A.07.24_Amendment_3.pdf

PDF 71 KB Posted

Attached to
Liquid Fertilizer Federal contract opportunity
Solicitation number
W912EF-17-Q-0053
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amendment 3

View the file

Other files for this federal contract opportunity

Other files attached to Liquid Fertilizer, newest first.
File Type Posted
A.07.24_Amendment_2.pdf PDF
A.07.24_Amendment.pdf PDF
A.01.31_Spec_Attachments_(1-4).pdf PDF
Solicitation.pdf PDF
A.01.31_Technical_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV70202837

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er questions from industry.

If you are submitting an offer, ensure that you acknow ledge receipt of this amendment by completing Blocks 8 and 15A. The signed amendment (SF30) shall be included in tthe proposal submission. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-Q-0053

X 9B. DATED (SEE ITEM 11)

24-Feb-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Mar-2017

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

RUTH A. JOHNSON

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1976

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-17-Q-0053

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS 2

Q: How many gallons of fertilizer were used on this same job last year? (we are trying to get an accurate estimate because of the clause in the contract that says the "Government reserves the right to increase ore decrease the fertilizer quantity during the course of the contract").

A: 2016 = 39,576.5 gallons 9‐year Hist Highest = 43,600 gallons 9‐year Hist Lowest = 31,000.6 gallons Last 5‐year’s Average = 37,230 gallons

Q: What type of substrate is under the secondary containment at the load site? (sand, gravel?)

A: The containment liner is sitting on a bed of sand.

Q: What is the approximate "minimum one week of fertilizer"? How many gallons is minimum 1 week supply?

A: The minimum varies based on the fertilizer prescription. The Contractor will not be required to determine when deliveries are needed; they WILL be required to deliver within the timeframe requested with each delivery order. (as described in paragraph 6.3.3)

Q: Does the Corps have a boom truck or crane on site that we could use to place a 9150 gallon tank?

A: No, the Government will not set the tank or provide the equipment to set the tank. The Government will take down the block wall on the facing side, as shown in the first photo in paragraph 4.2, to allow placement of a tank using a trailer designed to stand a tank upright, or parking tanks that are mounted on a trailer. A Government employee will provide access to the containment site and be present during placement and removal.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .