: Yes, Contractor may invoice multiple times against Job CLINs as long as the item(s)/work being invoiced has been completed and accepted by the Government. See FAR 52.212-4(i).

11. Can Contractor invoice each completed CLIN separately once each CLIN is completed?

Government Response: Yes, Contractor may invoice each CLIN as the work is completed.

As long as the item(s)/work being invoiced has been completed and accepted by the Government. See FAR

52.212-4(i).

12. Can each location provide lock out tag out of government equipment prior to Contractor arrival onsite?

Government Response: No, our process requires the contractor to be onsite to complete the lock-out tag-out.

13. Will each location have flushing connections with "TEE" fitting and isolation valves to attach oil flushing connections to each Supply line and Return Line, prior to Contractor arrival?

Government Response: Confirmed, at Lower Monumental and Little Goose the tie-in point is at the flowmeters in the supply and return lines. The contractor is expected to remove the flowmeter, make connections to the flushing loop, and cap the other open end to prevent dirt intrusion and oil leakage. When flushing is complete the flowmeters are to be replaced. See forthcoming amendment paragraph 3.2.2 of

SECTION 48 13 13.20 26.

14. Will each location have 100amp 480 electrical service for flushing equipment connection?

Government Response: Per paragraph 3.1 of SECTION 48 13 13.20 26. “Before starting any work, the

Contractor must examine the reference drawings and perform a site visit to field-verify all details needed for the work”. And per paragraph 1.2.3 of SECTION 01 51 00.00 28, “Site-specific details provided here for convenience must be field-verified by the Contractor:

Little Goose has 480 Volt 100 Amp sources available at the upstream powerhouse wall near Unit 3 and Unit 5.

Lower Granite has a 480 Volt 400 Amp disconnect switch on the generator floor under the assembly bay near Unit 1, two 480 Volt 100 Amp pin-and-sleeve connectors upstream of Unit 6, and a spare 100 Amp breaker in the upstream gallery.

Lower Monumental has a 480 Volt 100 Amp source available outdoors near Unit 6, approximately

200 feet away from the location where hoses from the pump skid will be able to connect into the supply and drainage headers.”

15. What is the Government requirement for Tank Cleanliness pass or fail?

Government Response: See paragraph 3.4 TANK CLEANING of SECTION 48 13 13.20 26.

16. Does the Government require a "chain of custody" form for any waste oil removal from tanks?

Government Response: See paragraphs 3.1.2.h Hazardous Waste Handling Plan and 3.1.3 Disposal of

Hazardous Waste of SECTION 01 57 20.00 28.

1. Revised the following Specifications:

a. SECTION 01 11 00.00 26 SUMMARY OF WORK

Revised paragraph 1.2 WORK COVERED BY CONTRACT DOCUMENTS

b. SECTION 01 14 00.10 28 PROJECT SITE RESTRICTIONS

Added paragraph 1.2 SITE CONDITIONS AND OPERATIONAL RESTRICTIONS

Added paragraph 1.4 USE OF PROJECT CRANES

c. SECTION 01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS

Added paragraph 1.2.3 Competent Person, Cranes and Rigging

Added paragraph 1.2.4 Competent Person, Fall Protection

Added paragraph 1.2.9 Load Handling Equipment (LHE) Accident or Load Handling Equipment

Mishap

Revised paragraph 1.3 SUBMITTALS

Added paragraph 1.5.1.3 Crane Operators/Riggers

Added paragraph 1.5.1.4 Contractor's Cranes

Added paragraph 1.6.2.2 Standard Lift Plan (SLP)

Added paragraph 1.6.2.3 Critical Lift Plan- Crane or Load Handling Equipment

Revised paragraph 1.6.2.3 Hazardous Energy Control Program (HECP)

Added paragraph 1.12.3 LHE Inspection Reports

Added paragraph 1.12.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and

Rigging

Added paragraph 3.3 EQUIPMENT

Added paragraph 3.3 ELECTRICAL

d. SECTION 01 57 20.00 28 ENVIRONMENTAL PROTECTION

Revised paragraph 3.1.5 Fuel And Lubricants

e. SECTION 48 13 13.20 26 FLUSHING AND CLEANING OF LUBRICATING OIL SYSTEMS

Revised paragraph 3.2.2 General

See revised specifications for details.

NWW Projects Main Unit Lubrication Oil System Flushing W912EF19R0011 Amemd-0002

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 28 GENERAL REQUIREMENTS

01 11 00.00 26 SUMMARY OF WORK

01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS

01 14 00.10 28 PROJECT SITE RESTRICTIONS

01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY

(OPSEC)

01 33 00 SUBMITTAL PROCEDURES

01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.01 28 CONTRACTOR QUALITY CONTROL

01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 51 00.00 28 TEMPORARY UTILITIES

01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20.00 28 ENVIRONMENTAL PROTECTION

DIVISION 48 - ELECTRICAL POWER GENERATION

48 13 13.02 26 FLUSHING AND CLEANING OF LUBRICATING OIL SYSTEMS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1 g4ecdrp9 Line g4ecdrp9 Line g4ecdrp9 Line g4ecdrp9 Line g4ecdrp9 Line

This page intentionally left blank

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00.00 28

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

SECTION 01 00 00.00 28

SECTION 01 00 00.00 28

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/

Department of Veterans Affairs-VOW to Hire Heroes Act http://benefits.va.gov/vow/

Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/

Guide to Hiring Veterans - Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house _business_council_-_guide_to_hiring_veterans_0.pdf

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

SECTION 01 00 00.00 28

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00.00 26

SUMMARY OF WORK

PART 1 GENERAL

1.1 GENERAL

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.3 LOCATION

1.4 OCCUPANCY OF PREMISES

1.5 PERFRMANCE REQUIREMENT SUMMARY

PART 2 PRODUCTS

PART 3 EXECUTION

ATTACHMENTS:

Little Goose Oil Analysis

Lower Monumental Oil Analysis

-- End of Section Table of Contents --

SECTION 01 11 00.00 26

SECTION 01 11 00.00 26

SUMMARY OF WORK

PART 1 GENERAL

1.1 GENERAL

This specification outlines the scope of work for the Lubricating Oil System Flushing job for three (3) powerhouses within the Walla Walla District: Little Goose, Lower Granite, and Lower Monumental. The work includes but is not limited to hot oil high velocity flushing of lubrication oil system piping and cleaning various oil tanks.

No flushing will be performed beyond the supply/drain branches from the main headers which supply the hydropower units; units will be isolated from the flushing circuits and continue to operate during flushing. All three powerhouses have 6 main units, with Unit 1 being closest to the oil storage and purification rooms. Pressure in the Government's piping must not exceed 120 psi.

Tank cleaning will require a minimum of two (2) mobilizations to each powerhouse. Some tanks have tested positive for PCBs; all tanks will contain residual oil which must be removed by the Contractor. Tank abbreviations used here include:

- Clean Lubrication Oil (CLO)

- Dirty Lubrication Oil (DLO)

- Clean Transformer Oil (CTO)

- Dirty Transformer oil (DTO)

1.2 WORK COVERED BY CONTRACT DOCUMENTS

The work includes but is not limited to manpower, equipment, all fittings to connect to existing powerhouse piping and to power outlets, and expertise to provide services listed below and incidental related work.

Powerhouse-specific information below is given for estimating purposes only, not for design/submittal purposes. Contractor must field-verify all information necessary to successfully perform the work.

Little Goose Powerhouse:

1. Work will include flushing the main lubrication oil header and the branches to/from each unit.

a. Supply header is 2" copper pipe. Drain header is 2.5" copper pipe, with a reduction to 2" at Unit 3. Headers are approximately 650 feet long. At Unit 6, furthest from the oil storage room, there are valves in the main supply header and the main drain header where hoses could be connected for flushing. To close the main header flushing loop, it will be necessary to install a jumper between two valves in the oil purification room and a jumper from the bottom of the DLO tank to a valve after the lube oil supply pump. Supply header is 2" copper pipe. Drain header is 2.5" copper pipe from the oil storage room to Unit 3, with a reduction to 2" at Unit 3. Headers are approximately 650 feet long. At Unit 6, furthest from the oil storage room, there are valves in the main supply header and the main drain header where hoses could be connected for flushing. To close the main header

SECTION 01 11 00.00 26

flushing loop, it will be necessary to install a jumper between two valves in the oil purification room and a jumper from the bottom of the DLO tank to a valve downstream of the lube oil supply pump.

b. Lube oil supply branches to each Unit are 1.5" diameter.

Drain branches are 2.5" diameter. Distance between main header and most likely valve location for temporary jumpers on the branches is approximately 15 feet for Units 1-3 and approximately 40 feet for Units 4-6. Lube oil supply branches to each Unit are 1.5" diameter. Return branch piping for Units 1-3 is 2.5" diameter. Return branch piping for Units 4-6 is 2" diameter.

c. Units 1-3 supply and return branch piping have flanged flow meters which will need to be removed in order to connect flushing piping. The distance from the headers to these flanges is approximately 15 feet. .

d. Units 4-6 supply and return branch piping have threaded connection points located approximately 40 feet from the headers.

ce. Piping to/from gravity tank will not be flushed.

df . Piping in oil storage and purification rooms, other than as needed to complete the main header flushing loop, will not be flushed.

eg. Little Goose has 480 Volt 100 Amp sources available at the upstream powerhouse wall near Unit 3 and Unit 5.

2. Work will include cleaning tanks.

a. During first mobilization

i. 20,000-gallon CTO tank, prior to flushing.

NOTE: CTO has tested positive for PCBs and contains approximately 1,000 gallons of oil which must be removed by the Contractor.

ii. 20,000-gallon DTO tank, prior to flushing.

NOTE: DTO has tested positive for PCBs and contains approximately 1,000 gallons of oil which must be removed by the Contractor. See attached Little Goose Oil Analysis.

iii. 10,000-gallon CLO tank.

iv. 600-gallon Gravity tank, accessible by 18" manhole.

b. During second mobilization, within 1 year of contract.

i. 20,000-gallon CTO tank.

ii. 20,000-gallon DTO tank.

iii. 10,000-gallon DLO tank.

Lower Granite Powerhouse - LOWER GRANITE IS TO BE FLUSHED FIRST:

1. Work will include flushing the main lubrication oil header and the branches to/from each unit.

a. Supply and drain headers are 2" copper pipe. Headers are approximately 650 feet long. At Unit 6, furthest from the oil storage room, the supply and drain headers are connected. At this location there are also valves in the main supply header and the main drain header where hoses could be connected for flushing. To close the main header flushing loop, it will be necessary to install a jumper between two valves in the oil purification room and a jumper from the bottom of the DLO tank to a valve after the lube oil supply pump. a. Supply and drain headers are 2" copper pipe. Headers are approximately 650 feet long. At Unit 6, furthest from the oil storage room, the supply and drain headers are connected. At this location there are also valves and tees in the main supply header and the main drain header where hoses could be connected for flushing. To close the main header flushing loop there are tees between two valves in the oil purification room

SECTION 01 11 00.00 26

g4ecdrp9 Line g4ecdrp9 Line where a jumper from the bottom of the DLO tank to a location after the lube oil supply pump.

b. Lube oil supply branches to each Unit are 1.5" diameter.

Drain branches are 1.5" diameter for Units 1-3 and 2" diameter at Units 4-6. Distance between main header and most likely valve location for temporary jumpers on the branches is approximately 30 feet.

c. Piping to/from gravity tank will not be flushed.

d. Piping in oil storage and purification rooms, other than as needed to complete the main header flushing loop, will not be flushed.

e. Lower Granite has a 480 Volt 400 Amp disconnect switch on the generator floor under the assembly bay near Unit 1, two 480 Volt 100 Amp pin-and-sleeve connectors upstream of Unit 6, and a spare 100 Amp breaker in the upstream gallery.

2. Work will include cleaning tanks.

a. During first mobilization

i. 10,000-gallon CLO tank.

ii. 600-gallon Gravity tank, accessible by 18" manhole.

b. During second mobilization, within 1 year of contract.

i. 10,000-gallon CTO tank.

ii. 10,000-gallon DTO tank.

iii. 10,000-gallon DLO tank.

Lower Monumental Powerhouse:

1. Work will include flushing the main lubrication oil header and the branches to/from each unit.

a. Supply header is 2" copper pipe. Drain header is 2.5" copper pipe. Headers are approximately 650 feet long with a crossover between headers at Unit 6, the unit furthest from the oil storage room Supply header is 2" copper pipe. Drain header is 2.5" copper pipe. Both headers have flowmeters which the contractor is to remove to allow connection to the headers.

Flowmeters are to be stored in a manner to protect from damage for replacement when flushing is complete. Open pipe ends from flowmeter removal are to be capped to prevent debris intrusion and oil leaks. Piping from flowmeters to oil storage tanks will not be flushed. Headers are approximately 650 feet long with a crossover between headers at Unit 6, the unit furthest from the oil storage room. .

b. Branches from headers to units will not be flushed at Lower Monumental.

c. Piping to/from gravity tank will not be flushed.

d. Piping in oil storage and purification rooms, other than as needed to complete the main header flushing loop, will not be flushed.

e. Lower Monumental has a 480 Volt 100 Amp source available outdoors near Unit 6, approximately 200 feet away from the location where hoses from the pump skid will be able to connect into the supply and drainage headers.

2. Work will include cleaning tanks.

a. During first mobilization

i. 20,000-gallon CTO tank, prior to flushing.

NOTE: CTO has tested positive for PCBs and contains approximately 1,000 gallons of oil which must be removed by the Contractor.

ii. 20,000-gallon DTO tank, prior to flushing.

NOTE: DTO has tested positive for PCBs and contains approximately 1,000 gallons of oil which must be

SECTION 01 11 00.00 26

g4ecdrp9 Line removed by the Contractor. See attached Lower Monumental Oil Analysis.

iii. 10,000-gallon CLO tank.

iv. Gravity tank will be cleaned by the Government at Lower Monumental.

b. During second mobilization, within 1 year of contract.

i. 20,000-gallon CTO tank.

ii. 20,000-gallon DTO tank.

iii. 10,000-gallon DLO tank.

1.3 LOCATION

The work is located at three Walla Walla District Powerhouses: Little Goose, Lower Granite and Lower Monumental. See reference drawings for relevant site details and dimensions.

1.4 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract.

Before work is started, arrange with the Contracting Officer a sequence of procedures, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.5 PERFRMANCE REQUIREMENT SUMMARY

The specification’s requirement to completely clean and flush the piping systems specified to ISO 15/13/10 (c) will be verified by the flushing oil cleanliness test log being inspected to ensure testing at least every hour and improvement in flushing oil cleanliness measurement. This will be accomplished by periodic inspection.

The specification’s requirement for sampling process will be accomplished by periodic inspection to verify clean sampling devices are used, 10 minute settling period is followed, and equipment calibration is current.

The specification’s requirement for ISO particle count cleanliness sampling process will be accomplished by witnessing sampling.

Tank cleaning will be verified such that no residual contamination can be detected on clean lint-free white cloths by inspection when tank cleaning is complete.

Other specification requirements will be verified by periodic inspection.

Submittals will be reviewed to verify all requirements have been met.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00.00 26

Client: US ARMY COE- LITTLE GOOSE DAM

Attn: STEPHANIE THOMAS

Address: 1001 LITTLE GOOSE DAM RD.

DAYTON, WA 99328

Analytical Results Report

Batch #: 150112008

Project Name: DIRTY TRANSFORMER

OIL

Anatek Labs, Inc.

1282 Alturas Drive • Moscow, ID 83843 • (208) 883-2839 • Fax (208) 882-9246 • email moscow@anateklabs.com

504 E Sprague Ste. D • Spokane WA 99202 • (509) 838-3999 • Fax (509) 838-4433 • email spokane@anateklabs.com

150112008-001Sample Number

Matrix Liquid

Parameter Result Units Analysis Date Analyst Method QualifierPQL

Client Sample ID

Sampling Date 1/8/2015

Sampling Time 1:00 PM

Date/Time Received 1/9/2015

Extraction Date1-12-2015-DO 1/14/2014

11:40 AM

Comments mg/Kg SAT1/15/2015Aroclor 1016 (PCB-1016) EPA 80823.43 1 mg/Kg SAT1/15/2015Aroclor 1221 (PCB-1221) EPA 8082ND 1 mg/Kg SAT1/15/2015Aroclor 1232 (PCB-1232) EPA 8082ND 1 mg/Kg SAT1/15/2015Aroclor 1242 (PCB-1242) EPA 8082ND 1 mg/Kg SAT1/15/2015Aroclor 1248 (PCB-1248) EPA 8082ND 1 mg/Kg SAT1/15/2015Aroclor 1254 (PCB-1254) EPA 8082ND 1 mg/Kg SAT1/15/2015Aroclor 1260 (PCB-1260) EPA 8082ND 1 mg/kg SAT1/15/2015PCB 8082 (total) EPA 80823.43 1

Surrogate Data

Surrogate Standard Percent Recovery Control Limits

Sample Number 150112008-001

Method

DCB 123.0 50-150EPA 8082

Authorized Signature

John Coddington, Lab Manager

MCL EPA's Maximum Contaminant Level

ND Not Detected PQL Practical Quantitation Limit

This report shall not be reproduced except in full, without the written approval of the laboratory.

The results reported relate only to the samples indicated.

Soil/solid results are reported on a dry-weight basis unless otherwise noted.

Page 1 of 1Friday, January 16, 2015

Certifications held by Anatek Labs ID: EPA:ID00013; AZ:0701; CO:ID00013; FL(NELAP):E87893; ID:ID00013; MT:CERT0028; NM: ID00013; OR:ID200001-002; WA:C595 Certifications held by Anatek Labs WA: EPA:WA00169; ID:WA00169; WA:C585; MT:Cert0095; FL(NELAP): E871099

Login Report

Anatek Labs, Inc.

1282 Alturas Drive • Moscow, ID 83843 • (208) 883-2839 • Fax (208) 882-9246 • email moscow@anateklabs.com

504 E Sprague Ste. D • Spokane WA 99202 • (509) 838-3999 • Fax (509) 838-4433 • email spokane@anateklabs.com

Order ID: 150112008Customer Name: US ARMY COE- LITTLE GOOSE DAM

1001 LITTLE GOOSE DAM RD.

Contact Name: STEPHANIE THOMAS

Comment:

Order Date: 1/12/2015

Project Name: DIRTY TRANSFORMER

OIL

DAYTON WA 99328

Sample #: 150112008-001

Date Collected: 1/8/2015

Date Received: 1/9/2015 11:40:00 AM

Customer Sample #: 1-12-2015-DO

Comment:

Collector: ASHTONMatrix: Liquid

Quantity: 1

Recv'd:

Test Method Due Date PriorityLab

Time Collected: 1:00 PM

PCB 8082 1/21/2015EPA 8082 Normal (~10 Days)M

SAMPLE CONDITION RECORD

Samples received in a cooler? Yes

Samples received intact? Yes

What is the temperature inside the cooler? 9.2

Samples received with a COC? Yes

Samples received within holding time? Yes

Are all sample bottles properly preserved? Yes

Are VOC samples free of headspace? N/A

Is there a trip blank to accompany VOC samples? N/A

Labels and chain agree? Yes

Client: USACE LOWER MONUMENTAL DAM

Attn: DAVE NEEDHAM

Address: P.O. BOX 10

KAHLOTUS, WA 99335

Analytical Results Report

Batch #: 160804074

Project Name: USED OIL & HAZ. WASTE

ANALYSIS

Anatek Labs, Inc.

1282 Alturas Drive • Moscow, ID 83843 • (208) 883-2839 • Fax (208) 882-9246 • email moscow@anateklabs.com

504 E Sprague Ste. D • Spokane WA 99202 • (509) 838-3999 • Fax (509) 838-4433 • email spokane@anateklabs.com

160804074-001Sample Number

Matrix Liquid

Parameter Result Units Analysis Date Analyst Method QualifierPQL

Client Sample ID

Sampling Date 7/28/2016

Sampling Time 3:30 PM

Date/Time Received 8/4/2016

LM072816-01 CLEAN LUBE OIL, EL. 396

11:50 AM

Comments mg/Kg SUB8/10/2016Arsenic EPA 6020AND 0.001 mg/Kg SUB8/10/2016Cadmium EPA 6020AND 0.001 mg/Kg SUB8/10/2016Chromium EPA 6020AND 0.001

°F RPR8/12/2016Flashpoint EPA 1010>200 mg/Kg SUB8/11/2016Lead EPA 6020AND 0.001 mg/Kg SAT8/12/2016Aroclor 1016 (PCB-1016) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1221 (PCB-1221) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1232 (PCB-1232) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1242 (PCB-1242) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1248 (PCB-1248) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1254 (PCB-1254) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1260 (PCB-1260) EPA 8082ND 1 mg/kg SAT8/12/2016PCB 8082 (total) EPA 8082ND 1 mg/Kg APM8/11/2016TOX EPA 9076<100 100

Surrogate Data

Surrogate Standard Percent Recovery Control Limits

Sample Number 160804074-001

Method

DCB 101.0 50-150EPA 8082

Page 1 of 4Thursday, August 18, 2016

Certifications held by Anatek Labs ID: EPA:ID00013; AZ:0701; FL(NELAP):E87893; ID:ID00013; MT:CERT0028; NM: ID00013;NV:ID00013; OR:ID200001-002; WA:C595 Certifications held by Anatek Labs WA: EPA:WA00169; ID:WA00169; WA:C585; MT:Cert0095; FL(NELAP): E871099

Address: P.O. BOX 10

KAHLOTUS, WA 99335

Analytical Results Report

Batch #: 160804074

Project Name: USED OIL & HAZ. WASTE

ANALYSIS

Anatek Labs, Inc.

1282 Alturas Drive • Moscow, ID 83843 • (208) 883-2839 • Fax (208) 882-9246 • email moscow@anateklabs.com

504 E Sprague Ste. D • Spokane WA 99202 • (509) 838-3999 • Fax (509) 838-4433 • email spokane@anateklabs.com

160804074-002Sample Number

Matrix Liquid

Parameter Result Units Analysis Date Analyst Method QualifierPQL

Client Sample ID

Sampling Date 7/28/2016

Sampling Time 3:30 PM

Date/Time Received 8/4/2016

LM072816-02 DIRTY TRANSFORMER OIL, EL. 396

11:50 AM

Comments mg/Kg SUB8/10/2016Arsenic EPA 6020AND 0.001 mg/Kg SUB8/10/2016Cadmium EPA 6020AND 0.001 mg/Kg SUB8/10/2016Chromium EPA 6020AND 0.001

°F RPR8/10/2016Flashpoint EPA 1010>200 mg/Kg SUB8/11/2016Lead EPA 6020A2 0.001 mg/Kg SAT8/12/2016Aroclor 1016 (PCB-1016) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1221 (PCB-1221) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1232 (PCB-1232) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1242 (PCB-1242) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1248 (PCB-1248) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1254 (PCB-1254) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1260 (PCB-1260) EPA 80822.01 1 mg/kg SAT8/12/2016PCB 8082 (total) EPA 80822.01 1 mg/Kg APM8/11/2016TOX EPA 9076<100 100

Surrogate Data

Surrogate Standard Percent Recovery Control Limits

Sample Number 160804074-002

Method

DCB 118.0 50-150EPA 8082

Page 2 of 4Thursday, August 18, 2016

Certifications held by Anatek Labs ID: EPA:ID00013; AZ:0701; FL(NELAP):E87893; ID:ID00013; MT:CERT0028; NM: ID00013;NV:ID00013; OR:ID200001-002; WA:C595 Certifications held by Anatek Labs WA: EPA:WA00169; ID:WA00169; WA:C585; MT:Cert0095; FL(NELAP): E871099

Address: P.O. BOX 10

KAHLOTUS, WA 99335

Analytical Results Report

Batch #: 160804074

Project Name: USED OIL & HAZ. WASTE

ANALYSIS

Anatek Labs, Inc.

1282 Alturas Drive • Moscow, ID 83843 • (208) 883-2839 • Fax (208) 882-9246 • email moscow@anateklabs.com

504 E Sprague Ste. D • Spokane WA 99202 • (509) 838-3999 • Fax (509) 838-4433 • email spokane@anateklabs.com

160804074-003Sample Number

Matrix Liquid

Parameter Result Units Analysis Date Analyst Method QualifierPQL

Client Sample ID

Sampling Date 7/28/2016

Sampling Time 3:30 PM

Date/Time Received 8/4/2016

LM072816-03 CLEAR TRANSFORMER OIL, EL. 396

11:50 AM

Comments mg/Kg SUB8/10/2016Arsenic EPA 6020AND 0.001 mg/Kg SUB8/10/2016Cadmium EPA 6020AND 0.001 mg/Kg SUB8/10/2016Chromium EPA 6020AND 0.001

°F RPR8/12/2016Flashpoint EPA 1010>200 mg/Kg SUB8/11/2016Lead EPA 6020AND 0.001 mg/Kg SAT8/12/2016Aroclor 1016 (PCB-1016) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1221 (PCB-1221) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1232 (PCB-1232) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1242 (PCB-1242) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1248 (PCB-1248) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1254 (PCB-1254) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1260 (PCB-1260) EPA 80822.02 1 mg/kg SAT8/12/2016PCB 8082 (total) EPA 80822.02 1 mg/Kg APM8/11/2016TOX EPA 9076108 100

Surrogate Data

Surrogate Standard Percent Recovery Control Limits

Sample Number 160804074-003

Method

DCB 125.0 50-150EPA 8082

Page 3 of 4Thursday, August 18, 2016

Certifications held by Anatek Labs ID: EPA:ID00013; AZ:0701; FL(NELAP):E87893; ID:ID00013; MT:CERT0028; NM: ID00013;NV:ID00013; OR:ID200001-002; WA:C595 Certifications held by Anatek Labs WA: EPA:WA00169; ID:WA00169; WA:C585; MT:Cert0095; FL(NELAP): E871099

Address: P.O. BOX 10

KAHLOTUS, WA 99335

Analytical Results Report

Batch #: 160804074

Project Name: USED OIL & HAZ. WASTE

ANALYSIS

Anatek Labs, Inc.

1282 Alturas Drive • Moscow, ID 83843 • (208) 883-2839 • Fax (208) 882-9246 • email moscow@anateklabs.com

504 E Sprague Ste. D • Spokane WA 99202 • (509) 838-3999 • Fax (509) 838-4433 • email spokane@anateklabs.com

160804074-004Sample Number

Matrix Liquid

Parameter Result Units Analysis Date Analyst Method QualifierPQL

Client Sample ID

Sampling Date 7/28/2016

Sampling Time 3:30 PM

Date/Time Received 8/4/2016

LM072816-04 DIRTY LUBE OIL, EL. 396

11:50 AM

Comments mg/Kg SUB8/10/2016Arsenic EPA 6020AND 0.001 mg/Kg SUB8/10/2016Cadmium EPA 6020AND 0.001 mg/Kg SUB8/10/2016Chromium EPA 6020AND 0.001

°F RPR8/12/2016Flashpoint EPA 1010>200 mg/Kg SUB8/11/2016Lead EPA 6020AND 0.001 mg/Kg SAT8/12/2016Aroclor 1016 (PCB-1016) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1221 (PCB-1221) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1232 (PCB-1232) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1242 (PCB-1242) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1248 (PCB-1248) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1254 (PCB-1254) EPA 8082ND 1 mg/Kg SAT8/12/2016Aroclor 1260 (PCB-1260) EPA 8082ND 1 mg/kg SAT8/12/2016PCB 8082 (total) EPA 8082ND 1 mg/Kg APM8/11/2016TOX EPA 9076<100 100

Surrogate Data

Surrogate Standard Percent Recovery Control Limits

Sample Number 160804074-004

Method

DCB 92.5 50-150EPA 8082

Authorized Signature

Todd Taruscio, Lab Manager

MCL EPA's Maximum Contaminant Level

ND Not Detected PQL Practical Quantitation Limit

This report shall not be reproduced except in full, without the written approval of the laboratory.

The results reported relate only to the samples indicated.

Soil/solid results are reported on a dry-weight basis unless otherwise noted.

Page 4 of 4Thursday, August 18, 2016

Certifications held by Anatek Labs ID: EPA:ID00013; AZ:0701; FL(NELAP):E87893; ID:ID00013; MT:CERT0028; NM: ID00013;NV:ID00013; OR:ID200001-002; WA:C595 Certifications held by Anatek Labs WA: EPA:WA00169; ID:WA00169; WA:C585; MT:Cert0095; FL(NELAP): E871099

Login Report

Anatek Labs, Inc.

1282 Alturas Drive • Moscow, ID 83843 • (208) 883-2839 • Fax (208) 882-9246 • email moscow@anateklabs.com

504 E Sprague Ste. D • Spokane WA 99202 • (509) 838-3999 • Fax (509) 838-4433 • email spokane@anateklabs.com

Order ID: 160804074Customer Name: USACE LOWER MONUMENTAL DAM

P.O. BOX 10

Contact Name: DAVE NEEDHAM

Comment:

Order Date: 8/4/2016

Project Name: USED OIL & HAZ.

WASTE ANALYSIS

KAHLOTUS WA 99335

Sample #: 160804074-001

Date Collected: 7/28/2016

Date Received: 8/4/2016 11:50:00 AM

Customer Sample #: LM072816-01 CLEAN LUBE OIL, EL. 396

Comment:

Collector: DAVE NEEDHAMMatrix: Liquid

Quantity: 1

Recv'd:

Test Method Due Date PriorityLab

Time Collected: 3:30 PM

ARSENIC 8/16/2016EPA 6020A Normal (~10 Days) CADMIUM 8/16/2016EPA 6020A Normal (~10 Days) CHROMIUM 8/16/2016EPA 6020A Normal (~10 Days) FLASHPOINT 8/16/2016EPA 1010 Normal (~10 Days)M

LEAD 8/16/2016EPA 6020A Normal (~10 Days) PCB 8082 8/16/2016EPA 8082 Normal (~10 Days)M

TOTAL CHLORINE 8/16/2016EPA 9076 Normal (~10 Days)S

Sample #: 160804074-002

Date Collected: 7/28/2016

Date Received: 8/4/2016 11:50:00 AM

Customer Sample #: LM072816-02 DIRTY TRANSFORMER OIL, EL. 396

Comment:

Collector: DAVE NEEDHAMMatrix: Liquid

Quantity: 1

Recv'd:

Test Method Due Date PriorityLab

Time Collected: 3:30 PM

ARSENIC 8/16/2016EPA 6020A Normal (~10 Days) CADMIUM 8/16/2016EPA 6020A Normal (~10 Days) CHROMIUM 8/16/2016EPA 6020A Normal (~10 Days) FLASHPOINT 8/16/2016EPA 1010 Normal (~10 Days)M

LEAD 8/16/2016EPA 6020A Normal (~10 Days) PCB 8082 8/16/2016EPA 8082 Normal (~10 Days)M

TOTAL CHLORINE 8/16/2016EPA 9076 Normal (~10 Days)S

Order ID: 160804074Customer Name: USACE LOWER MONUMENTAL DAM

P.O. BOX 10

Contact Name: DAVE NEEDHAM

Comment:

Order Date: 8/4/2016

Project Name: USED OIL & HAZ.

WASTE ANALYSIS

KAHLOTUS WA 99335

Sample #: 160804074-003

Date Collected: 7/28/2016

Date Received: 8/4/2016 11:50:00 AM

Customer Sample #: LM072816-03 CLEAR TRANSFORMER OIL, EL. 396

Comment:

Collector: DAVE NEEDHAMMatrix: Liquid

Quantity: 1

Recv'd:

Test Method Due Date PriorityLab

Time Collected: 3:30 PM

ARSENIC 8/16/2016EPA 6020A Normal (~10 Days) CADMIUM 8/16/2016EPA 6020A Normal (~10 Days) CHROMIUM 8/16/2016EPA 6020A Normal (~10 Days) FLASHPOINT 8/16/2016EPA 1010 Normal (~10 Days)M

LEAD 8/16/2016EPA 6020A Normal (~10 Days) PCB 8082 8/16/2016EPA 8082 Normal (~10 Days)M

TOTAL CHLORINE 8/16/2016EPA 9076 Normal (~10 Days)S

Sample #: 160804074-004

Date Collected: 7/28/2016

Date Received: 8/4/2016 11:50:00 AM

Customer Sample #: LM072816-04 DIRTY LUBE OIL, EL. 396

Comment:

Collector: DAVE NEEDHAMMatrix: Liquid

Quantity: 1

Recv'd:

Test Method Due Date PriorityLab

Time Collected: 3:30 PM

ARSENIC 8/16/2016EPA 6020A Normal (~10 Days) CADMIUM 8/16/2016EPA 6020A Normal (~10 Days) CHROMIUM 8/16/2016EPA 6020A Normal (~10 Days) FLASHPOINT 8/16/2016EPA 1010 Normal (~10 Days)M

LEAD 8/16/2016EPA 6020A Normal (~10 Days) PCB 8082 8/16/2016EPA 8082 Normal (~10 Days)M

TOTAL CHLORINE 8/16/2016EPA 9076 Normal (~10 Days)S

Order ID: 160804074Customer Name: USACE LOWER MONUMENTAL DAM

P.O. BOX 10

Contact Name: DAVE NEEDHAM

Comment:

Order Date: 8/4/2016

Project Name: USED OIL & HAZ.

WASTE ANALYSIS

KAHLOTUS WA 99335

SAMPLE CONDITION RECORD

Samples received in a cooler? Yes

Samples received intact? Yes

What is the temperature of the sample(s)? (°C) 22.2

Samples received with a COC? Yes

Samples received within holding time? Yes

Are all sample bottles properly preserved? Yes

Are VOC samples free of headspace? N/A

Is there a trip blank to accompany VOC samples? N/A

Labels and chain agree? Yes

FSSTEF

!'r

6^

-o9.)

i^

;o g e o f

E

9.g il a 9oi sr F

.s

Ga o,-.

,n9 a-

EA

e2i3

{EDo :6 gE Yoo

SF

"r 5>>xXo 3s oa \b!'v5= oo T -;t I t rl ttlro!!zz =+d I I € -!'Ed- 3 d

E:

dl

= BoEt! r :o:ts > q \x.D - = ?o,92 8:819 3,8 dl o l! e

=*io 6y t.tlt Egm-n<! 5. !r 3 P ga.=' -ad

35 r;.Dm (/) ol-o I6ilo i 3 '-i s s

IE5

E o rd

ON

-_o att

>PN:

s- ;ea-t9md

{c J c f, o- I 3o F uo

(t. \)a I

9.

6' v a v ng

6' al P E

I ts al P F t

P a

3!.

I

I z

(o @ o

3e o l d

E f d a' d

(,o(o N{ -.,1 g) o xq, =o e

!q

N9

(D (o (tr otgr o oo s.

d oo o u

CI

o, tD o o o z !q t-o{o o

3o g oo

# of Containers d

Sample Volum( l.\

N x x sw846. 3040/3050 xx x x x xx r 6', "3-i.., o d

!A s

I o-' z

0o o z ooo o _3 o|o(o (rl N-{ ..t (o t o m

.Lo

F.

ooc3l!

o ooo !Do F

_o s.

q z t cooo F -o !'t

=oo o to 6', 0o o zoo

CL

o totooc,o, o =oo =o z o o U,ooo E o Eo 4, o fo o o o5 a qgt q:BE d Fg o,tQ= fiat.J (O

6o.r) zzzz

-lo 3Eo tt c a c)

U )J hE I oo -o o) o-a)o 0,oo.\) oftx

1' o

ID

z'o o c

5=

T s' s o s

F' l, B rn$

-s o t' t s l ooo oo-eo

I 3o lltlIIIIIIllIl

IT

ITIlllIIIl lt

II

llrI ll

TI

TII

TIIII

TII

T

TIIII

T

TI

IIrrIIIlIrilIlIIllilrtIIIlIl

IIIIllIIrI

IT

ITII

IT

h-tr

I e$i

I

I

I lE t t I

I L i tt I

I

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 01.00 28

SUPPLEMENTARY REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 FIELD VERIFICATION OF SITE CONDITIONS

1.4 DEFINITIONS

1.5 PROJECT SCHEDULE

1.6 REGULAR CLEANUP AND DEBRIS DISPOSAL

1.7 EQUIPMENT LIST

1.8 TESTING OF EQUIPMENT

1.9 DISPOSITION OF REMOVED EQUIPMENT

1.10 PROTECTION AND RESTORATION OF EXISTING FACILITIES

1.11 PRE-WORK AND POST WORK SURVEYS

1.12 CONTRACTOR RESPONSIBILITY FOR CONTRACT WORK

1.13 CARE OF DRAINS

1.14 PROTECTION OF POWERHOUSE FLOORS AND PROJECT ELEVATORS

1.15 ELEVATOR USE

1.16 FIRE CONTROL

1.17 PROJECT SUPERINTENDENT

1.18 POST AWARD MEETINGS

1.18.1 Pre-Work

1.19 ADDITIONAL MEETINGS

1.20 GOVERNMENT QUALITY ASSURANCE (QASP)

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

SECTION 01 11 01.00 28

SECTION 01 11 01.00 28

SUPPLEMENTARY REQUIREMENTS

PART 1 GENERAL

The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 Safety and Health Requirements Manual

Comply with the current edition and all changes posted on the web as of the effective date of this solicitation.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals having an "I" designation are for information only.

Designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Project Schedule ; G C

Equipment List ; I C

Pre-Work Survey Photos And Report; I C

Project Superintendent ; I C

SD-11 Closeout Submittals

Post-Work Survey Photos And Report; I C

1.3 FIELD VERIFICATION OF SITE CONDITIONS

Field verify all elevations, dimensions, and coordinates of existing features indicated on the contract drawings that affect work on this contract.

1.4 DEFINITIONS

a. Qualified Person.

As defined in EM 385-1-1 ; "DEFINITIONS", unless otherwise specified.

b. F.O.B.

An abbreviation for free on board, which means that a vendor or consignor will deliver goods on a railroad car, truck, vessel, or other conveyance without any expense to the purchaser or consignee.

1.5 PROJECT SCHEDULE

a. Furnish a schedule for the complete project within 15 days after receipt of Notice of Award .

b. Provide an electronic copy of the Project Schedule in the original format the schedule was developed in (e.g. .xer, .xls., .mpp, etc.).

Each schedule file shall have a unique name to include the full contract number and data date. Send a copy of the schedule files to the Contracting Officer's Representative (COR) via email or file transfer and upload to RMS.

1.6 REGULAR CLEANUP AND DEBRIS DISPOSAL

With the exception of materials specifically indicated or specified to be salvaged for reuse, or turned over to the Government, all wastes and demolished materials shall become the property of the Contractor and shall be removed from the job site daily in accordance with Federal, State, and local regulations. The Contractor shall furnish waste containers. All small waste containers provided by the contractor shall be emptied daily, large bin containers shall be emptied when full or once a week.

1.7 EQUIPMENT LIST

Furnish a complete list of all equipment to be used on the Project 30 days prior to commencement of on-site work. Submit a revised list in the event of change of equipment. Lists shall include rented equipment as well as lease-purchase or sale-leaseback equipment. The initial list and the revised lists shall indicate dates equipment is assigned to or removed from the Project and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.

1.8 TESTING…