W912DW19B0007-_Duwamish__ABSTRACT_signed.pdf

PDF 226 KB Posted

Attached to
Duwamish River Dredging / Seattle Washington Federal contract opportunity
Solicitation number
W912DW19B0007
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

W912DW19B0007_Bid Abstract

View the file

Other files for this federal contract opportunity

Other files attached to Duwamish River Dredging / Seattle Washington, newest first.
File Type Posted
W912DW19B0007_R0001_Duwamish_Dredging.pdf PDF
W912DW19B0007-FY19_Duwamish_Dredging_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. Solicitation No. W912DW19B0007

2. Date Issued: 02 Aug 2019

3. Date Opened: 05 Sep 2019

4. Issuing Office:

Department of the Army Corps of Engineers, Seattle District P.O. Box 3755 Seattle, WA 98124-2255

6. Number of Amendments Issued: 1

1st Apparent low = American Construction Co. Inc., $807,750.00.

% Difference From GE: -41%

2nd Apparent low = Curtin Maritime Corp, $988,500.00.

% Difference From GE: -21%

3rd Apparent low = HME Construction, Inc., $1,463,750.00.

% Difference From GE: 18%

SIGNATURE: Bid Opening Officer: Gregory Cook

5. Project Title:

FY19 Duwamish Maintenance Dredging, Seattle, WA

Small Business Set Aside

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

OFFERS

NO. 1 NO. 2 NO. 3 NO. 4

A. Company: American Construction Co. Inc. A. Company: Curtin Maritime Corp. A. Company: HME Construction, Inc. A. Company: Western Marine Construction, Inc.

Address: 1501 Taylor Way Address: 1500 Pier C Street Berth 57 Address: 6801 NW Old Lower River Road Address: 2775 Harbor Ave SW, Suite A City, State: Tacoma, WA 98421 City, State: Long Beach, CA 90813 City, State: Vancouver, WA 98660 City, State: Seattle, WA 98126 email: kevinc@americanconstco.com (253) 254-0118 email: kelly@curtinmaritime.com (562) 983-7257 email: greg.speyer@hmeconst.com (360) 695-4553 email: patrick@wmc2775 (206) 622-9161

B. Bid Security Type/Amt : 20% Bid Bond-Yes B. Bid Security Type/Amt : 20% Bid Bond _Yes B. Bid Security Type/Amt : 20% Bid Bond - Yes B. Bid Security Type/Amt : 20% Bid Bond-Yes Business Size: SB Business Size: SB Business Size: SB Business Size: SB

C. Amendments Acknowledged: 1 C. Amendments Acknowledged: 1 C. Amendments Acknowledged: 1 C. Amendments Acknowledged: 1

D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT

NO. QTY PRICE NO. QTY PRICE NO. QTY PRICE NO. QTY PRICE

BASE

ITEMS BASE ITEMS BASE ITEMS BASE ITEMS

1000 1 176,500.00$ 176,500.00$ 1000 1 370,000.00$ 370,000.00$ 1000 1 756,000.00$ 756,000.00$ 1000 1 550,000.00$ 550,000.00$ 2000 40000 7.50$ 300,000.00$ 2000 40000 10.00$ 400,000.00$ 2000 40000 8.00$ 320,000.00$ 2000 40000 12.00$ 480,000.00$ 3000 15000 7.50$ 112,500.00$ 3000 15000 10.00$ 150,000.00$ 3000 15000 8.25$ 123,750.00$ 3000 15000 12.00$ 180,000.00$ 4000 5 250.00$ 1,250.00$ 4000 5 3,000.00$ 15,000.00$ 4000 5 2,000.00$ 10,000.00$ 4000 5 300.00$ 1,500.00$

TOTAL BASE ITEMS 590,250.00$ TOTAL BASE ITEMS 935,000.00$ TOTAL BASE ITEMS 1,209,750.00$ TOTAL BASE ITEMS 1,211,500.00$

OPTIONAL ITEMS OPTIONAL ITEMS OPTIONAL ITEMS OPTIONAL ITEMS

5100 18000 7.50$ 135,000.00$ 5100 18000 2.00$ 36,000.00$ 5100 18000 8.00$ 144,000.00$ 5100 18000 12.00$ 216,000.00$ 6100 10000 7.50$ 75,000.00$ 6100 10000 2.00$ 20,000.00$ 6100 10000 8.00$ 80,000.00$ 6100 10000 12.00$ 120,000.00$ 7100 30 250.00$ 7,500.00$ 7100 30 250.00$ 7,500.00$ 7100 30 1,000.00$ 30,000.00$ 7100 30 300.00$ 9,000.00$

TOTAL OPTIONAL ITEMS 217,500.00$ TOTAL OPTIONAL ITEMS 63,500.00$ TOTAL OPTIONAL ITEMS 254,000.00$ TOTAL OPTIONAL ITEMS 345,000.00$ TOTAL BASE & OPTIONAL 807,750.00$ TOTAL BASE & OPTIONAL 998,500.00$ TOTAL BASE & OPTIONAL 1,463,750.00$ TOTAL BASE & OPTIONAL 1,556,500.00$

Standard Form 1419 (2001)

COE SEATTLE DISTRICT (VERSION 3/01)

8. GOVERNMENT ESTIMATE

(Check A, B or C and Complete D, E F) A. Hired Labor B. Reasonable Contract (w/out profit) XX C. Reasonable Contract (w/ profit)

7A. ITEM 7B. DESCRIPTION OF OFFERED ITEM 7C. EST 7D. UNIT 7E. UNIT 7F. AMOUNT

NUMBER QTY PRICE

BASE ITEMS

1000 Mobilization and Demobilization 1 JOB 343,885.00$ 343,885.00$

Dredging & Disposal (Turning Basin & Section A - Sta. 254+00 to Sta. 275+56;

Minimum Depth - 15ft. MLLW plus 2ft. OD) 40,000 CY 10.40$ 416,000.00$

Dredging & Disposal (Section B - Sta.

242+00 to Sta. 254+00; Minimum Depth - 15ft. MLLW plus 1ft. OD) 15,000 CY 10.40$ 156,000.00$

4000 Water Quality Monitoring 5 Day 465.00$ 2,325.00$ 918,210.00$

Additional Dredging & Disposal (Turning Basin & Section A - Sta. 254+00 to Sta.

275+56; Minimum Depth - 15ft. MLLW plus 2ft. OD) 18,000 CY 10.40$ 187,200.00$

Additional Dredging & Disposal (Section B - Sta. 242+00 to Sta. 254+00; Minimum Depth - 15ft. MLLW plus 1ft. OD) 10,000 CY 10.40$ 104,000.00$

7100 Additional Water Quality Monitoring 30 Day 465.00$ 13,950.00$ 305,150.00$

1,223,360.00$

TOTAL BASE ITEMS

OPTIONAL ITEMS

TOTAL OPTIONAL ITEMS

TOTAL BASE & OPTIONAL

FY19 Duwamish Waterway Maintenance Dredging, Seattle Harbor, WA

W912DW19B0007

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. Quantities are estimated except where shown as “JOB” or “DAY”.

NOTE NO. 2. Option Item 5100 may be exercised up to 9 times (not to exceed 18,000 cy option total).

NOTE NO. 3. Option Item 6100 may be exercised up to 5 times (not to exceed 10,000 cy option total).

NOTE NO. 4. Option Item 7100 may be exercised up to 30 times (not to exceed 30 days option total).

2019-09-06T11:05:26-0700
COOK.GREGORY.ALLEN.1109082143

File details come from the government source that posted it.