W912DW22Q80080001.pdf
PDF 404 KB Posted
- Attached to
- Trailer Mounted Diesel Driven Dewatering and Sewage Pump Federal contract opportunity
- Solicitation number
- W912DW22Q8008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW22Q8008.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make revisions to the purchase description and extend the closing date. All other terms and conditions remain unchanged. Accordingly, this solicitation is hereby amended as follow s:
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW22Q8008
X 9B. DATED (SEE ITEM 11)
11-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Aug-2022
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW22Q8008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 25-Aug-2022 12:30 PM to 26-Aug-2022 12:30 PM.
The following have been modified:
ITEM(S) 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009 - PURCHASE DESCRIPTION
PURCHASE DESCRIPTION
Trailer Mounted Diesel Driven Dewatering and Sewage Pump
1. GENERAL INFORMATION:
The U.S. Army Corps of Engineers requires one (1) Trailer Mounted 6-inch diesel driven dewatering and sewage pump to include suction and discharge hose and one (1) Trailer Mounted 4-inch diesel driven dewatering and sewage pump to include suction and discharge hose to be procured and delivered to Seattle, WA.
2. SPECIFICATIONS:
Contractor shall supply and one (1) Trailer Mounted 6-inch diesel driven dewatering and sewage pump to include suction and discharge hose and one (1) Trailer Mounted 4-inch diesel driven dewatering and sewage pump to include suction and discharge hose meeting the following minimum criteria:
6” Pump Specifications:
Type .................................. BA150E D285 Max. flow .......................... 2200 US GPM (500 m3/hour) Max. pressure ................... 125 ft. / 54 PSI (38 mwc) Connections ...................... 6" (DN150) Solids handling ................. 3.15" (80 mm) Impeller type ..................... Open impeller Priming system ................. BBA MP50 Engine .............................. Hatz 4H50TIC DriveOn® Emission standard ............ Tier 4 final Canopy ............................. M10-23X Sound level ....................... 64 dB(A) at 33 ft.
Dry weight ......................... 3630 lbs. (1650 kg) Pump to be supplied with 2 copies of O&M Manuals and Parts Manual
STANDARD TECHNICAL SPECIFICATIONS
BBA Auto Prime Pump
Pump type ............................ BA150E D285 Max. flow .............................. 2200 US GPM (500 m3/hour) Max. head ............................ 125 feet / 54 PSI (38 mwc) Impeller type ........................ Open impeller Solids handling .................... 3.15 inch (80 mm) Pump casing ........................ Cast iron GG20 Impeller ................................ Chrome Moly 42CrM04
Self-cleaning wear plate ...... Chrome Moly 42CrM04 (cutter slots) Pump shaft........................... 42CrV6 Shaft seal ............................. Mechanical seal Seal faces ............................ Tung/Sic Seal rubbers ........................ Viton
BBA Priming System
Pump type ............................ BBA MP50 Diaphragm pump Air handling capacity ........... 30 CFM (50 m3/h) Max. vacuum ....................... 29 inHg (8.5 m) Drive .................................... Toothed belt (continuous drive) Float box .............................. Aluminium Non return valve .................. Cast iron GG25 Check valve disc .................. Buna-N
Engine
Engine brand ....................... Hatz Engine type .......................... 4H50TIC DriveOn® Oil change interval ............... 1500 running hours Max. power output ............... 75 Hp (55.4 kW) Variable engine speed ......... 1300 - 1900 RPM Fuel consumption ................ 220 g/kWh Displacement ....................... 1,952 cm3 Number of cylinders Aftertreatment ...................... EGR, DOC Exhaust emission US .......... Tier 4 Final
BBA Control Panel LC40
Auto start/stop system Two float switches included (10m cable) Key switch Rpm. control with push buttons Warning lights 4.3ʺ LCD display
Fuel System
PE fuel tank 80 US gallon (300 L.) net Fuel tank cap Ø 4" (100 mm) Electronic fuel injection system
Electrical System & Safety Features
Nominal voltage 12 Volt Premium quality battery Low oil pressure shut down
CANOPY M10-23X
BBA Sound Attenuating Canopy Canopy type......................... M10-23X Dimensions L x W x H ......... 89.4 x 41.3 x 62.8 inch Dimensions L x W x H ......... 2270 x 1050 x 1595 mm Basic frame .......................... Hot dip galvanized Doors ................................... 6 lockable composite doors Fuel tank .............................. PE net 80 US gallon (300 ltr)
Fuel tank autonomy ............. 30 hours (at 1900 rpm BEP) Fuel tank cap ....................... 4 inch (100mm) Forklift pockets..................... Fitted with 2 forklift pockets Lifting point .......................... Fitted with single lifting point Stackable ............................. Canopy is stackable Exhaust system ................... Fully integrated in canopy Additional ............................. Fitted with oil-water separator and battery isolator switch Connections ......................... Please consult “auxiliary items” in overleaf Documentation box .............. BBA user manual and warranty book
4” Pump Specifications
Pump Specifications:
Type .................................. BA100E D265 Max. flow .......................... 1255 US gpm (285 m3/hour) Max. pressure ................... 137 ft./ 59 PSI (41 mwc) Connections ...................... 4" or 6" Solids handling ................. 3,15" (80 mm) Impeller type ..................... Open impeller Priming system ................. BBA MP50 Engine .............................. Hatz 3H50TIC Emission standard ............ Tier 4 final Canopy ............................. M10-23X Sound level ....................... 64 dB(A) at 33 ft.
Dry weight ......................... 3465 lbs. (1575 kg)
STANDARD TECHNICAL SPECIFICATIONS
BBA Auto Prime Pump Pump type ............................ BA100E D265 Max. flow .............................. 1255 US gpm (285 m3/hour) Max. head ............................ 137 feet / 59 PSI (41 mwc) Impeller type ........................ Open impeller Solids handling .................... 3.15 inch (80 mm) Pump casing ........................ Cast iron GG20 Impeller ................................ Chrome Moly 42CrM04 Self-cleaning wear plate ...... Chrome Moly 42CrM04 (cutter slots) Pump shaft........................... 42CrV6 Shaft seal ............................. Mechanical seal Seal faces ............................ Tung/Sic Seal rubbers ........................ Viton
BBA Priming System
Pump type ............................ BBA MP50 Diaphragm pump Air handling capacity ........... 30 CFM (50 m3/h) Max. vacuum ....................... 29 inHg (8.5 m) Drive .................................... Toothed belt (continuous drive) Float box .............................. Aluminium Non return valve .................. Cast iron GG25 Check valve disc .................. Buna-N
Engine
Engine brand ....................... Hatz
Engine type .......................... 3H50TIC Max. power output ............... 59 Hp (43.7 kW) Variable speed ..................... 1300 - 2100 RPM Displacement ....................... 1.5 l Number of cylinders Aftertreatment ...................... EGR, DOC Exhaust emission US .......... EPA Tier 4 final
BBA Control Panel LC40
Auto start/stop system Two float switches included (10m cable) Key switch Rpm. control with push buttons Warning lights 4.3ʺ LCD display
Fuel System
PE fuel tank 80 US gallon (300 L.) net Fuel tank cap Ø 4" (100 mm) Electronic fuel injection system
Electrical System & Safety Features Nominal voltage 12 Volt Premium quality battery Low oil pressure shut down
Suction and Discharge Hoses 6” x 10’ Hard rubber suction hoses with Bauer fittings (10 EA) 6” x 25’ Lay flat discharge hoses with Bauer fittings (10 EA) 6” x 20’ PVC hard discharge pipe with Bauer fittings (10 EA) 4” x 20’ Hard rubber suction hoses with Bauer fittings (10 EA) 4” x 25’ Lay flat discharge hoses with Bauer fittings (10 EA) 4” x 20’ PVC hard discharge pipe with Bauer fittings (10 EA) 12” x 20’ Road crossing with all fittings to reduce back to 6” Bauer fitting for both sides. ( 1 EA)
3. WARRANTY:
All shall be covered by a manufacturer’s warranty on all parts, labor and workmanship.
4. ACCEPTANCE OF MATERIALS:
Materials will be inspected at the delivery point prior to acceptance. Contractor shall be responsible for maintaining the product’s condition as specified until the point of acceptance. New equipment only; no remanufactured or “gray market” items.
5. DELIVERY SCHEDULE:
Delivery must be received at the delivery location no later than 180 days after Award. The Contractor shall contact the Project Manager and Project staff ten (10) days prior to any pending deliveries. All deliveries must take place during delivery hours of Monday through Friday 7:00am - 1:00pm, excluding Federal holidays.
6. DELIVERY LOCATION:
Item shall be delivered FOB DESTINATION to the following address:
US Army Corps of Engineers Seattle District 6335 1st Ave S Seattle, WA 98108
(End of Summary of Changes)
File details come from the government source that posted it. Updated .