A.07.23_-_Solicitation_W912DW-17-Q-0034_-_Elevator_Modernization.pdf
PDF 279 KB Posted
- Attached to
- Elevator Modernization Federal contract opportunity
- Solicitation number
- W912DW-17-Q-0034
About this file
Elevator Modernization Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DW-17-Q-0034
Seattle District
Lake Washington Ship Canal Hydraulic Elevator Modernization
Construction Solicitation and Specifications
This is a 100% Small Business Set-Aside March 2016
*Instructions to Offeror is located in Section L*
HIRAM M. CHITTENDEN LOCKS
3015 NW 54TH ST
SEATTLE WA 98107-4299
TEL: 206-789-2622 FAX: 206-782-3192
W68MD970393790
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912DW-17-Q-0034 21-Mar-2017 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
25-Mar-2017(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
206-316 -3877DARRELL D HUTCHENS
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
LWSC ELEVATOR MODERNIZATION
PLEASE SEE ATTACHED SCHEDULE
FOB: Destination
PURCHASE REQUEST NUMBER: W68MD970393790
FFP
NET AMT
Section C - Descriptions and Specifications
WAGE DETERMINATION WA170036
General Decision Number: WA170036 03/10/2017 WA36
Superseded General Decision Number: WA20160036
State: Washington
Construction Type: Building
County: King County in Washington.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 02/03/2017 3 02/17/2017 4 03/03/2017 5 03/10/2017
ASBE0007-002 01/01/2017
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.35 15.37
* BRWA0001-011 06/01/2016
Rates Fringes
Bricklayers, Caulkers............$ 38.24 15.57
CARP0770-020 06/01/2016
Rates Fringes
CARPENTER (Acoustical Installation)....................$ 40.92 14.59 CARPENTER (Including Formwork, Drywall Hanging, Cabinet Installation;
Insulator-Batt and Metal Stud Installation)....................$ 40.92 14.59
MILLWRIGHT.......................$ 42.42 14.59
PILEDRIVERMAN....................$ 41.17 14.59
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend
Zone Pay:
0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center
Zone Pay:
0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour
ELEC0046-006 02/06/2017
Rates Fringes
ELECTRICIAN......................$ 47.56 3%+19.31
ELEC0046-007 02/06/2017
Rates Fringes
ELECTRICIAN (Alarm Installation Only)...............$ 31.67 3%+12.45 ELECTRICIAN (Low Voltage Wiring Only).....................$ 31.67 3%+12.45
ELEV0019-005 01/01/2017
Rates Fringes
ELEVATOR MECHANIC................$ 50.82 31.585
FOOTNOTE:
a. Employer contributes 8% of the basic hourly rate for over 5 year's service and
6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit.
b. Eight paid holidays: New Year's Day; Memorial Day; Independence Day; Labor Day;
Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day
ENGI0302-019 06/01/2013
Rates Fringes
Power equipment operators:
Group 1A...................$ 37.39 16.65 Group 1AA..................$ 37.96 16.65
Group 1AAA.................$ 38.52 16.65 Group 1.....................$ 36.84 16.65 Group 2.....................$ 36.35 16.65 Group 3.....................$ 35.93 16.65 Group 4.....................$ 33.57 16.65
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Excavator/Trackhoe: Over 90 metric tons
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Loaders-overhead, 8 yards and over; excavator/Trackhoe: over 50 metric tons to 90 metric tons
GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Excavator/Trackhoe: over 30 metric tons to 50 metric tons; Loader- overhead 6 yards to, but not including 8 yards; Dozer D-10; Screedman;
Scrapers: 45 yards and over; Grader/Blade
GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;
Drilling machine; Excavator/Trackhoe: 15 to 30 metric tons;
Horizontal/directional drill operator; Loaders-overhead under 6 yards; Crane Oiler-100 Tons and Over; Compactor;
Scraper: under 45 tons
GROUP 3 - Cranes-thru 19 tons with attachments; Dozers-D-9 and under; Motor patrol grader-nonfinishing; Roller-Plant Mix; Crane Oiler under 100 tons; Excavator/Trackhoe: under 15 metric tons; Forklift: 3000 lbs and over with attachments; Service Oiler; Concrete Pump; Outside Hoist (Elevators and Manlifts); Pump Grout
GROUP 4 - Roller-other than plant mix; Forklift: under 3000 lbs with attachments; Bobcat; Rigger/Bellman
IRON0086-010 07/01/2016
Rates Fringes
IRONWORKER (Reinforcing, Structural and Ornamental).......$ 40.52 24.71
LABO0242-002 06/01/2014
ZONE 1:
Rates Fringes
LABORER
GROUP 2.....................$ 25.79 10.30
GROUP 3.....................$ 32.29 10.30
GROUP 4.....................$ 33.08 10.30
GROUP 5.....................$ 33.62 10.30
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 - $1.00
ZONE 3 - $1.30
BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,
TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.
TOWNSEND, PT. ANGELES, AND BREMERTON
ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall
LABORERS CLASSIFICATIONS
GROUP 2: Flagman
GROUP 3: General Laborer; Mason Tender-Cement/Concrete;
Chipping Gun (under 30 lbs.); Form Stripping; Roof Tearoff
GROUP 4: Chipping Gun (over 30 lbs.); Concrete Saw Operator;
Grade Checker; Gunite; Pipe Layer; Vibrating Plate
GROUP 5: Mason Tender-Brick
PAIN0005-029 11/01/2016
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 38.50 16.76
PAIN0005-030 07/01/2013
Rates Fringes
Painters:
Parking Lot and Highway Striping Only...............$ 28.00 14.33
PAIN0005-031 07/01/2016
Rates Fringes
PAINTER (Including Brush, Roller, Spray and Prep Work).....$ 28.99 11.34
PAIN0188-005 08/01/2016
Rates Fringes
GLAZIER..........................$ 41.59 16.56
PAIN1238-002 07/01/2016
Rates Fringes
SOFT FLOOR LAYER (Including Vinyl and Carpet)................$ 29.60 15.98
PLAS0528-002 07/01/2016
Rates Fringes
PLASTERER........................$ 37.01 15.84
PLAS0528-004 06/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 39.52 16.04
PLUM0032-009 01/01/2017
Rates Fringes
PIPEFITTER.......................$ 53.06 23.03
PLUMBER (Including HVAC Pipe Installation)....................$ 52.81 22.28
REFRIGERATION MECHANIC...........$ 52.22 22.79
ROOF0054-008 06/01/2014
Rates Fringes
ROOFER (Includes Roof Tear Off, Waterproofing, and Installation of Metal Roofs).....$ 32.07 12.62
SFWA0699-006 01/01/2017
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 47.97 24.42
SHEE0066-023 06/01/2016
Rates Fringes
Sheet Metal Worker (Including HVAC Duct Work and Installation of HVAC Systems)....$ 48.17 25.52
* TEAM0174-005 01/01/2017
Rates Fringes
Truck drivers:
ZONE A:
GROUP 2:...................$ 34.13 18.57
ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates.
ZONE C (over 45 miles from centr of listed cities*): Add $1.00 per hour to Zone A rates.
*Zone pay will be calculated from the city center of the following listed cities:
BELLINGHAM CENTRALIA RAYMOND OLYMPIA
EVERETT SHELTON ANACORTES BELLEVUE
SEATTLE PORT ANGELES MT. VERNON KENT
TACOMA PORT TOWNSEND ABERDEEN BREMERTON
TRUCK DRIVERS CLASSIFICATIONS
GROUP 2 - Semi-Trailer Truck
HAZMAT PROJECTS
Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."
LEVEL A: +$.75 per hour - This level utilizes a fully-encapsulated suit with a self-contained breathing apparatus or a supplied air line.
SUWA2009-024 05/22/2009
Rates Fringes
LABORER: Driller................$ 17.17 5.36
LABORER: Irrigation.............$ 11.58 0.00
LABORER: Landscape..............$ 9.73 0.00
LABORER: Overhead Door Installation.....................$ 22.31 3.44
OPERATOR: Backhoe...............$ 29.95 7.20
OPERATOR: Mechanic..............$ 24.33 4.33
ROOFER: Metal Roof..............$ 24.30 4.05
TILE SETTER......................$ 18.72 3.35
TRUCK DRIVER: Dump Truck........$ 27.43 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
STATEMENT OF WORK
Statement of Work
LWSC Visitor Center Elevator Control System and Drive System Replacement
Part 1
General Information
1. GENERAL: This is a construction contract to supply and install a new control system to the visitor center elevator at Lake Washington Ship Canal (LWSC). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the installation of a new control system as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
CLIN 1 Replace and modernize elevator control system
CLIN 2 Replace and modernize elevator drive system
1.2 Background: The Lake Washington Ship Canal visitor center was updated in the late 1970’s and has been in regular operation since that time. The elevator is encountering operating problems. One symptom is non-responsive control. Another symptom is elevator cab will stop between floors. Another symptom is elevator suffers from sudden acceleration when moving. Elevator has been serviced annually. Original manufacturer is US Elevator Corps. Elevator type is hydraulic elevator.
1.3 Objectives:
Remove the old elevator control system Install new elevator control system Provide new Operations and Maintenance manuals Provide final as-built drawings, system settings, and all final mechanical and electrical diagrams Test elevator to ensure safe operations Ensure new elevator control system can pass Washington state inspection Ensure elevator has updated safety and control system Fix sudden acceleration problem Fix elevator cab stop at different level with the building floor Emergency phone in elevator cab must be operational when installation is complete
1.4 Scope: The contractor shall provide all equipment and expertise necessary to perform the work in this document.
1.5 Period of Performance: The period of performance shall be for six (6) months; allows for an eight – sixteen weeks lead time for supplies, parts and materials. Elevator must be operational by October 31, 2017.
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which they assure that work complies with the requirement of the contract. Quality Control Program (QCP) is to be delivered within 30 days after contract award, three copies of a comprehensive written QCP shall be submitted to the KO and QAR within 5 (five) working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to their QC system.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays: Contractor is not required to perform services on holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.4 Hours of Operation: The contractor is responsible for coordinating hours for conducting business with LWSC. LWSC maintenance staff hours are generally available between the hours of 06:00 and 15:00, Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at LWSC Hiram M.
Chittenden Locks, 3015 NW 54th St., Seattle, WA 98107.
Site visit to be conducted at the Hiram M. Chittenden Locks located at 3015 NW 54th Street, Seattle, Washington;
Refer to section 5.3 for date and time.
1.6.6 Type of Contract: The government will award a Firm Fixed Contract.
1.6.7 Security Requirements:
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy.
In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as
NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative.
This Form will be provided to the Contracting Officer and shall become part of the official contract file
1.6.7.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Quality Assurance Representative (QAR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.9 Quality Assurance Representative (QAR): The QAR monitors all technical aspects of the contract and assists in contract administration. The QAR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies: coordinate availability of government furnished party, and provide site entry of Contractor personnel.
The QAR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10 Key Personnel: The following personnel are considered key personnel by the government: Contract Manager/Alternate Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:00 a.m. to 3:00p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
1.6.11 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are
Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.12 Data Rights: If the elevator control system requires software for operation, then the government will get two copies of the software and associated relevant data.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government party.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.10. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.11. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation ATO Antiterrorism Officer CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf
DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense ECS Emergency Closure System FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer LWSC Lake Washington Ship Canal OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QAR Quality Assurance Representative QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PRTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: The Government will not provide any services under this contract, except forklift operator for unloading, loading, and moving equipment and materials as needed.
3.2 Facilities: The Government will provide loading and unloading area along with short term storage area for supplies and aerial platform at LWSC. Aerial platform can be stored two days prior to commencement of work and two days after completion.
3.3 Utilities: All utilities in the facility will be available for the contractor’s use in performance of tasks outlined in this PWS. If utilities are needed, the following is required: The Contractor shall instruct employees in utilities requirement and conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount..
3.4 Equipment: The Government will provide a forklift and operator for unloading and moving equipment and materials, if needed during staging and de-mobilization.
3.5 Materials: The Government will not provide any new material(s) for this contract.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, materials, facilities and services required to perform work under this contract that are not listed under Section 3 of this document. Manufactures warranty for hydraulic and contractor warranty of installation.
4.2 Secret Facility Clearance: NOT APPLICABLE
4.3. Materials: The Contractor shall provide all material for the work specified.
4.4. Equipment: The Contractor shall provide needed equipment for the work specified.
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.1. Basic Services. Visitor Center elevator control system and drive system needs to be modernized. The contractor shall provide parts and services for complete installation of a new elevator control system, drive system, and related components. The contractor will removed and dispose of the old components, and install the new components. Installation is complete when the system is operational, tested, and ready for use with the general public. The contractor shall provide all equipment and expertise necessary to perform the work in the PWS. Note contractor is required to come on site and inspect the existing system physically, and to take all necessary measurements prior to bidding. New control system shall be microprocessor controlled and completed work must meet Washington state laws and regulations. System interface inside the elevator cab and landing controls shall comply with Americans with Disability Act.
• New solid state elevator controller, phase 1 and phase 2 fire service and car top/door operator interface
• New solid state motor drive
• New car landing and leveling system
• New hoistway and interlock wiring
• New Car Operating Panel (COP)
• New hall stations and position indicators
• New car direction indicator (lantern)
• New traveling cable
• Phone/intercom system
• Door restrictors
• New door track rollers, doors, and door closers (as needed)
• New elevator door operator
• Escape hatch safety switch and hatch retainer
• Landing entry floor identification Braille
• New door obstruction detection edge, on cab, and on landing
• New top of car lighting
• New rupture valve
• New hoistway cable
• New Cylindrical Stainless handrails
• Owner’s Manual
• Inspection Test Record
• As-Built Drawings
• Documentation Language (English)
• Documentation Media (PACD)
5.2 Specifications:
Not much information is available on the existing elevator. Existing elevator was built by “US Elevator Corps.”
Physical inspection and measurement is required to match new components to existing machinery.
See additional specs and requirements in the Appendix I.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures. EM 385-1-1 USACE Safety and Health Requirements
6.2 The Contractor shall comply with Title 36, CFR, Part 327, and “Regulations Governing Corps of Engineers Projects”
6.3 The Contractor shall comply with ANSI B30.11 and OSHA 1926.554.
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Standard PERFORMANCE
THRESHOLD
Method of
Surveillance
PRS # 1.
The Contractor shall replace existing elevator control and drive system with new.
Systems shall meet requirements of EM 385-1-1 and specs herein. Control system is modern electrical/electronic and parts readily available.
Zero deviation from standard
Periodic Surveillance
PRS # 2
The Contractor shall provide all materials as listed under specifications.
The Contractor shall provide all equipment and expertise to replace hydraulic.
Zero deviation from standard
Periodic Surveillance
PRS #3
The Contractor shall comply with ANSI B30.11 and OSHA 1926.554. Para. 6.3
The Contractor shall comply with all standards.
Zero deviation from standard
Periodic Surveillance
Appendix I
Additional Specifications and Requirements:
PART 1: GENERAL
1.1 WORK INCLUDED
Section specifies the requirements for upgrading one existing passenger elevator at Lake Washington Ship Canal.
Install a new elevator control system and equipment to replace the old system and equipment. Existing features to be replaced include, but are not limited to: the hydraulic motor; the hydraulic gear box; elevator brakes; wedge sockets and shackle rods; elevator can door and actuators; brakes; speed governor; elevator car and counterweight guide rail rollers; elevator car safeties; elevator car door reversing edges; oil buffers for the elevator car and counterweights; and elevator electrical systems and wiring including all traveling elevator car power and communications cabling, disconnect switches, motor feeders, emergency power connection, and all associated controls including controller cabinets. Check support beams and car & counterweight guiderail and guiderail brackets, and car platform & sling, for structural adequacy and replaced with new assemblies if found to be structurally deficient. If guiderails reused, reattach existing guiderail brackets with new anchors bolts as specified herein. Also provide the elevator car with new operating controls, communications devices, and provide new hall call stations at each floor landing.
1.2 APPLICABLE CODES AND DESIGN CRITERIA
Design and fabrication of elevator improvements must be in compliance with all requirements for electric traction elevators as listed in ASME A17.1/CSA B44, Safety Code for Elevators and Escalators. Note that, for convenience, specific references are made in this specification to sections contained within ASME A17.1/CSA B44 for several elevator features. This does not exempt the Contractor from full compliance with all applicable provisions of ASME A17.1/CSA B44 where specific references are not listed for certain features. Elevator installations must also be in compliance with Chapter 296-96 of the State of Washington Administrative Codes (WAC) for elevators. Also comply with the International Building Code (IBC) for features such as fire ratings on elevator doors and door frames and with the ADA/ABA Accessibility Guidelines (New ADAAG) for accessibility and usability for physically disabled individuals. Dates of applicable codes are listed below in the references. When complete, elevator car shall have the capacity to lift a live load, exclusive of the car and cable, etc., over the specified travel distance and at the specified travel speed.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASME INTERNATIONAL (ASME)
ASME A17.1/CSA B44 (2013) Safety Code for Elevators and Escalators
ASME A17.2 (2012) Guide for Inspection of Elevators, Escalators, and Moving Walks Includes Inspection Procedures for Electric Traction and Winding Drum Elevators, Hydraulic Elevators, and Escalators and Moving Walks ASME A17.3 (2011) Safety Code for Existing Elevators and Escalators ASME QEI-1 (2013) Standard for the Qualification of Elevator Inspectors
ASTM INTERNATIONAL (ASTM)
ASTM B174 (2010) Standard Specification for Bunch-Stranded Copper Conductors for Electrical Conductors ASTM B3 (2013) Standard Specification for Soft or Annealed Copper Wire ASTM C881/C881M (2013) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete ASTM E84 (2014) Standard Test Method for Surface Burning Characteristics of Building Materials
ICC EVALUATION SERVICE, INC. (ICC-ES)
ICC-ES AC308 (2009) Acceptance Criteria for Post-Installed Adhesive Anchors in Concrete Elements
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C62.11 (2012) Standard for Metal-Oxide Surge Arresters for Alternating Current Power Circuits (>1kV) IEEE C62.41 (1991; R 1995) Recommended Practice on Surge Voltages in Low-Voltage AC Power Circuits IEEE C62.45 (2002; R 2008) Recommended Practice on Surge Testing for Equipment Connected to Low-Voltage (1000v and less)AC Power Circuits
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2012) International Building Code NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION (NEMA)
NEMA MG 1 (2014) Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.27 Fixed Ladders 36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
UNDERWRITERS LABORATORIES (UL)
UL 1449 (2014) Surge Protective Devices UL 1581 (2001; Reprint Aug 2013) Electrical Wires, Cables, and Flexible Cords
1.4 DEFINITIONS
1.4.1 Terminology
Terms used are defined in the Safety Code for Elevators and Escalators, ASME A17.1/CSA B44, which hereinafter includes any reference to the “Governing Code.”
1.4.2 Application of References to an Equipment Item
Reference to a device or a part of the equipment applies to the number of devices or parts required to complete the work.
1.5 SUBMITTALS
The Contractor shall furnish project timeline.
1.6 LONG LEAD TIME EQUIPMENT
Within 30 calendar days following receipt of Notice to Proceed, submit data for elevator equipment that requires long lead-times for ordering. Long lead-time is defined as requiring over 4 weeks from date of ordering to receipt of shipment at the job site. Long lead-time equipment may include, but is not limited to, elevator hydraulic equipment, solid state motor controller, custom elevator car operating panel, and custom hall call stations.
1.7 CERTIFICATIONS AND CONTRACTOR QUALIFICATIONS
1.7.1 Manufacturer Certification
Submit proof in the form of a certificate that the elevator installer is approved by the manufacturer of the elevator system to install the system as specified herein. Provide a certificate directly from the elevator manufacturer complete with the name and a contact phone number of the company representative who prepared the certificate.
1.7.2 Installer Qualifications
Submit proof that the elevator installer has at least five years of experience installing, supervising, and testing elevators of the type and rating specified. Provide licensed elevator mechanics on staff and have at least one licensed elevator mechanic on site at all times work is taking place on the elevator installations. Submit Proof of Current and Valid Elevator Installer License (Washington). Elevator mechanics shall hold either an Elevator Journeyman, an Elevator Mechanics License issued by the State of Washington as outlined in WAC 296-96-00906 and WAC 296-96-00910 or equivalent. Licenses from Washington shall be valid and current. Submit proof of current elevator licenses as part of the installer qualifications. Provide the names of at least three different jobs completed in the last five years that are of a similar type and scope to the specified work. On the list of former jobs, include the names, addresses and contact phone numbers for each client who received the services.
1.7.4 Elevator Mechanic
Work specified in this section shall be performed in compliance with ASME A17.3 under the direct guidance of the Elevator Mechanic who is regularly engaged in the installation and maintenance of the type and complexity of elevator system specified in the contract documents, and who served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 24 months. Elevator system manufacturer shall provide a letter of endorsement certifying that the Elevator Mechanic is acceptable to manufacturer. The Elevator Mechanic shall oversee the acceptance inspections and tests, and sign and certify the successful results, and after completion of the acceptance inspections and tests, certify in writing that the installation is in accordance with the contract requirements. Bring any discrepancies to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered.
1.7.5 Product Data Requirements
Provide Elevator and Accessory product data. Include information on motor, hall station, and buffer on elevators and accessories. For Elevator supporting systems, include information on Car Operating Panels, Signal Fixtures and Emergency Lighting and emergency power systems, and , provide document identification number or bulletin number, published or copyrighted prior to the date of contract bid opening.
1.8 SHOP DRAWINGS
a. Submit Elevator Shop Drawings for review. On the shop drawings, include dimensioned layouts, in plan, elevation, and section, showing the arrangement of new equipment required to be installed in the elevator machine rooms. Show anchorage of new equipment and critical dimensions for code-required clearances for maintenance and operation of the equipment. Provide details on elevator doors modifications, hall call stations, controllers, motors, and points of interface with the fire alarm smoke detection system and HVAC or exhaust systems. Also provide new elevator car interiors on the shop drawings and include wall elevations showing finishes and handrails, location of car operating panels, in-car position indicators, and car riding lanterns. Show any revised building electrical systems required to make the supplied elevator system function as specified.
b. For electrical equipment, provide shop drawings from the equipment manufacturers or shop drawings produced by the Contractor for the electrical equipment. Include the following information on electrical equipment shop drawings:
(1) Schematic diagrams showing all control components, devices and equipment with necessary wire connections with wire numbers for a fully functional control system and shall demonstrate sequence of operation and function of system devices.
(2) Wiring diagrams showing physical arrangement of all components, devices and equipment within cabinets and enclosures with terminals and wire routing to connect a fully functional control system.
(3) Connection diagrams showing all control cabinets, enclosures, boxes and external devices with terminals and the necessary wires with numbering to connect a fully functional control system.
(4) Appropriate sizing of electrical protective devices.
1.9 FIRE PROTECTION SYSTEM
Comply with International Building Code (IBC), NFPA 70, and all additional requirements identified herein
1.10 INDEPENDENT ELEVATOR INSPECTOR
Modified elevator and all tests shall be certified by an independent consultant that all Work is in accordance with procedure described in ASME A17.2 and ASME QEI-1. The Independent Elevator Inspector shall be licensed by the State of Washington to perform elevator inspections. The Elevator Inspector shall inspect the installation of the elevator to ensure that the installation conforms with contract and State of Washington requirements. The Elevator Inspector shall be directly employed by the Prime Contractor and be independent of the Elevator System Manufacturer and the Elevator Mechanic and shall witness the acceptance inspections and tests, approve all results and shall sign and certify the successful results. The Elevator Inspector, after completion of the acceptance inspections and tests, shall certify in writing that the installation is in accordance with the contract requirements, including Washington State laws (RCW) and administrative rules (WAC). Elevator certification and permitting shall be obtained by the Contractor. The inspector shall witness the acceptance inspections and tests, shall approve all results and shall sign and certify the successful results.