Amendment.pdf

PDF 32 KB Posted

Attached to
Cooling Water Strainers Federal contract opportunity
Solicitation number
W912EF-16-R-0013
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amendment

View the file

Other files for this federal contract opportunity

Other files attached to Cooling Water Strainers, newest first.
File Type Posted
Drawings.pdf PDF
Amendment2.pdf PDF
Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV53223348

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The pupose for this amendment is to include the e-verify information in the Technical Specifications and to answ er a question from industry.

Note: Lack of acknow ledgement of this amendment may rendor your quote as non-responsive.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Feb-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-16-R-0013

X 9B. DATED (SEE ITEM 11)

09-Feb-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Feb-2016

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

RUTH A. JOHNSON

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1976

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-16-R-0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

QUESTION AND ANSWER

Q: What are the serial numbers of the units they are replacing?

A: Elliot brand serial # WO415-5 and Zurn brand serial # 1941.

The following have been modified:

TECHNICAL SPECIFICATIONS

Revisions in Red Text

1. SCOPE

The successful offeror is responsible for supplying six (6) duplex raw water strainers conforming to the specifications detailed in the following text. The new duplex strainers shall be a direct replacement for the existing strainers, which are located in a concrete pit downstream of the main unit generators on concrete pedestals. The existing equipment is Elliott, size 10-inch, type AL, model 334 (Units 1-3) and Zurn, size 10-inch, type 570 FBS (Units 4-6). The successful offeror shall provide new duplex strainers capable of being mounted in the current location of the existing strainers without modification to the concrete structure and with minimal modifications to the piping.

2. RAW COOLING WATER DUPLEX STRAINERS

2.1. STRAINER HOUSING DESCRIPTION:

The duplex raw water strainers shall be Tate Andale Type AL, or equal, with the following salient characteristics:

i. Type: Duplex, with minimal moving parts, right hand assembly

ii. Construction: In accordance with (IAW) ASME Boiler and Pressure Vessel Code (BPVC) sections II, V, VIII, IX

iii. Material: Cast iron with painted exterior and interior corrosion protection

iv. Minimum Operational Pressure Rating: 100 PSIG

v. Flow Capacity Rating: No less than 1500 GPM

vi. Operating Temperature Range: -10 degrees C (14 degrees F) to 90 degrees C (194 degrees F)

vii. Type of Connection: 10 inch, ANSI Class 150 Flange (pre-drilled flanges)

viii. Clogging Indicator: Differential pressure gauge with colored clogging indicator

ix. Critical Dimensions:

• Nominal Flange-to-Flange not to exceed (NTE): 39-3/8 inches

• Base to Flange Centerline (Inlet and Outlet): No less than 10 inches and no greater than 18-3/8 inches

x. Overall Assembled Dimensions NTE:

• Height: 33-7/8 inches

• Width (Flange-to-Flange): 39-3/8 inches

• Depth: 45-1/8 inches

xi. Crossover Valve Assembly:

• Type: Sliding gate valve with hand wheel and LH/RH hand wheel interlocking ability, chain drive

• Material/Construction: Cast iron with ring type valve seal

• Valve Seal: Natural rubber, EPDM rubber, or approved equivalent

• Features: Valve position indicator

xii. Additional Equipment:

• Vent and drain valve

• Lifting davit(s)

• Pressure equalizing line and no less than three (3) ball valves

xiii. Mounting:

• To be floor mounted on concrete or steel pads via embedded threaded anchors

2.2. STRAINER FILTER ELEMENT DESCRIPTION:

The strainer filter elements shall be the accompanying filter elements of the Tate Andale Type AL strainer, or equal, with the following salient characteristics:

i. Type: Removable filter basket with handle

ii. Construction: Wedgewire or approved equivalent; Basket to withstand no less than 56

PSIG

iii. Material: Stainless steel

iv. Filtration Rating: 3175 micron

v. Basket Open Filtration Area: No less than 392.7 in2 (5 times the cross sectional area of intake)

vi. Additional Features:

a. Magnetic Assembly

3. SUBMITTALS

Descriptive Materials (brochures, illustrations, drawings, data sheets, etc) must be submitted which will allow the Contracting Officer to determine, without discussion with the offerer, whether the products being offered meets all of the required specifications. Submittals shall include copies of manufactures catalog cut sheet, specification sheets, material certifications, and warranty.

4. OPERATION AND MAINTENANCE MANUALS

Upon delivery of the strainers, submit three (3) complete paper copies and one (1) complete electronic copy of the Operation and Maintenance Manual. Include instructions on the installation, operation, maintenance, repair, troubleshooting, a list of recommended spare parts, and warranty of the strainers. Also include the name, phone and fax numbers, and email address of the contractor, manufacturer, and a distributor where spare parts and filters can be purchased.

The following identification shall be inscribed on the covers:

OPERATING AND MAINTENANCE

INSTRUCTIONS

Contract name

ICE HARBOR LOCK AND DAM

Name of the Contractor Contract Number

5. SHIPMENT AND DELIVERY

All strainers shall be delivered FOB to Ice Harbor Lock and Dam within 14 weeks of contract award. The Contractor is responsible for packing and shipping the strainers in a manner that will ensure undamaged and complete arrival to the Project. No shipments are allowed other than during normal business hours of Monday – Thursday 7:30 a.m. – 4:30 p.m., excluding federal holidays.

All shipments shall be delivered to:

Ice Harbor Lock and Dam

2763 Monument Road Burbank, WA 99323

Equal Opportunities for Veterans. In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx, Department of Labor Veterans Employment Assistance http://dol.gov/vets/, Department of Veterans Affairs-VOW to Hire Heros Act http://benefits.va.gov/vow/, Army Wounded Warrior Program - http://wtc.army.mil/modules/employers/index.html, U.S. Chamber of Commerce Foundation-Hiring Our Heros http://www.uschamberfoundation.org/hiring-our-heroes, Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf E-Verify: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award."

(End of Summary of Changes)