A.07.24_Amendment_01.pdf

PDF 32 KB Posted

Attached to
Cooling Water Strainers Federal contract opportunity
Solicitation number
W912EF-17-R-0013
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amendment 2

View the file

Other files for this federal contract opportunity

Other files attached to Cooling Water Strainers, newest first.
File Type Posted
A.04.35_Justification_for_Brand_Name_-_PARC.pdf PDF
Drawings.pdf PDF
Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the Technical Specifications. In Paragraph 3, the "Heavy Duty" verbiage is being removed from items A and B. Item J in Section 3 under spare parts is removed in its entirety. The delivery date is being changed. The solicitation due date has been extended to April 3, 2017.

If you are submitting an offer, ensure that you accknow ledge receipt of this amendment by completing Blocks 8 and 15A. The signed amendment (SF 30) shall be included in the proposal submission. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-R-0013

X 9B. DATED (SEE ITEM 11)

27-Feb-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Mar-2017

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

RUTH A. JOHNSON

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1976

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-17-R-0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 27-Mar-2017 12:30 PM to 03-Apr-2017 02:00 PM.

The following have been modified:

TECHNICAL SPECIFICATIONS

1.0 INTENT

The following specifications pertain to the purchase of thirteen (13) 14” duplex raw cooling water strainers for main unit cooling water at McNary Dam.

2.0 SCOPE

Supply the duplex raw cooling water strainers to McNary Dam by the date shown in section Shipment and Delivery.

Provide training, documentation, and other items as stated in the specifications.

3.0 DUPLEX RAW COOLING WATER STRAINER

The duplex raw cooling water strainers shall be an Eaton model 570. See appendix B for manufactures drawing SD57011. The strainers shall be supplied in accordance with the following specifications:

Operating Conditions:

A. Fluid: Water B. Flow rate = 2000 GPM C. Operating Pressure = 60 psig D. Maximum Operating Temperature = 100 degrees Fahrenheit

Strainer Description:

A. Screen basket process filter duplex housing configuration B. Perforated plate (cleanable) stainless steel filter basket C. Housing - cast iron D. Cover - carbon steel E. 14 inch class 125# flat face flange F. Cover gasket - non asbestos G. Crossover valve disc - cast iron H. Crossover valve seat - stainless steel I. Chamber drain access ports – 1” or ¾” NPT J. Equalizing valve K. Overall assembled dimensions shall not exceed the following:

- Height/Elevation - 32 inches

- Width - 47 inches

- Depth - 61 inches

L. Chamber equalizing assembly:

- Carbon Steel

- Brass Valve M. Lifting davit for body covers.

- Submittal of davit design for approval is required. Davit must be able to rotate freely and not bind on itself. See appendix B figure 1 for davit drawing.

Filter Element Description:

A. Screen Basket Element with handle (quantity of 2 tall and 2 short baskets per chamber, 2 chambers per duplex assembly) B. Perforated Plate Basket, 316 stainless steel material C. 3/16 inch basket perforations D. Maximum differential pressure across the basket when dirty = 1.38 bar (20 psi)

Strainer Operation Configuration:

Right hand orientation

Spare Parts:

One spare parts kit shall be provided containing the items listed below:

Quantity A. Short Heavy Duty Basket 16 B. Tall Heavy Duty Basket 16 C. Header Cover Gasket 4 D. Body Cover Gasket 4 E. O-ring 16 F. O-ring Spindle Mounting 8 G. Snap Ring 4 H. Stainless Steel Valve Seat 8 I. Valve Disk 1

4.0 TRAINING

Upon delivery of the equipment, a factory authorized service technician shall give a minimum one hour hands-on training of the recommended operation, maintenance, and installation of the strainers. The training shall be conducted at McNary Dam for a class of approximately five people. At a minimum, draft copies of the O&M manuals shall be provided during the training.

5.0 OPERATION AND MAINTENANCE MANUALS

Three complete paper copies and one complete electronic copy of the Operation and Maintenance Manual will be required, which shall include the bill of materials, instructions on the installation, operation, maintenance, repair, troubleshooting, warranty of the systems, and a list of recommended spare parts. Any information pertaining to models or components not supplied under this contract shall be crossed out.

Also included shall be the name, phone and fax numbers, and email address of the contractor, manufacturer, and a distributor where spare parts and baskets can be purchased.

The following identification shall be inscribed on the Operation and Maintenance Manual covers:

OPERATING AND MAINTENANCE INSTRUCTIONS

Contract name McNary DAM Name of the Contractor Contract Number

6.0 SHIPMENT AND DELIVERY

All items shall be delivered FOB to McNary Dam no later than the following schedule: Two (2) strainers will be delivered no later than 24 weeks after contract award. Every 3-4 weeks after that, 2 more strainers will be delivered.

The Contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to McNary Dam. No shipments are allowed other than normal business hours of Monday through Thursday 6:30 AM – 4:30 PM, excluding holidays. All shipments shall be delivered to:

McNary Dam 82790 Devore Road Umatilla, OR 97782-1230

Equal Opportunities for Veterans. In addition to complying with the requirements outlined in FAR Part 22.13, FAR

Provision 52.222-38, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx, Department of Labor Veterans Employment Assistance http://dol.gov/vets/, Department of Veterans Affairs-VOW to Hire Heros Act http://benefits.va.gov/vow/, Army Wounded Warrior Program - http://wtc.army.mil/modules/employers/index.html, U.S. Chamber of Commerce Foundation-Hiring Our Heros http://www.uschamberfoundation.org/hiring-our-heroes, Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf

E-Verify: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

(End of Summary of Changes)