This document summarizes a federal construction solicitation for maintenance dredging of the Snohomish River navigation channel in Everett, Washington. The U.S. Army Corps of Engineers, Seattle District is seeking a contractor to perform hydraulic dredging of approximately 140,000 cubic yards of sediment for placement at two upland sites. Work must be completed between October 16, 2021 and February 14, 2022. The solicitation is for a firm-fixed-price contract with an estimated value between $1 million and $5 million under NAICS code 237990. Interested parties must be registered in the System for Award Management database and check the website for any solicitation updates, as the government is not responsible for ensuring access. Bids are due as detailed on the solicitation, with a virtual bid opening.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW21B0002 ABSTRACT_Snohomish_Everett Dredging (Final).pdf | ||
| One organized site visit is scheduled as follows.docx | DOCX document | |
| W912DW21B0002R0001- Snohomish Everett Dredging (Final).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB No. W912DW21B0002
Seattle District
FY21 Snohomish/Everett Hydraulic Dredging
Construction Solicitation and Specifications
July 2021
DB-SP JOB # 21004
This requirement is Unrestricted.
Furnish all labor, materials, and equipment to perform all w ork for FY21 Snohomish/Everett Maintenance Dredging in accordance w ith the attached contract provisions, clauses, and technical specif ications.
IMPORTANT NOTE: Please see the Table of Contents for detailed instructions on bid submittal and bid opening procedures.
X
GREGORY COOK 206 764-6692
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
21-Jul-2021
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______14 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________24 Aug 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
206-764-6817FAX:TEL: TEL: FAX:
W912DW21B0002 49
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912DW21B0002
TABLE OF CONTENTS
CAUTION TO BIDDERS
SECTION TITLE
SF1442
00 21 00
Solicitation, Offer, and Award
Instructions
00 45 00 Representations and Certifications
00 72 00 Contract Clauses
00 73 00 Davis-Bacon General Wage Decision No. WA80
00 00 00 Technical Specifications: 01 00 00 thru 35 20 23-A
RETURN THE FOLLOWING WITH YOUR BID:
SF1442 - Solicitation, Offer, and Award
Bid Bond -- The amount of the bid guarantee shall be 20 percent (20%) of the bid price or $3 Million, whichever is less. Bid Bonds (SF24) must be accompanied by a Power of Attorney containing an original or electronic signature from the surety, which must be affixed to the Power of Attorney after the Power of Attorney has been generated. Computer generated and signed Powers of Attorney will be accepted if accompanied by a certification from a current officer of the surety attesting to its authenticity and continuing validity.
NOTE: Digital scans, or photographed or otherwise reproduced images, of ink signatures are not considered acceptable "electronic signatures." If a required submitted document does not contain electronic signatures, you must submit original hard-copy documents.
Current SF24 forms are available at the following website: http://www.gsa.gov/portal/forms/type/TOP.
Unless specified, the following information does not need to be submitted with your bid, BUT it is required to be completed before the contract can be awarded:
Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled System for Award Management (SAM) and that all information required is current and up to date. https://www.sam.gov/portal/public/SAM/ http://www.gsa.gov/portal/forms/type/TOP https://www.sam.gov/portal/public/SAM/
! ! ! C A U T I O N TO B I D D E R S ! ! !
1. BUSINESS HOURS: For the Seattle District Corps of Engineers are from 7:30 A.M. to 4:00 P.M. Pacific Time, Monday through Friday.
BEFORE SIGNING AND SUBMITTING THIS OFFER, PLEASE TAKE NOTE OF THE
FOLLOWING, AS FAILURE TO PERFORM ANY ONE OF THESE ACTIONS MAY CAUSE YOUR
OFFER TO BE REJECTED
2. AMENDMENTS: Have you acknowledged receipt of ALL amendments? If in doubt as to the number of amendments issued, please contact the representative listed on the Information Page.
3. AMENDED SECTIONS: If any of the amendments furnished amended sections, the amended sections must be used in submitting your offer.
4. MISTAKE IN OFFER: Have you reviewed your offer price for possible errors in calculation or work left out?
5. OFFER ACCEPTANCE PERIOD: The minimum offer acceptance period is specified in block 13D of SF1442, Solicitation, Offer and Award. Please ensure that you allow at least the stated number of calendar days for the Government to accept your offer.
6. SYSTEM FOR AWARD MANAGEMENT: Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled System for Award Management (SAM) and that all information required is current and up to date. https://www.sam.gov/portal/public/SAM/
7. GOVERNMENT SECURITY REQUIREMENTS:
The Offeror’s bid shall be submitted electronically, as described below in Item 9, Bid Submittals. The IFB will provide the receipt date for bid submittal. The Offeror’s bid shall not contain classified data. The use of hyperlinks in bids in prohibited.
NOTE: The only authorized transmission method for bids in response to this solicitation is electronically via DoD SAFE online submission. NO OTHER TRANSMISSION METHODS (E-MAIL, FACSIMILE, REGULAR
MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
8. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS:
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the U.S. Government’s Contract Opportunities website at: https://SAM.gov under Solicitation Number W912DW21B0002. A list of interested vendors (potential offerors and subcontractors) is available on the web site (registration required) with the solicitation announcement.
NOTE: SAM.gov is the official U.S. Government website for Contract Opportunities.
It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the bid all requested information specified in this solicitation.
Additional information regarding this solicitation and potential Offerors and/or subcontractors is available at https://www.sam.gov/portal/public/SAM/ https://sam.gov/ http://www.nws.usace.army.mil/BusinessWithUs/Contracting.aspx.
9. Bid Submittals
In strict compliance with guidance relating to the current situation with COVID-19 and social distancing, the only authorized transmission method for bids in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (E-MAIL, FACSIMILE, REGULAR MAIL, HAND
CARRIED, ETC.) WILL BE ACCEPTED.
The Offeror’s bid must be received by the Government by the date/time specified in the solicitation. Offerors shall e-mail their bids using the link provided in the response email from the Contract Specialist. Please send bids to Contract Specialist Gregory Cook at gregory.a.cook@usace.army.mil AND to Contracting Officer Scott Britt at scotty.w.britt@usace.army.mil.
In the absence of an email from the Contract Specialist, you may access DoD SAFE at the following link:
https://safe.apps.mil
*** Please do NOT encrypt your file with a passphrase because there will not be enough time, between the cutoff time for receipt of bids and the bid opening, to communicate the passphrase to the Government.
INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS:
In an effort to reduce paperwork and cost, all bids shall be submitted electronically through the SAFE site.
Submission shall be in Adobe PDF format. You are limited to twenty-five (25) maximum files per upload (total size cannot exceed 8GB). If you have a large number of files, it is recommended that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
REQUEST FOR UPLOAD CODE/LINK: Offerors must email Contract Specialist Gregory Cook at Gregory.a.cook@usace.army.mil AND Contracting Officer Scott Britt at scotty.w.britt@usace.army.mil no later than five (5) working days prior to the bid due date to receive an email which will contain a link that will allow for file uploads via the SAFE site. Offerors that fail to e-mail for a request code five (5) working days before the bid submission date may not be able to receive the email that will contain the link required to upload their submission.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the e-mail notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identifiable Information (PII) in the File Description).
FILE NAMING CONVENTION: Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description. Please see examples below. To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
W912DW21B0002-FIRMNAME-Bid W912DW21B0002-FIRMNAME-Amendments W912DW21B0002-FIRMNAME-Bid Bonds http://www.nws.usace.army.mil/BusinessWithUs/Contracting.aspx mailto:gregory.a.cook@usace.army.mil mailto:scotty.w.britt@usace.army.mil https://safe.apps.mil/
A completed bid includes:
- Fully executed Form 1442-with amendments acknowledged
- Bid Bond
- Fully completed Bid Schedule
- Completed Reps and Certs from @SAM.GOV and any fill in FAR clause incorporated by reference or by full text. Submission shall be in Adobe PDF format.
INSTRUCTIONS IF RESPONDING TO EMAIL FROM SPECIALIST (PREFERRED METHOD):
1. If you received an upload link from the Contract Specialist, the e-mail address of the Government Employee who initiated the request code will be automatically entered. The Proposer must enter the e-mail address for both the Contracting Officer and Specialist. The Proposer can enter an additional e-mail address if desired. After entering the e-mail address, click the ADD button to add the person(s) e-mail to the “Recipients List” of your response. When your bid is submitted, a notification will be sent to the recipients you added.
2. Click on the “Click to Add Files or Drag Them Here” button to add your files.
3. Click on the “Drop-off Files” button to send your files to the Contract Specialist.
4. If successful, you will be directed to a screen that shows your drop-off was completed. You will also receive a confirmation email showing your files were picked up. NOTE: Files will not be picked up until after the due date and time for receipt of bids.
*** Please do NOT encrypt your file with a passphrase because there will not be enough time, between the cutoff time for receipt of bids and the bid opening, to communicate the passphrase to the Government.
INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE IF NOT USING UPLOAD LINK:
1. Once at the SAFE website, select the “Drop-Off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.
2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and e-mail settings.
3. When completing your file information for transmittal via the SAFE website, you will be required to enter the e-mail address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation is gregory.a.cook@usace.army.mil and the Contracting Officer is scotty.w.britt@usace.army.mil.
4. Even if you successfully upload your bid to the SAFE site, notification will not be sent to the government recipients until you verify your e-mail address. Entering an incorrect e-mail may result in the rejection of your submission for lateness. A Bidder can confirm proper submission on the “Drop-Off Completed” screen which generates a confirmation based on proper file submission.
mailto:gregory.a.cook@usace.army.mil file://NWS-AS01DFS/NWS/Public-Project/CT-PROJECT/CT-C%20Backup%20for%20Greg/FY20%20GH%20Breakwater%20A/Solicitation/scotty.w.britt@usace.army.mil
NOTE: Do NOT send the SAFE site packages to group e-mail accounts. It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.
RECEIPT OF SUBMISSIONS:
For the purposes of establishing whether a bid submission is considered timely, the government considers the date and time the submission is completely uploaded into the SAFE website. For bids larger than the 2GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
10. BID OPENING PROCEDURE- The virtual bid opening will occur 30 minutes after the due date and time for receipt of bids to allow for the downloading of bids from the DoD SAFE site. Virtual bid opening is scheduled for 24 August 2021 at 10:30 AM Pacific Time. Please use the following information:
The link to join the meeting /view on-line is:
https://usace1.webex.com/usace1/j.php?MTID=m6d401cd196e460e26d77a918ccd64baa
Meeting number (access code): 199 387 3318 Meeting password: BBjsDcY@926
NOTE: It has been reported the ‘Call Me’ function is the simplest way to connect audio to the meeting. Please use this function if it is provided. Instructions for the ‘Call Me’ function- 1) Enter your phone number. 2) The system will immediately call the number you entered. 3) Answer and follow the prompts to join the meeting.
Join by phone
+1-844-800-2712 US Toll Free +1-669-234-1177 US Toll
Access code: 199 387 3318
*** Please note the Access Code is also the Security Code so you will have to enter the Access Code twice when connecting by phone. The bid opening will begin promptly at 10:30 AM so please allow time for connecting by audio and/or resolving any technical difficulties before the beginning of proceedings.
11. BID EXPENSES AND PRE-CONTRACT COSTS
This Invitation for Bid (IFB) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a bid.
12. ACCURACY IN BIDS
Bids must set forth full, accurate, and complete information as required by this IFB, (including attachments).
The penalty for making false statements is prescribed in 18 U.S.C. 1001.
13. BASIS OF AWARD
Per FAR 14.408-1(a)(3), award will be made to the responsible bidder whose bid, responsive to the invitation, will be most advantageous to the Government, considering only price and the price-related https://usace1.webex.com/usace1/j.php?MTID=m6d401cd196e460e26d77a918ccd64baa factors included in the invitation. Award shall not be made until all required approvals have been obtained and the award otherwise conforms to FAR 14.103-2.
THIS PROCUREMENT IS: Unrestricted
SITE VISIT:
BIDDING DOCUMENTS: Register for solicitations at the Internet site: http://www.SAM.gov/
FOR INQUIRIES AND ADMINISTRATIVE MATTERS: Contact the following individuals Monday through Friday between the hours of 7:00 a.m. and 2:30 P.M. Pacific Time:
Gregory Cook, 206-764-6692, Gregory.a.cook@usace.army.mil AND Sonia Frees, 206-764-3516, Sonia.m.frees@usace.army.mil
TECHNICAL QUESTIONS:
All inquiries regarding this solicitation are to be submitted via ProjNet-Bidsm. Telephone and email inquiries will not be accepted. ProjNet-Bidsm is a web-based program that allows bidders to post questions regarding the solicitation and to view all questions by other bidders and answers by USACE. ProjNet-Bidsm can be accessed through ProjNetsm at https://www.projnet.org To access the ProjNet-Bidsm website the first time:
1) Click the Bid tab
2) Click Bidder Inquiry. (The Agency is USACE.)
3). a) Enter the following information for access:
1. The Bidder Inquiry Key: WXKF78-DW76Q6
2. Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). (required on first project only)
3. Establish Secret Question and Answer which will be used as a password (required on first project only) . b) For subsequent access use your email address, the Bid Inquiry Key and response to the Secret Question to access the ProjNet-Bidsm Module.
4) Submit technical questions. When an answer is posted to a question, the question and answer is then available for all other bidders to review.
5) For questions about ProjNet-Bid, please contact the Call Center help desk from 8AM to 5PM CST:
ProjNet Call Center numbers: 833-389-1097 and 217-367-3273 or email: staff@projnet.info (preferred).
No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bidsm prior to bid submission. Nothing in the solicitation is changed unless an amendment is sent out.
• BIDDERS ARE URGED and expected to inspect the site where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract, to the extent, such information is reasonably obtainable. In no event, will a failure to inspect the site constitute grounds for withdrawal of a bid after opening or for a claim after award of the contract.
http://www.sam.gov/ mailto:Gregory.a.cook@usace.army.mil mailto:Sonia.m.frees@usace.army.mil https://www.projnet.org/
IF THE CONTRACTOR IS A CORPORATION OR PARTNERSHIP, THE APPLICABLE
PORTION OF THE FORM LISTED BELOW MUST BE COMPLETED. IN THE
ALTERNATIVE, OTHER EVIDENCE MUST BE SUBMITTED TO SUBSTANTIATE THE
AUTHORITY OF THE PERSON SIGNING THE CONTRACT. IF A CORPORATION, THE
SAME OFFICER SHALL NOT EXECUTE BOTH THE CONTRACT AND THE
CERTIFICATE.
CORPORATE CERTIFICATE
I, , certify that I am the Secretary of the Corporation named as Contractor herein; that , who signed this contract on behalf of the Contractor was then of said corporation; that said contract was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.
(CORPORATE
(Secretary) SEAL)
AUTHORITY TO BIND PARTNERSHIP
This is to certify that the names and signatures of all partners are listed below and that the person signing the contract has authority actually to bind the partnership pursuant to its partnership agreements. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership with the United States of America, except as follows: (state "none" or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to, and acknowledged by, the Contracting Officer.
(Names and Signatures of all
Partners)
NAME SIGNATURE
FY21 Snohomish River Hydraulic Dredging 21004 Everett, WA
W912DW21B0002 00 11 00-1
BID SCHEDULE
ITEM
NO. DESCRIPTION OF ITEM
ESTIMATED
QUANTITY
(Note 1) UNIT
UNIT
PRICE AMOUNT
BASE ITEMS
1000 Mobilization and Demobilization 1 JOB $__________ $__________
Hydraulic Pipeline Dredge Sediment - Sta. 90+00 to 115+00 to a depth of -8 feet plus 2 foot OD, Placement/Dewatering of dredge at the Jetty Island Placement Area.
20,000 CY $__________ $__________
Hydraulic Pipeline Dredge Sediment - Sta. 337+07 to 354+47 (Upstream Settling Basin) to a depth of - 14 feet plus 2 foot OD with disposal at the Parcel “O” Upland Disposal Site.
85,000 CY $__________ $__________
TOTAL AMOUNT BASE ITEMS: $ __________________
OPTIONAL ITEMS
(Note 2)
Hydraulic Pipeline Dredge Sediment - Sta. 90+00 to 115+00 to a depth of -8 feet plus 2 foot OD, Placement/Dewatering of dredge at the Jetty Island Placement Area.
(Note 2)
Hydraulic dredging and placement at the Jetty island (Sta. 90+00 to 115+00) 5,000 CY $___________ $__________
(Note 2)
Hydraulic dredging and placement at the Jetty island (Sta. 90+00 to 115+00) 3,000 CY $___________ $__________
(Note 3)
Pipeline Dredge Sediment - Sta. 337+07 to 354+47 (Upstream Settling Basin) to a depth of -14 feet plus 2 foot OD with Hydraulic disposal at the Parcel “O” Upland Disposal Site.
(Note 3)
Hydraulic dredging and placement at the Parcel “O” Upland Disposal Site (Sta. 337+07 to 354+47) 9,000 CY $__________ $__________
(Note 3)
Hydraulic dredging and placement at the Parcel “O” Upland Disposal Site (Sta. 337+07 to 354+47) 6,000 CY $__________ $__________
FY21 Snohomish River Hydraulic Dredging 21004 Everett, WA
W912DW21B0002 00 11 00-2
ITEM
NO. DESCRIPTION OF ITEM
ESTIMATED
QUANTITY
(Note 1) UNIT
UNIT
PRICE AMOUNT
(Note 4)
Hydraulic Pipeline Dredge Sediment - Sta. 89+50 to 90+00 (Lower Settling Basin) to a depth of -20 feet plus 2 foot OD, Placement/Dewatering of dredge at the Jetty Island Placement Area.
(Note 4)
Hydraulic dredging and placement at the Jetty island (Sta. 89+50 to 90+00) 6,000 CY $__________ $__________
(Note 4)
Hydraulic dredging and placement at the Jetty island (Sta. 89+50 to 90+00) 6,000 CY $__________ $__________
TOTAL AMOUNT OPTION ITEMS: $ __________________
TOTAL AMOUNT BASE & OPTION ITEMS: $ __________________
NOTE NO. 1. Quantities are estimated except where shown as “JOB” or “DAY”.
NOTE NO. 2. Option Item No. 4101 Item is the first subdivided item and Item No 4102 is the second subdivided item under Item No. 4100.
NOTE NO. 3. Option Item No. 5101 Item is the first subdivided item and Item No 5102 is the second subdivided item under Item No. 5100.
NOTE NO. 4. Option Item No. 6101 Item is the first subdivided item and Item No 6102 is the second subdivided item under Item No. 6100.
1. To facilitate the receipt and bid process, all responses shall be submitted on the latest Bid Schedule as published in the solicitation or the latest amendment thereto. All amendments must be acknowleged.
2. Bids shall not be submitted for quantities less than those specified for each line item.
3. Offerors must insert a price on all numbered items of the Price Schedule. Failure to include pricing for all quantities of all line items will result in rejection of the bid as non-responsive.
4. The contract price will be evaluated based on the total price of all options exercised the maximum number of times, added to the total price of the base items.
DEFINITIONS FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
CY = cubic yards OD = Allowable Paid Overdepth
--END OF SECTION--
Section 00 21 00 - Instructions
MAGNITUDE OF CONSTRUCTION
The magnitude of construction is estimated to be between $1 million and $5 million.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
JUL 2018
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
OCT 2020
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.233-3 Protest After Award AUG 1996
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
7.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Washington State, Snohomish County, City of Everett.
52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (FEB 2021)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if--
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
___ [Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) \*\ Item 1:
Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___ Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___ Item 2:
Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___
Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___ [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.]
(End of clause)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
US Army, Corps of Engineers, Seattle District
Contracting Officer Scott Britt Email: Scotty.W.Britt@usace.army.mil
AND
Contract Specialist Gregory Cook Email: Gregory.A.Cook@usace.army.mil
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov is the site for the following clauses in full text: Federal Acquisition Regulation (FAR) clauses, Department of Defense FAR Supplement (DFARS) clauses, Army FAR Supplement (AFARS) clauses and current authorized deviations.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov is the site for the following clauses in full text: Federal Acquisition Regulation (FAR) clauses, Department of Defense FAR Supplement (DFARS) clauses, Army FAR Supplement (AFARS) clauses and current authorized deviations.
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Alterations, if applicable, will be incorporated by solicitation amendment.
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
INDEX OF DRAWINGS
Condition survey drawings are based on the latest post-dredge and condition surveys available and are provided show conditions on the dates shown. These drawings are furnished for information only and the Government does not warrant that conditions will be exactly as shown.
Minor deviations can be anticipated and shall not be the basis for a claim for extra compensation.
Drawings showing condition surveys and cross section sheets are furnished for information only.
DRAWING
FILE NO.
SHEET
NUMBER
PLATE
NUMBER TITLE
E-2-8-342 1 G-001 Title, Vicinity Map, and Drawing Index E-2-8-342 2 G-101 General Plan E-2-8-342 3 CN501 Snohomish River Channel, Sta. 85+50 to Sta. 90+00 and Sta. 90+00 to 115+00 E-2-8-342 4 CN502 Snohomish River Channel, Sta. 335+50 to 355+79 and Typical Sections E-2-8-342 5 CN301 Sections and Details
E-2-8-342 6 CN302 Sections and Details E-2-8-342 7 VH401 General Plan for Representative Condition Surveys
REFERENCE DRAWINGS
Reference drawings provided show conditions at time of construction or as specified. These drawings are furnished for information only and the Government does not warrant that conditions will be exactly as shown. Minor deviations can be anticipated and shall not be the basis for a claim for extra compensation.
DRAWING
FILE NO.
SHEET TITLE
E-2-8-341 2 Snohomish Channel, ES 01 EHS 20210217 CS E 2-8-341 E-2-8-341 3 Snohomish Channel, ES 01 EHS 20210217 CS E 2-8-341 E-2-8-341 4 Snohomish Channel, ES 01 EHS 20210217 CS E 2-8-341 E-2-8-341 5 Snohomish Channel, ES 01 EHS 20210217 CS E 2-8-341 E-2-8-341 6 Snohomish Channel, ES 01 EHS 20210217 CS E 2-8-341 E-2-8-341 7 Snohomish Channel, ES 01 EHS 20210217 CS E 2-8-341
Section 00 45 00 - Representations and Certifications
PREAWARD INFORMATION
SUBMIT THE FOLLOWING INFORMATION WITH YOUR BID
NOTICE TO BIDDERS REGARDING PRE-AWARD INFORMATION
1. Company Name and Address:
2. Point of Contact Name:
Email address:
Telephone Number: Fax Number:
3. Electronic Transfer Payments will now be required for all new contracts. Do you currently receive
Electronic Transfer Payments from this agency? (agency codes 00005524/00006482) Yes No
4. Name of Bank and Branch:
Personal Banker:
Email address:
Telephone Number: Fax Number:
5. Name of Bonding Agent Company:
Agents Name:
Telephone Number: Fax Number:
6. Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled System for Award Management (SAM) and that all information required is current and up to date.
https://www.sam.gov/SAM/.
Ensure that your company’s information is updated for the following areas:
CORE DATA: Ensure that your business types are correctly filled in:
What is your business type?
(Examples of Business types: Small Business (SB), Small Disadvantaged Business (SDB), Woman- Owned Small Business (WOSB), Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small
Business (VOSB),…