Amendment_0005.pdf

PDF 477 KB Posted

Attached to
McNary Navigation Lock Tainter Valves Replacement Federal contract opportunity
Solicitation number
W912EF17R0048
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to McNary Navigation Lock Tainter Valves Replacement, newest first.
File Type Posted
Amend-0005_Plans.pdf PDF
Amend-004_Plans.pdf PDF
Amendment_0004_-_17R0048_MNA_Tainter_Valves.pdf PDF
Amendment_0003.pdf PDF
Site_Visit_Attendees.pdf PDF
Amendment_0002_17R0048_MNA_Tainter_Valves.pdf PDF
Amendment_0001_-_17R0048.pdf PDF
PLANS.pdf PDF
A.07.23_Solicitation_MNA_Tainter_Valves.pdf PDF
Site_Visit_Information.pdf PDF
PLANS.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV70594637

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

McNary Tainter Valves Replacement

The purpose of this amendment is to incorporate the revisions in the summary of changes below . The proposal submission date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Oct-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF17R0048

X 9B. DATED (SEE ITEM 11)

15-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Oct-2017

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

HILLARY A. MORGAN

201 N. THIRD AVENUE

WALLA WALLA WA 99362

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF17R0048

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

Summary of Changes for Amend-0005 McNary Navigation Lock Tainter Valves Replacement

1. SOLICITATION: Included revised wage determination

2. CLAUSE: CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS – amended the drawing list to show revisions to sheets G-002, SJ501, SJ502, and SJ503.

3. TECH SPECS

05 60 10.00 25 TAINTER VALVE REPLACEMENT,

Changed paragraph 3.2 from “VALVE REMOVAL AND FIELD VERIFICATION” TO “FIELD VERIFICATION. Deleted subparagraph 3.2.1 and 3.2.2 titles. Added paragraph 3.3 “VALVE REMOVAL”, and renumbered all succeeding paragraphs.

09 97 02.00 28 PAINTING: HYDRAULIC STRUCTURES,

Edited paragraphs 3.1.2, 3.2.6, and 3.2.9 to allow shop painting of the complete paint system with written approval and other minor edits.

4. DRAWINGS:

Revisions to the following drawings G-002 G-102

SA301

SA501

SA503

SJ501

SJ502

SJ503

SJ504

SJ505

SECTION I - CONTRACT CLAUSES

The following have been modified:

Section I

Construction Clauses – Applicable to all onsite work (CLIN’s 0002 through 0007)

Clauses Incorporated By Full Text

252.236-7001 CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall—

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Drawing Number

Sheet Number

Title

Revision Number

Date

McNary Lock and Dam Navigation Lock Tainter Valves Replacement

GENERAL

MDG-1-0-0/599 G-001 COVER SHEET AND LOCATION MAPS

MDG-1-0-0/600 G-002 INDEX TO DRAWINGS C 18 Oct 17

MDG-1-0-0/601 G-003 GENERAL NOTES

MDG-1-0-0/602 G-101 GENERAL NAVLOCK PLAN

MDG-1-5-0/35 G-102 ISOMETRIC 1 C 18 Oct 17

MDG-1-5-0/36 G-103 CRANE STAGING AREAS

MDG-1-5-0/37 G-104 CRITICAL DIMENSION SHEET

MDG-1-5-0/38 G-301 VALVE SHAFT SECTION - COMPONENT IDENTIFICATION

STRUCTURAL

MDN-1-5-5/8 SA101 PLANS FOR VALVE BODY - SECTIONS AND DIMENSIONS

MDN-1-5-5/9 SA201 ELEVATIONS FOR - SECTIONS AND DIMS

MDN-1-5-5/10 SA301 SECTIONS AND DIMENSIONS - FOR VALVE B 18 Oct 17

MDN-1-5-5/11 SA302 SECTIONS AND DIMS FOR VALVE

MDN-1-5-5/12 SA303 SECTIONS AND DIMENSIONS FOR VALVE

MDN-1-5-5/13 SA501 DETAILS - SKIN PLATE AND WT B 18 Oct 17

MDN-1-5-5/14 SA502 DETAILS - SKIN PLATE AND WT

MDN-1-5-5/15 SA503 STIFFENER DETAILS C 18 Oct 17

MDN-1-5-5/7 SD101

DEMOLITION OF VALVE AND - REMOVAL AND

REINSTALLATION - OF ITEMS

MDN-1-5-5/17 SE201 ELEVATION - OF TRUNNION HUB

MDN-1-5-5/18 SE501 DETAILS - TRUNION HUB

MDN-1-5-5/19 SG501 DETAILS - LIFTING EYE

MDN-1-5-5/20 SH901 TRUNNION BASE

MDN-1-5-5/21 SJ501 DETAILS - VALVE 1 SEAL ASSEMBLY B 18 Oct 17 MDN-1-5-5/22 SJ502 DETAILS – VALVES 2, 3, & 4 SEAL ASSEMBLY B 18 Oct 17

MDN-1-5-5/23 SJ503

DETAILS - SIDE SEAL KEEPER PLATE, - CLAMPING BAR,

AND J-BULB SEAL

B 18 Oct 17

MDN-1-5-5/24 SJ504 DETAILS - BOTTOM SEAL AND - KEEPER PLATE B 18 Oct 17 MDN-1-5-5/25 SJ505 SEAL DETAILS - BOTTOM SEAL STIFFNER PLATE B 18 Oct 17

MDN-1-5-5/26 SJ506 SEAL DETAILS - VALVE 1 TOP CORNER SEAL

MDN-1-5-5/27 SJ507 DETAILS - BOTTOM CORNER SEALS

MDN-1-5-5/28 SJ508 SEAL DETAILS - VALVE 3 TOP CORNER SEAL

MDN-1-5-5/29 SJ509 SEAL DETAILS

MECHANICAL

MDN-1-3-5/10 M-001 MECHANICAL - BILL OF MATERIALS

MDN-1-3-5/13 M-101 MECHANICAL - VALVE KEY PLAN

MDN-1-3-5/14 M-201 SHEET TITLE 1 - MECHANICAL - KEY ELEVATIONS

MDN-1-3-5/15 MA501 DETAILS - TRUNION PIN, BUSHING, AND KEEPER

MDN-1-3-5/16 MA502

DETAILS - INTERMEDIATE ROD AND - GUIDE POSITION

INDICATOR

MDN-1-3-5/17 MA503

DETAILS - INTERMEDIATE ROD AND - GUIDE POSITION

INDICATOR

MDN-1-3-5/18 MA504 DETAILS - X-HEAD GUIDE AND MOUNTING

MDN-1-3-5/19 MA505 DETAILS - CONNECTING ROD AND BUSHING

MDN-1-3-5/20 MA506 CROSSHEAD AND ROD GUIDE - ANCHOR DETAIL

MDN-1-3-5/21 MB201 SECTIONS - LUBE LINE

MDN-1-3-5/11 MD101 DEMOLITION - LUBE LINE

MDN-1-3-5/12 MD102 DEMOLITION - PUSH-PULL RODS

MDN-1-3-5/22 ME101

DETAILS - TRUNNION BASE LINE BORE - AND

CATHODIC PROTECTION

MDN-1-3-5/23 ME501 DETAILS - TRUNNION PARTS

FOR INFORMATION ONLY (FIO)

The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.

MDN-1-3-5/3 FIO-001

FOR INFORMATION ONLY - TAINTER VALVE

MACHINERY - GENERAL ASSEMBLY

MDN-1-3-5/4 FIO-002

FOR INFORMATION ONLY - NAVIGATION LOCK -

TAINTER VALVE LINER – ASSEMBLY

MDN-1-3-6/1 FIO-003

MACHINERY - GENERAL ASSEMBLY - SCHEME "A"

MDN-1-3-6/2 FIO-004

MACHINERY - CONNECTING ROD & GUIDES

MDN-1-3-6/4 FIO-005

MACHINERY - CROSSHEAD & GUIDE DETAILS

MDN-1-3-6/5A FIO-006

MACHINERY - CYLINDER, PISTON & ROD DETAILS

MDN-1-3-6-6A FIO-007

MACHINERY - VALVE POSITION INDICATOR - SCHEME

"A"

MDN-1-3-6/7A FIO-008

MACHINERY - LUBRICATION SYSTEM

MDN-1-3-6/9B FIO-009

FOR INFORMATION ONLY - TAINTER VALVE MACH'Y.

PARTS LIST - -SCHEME "A"-

MDN-1-3-6/16 FIO-010

FOR INFORMATION ONLY - TAINTER VALVE CONTROLS

- UPSTREAM-I SCHEME A

MDN-1-3-6/20 FIO-011

- DOWNSTREAM-V SCHEME A

MDN-1-3-6/22 FIO-012

- DETAILS VII - SCHEME A

MDN-1-3-6/24 FIO-013

MACHINERY - GENERAL ASSEMBLY - SCHEME B

MDN1-3-6/25 FIO-014

MACHINERY - CYL. INDICA- - TOR & CAM CONTROL

ASSEM - SCHEME "B"

MDN-1-3-6/26 FIO-015

MACHINERY - INDICATOR AND MISC. DETAILS SCHEME

B

MDN-1-3-6/27 FIO-016

MACHINERY - OPERATIONAL CURVES

MDN-1-3-6/29 FIO-017

- DIGRAMATIC - SCHEME B

MDN-1-3-6/31 FIO-018

FOR INFORMATION ONLY - TAINTER VALVE MACH'Y.

PARTS LIST - SCHEME B

MDN-1-4-1/6 FIO-019

ELEVATIONS - MONOLITHS 29, 31, 35, 37, 39, 41 & 43

MDN-1-4-1/16 FIO-020

DETAILS - MONOLITHS 31, 33, 35, 37 & 39

MDN-1-5-1/3 FIO-021

FOR INFORMATION ONLY - TAINTER VALVE SHAFT -

MISCELLANEOUS METAL I

MDN-1-5-6/1 FIO-022

TAINTER VALVE

MDN-1-5-6/2 FIO-023

TAINTER VALVE

MDN-1-5-6/3 FIO-024

TAINTER VALVE - SEALS AND TRUNNION

MDN-1-5-6/6 FIO-025

TAINTER VALVE NO. 1 - TOP SEAL DETAILS

MDN-1-5-1/2 FIO-026

TAINTER VALVE SHAFT - EMBEDDED STEEL

MDN-2-3-6/2 FIO-027

MACHINERY - GENERAL ASSEMBLY

MDN-2-4-1/60 FIO-028

FOR INFORMATION ONLY - NAVIGAITON LOCK -

GENERAL PLAN AND VICINITY MAP

MDN-2-4-5/1 FIO-029

FILLING & EMPTYING SYSTEM

MDN-2-5-1/4 FIO-030

TAINTER VALVE SHAFT - MISCELLANEOUS METAL - I

MDN-2-5-1/15 FIO-031

TAINTER VALVE SHAFT – COVER

MDN-2-5-6/1 FIO-032

TAINTER VALVE - LIFTING EYE MODIFICATION

D-2156 FIO-033

MACHINERY-INTERMEDIATE - ROD, CROSSHEAD,

GUIDE, RETAINER, ETC.

D-2157 FIO-034

MACHINERY-CROSSHEAD GUIDE - & SUPPORT,

CONNECTING ROD,BUSHINGS, ETC.

D-2158 FIO-035

FOR INFORMATION ONLY - TAINTER VALVE-ASSEMBLY

OF CROSSHEAD, - GUIDE AND CONNECTING ROD;

MISC PARTS

D-2159 FIO-036

FOR INFORMATION ONLY - TAINTER VALVE -

ASSEMBLY OF HYDRAULIC - HOIST, INTER. ROD &

GUIDE, MISC. DETAILS

D-2160 FIO-037

FOR INFORMATION ONLY - TAINTER VALVE MACH. -

VALVE POSITION - INDICATOR, GUIDES, ROD, BASES,

ETC.

D-2161 FIO-038

MACHINERY - VALVE - POSITION INDICATOR -

ASSEMBLY & DETAILS

D-2162 FIO-039

FOR INFORMATION ONLY - HYDRAULIC SYSTEM -

TAINTER VALVE - CONTROLS - SYMBOLIC DIAGRAM -

SCHEME B

D-2181 FIO-040

OPERATING MACHINERY - ASSEMBLIES - LUBRICATION

SYSTEM

D-2182 FIO-041

OPERATING MACHINERY - DETAILS - LUBRICATION

SYSTEM

A203D1002 FIO-042

FOR INFORMATION ONLY - TRUNNION ARM

ASSEMBLY

A203E1017 FIO-043

FOR INFORMATION ONLY - TAINTER GATE SEAL

ASSEMBLY

A203F1000 FIO-044 FOR INFORMATION ONLY - ASSEMBLY GATE & LINERS

230D1001 FIO-045 FOR INFORMATION ONLY - TRUNNION BASE

230D1002 FIO-046 FOR INFORMATION ONLY - TRUNNION ARM

203D1010R FIO-047

FOR INFORMATION ONLY - TOP CORNER SEAL FOR

GATE

203D1011R FIO-048

FOR INFORMATION ONLY - BOTTOM CORNER SEAL

FOR GATE

203D1012R FIO-049

FOR INFORMATION ONLY - SIDE SEAL KEEPER FOR

203D1013 FIO-050

FOR INFORMATION ONLY - BOTTOM SEAL KEEPER FOR

203D1014 FIO-051 FOR INFORMATION ONLY - TOP SEAL KEEPER

203F1017 FIO-052 FOR INFORMATION ONLY - TAINTER GATE

8982-54 FIO-053

FOR INFORMATION ONLY - NAVLOCK GRATING

SUPPORTS

316 FIO-054

FOR INFORMATION ONLY - ACTUAL EXISTING ANCHOR

BOLT SETTINGS - TAINTER VALVE TRUN. ANCHORAGE

MONOLITH 11

318 FIO-055

FOR INFORMATION ONLY - ACTUAL EXIST. ANCHOR

BOLT SETTINGS TAINTER - VALVE TRUNNION

ANCHORAGE MONOLITH 35

344 FIO-056

TAINTER VALVE LIFTING LUG

357 FIO-057

FOR INFORMATION ONLY - MODIFICATIONS TO TOP

SEAL ASSEMBLY - TAINTER VALVE NO. ONE

407 FIO-058

FOR INFORMATION ONLY - TAINTER VALVE - GRAPHIC

DETERMINATION - OF CROSSHEAD MOVEMENT

415 FIO-059

HOUSING FOR LUBRICATION LINES

415-2 FIO-060

HOUSING - FOR LUBRICATION LINES ASSEMBLY

949 FIO-061

FOR INFORMATION ONLY - MODIFICATONS TO

TAINTER VALVE - TOP SEAL PLATE

7050-10 FIO-062

FOR INFORMATION ONLY - TAINTER VAVLE TRUNNION

ANCHORAGE

V-36 FIO-063

FOR INFORMATION ONLY - DETAIL OF TRUNNION

ANCHORAGE - FOR FABRICATION BY GILMORE

203E2000 FIO-064

FOR INFORMATION ONLY - SHOP DRAWING - CULVERT

LINER TOP CASTING

203E2002 FIO-065

FOR INFORMATION ONLY - SHOP DRAWING - VALVE

LINER BOTTOM PLATE

203E2003 FIO-066

FOR INFORMATION ONLY - SHOP DRAWING - VALVE

LINER TOP PLATE

MDN-2-3-5/1 FIO-067

UPSTREAM - UNWATERING SYSTEM - EMBEDDED

PIPING

MDN-1-3-5/2 FIO-068

DOWNSTREAM - UNWATERING SYSTEM - EMBEDDED

PIPING

MDN-1-4-1/15 FIO-069

FOR INFORMATION ONLY - DETAILS - MONOLITHS 7 &

9 & 11 & 13

MDN-1-5-1/9 FIO-070

FOR INFORMATION ONLY - CABLE FENDER

MACHINERY PITS - COVER & EMBEDDED STEEL

MDN-2-4-1/1 FIO-071

FOR INFORMATION ONLY – NAVIGATION LOCK –

MONOLITHS 4, 6, 8 – BELOW ELEV. 280

MDN-1-4-1/3 FIO-072

PLAN – MONOLITHS 28 TO 43

MDN-1-4-1/7 FIO-073

ELEVATIONS – MONOLITHS 2, 4, 6, 8, 10 & 12

MDN-1-4-1/9 FIO-074

ELEVATIONS – MONOLITHS 28, 30, 32, 34, 36, 38, 40 &

MDN-1-4-1/14 FIO-075

DETAILS – MONOLITHS 4, 6, 8, 10 & 12

(End of drawing list)

(End of Clause)

Microstation V8 is the only CAD system used by Walla Walla District. Contract drawings created on CAD in Microstation V8 will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CAD. The Contractor assumes all risks associated in using electronic CAD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CAD drawing. If contract modifications are issued, the associated electronic CAD drawings will not be available to the Contractor. Electronic copies of CAD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM.

(End of clause)

The following have been modified:

WAGE DETERMINATION

NOTE: This wage decision is only applicable to the onsite construction portion of the work.

General Decision Number: WA170087 10/13/2017 WA87

Superseded General Decision Number: WA20160087

State: Washington

Construction Type: Heavy including water and sewer line construction

Counties: Columbia, Ferry and Garfield Counties in Washington.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 02/03/2017 2 06/02/2017 3 07/21/2017 4 07/28/2017 5 10/13/2017

ELEC0073-005 07/01/2017

FERRY COUNTY

Rates Fringes

ELECTRICIAN......................$ 32.75 18.13

ELEC0077-001 02/01/2013

Rates Fringes

Line Construction:

LINEMEN.....................$ 45.62 4%+12.90

ELEC0112-014 06/01/2017

Rates Fringes

ELECTRICIAN......................$ 40.90 20.06

ENGI0370-010 06/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 26.66 14.55

GROUP 2.....................$ 26.98 14.55

GROUP 3.....................$ 27.59 14.55

GROUP 4.....................$ 27.75 14.55

GROUP 5.....................$ 27.91 14.55

GROUP 6.....................$ 28.19 14.55

GROUP 7.....................$ 28.46 14.55

GROUP 8.....................$ 29.56 14.55

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00

Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho

Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Rollers, all types on subgrade, including seal and chip coatings

GROUP 2: Fork Lift

GROUP 3: Bulldozer (up to D-6 or equivalent)

GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T);

Oiler; Drill (churn, core, calyx or diamond)

GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.); Cranes (25 tons & under); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Boom Truck (Under 25 tons)

GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic

GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons);

Loaders (overhead & front-end, over 8 yds. to 10 yds.);

Grader/Blade

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)

BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

IRON0014-001 07/01/2016

Rates Fringes

IRONWORKER (Reinforcing and Structural)......................$ 32.89 24.56

LABO0238-002 06/01/2017

Rates Fringes

LABORER (Spokane)

GROUP 1.....................$ 24.66 11.30

GROUP 2.....................$ 26.76 11.30

GROUP 3.....................$ 27.03 11.30

GROUP 4.....................$ 27.30 11.30

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABORERS CLASSIFICATIONS

GROUP 1: Flagger

GROUP 2: Common or General Laborer;

GROUP 3: Mason Tender-Cement/Concrete; Pipelayer; Chipping Guns

GROUP 4: Grade Checker

LABO0238-007 06/01/2017

Rates Fringes

Laborer, Mason Tender Brick......$ 26.76 11.30

* PAIN0005-003 07/01/2017

Rates Fringes

PAINTER (Brush, Roller, and Spray.)..........................$ 25.19 11.10

SUWA2009-053 08/07/2009

Rates Fringes

CARPENTER........................$ 24.03 6.50

CEMENT MASON/CONCRETE FINISHER...$ 17.21 0.00

LABORER: Landscape..............$ 14.67 0.00

TRUCK DRIVER: Dump Truck........$ 19.67 0.00

TRUCK DRIVER: Water Truck.......$ 24.36 8.30

TRUCK DRIVER: 10 Yard Truck.....$ 24.61 8.34

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

McNary Navigation Lock Tainter Valves Replacement W912EF17R0048

SECTION TABLE OF CONTENTS

DIVISION 05 - METALS

SECTION 05 60 10.00 25

TAINTER VALVE REPLACEMENT

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 SUBMITTALS

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 GENERAL

3.2 FIELD VERIFICATION

3.3 VALVE REMOVAL

3.4 VALVE ASSEMBLY AND INSTALLATION

3.4.1 Seal Assembly

3.4.1.1 Seal Screws and Bolted Connections

3.4.2 Installation Platform

3.5 VALVE TESTING

-- End of Section Table of Contents --

SECTION 05 60 10.00 25 Page 1

AMENDMENT 5

s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Line

SECTION 05 60 10.00 25

TAINTER VALVE REPLACEMENT

PART 1 GENERAL

1.1 GENERAL INFORMATION

The specified work includes, but is not limited to, the removal, fabrication reassembly, reinstallation, and testing of 4 Tainter Valves and appurtenant components at the McNary Dam Navigation Lock. The valves are a reverse tainter-style valve for filling & emptying the navigation lock. The Contractor shall provide all labor, necessary components, miscellaneous materials, and equipment to complete the tainter valve replacement unless otherwise specified.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

FIELD VERIFICATION; G, ST

Installation Platform; I, ST

SD-03 Product Data

Safety Plan; G, C Crane Pick and Removal Plan; G, ST Crane Pick and Re-Installation Plan; G, ST

SD-06 Test Reports

Operational Test Report; G, ME

Report documenting the results of the operational test, within 10 calendar days after test performance.

PART 2 PRODUCTS

(not used)

PART 3 EXECUTION

3.1 GENERAL

The Contracting Officer's Representative maintains the right to reject any work that is found to be in error, incomplete, illegible, or in any way not conforming to the statement of work provided for this contract. The Contractor shall be liable for all costs in connection with correcting such errors.

SECTION 05 60 10.00 25 Page 2

AMENDMENT 5

3.2 FIELD VERIFICATION

With the tainter valves in place, perform a field verification of dimensions of the existing tainter valve shafts, conduit openings, and tainter valves prior to final approval of shop drawings. Any and all required adjustments in the dimensions and alignment of the tainter valves are to be done after a full survey of existing conditions are made and verified by the Contractor and approved by the COR/GQOR/Engineer. Any and all required adjustments are to be made during fabrication and line boring operations prior to installation. Existing dimensions will include but not be limited to the following:

a. Out to out distance (vertical and horizontal) of the tainter valve shaft and downstream conduit opening.

b. The height and alignment of the top liner plate

c. Center of trunnions to top seal nose

d. Center of trunnions to side and bottom conduit walls

e. The height, alignment and out to out distance of the trunnion and lifting eyes. This includes the center of the existing hubs to center of the lifting eyes

f. Center of existing hubs to end of downstream skin plates at top, bottom and sides

g. Out to out dimensions of existing downstream skin plate

h. Alignment, straightness, and perpendicularity of embedded steel sealing surfaces in the floor, both walls, and top seal nose.

The Contractor shall allow the Government 3 hours of inspection time per valve during the field verification outage and shall provide the necessary support for Government personnel ingress and egress to the existing valve in the valve pit. Four brass cap survey monuments have been installed in the valve shaft walls in the vicinity of each valve, and may be used as control or reference points.

3.3 VALVE REMOVAL

a. The Contractor shall submit a Crane Pick and Removal Plan for approval to beginning work.

b. Parts to be removed include but are not limited to: valve, rods, guides and brackets, push rods, push rod guides, branch lines, crosshead, crosshead guide, connecting rod, indicator rod crosshead and indicator rod brackets and pins. (See Informational Drawings).

The Contractor shall also remove all lubrication lines. This includes all cover plates, support brackets, hoses, manifolds and grease pumps from inside the tainter valve shafts and machine rooms (see informational drawings). Grease in the removed lines shall be disposed of in accordance with state and local regulations. Grease is Chevron Ultra-Duty EP NLGI 00.

c. The new valves and components shall be transported to a location at the project as directed by the Government. The Contractor shall submit a Safety Plan for safely transporting the valve.

d. The existing valves to be removed from the valve pit shall be removed in one piece, not to include pins, seals, or seal keeper plates.

3.4 VALVE ASSEMBLY AND INSTALLATION

3.4.1 Seal Assembly

a. Each tainter valve, shall be shop assembled and checked for fit up prior to installation.

SECTION 05 60 10.00 25 Page 3

AMENDMENT 5

s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Line s0cwh1rw Line

b. All rubber seals shall be shop fitted to length for each valve. All seals are to be left long at each end and trimmed during installation.

c. All rubber seals shall be shipped loose.

d. During installation, all seals shall be fit to a snug tight condition.

d. The top and side seal supports shall be straight within + or - 1/16" in all planes.

e. The finished seal shall have contact with the sealing surface the entire length of the seal. Follow manufacturer recommendations on compression tolerances to obtain best seal.

f. The use of hot-splicing or vulcanizing shall be used to assemble tainter valve seals. Cold splices shall only be used to make final splices on the tainter valve assembly.

3.4.1.1 Seal Screws and Bolted Connections

On stainless steel connections, not requiring nuts, marine grade, non-metallic anti-seize shall be applied to the threads to reduce galling.

When nuts are called for in drawings, a nylon thread locking nut shall be used to ensure bolts and nuts will not vibrate loose valve operation.

Seal keeper plates shall not compress seals more than 1/16", with a minimum torque of 60 ft-lbs. If more torque is required to reach desired compression, torque is limited to the bolt manufacturer's recommended value.

It may be necessary to tighten the seal nuts several times until the desired torque has been reached. As the seals are tightened, the nuts will tend to loosen after the adjacent nut is tightened.

3.3.2 Installation

The Contractor shall submit, for approval, a Crane Pick and Re-Installation Plan to handle and reassemble each valve and its components prior to beginning work. The mechanical equipment shall be checked for alignment and clearances prior to installing tainter valve.

The Contractor shall insure proper alignment of the crossheads on each guide.

3.4.2 Installation Platform

Contractor to provide all tools and components necessary to install valves. Scaffolding used to install the valve (particularly the top seals, anodes, and pins) shall be provided to the Government once valve installation is complete. This scaffolding shall be provided in good working order and shall be new from the manufacturer prior to use on the valve installation.

3.5 VALVE TESTING

a. The Government Quality Assurance Representative (GQAR) will examine the valves for final acceptance upon completion of valve installation.

The Contractor shall coordinate with the COR/GQAR/Engineer to perform a field test to show that the tainter valves and operating systems are installed and work correctly. All valve operations must be performed by Project Personnel. Because of this, the Contractor shall confirm the testing date a minimum of 7 calendar days in advance and during

SECTION 05 60 10.00 25 Page 4

AMENDMENT 5

s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Highlight s0cwh1rw Line s0cwh1rw Line s0cwh1rw Line normal working hours for McNary Dam personnel and submit an Operational Test Report.

b. The Contractor shall provide and install temporary restraints and shoring to prevent unintentional or accidental operation of the valve.

The workmanship in the fabrication, installation of the valve, attachment and adjustment of the seals shall be such that the valve in the closed position will form a watertight barrier along all seals.

All valve testing will be witnessed by the GQAR, project personnel and design engineers to observe any possible malfunction in the movement or defects in the valve. The valves will be operated from the fully-opened to fully-closed position a minimum of 5 cycles to demonstrate to the satisfaction of the GQAR that all parts are functioning properly and smoothly, all linkages, seals and appurtenances are attached and working as intended, that all machine and construction tolerances have been met and that there are no excessive vibrations or movements in the trunnion and lifting eye connections. The seals shall be wetted with water to prevent vibrations due to seals being operated dry. Any and all required repairs or replacements identified by the GQAR to correct defects shall be made at no cost to the Government. The Contractor will record and report to the GQAR the valve and valve position, seal positions at ends and midpoints, excessive seal gaps, if it is raised or lowered, observations on valve movement, hydraulic pressure and motor current drawn upon test completion. If defects are found during final testing the operational tests cycles shall be repeated after all defects are corrected prior to final acceptance by the GQAR.

-- End of Section --

SECTION 05 60 10.00 25 Page 5

This page intentionally left blank

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 97 02.00 28

PAINTING: HYDRAULIC STRUCTURES

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 QUALIFICATIONS

1.3.1 Qualified Painting Contractor

1.3.2 Independent Third Party Test Agency

1.3.3 Qualified Paint Applicator

1.3.3.1 Test Plate

1.3.3.2 Certification Test Procedure

1.3.3.3 Certification Criteria

1.3.4 Coating Thickness Gage Qualification

1.4 DELIVERY, STORAGE, AND HANDLING

1.5 AMBIENT CONDITIONS

PART 2 PRODUCTS

2.1 SPECIAL PAINT FORMULAS

2.2 PAINT FORMULATIONS

2.2.1 Formula V-766e

2.2.2 Formula VZ-108d

2.3 INGREDIENTS FOR SPECIAL PAINT FORMULAS

2.3.1 Pigments and Suspending Agents

2.3.1.1 Carbon Black

2.3.1.2 Zinc Dust

2.3.1.3 Titanium Dioxide

2.3.1.4 Suspending Agent E

2.3.1.5 Suspending Agent F

2.3.2 Resins, Plasticizer, and Catalyst

2.3.2.1 Plasticizer

2.3.2.2 Vinyl Resin, Type 3

2.3.2.3 Vinyl Resin, Type 4

2.3.2.4 Ortho-phosphoric Acid

2.3.3 Solvent and Thinners

2.3.3.1 Methanol

2.3.3.2 Methyl Ethyl Ketone

2.3.3.3 Methyl Isobutyl Ketone

2.3.3.4 Methyl Isoamyl Ketone

2.3.3.5 Toluene

2.3.4 Silane B

2.3.5 Propylene Oxide

2.4 TESTING

2.4.1 Chromatographic Analysis

2.4.2 Vinyl Paints

PART 3 EXECUTION

SECTION 09 97 02.00 28 Page 1

AMENDMENT 5

Highlight

3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED

3.1.1 General Requirements

3.1.2 Ferrous Surfaces Subject to Severe Exposure

3.1.3 Existing Painted Surfaces

3.2 PAINT APPLICATION

3.2.1 General

3.2.2 Mixing and Thinning

3.2.3 Time Between Surface Preparation and Painting

3.2.4 Method of Paint Application

3.2.5 Coverage and Film Thickness

3.2.5.1 Measurement on Ferrous Metal

3.2.6 Progress of Painting Work

3.2.7 Contacting Surfaces

3.2.8 Drying Time Prior to Immersion

3.2.9 Protection of Painted Surfaces

3.2.10 Vinyl Paints

3.2.10.1 General

3.2.10.2 Vinyl Zinc-Rich Primer

3.2.10.3 Vinyl Paints

3.3 PAINT SYSTEMS APPLICATION

3.3.1 Fabricated and Assembled Items

3.3.2 Slip Critical Joints

3.3.3 Surface Preparation

3.3.4 System No. 5-E-Z

3.3.5 Protection of Nonpainted Items and Cleanup

3.4 INSPECTION

3.5 PAINTING SCHEDULES

-- End of Section Table of Contents --

SECTION 09 97 02.00 28 Page 2

SECTION 09 97 02.00 28

PAINTING: HYDRAULIC STRUCTURES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D1045 (2008) Sampling and Testing Plasticizers Used in Plastics

ASTM D1152 (2006; R 2012) Methanol (Methyl Alcohol)

ASTM D1153 (2012) Methyl Isobutyl Ketone

ASTM D1200 (2010) Viscosity by Ford Viscosity Cup

ASTM D1210 (2005; R 2010) Fineness of Dispersion of Pigment-Vehicle Systems by Hegman-Type Gage

ASTM D2917 (2007; R 2013) Methyl Isoamyl Ketone

ASTM D3465 (2000; E 2007; R 2007) Standard Test Method for Purity of Monmeric Plasticizers by Gas Chromatography

ASTM D4417 (2011) Field Measurement of Surface Profile of Blast Cleaned Steel

ASTM D520 (2000; R 2011) Zinc Dust Pigment

ASTM D561 (1982; R 2008) Carbon Black Pigment for Paint

ASTM D7091 (2012) Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic, Nondestructive Coatings Applied to Non-Ferrous Metals

ASTM D740 (2011) Methyl Ethyl Ketone

ASTM D841 (2013) Nitration Grade Toluene

ASTM E1347 (2006; R 2011) Color and Color Difference Measurement by Tristimulus (Filter) Colorimetry

SECTION 09 97 02.00 28 Page 3

NACE INTERNATIONAL (NACE)

NACE CIP 2 Coating Inspector Program, Level 2

THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC QP 1 (1998; R 2000) Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)

SSPC SP 1 (1982; R 2000) Solvent Cleaning

SSPC SP 5/NACE No. 1 (2007) White Metal Blast Cleaning

SSPC-PCI 2 (2011) Protective Coatings Inspector, Level 2

SSPC-PCS Protective Coatings Specialist (PCS)

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FED-STD-595 (Rev C; Notice 1) Colors Used in Government Procurement

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Manufacturer's Product Data Sheet; G, GE

SD-06 Test Reports

Inspection Reports; G, GE

SD-07 Certificates

SSPC QP 1 Certificate; G, C Coating Thickness Gage Qualification; G, C Qualified Paint Applicator; G, C Special Formulation Paint; G, C Independent Third Party Test Agency; G, C Solvents and Thinners; G, C

1.3 QUALIFICATIONS

Qualifications and experience shall comply with the following.

1.3.1 Qualified Painting Contractor

Provide a certified SSPC QP 1 Painting Contractor. Submit a copy of the SSPC QP 1 Certificate.

SECTION 09 97 02.00 28 Page 4

1.3.2 Independent Third Party Test Agency

Hire an independent SSPC-PCI 2 , SSPC-PCS, or NACE CIP 2 test agency inspector for Qualified Paint Applicator certification. Submit current certification, for approval. The Test Agency Inspector shall be responsible for administering all Qualified Paint Applicator certifications and providing documentation of certification results to the Government. See paragraph "Qualified Paint Applicator".

1.3.3 Qualified Paint Applicator

Submit records of qualification tests and third party certification for each Qualified Paint Applicator. Prior to the initiation of any work all paint applicators shall be tested and certified as meeting the requirements of the qualified paint applicator. Certification shall be administered by the government approved independent third party Test Agency. Applicators failing the certification test shall not be permitted to apply any paint on the project.

1.3.3.1 Test Plate

The test plate shall consist of a 6 by 6 feet steel plate with a 3/8 inch minimum thickness. The test plate shall have at least six bolts, three with bolt heads exposed and three with threads exposed, a 12-inch wide flange and a 6-inch diameter pipe each 18 inches long welded perpendicular to the test panel and a 6-inch deep T-beam with sealed ends welded horizontal across the test panel one foot up from the bottom all within the area to be painted on one side. Bolts shall be 1 inch minimum diameter.

1.3.3.2 Certification Test Procedure

Conduct certification testing of paint applicators at the job site in coordination with the Contracting Officer. Supply the fabricated test plates to be used for the tests and provide crane service, rigging, and any other work necessary to provide accessibility for the certification testing and inspection. In preparation, clean and prepare the test plates in accordance with the requirements of the contracted work. Perform abrasive blasting with the blast media to be used in the contract. The paints to be applied shall be the Contractor supplied materials and shall be those previously tested and approved for use on the contract. Paints shall be applied as specified in the contract. The painter being tested shall mix and thin the paints to be used in the test and shall set up and adjust the application equipment for use. Each painter shall apply each of the types of paint comprising the specified system. The test plate shall be painted in a near vertical position.

1.3.3.3 Certification Criteria

Evaluate the paint applicator based on the conformance of the applied paint system to the requirements of the specifications. Deficiencies in the coatings, improper mixing or improper application methods are basis for failure. The Test Agency shall be the sole judge as to the acceptability of each paint applicator's performance.

1.3.4 Coating Thickness Gage Qualification

Submit Coating Thickness Gage Qualification documentation of

SECTION 09 97 02.00 28 Page 5 manufacturer's certification for all coating thickness gages. Magnetic flux thickness gages as described in ASTM D7091 shall be used to make all coating thickness measurements on ferrous metal substrates. Gages shall have an accuracy of +/- 3 percent or better. Gages to be used on the job shall be certified by the manufacturer as meeting these requirements.

1.4 DELIVERY, STORAGE, AND HANDLING

Process and package paints to ensure that within a period of one year from date of manufacture, they will not gel, liver, or thicken deleteriously, or form gas in the closed container. Paints, unless otherwise specified or permitted, shall be packaged in standard containers not larger than 5 gal, with removable friction or lug-type covers. Containers for vinyl-type paints shall be lined with a coating resistant to solvents in the formulations and capable of effectively isolating the paint from contact with the metal container. Each container of paint or separately packaged component thereof shall be labeled to indicate the purchaser's order number, date of manufacture, manufacturer's batch number, quantity, color, component identification and designated name, and formula or specification number of the paint together with special labeling instructions, when specified. Paint shall be delivered to the job in unbroken containers. Paints that can be harmed by exposure to cold weather shall be stored in ventilated, heated shelters. All paints shall be stored under cover from the elements and in locations free from sparks and flames.

1.5 AMBIENT CONDITIONS

Paint shall be applied only to surfaces that are above the dew point temperature and that are completely free of moisture as determined by sight and touch. Paint shall not be applied to surfaces upon which there is detectable frost or ice. Except as otherwise specified, the temperature of the surfaces to be painted and of air in contact therewith shall be not less than 45 degrees F during paint application nor shall paint be applied if the surfaces can be expected to drop to 32 degrees F or lower before the film has dried to a reasonably firm condition. During periods of inclement weather, painting may be continued by enclosing the surfaces and applying artificial heat, provided the minimum temperatures and surface dryness requirements prescribed previously are maintained.

Paint shall not be applied to surfaces heated by direct sunlight or other sources to temperatures that will cause detrimental blistering, pinholing, or porosity of the film.

PART 2 PRODUCTS

Submit Manufacturer's Product Data Sheet for each type of paint used; for products that are specified to be applied in accordance with the manufacturer's recommendations, submit the paint manufacturer's product data sheet or other written instructions for those products. For Special Formulation Paint, submit a signed certificate from the paint manufacturer certifying that all paint supplied is from batches that are the correct formulation, meet all the specified requirements, and have been tested and approved by the U.S. Army Corps of Engineers Construction Engineering Research Lab (CERL Lab). For Solvents and Thinners for Special Formulation Paint, submit a signed certificate from the manufacturer certifying that all solvents and thinners supplied are from batches that are the correct formulation, meet all the specified requirements, and have been tested and approved by the U.S. Army Corps of Engineers Construction Engineering Research Lab (CERL Lab). Information about CERL Lab may be obtained at the

SECTION 09 97 02.00 28 Page 6 following website:

http://www.cecer.army.mil/td/tips/product/details.cfm?ID=541

Costs for initial testing of Special Formulation Paint, Solvents and Thinners will be borne by the Government. Costs for retesting rejected material will be deducted from payments to the Contractor at the rate of $600 dollars for each paint, solvent or thinner sample retested.

2.1 SPECIAL PAINT FORMULAS

Special paints shall have the composition as indicated in the formulas listed herein. Where so specified, certain components of a paint formulation shall be packaged in separate containers for mixing on the job. If not specified or otherwise prescribed, the color shall be that naturally obtained from the required pigmentation.

2.2 PAINT FORMULATIONS

Special paint formulas shall comply with the following:

2.2.1 Formula V-766e

This formula is for Vinyl-Type White (or Gray) Impacted Immersion Coating, the ingredients are shown below.

INGREDIENTS PERCENT BY MASS

Vinyl Resin, Type 3 5.6

Vinyl Resin, Type 4 11.6

Titanium Dioxide and (for Gray) Carbon Black

13.0

Diisodecyl Phthalate 2.9

Methyl Isobutyl Ketone 32.0

Toluene 34.7

Ortho-Phosphoric Acid 0.2

Total 100.0

a. The dispersion of pigment shall be accomplished by means of pebble mills or other approved methods to produce a fineness of grind ( ASTM D1210) of not less than 7 on the Hegman scale. Grinding in steel-lined or steel-ball mills will not be permitted. No grinding aids, antisettling agents, or any other materials except those shown in the formula will be permitted. The paint shall show the proper proportions of specified materials when analyzed by chromatographic and/or spectrophotometric methods. The ortho-phosphoric acid shall be measured accurately and diluted with at least four parts of ketone to one part of acid and it shall be slowly incorporated into the finished paint with constant and thorough agitation.

SECTION 09 97 02.00 28 Page 7

b. The viscosity of the paint shall be between 60 and 90 seconds using ASTM D1200 and a No. 4 Ford cup.

c. The white and gray paints shall be furnished in the volume ratio designated by the purchaser. The gray paint shall contain no pigments other than those specified. Enough carbon black shall be included to produce a dry paint film having a reflectance of 20-24 ( ASTM E1347).

The resulting gray color shall approximate color 26231 of FED-STD-595 .

2.2.2 Formula VZ-108d

This formula is for Vinyl-Type Zinc-Rich Impacted Immersion Coating, the ingredients are shown below.

INGREDIENTS PERCENT BY WEIGHT POUNDS GALLONS

COMPONENT A

Vinyl Resin, Type 3 16.6 109.2 9.65

Methyl Isobutyl Ketone

80.6 528.9 79.30

Suspending Agent E 0.7 4.6 0.28

Suspending Agent F 0.4 2.7 0.19

Methanol 0.5 3.3 0.50

Synthetic Iron Oxide (Red)

1.2 7.9 0.19

Total 100.0 656.6 90.11

COMPONENT B

Silane B 100.0 4.1 0.47

COMPONENT C

Zinc Dust 100.0 550.0 9.42

Total Volume 100.00 (mixed paint)

a. The iron oxide and suspending agents shall be dispersed into the vehicle…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .