W912DW20Q0059 Amendment 0001.pdf
PDF 2 MB Posted
- Attached to
- Libby Dam Control Room Consoles Federal contract opportunity
- Solicitation number
- W912DW20Q0059
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW20Q0059 LD Control Room Consoles.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to include the answ ers to questions received, add Control Room Console layout and elevations and extend the quotation due date from 17 August 2020 to 24 August 2020 10:00 AM PST.All other conditions of the solicitation remain unchanged. Please refer to continuation page for additional information.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW20Q0059
X 9B. DATED (SEE ITEM 11)
27-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2020
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW20Q0059
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Libby Dam Control Room Consoles Q &A
Q-1: The drawings show a Mobile Cabinet and Flip Counter, however it is not mentioned in the specifications.
Should the Mobile Cabinet and Flip Counter be priced?
A-1: No, the Mobile Cabinet and Flip Counter are not part of this purchase.
Q-2: Is the design intent of the “J” and Straight Consoles to be a Factory Built Particle Board and PLAM Diewall with Plam Counter Tops on a level grade? If so, the diewall will be produced in multiple pieces for final field assembly – Please confirm.
A-2: Yes. Yes-multiple pieces for final assembly (as few as possible).
Q-3: Is the “Ultimate Slat” material to be applied to the worker side of the diewall only?
A-3: Yes- “Ultimate Slat” material to be applied to the worker side of the diewall only.
Q-4: The spec calls out a data/power grommet. Do you know exactly what they want in that? Power, USB, HDMI, RJ45 etc…?
A-4: Data/power grommet- 4- Port Grommet with (2) Power outlets, (1) USB 2-Port Simplex Charger & (1) RJ45, CAT 6 Data Jack or approved equal.
Q-5: The specifications call out for surge protected power bars. Can racks be mounted in the base of the console?
A-5: Surge protected power bars – add rack mounts in the base of the console.
Q-6: Specifications call out accommodation of CPUs. Will doors with CPU shelves attached that are steel based and not high pressure laminate work?
A-6: No. Provide high pressure laminate as specified in the solicitation specifications.
Q-7: Can the slat wall be substituted with a less expensive sight-line console with the same base structure minus the slat wall?
A-7: Provide slat wall as specified in the solicitation.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-Aug-2020 10:00 AM to 24-Aug-2020 10:00 AM.
(End of Summary of Changes)