Amendment_0003.pdf
PDF 68 KB Posted
- Attached to
- Ice Harbor Spillway Chute/Deflector Modifications Federal contract opportunity
- Solicitation number
- W912EF-14-B-0003
About this file
Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Results.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Site_Visit_Attendees.pdf | ||
| Amendment_0002.pdf | ||
| Revised_Site_Visit_Information.pdf | ||
| Amendment_0001.pdf | ||
| PLANS_14-B-0003.pdf | ||
| Site_Visit_Information.pdf | ||
| W912EF-14-B-0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV33229607
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TITLE: Ice Harbor Spillw ay Chute/Deflector Modif ications
The purpose of this amendment is to revise the w age determinations. Revised w age determinations attached.
Bid opening date has been extended to January 14, 2014 at 2:00 p.m.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jan-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-14-B-0003
X 9B. DATED (SEE ITEM 11)
06-Dec-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jan-2014
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
JANI C. LONG
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-14-B-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 10-Jan-2014 02:00 PM to 14-Jan-2014 02:00 PM.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATIONS
General Decision Number: WA140094 01/03/2014 WA94
Superseded General Decision Number: WA20130094
State: Washington
Construction Type: Heavy including water and sewer line construction
County: Franklin County in Washington.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Modification Number Publication Date 0 01/03/2014
* CARP9003-001 06/01/2013
Rates Fringes
CARPENTER (Including Form Work)............................$ 30.66 12.87
MILLWRIGHT.......................$ 38.30 12.87
PILEDRIVERMAN....................$ 31.64 12.87
ZONE PAY:
ZONE 1 0-45 MILES FREE
ZONE 2 46-65 MILES $2.00/PER HOUR
ZONE 3 66-100 MILES $3.00/PER HOUR
ZONE 4 OVER 100 MILES $4.50/PER HOUR
DISPATCH POINTS:
PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
ELEC0112-014 07/01/2013
Rates Fringes
ELECTRICIAN......................$ 37.05 17.29
ENGI0370-022 06/01/2013
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 25.56 12.85
GROUP 2.....................$ 25.88 12.85
GROUP 3.....................$ 26.49 12.85
GROUP 4.....................$ 26.65 12.85
GROUP 5.....................$ 26.81 12.85
GROUP 6.....................$ 27.09 12.85
GROUP 7.....................$ 27.36 12.85
GROUP 8.....................$ 28.46 12.85
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Rollers, all types on subgrade, including seal and chip coatings; Drill Assistant; Crane Oiler
GROUP 2: Fork Lift; Broom/Sweeper
GROUP 3: Bulldozer (up to D-6 or equivalent); Boring Machine
GROUP 4: Oiler; Drill (churn, core, calyx or diamond);
Loaders (overhead & front-end, under 4 yds. R/T)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under
3/4 yd.); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Piledriver;
Grade Checker; Boom Truck (Under 25 tons)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.), Bulldozer, 834 R/T & similar; Mechanic; Paver; Scraper;
Screed; Loader Operator (front-end & overhead, 4 yds. incl.
8 yds.)
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Grader/Blade; Loaders (overhead & front-end, over 8 yds. to 10 yds.)
GROUP 8: Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-012 07/01/2013
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 31.60 21.35
LABO0238-014 06/01/2013
Rates Fringes
LABORER: Mason Tender - Brick...$ 24.10 10.65
LABO0238-015 06/01/2013
Rates Fringes
LABORER (Pasco)
GROUP 1.....................$ 21.70 10.65
GROUP 2.....................$ 23.80 10.65
GROUP 3.....................$ 24.07 10.65
GROUP 4.....................$ 24.34 10.65
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagger
GROUP 2: Common or General Laborer; Form-Stripping
GROUP 3: Mason Tender-Cement/Concrete
GROUP 4: Grade Checker; High Scaler; Handheld Drill
PAIN0005-003 07/01/2013
Rates Fringes
PAINTER (Brush, Roller, and Spray.)..........................$ 21.69 10.41
PLAS0072-008 06/01/2012
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 25.44 11.64
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee
Zone 1: 0 - 45 radius miles from the main post office
Zone 2: 45 radius miles from the main post office
TEAM0690-005 01/01/2013
Rates Fringes
Truck drivers: (ANYONE
WORKING ON HAZMAT JOBS SEE
FOOTNOTE A BELOW)
ZONE 1:PASCO ZONE CENTER
GROUP 4....................$ 25.39 14.44
GROUP 5....................$ 25.50 14.44
GROUP 6....................$ 25.50 14.44
Zone Differential (Add to Zone 1 rate: Zone 1 + $2.00)
BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office Zone 2: Outside a 45 mile radius from the main post office
TRUCK DRIVERS CLASSIFICATIONS
GROUP 4: Water Truck (0-8,000 gallons)
GROUP 5: Semi-Trailer Truck
GROUP 6: Water Truck (8,001-14,000 Gallons)
FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.
LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.
Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.
SUWA2009-060 08/07/2009
Rates Fringes
CARPENTER, Excludes Form Work....$ 23.54 4.99
LABORER: Landscape & Irrigation.......................$ 12.27 2.73
LABORER: Pipelayer..............$ 19.28 0.00
OPERATOR: Asphalt Plant.........$ 34.14 0.68
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 10.63 0.00
OPERATOR: Crane.................$ 23.42 5.54
OPERATOR: Power Shovel..........$ 25.12 7.83
TRUCK DRIVER, Includes Dump Truck............................$ 27.67 0.00
TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29
TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: WA140085 01/03/2014 WA85
Superseded General Decision Number: WA20130085
State: Washington
Construction Type: Heavy including water and sewer line construction
County: Walla Walla County in Washington.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Modification Number Publication Date 0 01/03/2014
ELEC0077-001 02/01/2013
Rates Fringes
Line Construction:
LINEMEN.....................$ 45.62 4%+12.90
ELEC0112-014 07/01/2013
Rates Fringes
ELECTRICIAN......................$ 37.05 17.29
* ENGI0370-010 06/01/2013
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 25.56 12.85
GROUP 2.....................$ 25.88 12.85
GROUP 3.....................$ 26.49 12.85
GROUP 4.....................$ 26.65 12.85
GROUP 5.....................$ 26.81 12.85
GROUP 6.....................$ 27.09 12.85
GROUP 7.....................$ 27.36 12.85
GROUP 8.....................$ 28.46 12.85
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T);
Oiler; Drill (churn, core, calyx or diamond)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.); Cranes (25 tons & under); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Boom Truck (Under 25 tons)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons);
Loaders (overhead & front-end, over 8 yds. to 10 yds.);
Grader/Blade
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-001 07/01/2013
Rates Fringes
IRONWORKER (Reinforcing and Structural)......................$ 31.60 21.35
LABO0238-002 06/01/2013
Rates Fringes
LABORER (Pasco)
GROUP 1.....................$ 22.00 10.65
GROUP 2.....................$ 24.10 10.65
GROUP 3.....................$ 24.37 10.65
GROUP 4.....................$ 24.64 10.65
GROUP 5.....................$ 24.92 10.65
LABORER (Spokane)
GROUP 1.....................$ 21.70 10.65
GROUP 2.....................$ 23.80 10.65
GROUP 3.....................$ 24.07 10.65
GROUP 4.....................$ 24.34 10.65
GROUP 5.....................$ 24.62 10.65
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagger
GROUP 2: Common or General Laborer;
GROUP 3: Mason Tender-Cement/Concrete; Pipelayer; Chipping Guns
GROUP 4: Grade Checker
LABO0238-007 06/01/2013
Rates Fringes
Laborer, Mason Tender Brick......$ 24.10 10.65
* PAIN0005-003 07/01/2013
Rates Fringes
PAINTER (Brush, Roller, and Spray.)..........................$ 21.69 10.41
SUWA2009-051 08/07/2009
Rates Fringes
CARPENTER........................$ 24.03 6.50
CEMENT MASON/CONCRETE FINISHER...$ 17.21 0.00
LABORER: Landscape..............$ 14.67 0.00
TRUCK DRIVER: Dump Truck........$ 19.67 0.00
TRUCK DRIVER: Water Truck.......$ 24.36 8.30
TRUCK DRIVER: 10 Yard Truck.....$ 24.61 8.34
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .