Amendment1W912DW21Q0045.pdf
PDF 3 MB Posted
- Attached to
- Mud Mountain Dam (MMD) Fish Transportation Federal contract opportunity
- Solicitation number
- W912DW21Q0045
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation W912DW21Q0045 for Mud Mountain Dam Fish Transport.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. This modification is for the follow ing:
1. Provide for Questions and Answ ers (Q&A) as enclosed.
2. Replace the previous Performance Work Statement (PWS) w ith the enclosed PWS (dated 15 June 2021) in its entirety for updates as show n in the tracking changes.
B. The solicitation closing time and date remains unchanged at 11:00 AM, Pacific Time, 6 July 2021.
C. All other terms and conditions of the solicitation remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW21Q0045
X 9B. DATED (SEE ITEM 11)
08-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jun-2021
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
Questions and Answers (Q&A), dated 15 June 2021
1) I noticed that the projection of hours or operations collectively is 1,180 hours.
Answer: The total possible hours in the contract are 1,180. However, there is no guarantee that all hours will be utilized. In addition, there is no guarantee that the Optional hours will be awarded either. Refer to Section 4 of the Performance Work Statement (PWS) regarding hours.
2) What type of trailers are needed to transport the fish?
Answer: The trailers that will be transporting fish are owned by the government. Refer to Section 4 of the PWS regarding the fish transport trailers. In addition, review PWS Attachment 02 for dimension of the trailer.
3) What is the approximate mileage of the pickup and drop-off locations?
Answer: Mileage between the locations is identified in Section 4 of the PWS. In addition, review PWS Attachment 04 for exact route to be traveled.
4) Also, what is the approximate weight that will be loaded of the trailers.
Answer: The fish transport trailers each have a capacity of 5,200 gallons. See Section 4.1.8 and
4.1.11 of the PWS for details.
5) If the fish are to be placed in containers that can be then loaded onto a trailer, I am certain depending on all the all the information that I have a way to cut the project time right at half, if you are interested also in the fastest time to complete the project.
Answer: Fish can only be loaded in the government owned fish transport trailers. Please review Sections 03 and 04 of the PWS for the exact requirements of this contract.
Performance Work Statement
Mud Mountain Dam Fish Passage Facility Fish Transportation
2 June 2021 15 June 2021(Amendment 1)
1. DESCRIPTION OF WORK: Provide all plant, labor, tools, and equipment and perform all work in strict accordance with this Performance Work Statement, all Federal, State and Local codes and regulations and all applicable industry standards to:
Provide trucking services to transport live fish from the Mud Mountain Dam Fish Passage Facility, located on the White River, to the Fish Release Site.
2. BACKGROUND INFORMATION: The newly constructed Mud Mountain Dam (MMD)
Fish Passage Facility (FPF) was put into service in 2021. The purpose of the FPF is to provide means of capturing live salmonids and transporting them to a release site located upstream of the dam. The new FPF was constructed because the existing fish trap and trucking operation could not keep up with the increasing numbers mostly caused by population growth of pink salmon. The new FPF was supplied with five, 5,200 gallon trailers, for the transportation of fish. During the peak of the fish run, typically starting in August and concluding in October, the employees at the FPF do not have the staffing or the equipment necessary to haul all five trailers. This PWS is set up to supplement the government’s effort in transporting fish during the peak of the fish run.
Physical address of the MMD Fish Passage Facility is:
25305 SE Mud Mountain RD Enumclaw WA, 98022
3. GENERAL REQUIRMENTS FOR ALL WORK:
3.1. During the performance of this work, the contractor must comply with all current OSHA regulations and the requirements contained in Engineering Manual 385-1-1 US Army Corps of Engineers Safety and Health Requirements Manual. Prior to start of work, Government Approval is required for the Accident Prevention Plan and a COVID-19 Plan.
3.2. Contractor shall abide by the most current COVID Business Activity Guidelines published by the State of Washington. Documentation for the current Phase of reopening can be found at the following location: https://www.governor.wa.gov/issues/issues/covid-19-resources/covid-19-reopening-guidance-businesses-and-workers. In addition, while on federal property, masks must be worn at all times.
3.3. Any damage to property will be repaired to its original condition by the contractor at their own expense.
3.4. While onsite, contractors shall be easily identifiable to the government employees and the public. This can be achieved by wearing clothing with company logo, hardhats with company logo, vests with company logo, etc.
3.5. USACE will provide portable toilets will be provided at the Fish Passage Facility and at the Fish Release Site for use by drivers.
https://www.governor.wa.gov/issues/issues/covid-19-resources/covid-19-reopening-guidance-businesses-and-workers https://www.governor.wa.gov/issues/issues/covid-19-resources/covid-19-reopening-guidance-businesses-and-workers
3.6. Trucking operations will be between the hours of 0600 and 1900 and may require 7 days a week.
4. SERVICES TO BE PROVIDED ARE:
4.1.Base Bid Item 0001 – Trucking Services
4.1.1. Contractor shall provide up to 3 trucks with drivers for the performance of the work described below. Each truck must be capable of working up to 12 continuous hours in a single day.
4.1.2. Trucking needs will vary day to day depending on factors such as fish run size, fish trap attraction success rate, equipment breakdowns, weather, etc. During peak operations, all 3 trucks may be utilized, working 12 hours a day 7 days a week. During slower periods, the number of trucks may vary between 0 and 3.
4.1.3. Government will determine the number of trucks required on a daily basis. Contractor will be given 24-hour notice for truck mobilization(s). Contractor will be given 12-hour notice for truck demobilization(s).
4.1.4. Inability to meet the mobilization and demobilization requirements stated above may be grounds for termination of the contract.
4.1.5. Upon arrival to the Fish Passage Facility (FPF) site, the truck(s) will first hook up to the fish transport trailer(s). The daily activities will then include the cyclical repetition of the following procedures:
• At the FPF, fill the fish transport trailer with water
• Drive up to the fish trap and load trailer with live fish
• Drive to the Fish Release Site
• Hook up to the release chute
• Release fish
• Drive back to the FPF
4.1.6. Government employees will only assist with filling trailers with water, loading of fish, and releasing of fish. Drivers may remain in their trucks during these tasks. All other tasks will be the responsibility of the driver.
4.1.7. During the transportation of live fish, the drivers are required to monitor the dissolved oxygen levels within the trailer. When necessary, drivers shall make adjustments to maintain acceptable levels. This will be performed via an electronic tablet device that is remotely synced to the trailer. The tablet will be handed to the driver upon coupling to the fish transport trailer. Need for adjustments is anticipated to be minimal.
4.1.8. The trailers that will be transported can be seen in Attachment 2. The dimensions of the trailer as well as hookups are identified. Contractor must ensure that the trucks being provided can successfully couple with the fish transport trailers. In addition, Attachment 2 displays the trailer’s data plate.
4.1.9. Attachment 3 provides the dimensions of the release chute located at the Fish Release Site. Drivers will have to back the trailers up to the chute in order to release the fish.
4.1.10. Total distance for a round trip between the FPF and the Fish Release Site is approximately 25 miles. See Attachment 4 for truck route. Drivers must follow the exact route identified. A maximum of 8-10 trips per day is anticipated per truck.
4.1.11. Requirements for each truck are:
• Minimum 425 horsepower
• Minimum 12 speed transmission
• Capability to couple with fish transport trailer, to include all air and electrical connections. Truck shall have at a minimum two 7 pin trailer connectors
• Equipped with CB radios
• Capable of hauling a full 5,200 gallon fish transport trailer up 7% grade on state highway
• Must pass the equipment safety check as identified in Attachment 5
• Insurance for truck and payload
• Height of truck is restricted to the clearance for the fish loading bay which is 13 ft.
4.1.12. Requirements for the drivers are:
• Class A CDL with Tanker Endorsement
• Able to pass background check
• Follow traffic laws
4.1.13. Upon successfully coupling with the trailer, the driver must complete the equipment safety checklist found in Attachment 5. The condition assessment form must be completed at the start of each day for each truck. Any defects identified should be immediately communicated to the contractor/subcontractor as well as a government representative. Equipment shall not be operated until deficiencies are resolved.
4.1.14. Clock hours for the truck will begin as soon as the driver successfully hooks up to the fish transport trailer and completes the equipment safety checklist.
4.1.15. At the end of each day, each driver must submit a haul log that captures number of trips made that day and hours the truck worked.
4.1.16. More than 3 breakdowns from the same truck will require that truck to be replaced for the remainder of the contract.
4.1.17. Except for short bathroom breaks, no stoppages will be allowed. If the contractor is required to provide a lunch break and/or other breaks for the drivers, a replacement driver or replacement truck with driver must take over the transporting operation to eliminate any down time. As identified in section 4.1.6, contractor will have short periods of downtime while the fish are being loaded and released.
4.1.18. Hourly rate shall be all inclusive and account for contractor’s overhead cost, fuel, insurance, transportation cost to and from job site, standby cost, overtime, uncertainties, etc.
4.1.19. Trucks shall be fueled prior to arriving onsite
4.1.20. The base of this contract is for a total of 840 hours. The amount identified is a not to exceed amount. Contractor shall provide a unit price and charge only for the hours worked.
4.1.21. Due to the unknown size of the fish run and other factors mentioned above, the government only guarantees the utilization of 400 hours. If all guaranteed hours are not utilized by the end of the fish run, government will still pay out the remainder of the guaranteed hours.
4.1.22. Remainder of the guaranteed hours shall not be paid out if the contract is terminated by the government. Contract termination may occur if contractor is not meeting the requirements identified in this PWS, is being unresponsive, or not meeting the performance requirements identified in the Quality Assurance Surveillance Plan.
4.1.23. Contractor will not be paid for the hours the truck is broken down or hours the driver is unable to operate equipment.
4.1.24. Parking may be made available for up to three trucks if the contractor wants to park the trucks at the facility overnight.
4.1.25. Truck drivers are to report directly to the contractor or their representative. Contractor is responsible for managing of all drivers and ensuring they comply with all DOT requirements. The government will not be involved in personnel management regarding drivers.
4.1.26. Upon award of the contract, the contractor or a representative, shall attend a site visit and walk through the trucking procedures. During the first day of hauling, that same representative shall be onsite to train the driver(s).
4.2 Optional Item 0002: Additional Trucking Services
4.2.1 Contract will have an option for an additional 340 hours of trucking. Work performed under the optional hours will be identical to what was identified in Section 4.1.
Contractor must abide by the trucking requirements identified in Section 4.1.
4.2.2 The amount identified for the optional hours is a not to exceed amount. Contractor shall provide a unit price and charge only for the hours worked.
4.2.3 There is no guarantee for utilization of any optional hours.
5. IMAGES/ATTACHMENTS:
Attachment 01: Quality Assurance Surveillance Plan Attachment 02: Fish Transport Trailer and Data Plate for Fish Transport Trailer Attachment 03: Fish Release Chute Attachment 04: Travel Route Attachment 05: Equipment Safety Checklist
6. PRE-BID SITE VISIT
6.1. A pre-bid site visit will be scheduled for this contract. All interested parties must contact
Contracting Specialist and the Project Manger (PM) at least 24 hours prior to the site visit in order to register for the site visit.
7. CONDITIONS AFFECTING WORK
7.1.Work Coordination:
7.1.1. The Contractor shall attend a kickoff meeting prior to commencing any work activities.
The Contractor shall contact the PM within five (5) days of award to set a date and time for the kickoff meeting. The Contractor shall submit a site-specific Accident Prevention Plan and a COVID 19 Plan prior to the kickoff meeting.
7.1.2. During performance of this work, bi-weekly coordination meetings are required. The Contractor’s site lead shall schedule the bi-weekly coordination meeting with the PM and dam staff.
7.2.Interface with Others:
7.2.1. Work under this PWS shall be planned and accomplished in a way to minimize any interferences and inconveniences to the government, the public, and private entities in the area.
7.3.Work Restrictions:
7.3.1. Working Hours: The Contractor is required to work within the hours of 0600-1900, 7 days a week. Work may be performed during Federal Holidays.
7.3.2. Laws, Rules, Regulations and Compliance: All Contractor and subcontractor employees shall observe and comply with all applicable local, State and Federal laws, rules and regulations, including those traffic, safety, sanitation, COVID, security, noise, and vehicle operations. All work shall meet or exceed applicable industry standards related to materials and workmanship.
7.3.3. Safety Requirements: The current edition of the U.S. Army Corps of Engineers Safety and Health Manual, EM 385-1-1 (30 Nov 2014), shall be considered a part of this contract and will be enforced as such. The most recent Safety Manual can be found here:
https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_ 385-1-1.pdf
7.4.Security:
7.4.1. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
7.4.2. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
7.4.3. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the Contracting Specialist and PM no later than 10 business days after the initial contract award.
8. FACILITIES:
8.1.Drivers will have access to temporary bathroom facilities.
8.2. If requested, parking for up to three trucks will be made available.
8.3.In addition to the requirements of any other contract clauses, the Contractor shall protect all Government property within the work area, and shall be responsible for any damage to Government property and private property caused by Contractor or subcontractor personnel during the performance of this contract.
8.4.Contractor will be operating during hours USACE employees will be onsite. Contractor will not be given additional access to the facility.
9. SUBMITTALS:
9.1. A Site Specific Safety Plan: Contractor shall develop a Site Specific Safety Plan and an Activity
Hazard Analysis AHA per EM 385-1-1. An AHA shall be prepared by the contractor performing the work. The AHA shall define the steps performed within the activity, and identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented. The names of the qualified person(s) required for a particular activity shall be identified and included in the AHA, as well as proof of their competency/qualification. The Contractor shall coordinate with the USACE technical POC to develop and provide the AHA, and host a pre-work safety briefing before safety barrier installation work commences. The AHA shall be developed to the extent possible with information available prior to the work activity and submitted to the USACE as a draft no less than four (4) days prior to the commencing work. The AHA shall be completed on site by the Contractor with USACE and facility POC input, reviewed and signed by all applicable parties at the pre-work safety briefing prior to the commencing work. Samples of Site Specific Safety Plans and AHAs are available in the EM 385-1-1, current version.
9.2. COVID-19 Plan: Contractor shall develop and submit a comprehensive COVID-19 exposure control, mitigation, and recovery plan. The requirements of the plan are found in the COVID Business Activity Guidelines for Construction as identified in Section 2.12.
9.3. Truck Specs: Contractor shall submit the specification of each truck, documenting that they meet the requirements identified in Section 4 of this PWS.
9.4. Driver Info: A background check must be performed on each driver. For each driver, the contractor must submit a copy of a government issued ID along with a filled out Standard Form 86.
A Copy of their CDL must also be submitted.
9.5. All submittals must be sent to the PM via email.
10. PERFORMANCE PERIOD:
10.1. The Contractor is required to commence work under this contract within ten (10) calendar days after the award of the contract. The period of performance will begin on the award date and conclude after 120 days.
10.2. The Government may choose to award all or none of the Option Items. The Optional Items may be awarded at the same time as the base items or any time within 90 days of the initial award.
Award of the Optional Items will not extend the period of performance.
11. POINTS OF CONTACT:
Project Manager – Vyacheslav Govorushkin Phone: (206) 764-6748
Vyacheslav.v.govorushkin@usace.army.mil mailto:Vyacheslav.v.govorushkin@usace.army.mil
Attachment 01
QUALITY ASSURANCE SURVEILLANCE PLAN
For Mud Mountain Dam Fish Passage Facility
Fish Transportation Services U.S. Army Corps of Engineers Seattle District (USACE-NWS)
Contract Description: Trucking services to transport live fish from the MMD Fish Passage Facility to the release site. Contractor will provide trucks with drivers and will haul government owned fish transport trailers.
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored
• How monitoring will take place
• Who will conduct the monitoring
• How monitoring efforts and results will be documented
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis.
However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type: 52.246-4 Inspection of Services – Fixed- Price
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
b. Acquisition Manager (AM) - The AM acts as an acquisition consultant and serves as liaison between the USACE and the requesting program office, as well as liaison between the USACE and the supporting contracting office.
c. Quality Assurance Represented (QAR): The QAR monitors all technical aspects of the contract and assists in contract administration. The QAR is authorized to perform the following functions; assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; monitor Contractor's performance and notifies both the
Contracting Officer and Contractor of any deficiencies, coordinate availability of government furnished party; and provide site entry of Contractor personnel. The QAR is not authorized to change any of the terms and conditions of the resulting order.
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract:
a. Program Manager – To Be Determined Telephone: To Be Determined Email: To Be Determined
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix identifies performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective Standard Performance Threshold
Method of Surveillance
PRS # 1.
The contractor shall provide all labor, equipment, materials and supplies necessary to haul government owned fish transport trailers
Safely and efficiently, perform cyclical duties of transporting fish from the Fish Passage Facility to the release site in a timely matter.
Zero deviation from standard.
Periodic Inspections:
QAR will be onsite weekly inspecting during trucking operations
PRS #2.
The contractor shall meet the mobilization and demobilization requirements as identified in the SOW
Mobilize truck and driver within 24 hours of a request from the government. Demobilize truck and driver within 12 hours of request from a government.
Zero deviation from standard
Periodic Inspections:
QAR will be onsite weekly inspecting during trucking operations
DELIVERABLES SCHEDULE
Contractor shall submit the following documents.
Deliverable Frequency # of Copies Medium/Format Submit To Site Specific Safety Plan
Once 1 Electronic Format
(PDF)
ATTN:
Slava Govorushkin Vyacheslav.V.Govorushki n@usace.army.mil COVID Plan Once 1 Electronic Format
(PDF)
Driver’s Documentation
Once per driver One per driver Electronic Format
(PDF)
Truck Specifications
Once per truck Once per truck Electronic Format
(PDF)
5. INCENTIVES: NA
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The QAR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the QAR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem.
The QAR, with assistance from the onsite USACE employees, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard.
a. PERIODIC INSPECTION - Periodic Inspections of the quality and the status of the project may be scheduled daily or unscheduled, as required.
b. VALIDATED COMPLAINTS - Upon notification of a valid complaint the QAR will complete an inspection.
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the KO’s actions.
8. RATINGS
mailto:Vyacheslav.V.Govorushkin@usace.army.mil mailto:Vyacheslav.V.Govorushkin@usace.army.mil
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
• EXCEPTIONAL: Performance significantly exceeds contract requirements to the Government’s benefit.
• SATISFACTORY: Performance meets contractual requirements.
• UNSATISFACTORY: Performance does not meet contractual requirements.
9. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the QAR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the QAR shall document the discussion and place it file.
When the QAR determines formal written communication is required, the QAR will contact the Contracting Specialist and Contracting Officer. Contracting will prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to Contracting and QAR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.
10. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement. During contract/order performance, the QAR shall take periodic measurements, as specified in the PRS matrix identified in section 4, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
Prepared by:
Vyacheslav Govorushkin, Civil Engineer
Signature – Operations Division - Technical Support - Project Support o f
Attachment 2 Fish Transport Trailer
Image of Fish Transport Trailer
Data Plate for Fish Transport Trailer
Attachment 03: Fish Release Chute
Image of Fish Release Shoot at the Fish Release Site
Attachment 4: Travel Route
Route to Fish Release Site Route to Fish Passage Facility
1) Head north toward SE Mud Mountain Rd (0.3 miles) 1) Return on route taken to the Release Site
2) Turn left onto SE Mud Mountain Rd (0.3 miles)
3) Turn right onto 248th Ave SE (0.6 miles)
4) Continue onto SE 464th St (1.0 miles)
5) Turn left onto 268th Ave SE (0.5 miles)
6) Continue onto Blake St (0.5 miles)
7) Turn right onto WA-410 E/Roosevelt Ave (7.4 miles)
8) Turn right onto Bridge Lamp Rd (0.8 miles)
Attachment 05 Equipment Safety Checklists
MACHINERY AND MOBILE EQUIPMENT
(BACKHOES, DOZERS, SCRAPERS, EXCAVATORS, LIFT TRUCKS, etc.)
Contract Name and Number:
Contractor/Subcontractor:
Contractor Inspector:
Location:
Equipment name and number
Date:
Complete one checklist for each piece of equipment daily YES NO N/A
1. Where reduced visibility warrants, has all equipment been provided with additional lights or reflective markings? (18.A.05)
2. Are initial and daily/shift inspection records available? (18.A.03)
3. When machinery or equipment is found to be unsafe or when a deficiency which affects the safe operation of equipment is observed, is the equipment immediately taken out of service and its use prohibited until unsafe conditions have been corrected? (18.A.04)
4. Is machinery or equipment operated only by designated personnel?
(18.G.06)
5. Have inspections or determinations of road conditions and structures been made in advance to assure that clearances and load capacities are safe for the passage or placing any machinery or equipment? (18.G.08)
6. Are seats or equal protection provided for each person required to ride on the equipment? (18.G.01)
7. Is equipment operating on streets and highways equipped with headlights, taillights, brake lights, back light, and turn signals (visible from front and rear) and are they functioning? (18.A.05)
8. Is all equipment equipped with operable windshield wipers, and defrosting or defogging equipment and are they functioning? (18.A.03)
9. Does the unit have an emergency brake which will automatically stop the equipment upon brake failure? Is this system manually operable from the driver’s position? (18.B.04)
10. Is all maintenance (including preventive maintenance) and repairs done in accordance with the manufacturer’s recommendations and is it documented? (18.G.25)
11. Has adequate ventilation been provided when equipment powered by internal combustion engines is operating in enclosed areas? (18.G.14)
12. Are all vehicles which will be parked or moving slower than normal traffic on haul roads equipped with a yellow flashing light or flasher visible from all directions? (18.G.15)
13. Is all mechanized equipment shut down before and during refueling?
(18.G.10)
14. Are all towing devices used on any combination of equipment structurally adequate for the weight drawn and securely mounted? (18.G.28)
15. Have the wheels been chocked or track mechanisms blocked and the parking brake set when equipment is parked on an incline? (18.G.28)
16. Does the unit have a dry chemical or carbon-dioxide fire extinguisher with a minimum rating of 5-B C? (18.G.23)
17. Is there an effective, working reverse alarm? (18.B.01)
18. Is protection against hot surfaces, exhausts, etc., provided? (18.B.03)
19. Are platforms, foot walks, steps, handholds, guardrails, and toeboards designed, constructed, and installed on machinery and equipment to provide safe footing and access ways? (18.B.03)
20. Are exhaust or discharges from equipment directed so they do not endanger persons or obstruct operator vision? (18.B.06)
21. Are seatbelts installed and worn in all motor vehicles? (18.B.09)
22. Is roll over protection provided? (18.B.13)
23. Prior to each use, but no more often than daily, vehicles/equipment shall be checked by the operator to assure that the following parts, equipment, and accessories (as applicable) are in safe operating condition and free of apparent damage that could cause failure while in use: service brakes including trailer brake connections, parking system, emergency stopping system, tires, horns, steering mechanism, coupling devices, seat belts, operating controls, safety devices, accessories (lights, reflectors, windshield wipers, defrost, etc.). (18.A.03)
*Any defects identified should be immediately communicated to the contractor subcontractor as well as a government representative. Equipment shall not be operated until deficiencies are resolved. *
Comments:
| SF30_21Q0045_Amend 1 |
| Responses to Fish Transport questions_15 June |
| A.02.11 - PWS MMD FPF Fish Trasportation_15JUNE for Amed 1 |
| A.02.11 - PWS_Attachment 2 Fish Transport Trailer (updated 15 June for Amend 1) |
| Attachment 2 Fish Transport Trailer |
| MUD MOUNTAIN 5200 Gallon Fish Transport specs |
| Image of Fish Transport Trailer |
Data Plate
| A.02.11 - PWS_Attachment 3 Fish Release Chute |
| Release site chute shop drawings |
| 24388-40 thru 60 Rev A.pdf |
| 17311B40-03 |
| 40RevA |
| 41RevA |
| 17311B45-01 |
| 45RevA |
| 17311B46-01 |
| 46RevA |
| 47RevA |
Fish Release Chute
| A.02.11 - PWS_Attachment 4 Travel Route |
| A.02.11 - PWS_Attachment 5 Equipment Safety Check |