Amend_0004_DWA_Exciters_18R0003.pdf
PDF 1 MB Posted
- Attached to
- Dworshak Digital Exciter Replacement Federal contract opportunity
- Solicitation number
- W912EF18R0003
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0005_DWA_Exciters_18R0003.pdf | ||
| Amend_0003_18R0003.pdf | ||
| Site_Visit_Attendees_DWA_Excitation_System_Replacement.pdf | ||
| Amendment_0002_18R0003_DWA_Excitation_System_Replacement.pdf | ||
| Amendment_0001_W91EF18R0003.pdf | ||
| Solicitation_18R0003_DWA_Excitation_System_Replacement.pdf | ||
| 18R0003_Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV81494782
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the changes outlined below . The proposal submission date has been extended to 02 August 2018 at 4:00 PM PDT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 27
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF18R0003
X 9B. DATED (SEE ITEM 11)
05-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jul-2018
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF18R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
Summary of changes for Amend -0004
Dworshak Excitation System Replacement
1. Revised the following section in the solicitation:
a. Revised language that states what Construction clauses are applicable to all onsite work CLINS
• See Highlighted Sections
b. SECTION B
• Revised bid schedule to delineate Spare Parts as a supply base item.
c. SECTION M
• Revised Factor 3 – Small Business Participation Plan
• Revised Factor 4 - Price
2. Revised the following Specifications:
a. SECTION 00 01 15.00 28 LIST OF DRAWINGS
• Revised the following paragraph:
o 1.2 Contract Drawings
b. SECTION 01 22 00.28, MEASUREMENT AND PAYMENT o 1.3.3 CLIN 0003 Spare Parts and renumbered CLINS 0004 – CLINS 0009
c. SECTION 48 19 26.00 26, DIGITAL EXCITERS o 2.5.2 System Characteristics o 2.6.6 DC Conductors Between Exciter and Brush Rigging o 2.6.12.8 Painting
See revised specification for details.
3. Revised the following Drawings (See clouded areas on the drawing for revisions)
SHEET G-002 Index of Drawings Sheet 1 SHEET G-007 Contractor Staging and Storage Area (new sheet)
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Jul-2018 04:00 PM to 02-Aug-2018 04:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
AMENDMENT 0004
Walla Walla District Corps of Engineers
Dworshak Excitation System Replacement
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT
SUPPLY BASE ITEMS
0001 Design, manufacture, test and deliver excitation system and appurtenances for Units 1 and 2
1 JOB XXXXX $_____
0002 Design, manufacture, test and deliver excitation system and appurtenances for Unit
0003 Spare Parts 1 JOB XXXXX $_____
SUPPLY BASE ITEMS SCHEDULE TOTAL $__________
CONSTRUCTION BASE ITEMS
0004 Disassemble and remove existing excitation system Units 1 and 2
0005 Disassemble and remove existing excitation system Unit 3
0006 Install Excitation Systems and appurtenances for Units 1 & 2
0007 Install Excitation Systems and appurtenances for Unit 3
0008 Perform field testing and Commissioning 1 JOB XXXXX $_____
0009 Wrenches, tools, and Special equipment 1 JOB XXXXX $_____
CONSTRUCTION BASE ITEMS SCHEDULE TOTAL $__________
OPTIONAL ITEMS
0010 Unit 1 Collector Ring Refurbishment (Optional)
0011 Unit 2 Collector Ring Refurbishment
0012 Unit 3 Collector Ring Refurbishment
0013 Unit 1 Collector Ring Replacement
0014 Unit 2 Collector Ring Replacement
0015 Unit 3 Collector Ring Replacement
OPTIONAL ITEMS SCHEDULE TOTAL $__________
SCHEDULE TOTAL $__________
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
Funds are not presently available for this acquisition. No contract award will be made until funds are made available.
SECTION E - INSPECTION AND ACCEPTANCE
The following have been modified:
CONSTRUCTION CLAUSES
Construction Clauses – Applicable to all onsite work (CLINS 0004 through 0009 and all Optional CLINs)
52.246-12 Inspection of Construction AUG 1996
SECTION F - DELIVERIES OR PERFORMANCE
The following have been modified:
Construction Clauses – Applicable to all onsite work (CLINs 0004 through 0009 and all Optional CLINs)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to
(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than the dates listed below.
(1) The Contractor shall complete all work by not later (NLT) than March 1st 2020. On site work window is between September 16th, 2019 and March 1st 2020.
i. Only one unit may be out of commission at a time.
ii. Each unit outage shall not exceed 6 calendar weeks (7 days per week).
iii Work may not commence on Unit 3 until all work on Units 1 and 2 have been completed as specified in iv below.
iv. Work may not commence on the next Unit until after the previous Unit has been commissioned, accepted by the Government as completed, placed back into service, and ran successfully for 24 hours.
(2) The Contractor shall complete final cleanup and demobilization by not later than 15 calendar days after completion of work in (1) above.
(3) The Contractor shall complete final submission of O&M manuals, working “as-built” contract drawings and final approved versions of Contractor prepared drawings (see SECTION 01 78 00.00 28) by not later than 30 calendar days after completion of work in (1) above.
(End of Clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amounts specified below for each calendar day of delay until the work is completed or accepted.
(1) The sum of $2,917.00 for each calendar day of delay in completing the work in 52.211-10.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
SECTION I - CONTRACT CLAUSES
Construction Clauses – Applicable to all onsite work (CLIN’s 0004 through 0009 and all Optional CLINs )
Clauses Incorporated By Reference
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions on Subcontractor Sales to the Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal MAY 2014 or Improper Activity 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity MAY 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions OCT 2010 52.203-17 Contractor Employee Whistleblower Rights and Requirement To APR 2014 Inform Employees of Whistleblower Rights 52.204-2 Alt. II Security Requirements APR 1984 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper May 2011 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards OCT 2016 52.204-13 System for Award Management Maintenance 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.209-6 Protecting the Government’s Interest When Subcontracting with OCT 2015 Contractors Debarred, Suspended, or Proposed for Debarment 52.209-9 Updates of Publicly Available Information Regarding Responsibility JUL 2013 Matters 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations NOV 2015 52.211-13 Time Extensions SEP 2000 52.215-2 Audit and Records—Negotiation OCT 2010 52.215-11 Price Reduction for Defective Cost or Pricing Data—Modifications AUG 2011 52.215-13 Subcontractor Cost or Pricing Data—Modifications OCT 2010 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) JUL 2005 Other Than Pensions 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than OCT 2010 Certified Cost or Pricing Data—Modifications 52.219-8 Utilization of Small Business Concerns OCT 2014 52.219-28 Post-Award Small Business Program Representation JUL 2013 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards Act – Overtime MAY 2014 Compensation 52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination – Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related MAY 2014 Regulations 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014
52.222-21 Prohibition of Segregated Facilities APR 2015 52.222-26 Equal Opportunity APR 2015 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-38 Compliance with Veterans’ Employment Reporting Requirements FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor DEC 2010 Relations Act 52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service And SEP 2013 Construction Contracts 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and MAY 2008 Construction Contracts 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While AUG 2011 Driving 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement DEC 2007 52.227-4 Patent Indemnity – Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance – Work on a Government Installation JAN 1997 52.228-11 Pledges of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds – Construction OCT 2010 52.229-3 Federal, State, and Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Alt I Assignment of Claims – Alternate I APR 1984 52.232-27 Prompt Payment for Construction Contracts MAY 2014 52.232-33 Payment by Electronic Funds Transfer—System for Award JUL 2013 Management 52.233-1 Disputes MAY 2014 52.233-3 Protest after Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, APR 1984 Utilities and Improvements 52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984
52.236-21 Alt I Specifications and Drawings for Construction APR 1984 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Items FEB 2016 52.245-1 Government Property JAN 2017 52.245-9 Use and Charges APR 2012 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering – Construction OCT 2015 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) APR 2012 52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer’s Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD Officials SEP 2011 252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract- DEC 2008 Related Felonies 252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control of Government Personnel Work Product APR 1992 252.204-7005 Oral Attestation of Security Responsibilities NOV 2001 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident DEC 2015 Reporting 252.205-7000 Provision of Information to Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting with Firms that are Owned or Controlled by the OCT 2015 Government of a Country that is a State Sponsor of Terrorism 252.215-7000 Pricing Adjustments DEC 2012 252.219-7003 Small Business Subcontracting Plan (DoD Contracts) OCT 2014 252.223-7001 Hazard Warning Labels DEC 1991 252.223-7006 Prohibition on Storage and Disposal of Toxic and Hazardous SEP 2014 Materials 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.227-7033 Rights in Shop Drawings APR 1966 252.231-7000 Supplemental Cost Principles DEC 1991 252-232-7003 Electronic Submission of Payment Requests and Receiving Reports JUL 2012 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals – Price Breakdown DEC 1991 252.243-7001 Pricing of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished Property APR 2012 252.245-7002 Reporting Loss of Government Property APR 2012 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal SEP 2016 252.247-7023 Transportation of Supplies by Sea APR 2014
Clauses Incorporated By Full Text
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days of approval of the Collector Ring Inspections Report as required in specification section 48 19 26.00 26.
52.225-9 - Buy American–Construction Materials (May 2014)
(a) Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
(End of Clause)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of clause)
252.236-7001 CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and http://farsite.hill.af.mil/
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified in SECTION 00 01 15.00 28.
(End of Clause)
UAI 5152.249-9000 - Basis for Settlement of Proposals (MAR 2009) Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a terminations settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:
(1) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.
(2) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.
(3) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.
(4) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of FAR 31.205-11).
(5) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.
(End of clause) UAI 5152.236-9009 - Partnering (FEB 2000)
In order to most effectively accomplish this contract, the Government proposes to form a partnership with the Contractor to develop a cohesive building team. It is anticipated that this partnership would involve the Contractor, primary subcontractors and designers and the Corps of Engineers. This partnership would strive to develop a cooperative management team drawing on the strengths of each team member in an effort to achieve a quality project within budget and on schedule. This partnership would be bilateral in membership and participation will be totally voluntary. Any cost associated with effectuating this partnership, excluding travel and lodging cost of Government personnel, will be borne by each party. The partnering meetings shall be held in a place acceptable to both parties. Costs associated with partnering will be negotiated bilaterally after award.
(End of clause)
UAI 5152.231-9000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995)
(a) This clause does not apply to terminations. See UAI 5152.249-9000, Basis for Settlement of Proposals, and Federal Acquisition Regulation (FAR) part 49.
(b) Allowable costs for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of Engineer Pamphlet (EP) 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region [insert Roman numeral for the appropriate region of the schedule]. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/49.htm#P332_61981 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/31.htm#P489_93024 using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the simplified acquisition threshold (SAT), the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
(End of clause)
The following have been deleted:
52.219-3
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
Construction Provisions – Applicable to all onsite work (CLINs 0004 through 0009 and All Optional CLINs)
CLAUSES INCORPORATED BY REFERENCE
52.236-28 Preparation of Proposals – Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
3.0% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Clearwater County , Idaho.
(End of provision)
52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT--CONSTRUCTION MATERIALS (FEB
2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act--Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— 19 June 2018 at 1:00 pm Local Time
(a) Participants will meet at:
Dworshak Dam 1428 Northfork Road Ahsahka, Idaho 83520
There will be only one site visit offered. Offerors planning to attend must register for the site visit by sending an email to: Hillary.A.Morgan@usace.army.mil and Julie.M.Morris@usace.army.mil
Firms must register no later than the day before the site visit.
Site visit attendees must provide the following information: 1) Solicitation Number; 2) Project Title; 3) Name(s) of individual(s) attending site visit; 4) Are all individuals U.S. Citizens? If not, please refer to ACCESS FOR FOREIGN NATIONALS in Section 00800; 5) Name of Company; 6)Phone Number of Company.
Each individual must have picture identification on his/her person while at the project site. There can be no substitutions of one individual for another. If an individual arrives at the site visit without having called ahead of time and/or without picture identification, that individual may not be allowed on the project.
Participants of scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, “Personal Protective and Safety Equipment.” It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation. Failure to comply could result in denial of access to site visit location.
The latest version of EM 385-1-1 is available online at:
mailto:Hillary.A.Morgan@usace.army.mil mailto:Julie.M.Morris@usace.army.mil http://www.usace.army.mil/SafetyandOccupationalHealth.aspx.
(End of provision)
SECTION M - EVALUATION FACTORS FOR AWARD
A. BASIS FOR AWARD
The award will be made based on the best overall (i.e., best value-tradeoff) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the four (4) evaluation factors:
Technical; Past Performance; Small Business Participation Plan; and Price.
All sub-factors of Factor 1, Technical, are of equal importance. Factor 1, Technical and Factor 2, Past Performance are equally important. Factors 1 and 2 are more important than Factor 3, Small Business Participation When combined, the non-price factors (Factors 1 and 2) are significantly more important than Factor 3, Price. As proposals become more equal in their technical (non-price) merit, the evaluated price becomes more important in determining the best value proposal.
B. FACTORS AND SUB-FACTORS TO BE EVALUATED
The following evaluation factors and sub-factors will be used to evaluate each proposal. Award will be made to the offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors and sub-factors described below.
1. FACTOR 1 Technical - The technical evaluation will be comprised of three (3) Sub-Factors. Risk assesses the degree to which the offeror’s proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. Risk will be evaluated as one aspect of the technical evaluation, inherent in the technical evaluation factor or sub-factor ratings.
Sub-factor 1A: Design and Manufacturing Experience Sub-factor 1B: Installation Experience Sub-factor 1C: Technical Approach
The three (3) sub-factors are of equal importance.
Evaluation of the offeror’s proposal shall address each sub-factor as it applies to the scope of work. A detailed explanation of the criteria for the evaluation is set forth in the Evaluation Approach, Paragraph C of this section.
During evaluations of each proposal, the Government will assign each sub-factor an adjectival rating and write a narrative evaluation reflecting the identified findings.
3. FACTOR 2 Past Performance - Each offeror’s current and past performance will be reviewed to determine relevancy and confidence.
4. FACTOR 3 Small Business Participation Plan – The extent of Small Business Participation will be evaluated for unrestricted acquisitions.
5. FACTOR 4 Price - The resulting award will be a firm-fixed price contract. Price reasonableness will be utilized in the evaluation of the proposal.
C. EVALUATION APPROACH
1. All proposals will be evaluated by the Source Selection Evaluation Board (SSEB).
2. The overarching evaluation approach will be based upon adequacy of response. The proposal will be evaluated to determine whether the offeror’s methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP. Marginal levels of overall detail could indicate a lack of understanding concerning the requirements and may result in the entire factor receiving an unfavorable rating and/or being eliminated from the competitive range.
3. Factor 1 Technical - This factor is comprised of the following sub-factors:
a. Sub-factor 1A: Design and Manufacturing Experience
Proposals will be evaluated to determine experience with the design and manufacturing of static excitation systems relevant with the scope and complexity required in the solicitation. Offerors shall provide sufficient information to clearly demonstrate the breadth and depth of the Offeror’s fabrication experience.
Offerors shall submit the following for Sub-factor 1A:
I. Offerors must demonstrate design and manufacturing experience by providing a minimum of three
(3) examples that collectively address each of the elements identified below performed within the past seven (7) years.
a. Project examples must include units that are 100% complete to include commissioning at the time of proposal submission and have been completed within the last seven (7) years.
b. Designed and manufactured static excitation systems for hydrogenerators rated at a minimum of 250 MVA.
c. Use Attached “Offeror Experience Form” to describe the projects in which the Offeror has relevant design and manufacturing experience. Project experience shall include adequate detail such as configuration and dimensions to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.
b. Sub-factor 1B: Installation Experience
Proposals will be evaluated to determine installation experience for relevant projects of the scope and complexity required in the solicitation. Offerors shall provide sufficient information to clearly demonstrate the breadth and depth of the Offeror’s installation experience.
Offerors shall submit the following for Sub-factor 1B:
I. Offerors must demonstrate installation experience by providing a minimum of three (3) project examples that collectively address the elements identified below performed within the past seven
(7) years.
a. Project examples must include units that are 100% complete to include commissioning at the time of proposal submission and have been completed within the last seven (7) years.
b. Installation of static excitation systems for hydrogenerators rated at a minimum of 250 MVA.
c. Installation experience requiring the services of a commissioning engineer from an excitation manufacturer responsible for functionality checks, reports and setup required for field testing and commissioning of excitation systems.
d. Installation experience requiring the removal of an existing excitation system and installation of new utilizing existing connections.
e. Use Attached “Offeror Experience Form” to describe the projects in which the Offeror has relevant installation experience. Project experience shall include adequate detail such as equipment types, ratings, capacities, and configuration to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.
c. Sub-factor 1C: Technical Approach
This sub-factor evaluates the offeror’s understanding of the required scope of work and evaluates the offerors capabilities and availability of resources necessary to complete all requirements.
Offerors shall submit the following for Sub-factor 1C:
I. Provide a work plan / schedule
1) Work plan / Schedule should reflect the planned activities, order of major tasks identified, task dependencies and durations proposed to successfully accomplish the entire project from notice to proceed to final commissioning, and contract close-out. Any assumptions made by the offeror shall be clearly illustrated in the proposal. Offeror should assume, for evaluation purposes only, an award date of 30 September 2018. At a minimum, the schedule must include the following:
a. Submittal of design drawings and equipment information
b. Manufacturing Facility Inspection
c. Factory Testing
d. Delivery of exciters and ancillary equipment onsite
e. Inspection of new exciters and ancillary equipment
f. Mobilization onsite
g. Site preparation
h. Removal of old exciters and ancillary equipment
i. Installation of new exciters and ancillary equipment
j. Commissioning/testing of new exciters and ancillary equipment
2) Discuss how work to complete one task may impact or be impacted by work to complete other tasks.
3) Clearly distinguish which work will be completed on-site versus work that will be completed off-site.
4) Clearly identify where off-site work will be accomplished.
5) Clearly identify work completed by the prime and work completed by sub-contractors or members of a joint venture team as applicable.
6) Identify any critical assumptions and uncertainties that may impact the completion of work and identify methods to check assumptions and address uncertainties.
7) Document capabilities and availability of resources necessary to complete all required major tasks above.
8) List any specialty work crews, trades and crafts, or individuals required to complete unique or special tasks.
9) List all critical subcontractors with their respective role and responsibility to complete all major tasks.
10) Provide narrative description of the bridge redundancy approach relevant to the immediate project, including the number of bridges and their continuous and maximum current capabilities.
Factor 1 Technical Ratings
The ratings excerpted below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the Technical subfactor requirements.
Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance…
This is the start of the file's text. The full file is on GovTribe.