W912DR22R0028 - DLA Headquarters Elevator Modernization RFP.pdf

PDF 1 MB Posted

Attached to
DLA HQ Elevator Modernization Federal contract opportunity
Solicitation number
W912DR22R0028
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

View the file

Other files for this federal contract opportunity

Other files attached to DLA HQ Elevator Modernization, newest first.
File Type Posted
Amendment 0003 W912DR22R0028 RFI - Elevator Modernization 6.30.22 (3).pdf PDF
Amendment 0002 Solicitation W912DR22R0028 (3).pdf PDF
Amendment 1 W912DR22R0028 - DLA HQ Elevator Modernization RFP 26May22......pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT TITLE: DLA HQ ELEVATOR MODERNIZATION

PROJECT DESCRPTION: The U.S. Army Corps of Engineers, Baltimore District (NAB) has been tasked to solicit for and aw ard construction services for the modernization of the DLA HQ Building and Parking Garage Elevators at Ft. Belvoir, VA 22060.

The proposed project w ill be full and open competition (Unrestricted) NAICS CODE: 236220 “Commercial and Institutional Building Construction” w ith a size standard of $39,500,000.00.

MAGNITUDE OF CONSTRUCTION: Betw een $10,000,000 and $25,000,000.

This is a Firm-Fixed Price Tw o (2) Phase Design-Build Construction Contract utilizing the Best Value Trade-off Process.

Contractors are requested to review requirements and instructions for a Tw o (2) Phase Design-Build selection in response to this RFP in accordance w ith FAR Subpart 36.3 - Tw o-Phase Design-Build Selection Procedures. This is Phase 1 of the solicitation phase. Phase 1 of the solicitation w ill be issued as an amendment and w ill only be available to those Offerors selected to advance from Phase 1 to Phase II

DORIS M COLEMAN DAVIS

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

06-May-2022

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1095 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________06 Jun 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE, BALTIMORE, RSFO

300 SENTINEL DRIVE, STE 400

ANNAPOLIS JUNCTION MD 20701-0548

W912DR

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

12:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 410-854-0700 TEL: FAX:

W912DR22R0028 107

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DR22R0028

Section 00 20 00 - Instructions for Procurement

NOTES TO OFFERORS

This is a two (2)-phase Design-Build procurement. This Request for Proposals (RFP) is for Phase I only. Phase I submissions will be reviewed and a maximum of five (5) of the most highly qualified proposals will be invited to submit Phase II proposals. Bid bonds are not required to be submitted until Phase II submissions. Additionally, a price schedule and expanded specifications and details regarding the concept design will be provided in the Phase II via an amendment to this RFP.

INSTRUCTION TO OFFERORS

IMPORTANT NOTES REGARDING THIS ACQUISITION

1. PROPOSAL CONDITIONS

a. Contractors must provide all required documents for Phase I and bid all items in Phase II with no exceptions. Should a contractor fail to fully complete the bid schedule, its offer will not be considered responsive to the solicitation and ineligible for the resultant contract award.

b. Split awards or multiple award contracts will not result from this solicitation.

2. COMPETITION: Full and Open Competition

3. SUBMISSION OF PROPOSALS

1. Proposal Submission

a. Each volume shall be submitted electronically. Any portion of the proposal that is changed (as a result of negotiations or proposal revisions) should be annotated and dated. Each volume shall be clearly labeled with its Title and the solicitation number (i.e. Company Name_Title_Solicitation Number).

b. Offerors shall submit their proposals using the link, https://safe.apps.mil, to the Contract Specialist.

ALL PROPOSALS SHALL BE SUBMITTED ELECTRONICALLY THROUGH THE SAFE SITE. Submission shall be in searchable Adobe PDF format. You are limited to five (5) maximum files per upload (total size cannot exceed 2 GB). If you have a large number of files, it is recommend that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PK.Zip to reduce file size and facilitate transmission.

REQUEST FOR UPLOAD CODE: Offerors must email the Contract Specialist, Doris Coleman, at doris.m.colemandavis@usace.army.mil and Ericka Collins at Ericka.T.Collins@usace.army.mil no later than five

(5) business days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for a request code five (5) business days before proposal submission date may not be able to receive a request code in time to upload their submission.

FILE DESCRIPTION: Include a "File Description" for each file(s) you upload. The "File Description" will be included in the email notice to the recipient you choose to have access your file(s).

NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)

Submission shall be in searchable Adobe PDF format and legible.

INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:

1. Once at the SAFE website select the "Drop-off' icon. This allows users without a CAC or users whose computer is not configured to read a CAC, the option to access the SAFE site as a guest.

2. After selecting the "Click Here" link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.

3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for the recipient. For this solicitation, the recipient is the Contract Specialist as noted above. The E- Mail address of the Government Employee who initiated the request code will be automatically entered. The Proposer must enter the E-Mail address for the Contract Specialist After entering the email address, click the ADD button to add the person(s) email to the "Recipients List" of your response. When your proposal is submitted, a notification will be sent to the recipient you added.

NOTE: Do not send the SAFE site packages to group email accounts.

Each paragraph should be single spaced and shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be produced in landscape mode.

c. The following volumes of material shall be submitted:

Volume Factors Title Digital Copies

Maximum Pages

1 Factor I (Phase I)

Past Performance 1 12 (3 pages per project;

excluding completed CPARS and PPQs)

1 Factor II (Phase I)

Management Approach 1 10 (excluding resumes)

2 Factor III (Phase II)

Technical Approach 1 20

3 Factor IV (Phase II)

Small Business Participation Price

1 No page limit

3 Factor V (Phase II)

Cost/Price 1 No page limit

3 Phase I/II Solicitation, Offer and Award Documents, and Certifications / Representations

1 No page limit

NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.

2. PROPOSAL FILES

a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and Request for Proposal (RFP) number in the header and/or footer.

The proposals must be in an 8-1/2” x 11” format (except for organization chart, in which a folded 11” x 17” format may be used and shall be counted as one page provided the only information presented is the organization chart).

Pages must be numbered. The minimum acceptable type size is eleven (11) point with a minimum of one-inch margins on all sides.

b. File Packaging. All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc. Files shall be in read-only format, using PDF files. **Please note – Self extracting exe files are not acceptable.

c. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked. Each Offeror is required to submit a proposal consisting of the following volumes:

***PHASE I***

a. Phase I: Volume I – Technical Proposal, Part 1 (Factors 1-2),

b. Phase I: Volume II – Administrative Documents

The content of these volumes is discussed in Section 00 21 16, below.

1. Specific Requirements: An Offeror’s proposal shall consist of all information and material submitted in writing for evaluation in response to this solicitation. The submission of false or misleading information shall be grounds for disqualification of the proposal. Offerors must organize their proposals as described and outlined below. Each volume must have a table of contents and a Cover Sheet to include the Offeror’s CAGE Code, UEI, address, NAICS and business size in accordance with the System for Award Management (SAM) and Point of Contact information, such as email and phone number. Each volume’s contents must be separated by tabs as discussed below.

2. Volume I (Technical Proposal) (Factors 1-2): Offerors must submit the information identified in section 2, below.

The information must be divided by tabs and shall be organized as follows:

TAB 1 - Factor 1: Past Performance TAB 2 - Factor 2: Management Approach

Factor 1 shall not exceed 12 pages, excluding completed CPARS and PPQs. Factor 2 shall not exceed 10 pages, excluding resumes. If the Offeror exceeds the page limitation, then the excess page(s) will not be evaluated (actual tabs are not included in the count).

3. Volume II (Administrative Documents): The Administrative Documents must contain the following:

a. SF 1442 (Solicitation, Offer and Award). Note - All amendments must be acknowledged in block 19;

b. Completed Representations and Certifications (Section(s) 00 45 00)

c. Teaming Arrangements

4. VISITOR/SECURITY REQUIREMENTS

The Prime Contractor shall possess at a minimum a DOD SECRET CLEARANCE level as verified through the Joint Personnel Adjudication System (JPAS).

AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT

Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.

Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

For contractors who do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

For Contracts that Require OPSEC Training. "All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:

https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.

5. REQUESTS FOR INFORMATION

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 11:00 A.M. (EST), 20 May 2022. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.

The Bidder Inquiry Key is: 89A955-679UZ4

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret

Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Responses to RFIs via ProjNet are for informational purposes only. Official responses will be provided by amendment.

SCOPE OF WORK

Statement of Work

OBJECTIVE

Project objective is to modernize the elevators at the DLA Headquarters Complex located at 8725 John J. Kingman Rd. Ft. Belvoir, VA 22060. The existing elevator components have been operational since 1995 and are reaching the end of their life expectancy.

There is a total of 25 elevators spread across 9 elevator banks located in three different buildings on campus.

Building 2462 is five stories and contains 16 passenger and 2 freight traction elevators. POD 10 is five stories and contains 6 passenger traction elevators. The parking garage is three stories and contains a single hydraulic passenger elevator with a capacity of 3,500 lb.

Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Further, the OFFEROR is encouraged to seek solutions that will expedite construction and shorten the schedule while complying with all applicable laws and regulations of the government, the facility, and the authorities having jurisdiction. The intent of the Government is to emphasize the placement of funds into functional/operational requirements. Materials and methods should reflect this by choosing the lowest Type of Construction allowed by code for this occupancy/project allowing the funding to be reflected in the quality of interior/exterior finishes and systems selected.

SCOPE

Design includes modernization of 25 elevators spread across 9 elevator banks located in three different buildings on campus.

All modifications must comply with the UFCs, Federal, State, installation and local standards. Where conflict exists between the standards, the most stringent requirements shall govern.

DLA HQ (BUILDING 2462)

The work in the DLA Headquarters Building consists of elevator banks in PODs 1 through 9 and the following elevators:

POD 1 – Freight Elevator ‘A’ POD 2 – Passenger Elevators ‘A-B’ POD 4 – Passenger Elevators ‘C-D’ POD 5 – Passenger Elevators ‘D-E’ POD 7 – Passenger Elevators ‘F-G’ POD 9 – Passenger Elevators ‘H-J’ POD 9 South – Freight Elevator ‘B’

DLA HQ (POD 10)

The work in the DLA Headquarters Building consists of elevator banks in POD 10 and the following elevators:

POD 10 – Passenger Elevators 1-4 POD 10 – Passenger Elevators 5-6

DLA HQ (PARKING GARAGE)

The work at the DLA Headquarters Building consists of elevator banks in the Parking Garage and the following elevator:

PARKING GARAGE – Passenger Elevator 1

SECURITY CLEARANCE

All Contractors’ and subcontractors’ personnel accessing the Main Building (PODs 1 – 9), the Garage, and POD 10 infrastructure shall possess at a minimum a DOD SECRET CLEARANCE level as verified through the Joint

Personnel Adjudication System (JPAS), prior to commencement of work.

the Prime Contractor shall provide Visit Authorization Requests in accordance with the National Industrial Security Program Manual (DOD 5220.22-M) and any instructions contained in the DD Form 254 (Contract Security Classification Specification), on all personnel that will be required to have access to DTRA infrastructure (POD 10).

Section 00 21 16 - Instructions to Proposers

PHASE I PROPOSAL SUBMISSION

PHASE I SOLICIATION PROVISIONS

General: This Request for Proposal (RFP) seeks proposals from Offerors interested in being selected for the design and construction of the DLA HQ Elevator Modernization. This is Phase I of a two-phase FP. This RFP is requesting submission of proposal under Phase I submission criteria ONLY. After evaluating Phase I proposals, the Contracting Officer will select the most highly qualified Offerors and request that only those Offerors submit proposal for Phase II. The maximum number of Offerors will be selected to submit Phase II proposal shall not exceed five (5). Offerors shall not submit any proposals under Phase II submission criteria at this time. Phase II of the solicitation will be issued in an amendment directly to those Offerors selected for Phase II. Submitting any information under Phase II criteria may lead to disqualification of your proposal. This is an unrestricted competitive RFP. Offerors responding to this RFP are required to submit their proposals in accordance wit the instruction contained in this Section 00 21 16. A contract will be awarded to the Offeror whose proposal represents the “Best Value” to the Government. The best value determination will be based on a comparative assessment of proposals against all source selection criteria in the solicitation.

FACTOR 1 – PAST PERFORMANCE: The submitted material MUST be organized sequentially under tabs for each numbered section to facilitate evaluation. All narratives must contain sufficient detail to demonstrate technical capability.

An Offeror that relies upon the experience and performance history of a member, members or affiliates of a proposed contractor team arrangement, as indicated above, must provide a teaming agreement or commitment (in the case of any affiliates) signed by all parties.

The Offeror shall provide a teaming agreement with their proposed Designer.

In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this solicitation, the prime contractor must have completed at least fifty percent (50%) of the total number of projects that meet the requirements for Factor 1 for consideration in response to the experience requirements of this solicitation.

All teaming agreements/commitment shall be provided at the beginning of the Offeror’s technical proposal, prior to Factor 1, and will not be included in the overall page count.

1.1 EXPERIENCE IN RELEVANT PROJECTS: The Offeror shall submit information on at least two (2) but no more than four (4) Design-Build (DB) and/or Design-Bid-Build (DBB) projects demonstrating the Offeror’s recent and relevant experience. If the Offeror’s submission exceeds the maximum project limitation of four

(4) completed projects, the first four (4) projects submitted will be evaluated only, while the remaining additional project(s) will not be evaluated. These projects must be of relevant scope and complexity and demonstrate a minimum completion value of $11,000,000 considering adjustment for escalation from project completion to 2022 (all escalation values are to be labeled as escalated and the Offeror must explain in detail their escalation rationale, which must include any formulas, calculations, assumptions, etc.) and address the discussions requested on Attachment A while meeting the teaming agreement requirements in section above. Completed projects must have a completion date no earlier than six (6) years preceding the original date of issuance of this solicitation. Projects that have a Beneficial Occupancy Date (BOD) within the same date range will also be considered. The Beneficial Occupancy Date (BOD) is the point at which the customer determines the facility or area can be occupied from both a regulatory and work function standpoint.

Note: In reference to Task Order Construction Contracts (TOCCs)/Indefinite Delivery/Indefinite Quantity (ID/IQ) contracts, these base contracts will not be accepted as a project submission; however, individual task orders/delivery orders on TOCCs and/or ID/IQ contracts can be submitted under Factor 1. Each task/delivery order submitted must individually meet the requirements of the factor. Submissions of multiple task/delivery orders as a project will not be accepted or evaluated.

At least one (1) project must be a Design-Build (DB) project from the Offeror. At least one (1) project must demonstrate Design-Build (DB) experience from the proposed Designer. For projects demonstrating past experience from the designer, one hundred percent (100%) of the design and at least seventy five percent (75%) of the construction of each project must be completed by the original date of issuance of this solicitation.

For projects demonstrating past experience for the construction contractor, one hundred percent (100%) of the construction must be complete.

In order for a project to be considered relevant, the project must include the following:

Experience installing/designing/ modernizing/commissioning various types of elevators to include freight traction and/or passenger elevators.

Experience hydraulic elevators with a minimum capacity of 3,500 lbs

In addition, if the project includes the following elements, discussion/documentation of additional elements may be considered more highly:

Experience working concurrently in multiple buildings on the same work site/installation.

Experience working in an occupied facility. Must include discussion of how the work was phased/coordinated to accommodate access to facility occupants.

Each element must have a description of how the project meets the element (e.g. concrete paving – For this project, 500 LF of concrete sidewalks were installed, 300 LF of curbs were removed and re-installed, etc.)

*Lists, charts/matrices, and bullets will not be accepted when identifying relevant elements.

It is the responsibility of the Offeror to identify, detail and demonstrate the relevancy of the submitted projects to the solicitation criteria elements. The evaluation committee WILL NOT make assumptions.

The information that is required to be supplied is identified on the form provided entitled “EXPERIENCE IN RELEVANT PROJECTS” (Attachment A). Offerors are not required to use the form itself as part of their proposal, but the information requested on the form must be in the Offeror’s proposal and should be in the same format as the form. Offerors may expand the form as necessary to accommodate the required project information.

The only submissions under the tab for this section are to be the completed “Attachment A” forms or similar format as indicated above. Only the information provided in either of these formats will be considered. Company summaries/introductions, project summary charts/matrixes, etc. will not be accepted or evaluated.

1.2 PAST PERFORMANCE QUESTIONNAIRES EXPERIENCE IN RELEVANT PROJECTS:

For each of the projects submitted, provide a copy of the Contractor Performance Assessment Reporting System (CPARS) report, or USACE Past Performance Questionnaire (PPQ-0) (Attachment B) from a representative of the owner. The Offeror must request that their client complete the USACE Past Performance Questionnaire for Relevant Experience (Form PPQ-0) and submit the questionnaire as part of the Offeror’s technical proposal. The Offeror may provide an explanation if the performance evaluation rating is less than satisfactory. Offerors are encouraged to follow-up with clients/references to ensure timely submittal of questionnaires.

If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the Offeror must complete and submit with the proposal the first page of the PPQ (Attachment B) for projects submitted under the tab for EXPERIENCE IN RELEVANT PROJECTS, which will provide contract and client information for the respective project(s). Ensure correct phone numbers and email addresses are provided for the owner point of contact.

Previously completed PPQ-0s may be submitted provided that the documents do not reference any other solicitations.

Submitted PPQ-0s must only reference this solicitation. Contractor Performance Assessment Reporting System (CPARS) ratings will take precedence over PPQs.

Past Performance information may be obtained from other sources available to the Government, to include, but not limited to, Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Assessment Reporting System (CPARS) or other databases using all CAGE/DUNS number of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency The information obtained from these sources will be evaluated supplementary to the past performance questionnaires. In reference to the contracts pulled from these sources, the relevancy of the projects, completion dates, ratings and comments in the individual categories and overall ratings will be considered in making the overall confidence assessment. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

d. The past performance factor considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract requirements. There are three aspects to the past performance evaluation: recency, relevancy, and quality.

(i) RECENCY: The first aspect is to evaluate the recency of the offeror’s past performance.

Recency is generally expressed as a time period during which past performance references are considered relevant and is critical to establishing the relevancy of past performance information.

(ii) RELEVANCY: The second aspect is to determine how relevant a recent effort accomplished by the offeror is to the effort to be acquired through the source selection.

Relevancy is not separately rated; however, the following criteria (see Table 2) will be used to establish what is relevant which shall include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming.

Table 2 - Past Performance Relevancy Ratings Rating Definition

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

(iii) QUALITY ASSESSMENT: The third aspect assesses the overall quality of the offeror’s past performance. Documented results from Past Performance Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment.

e. Performance Confidence Assessment: Utilize the Performance Confidence Assessment (see Table 3 below) to select the most appropriate confidence level for each Offeror. Ensure the rationale for the conclusions reached are included.

TABLE 3 - Performance Confidence Assessments Rating Definition

Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the facto of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

2. FACTOR 2 – MANAGEMENT APPROACH: The submitted material MUST be organized sequentially under tabs/pages for each numbered section to facilitate evaluation. All narratives must contain sufficient detail to demonstrate technical capability. All narratives/responses must be specific to the solicitation requirements (boilerplates and company histories/summaries will not be accepted) and contain sufficient detail to demonstrate management capability.

2.1 Describe the proposed management structure for the team to include both the construction and design firms, the resources available to each firm and how those resources will be utilized, their roles and responsibilities, and what subcontracting firms the Offeror is considering utilizing. Describe how subcontractors are managed by the contractor to include flow-down of contract requirements, duties, responsibilities, and coordination. Discuss how non-performance by subcontractors is handled by the general contractor.

Offerors are encouraged to describe prior experience working with their proposed designer.

The Offerors must also provide a statement that, in accordance with the specifications of the RFP, all individuals, including subcontractors, will be able to gain access to the Fort Belvoir installation and adhere to current access requirements.

Note: The Offerors down selected to Phase II will be required to possess a secret security clearance.

2.2 Describe the role and interaction of the design team with the construction team during construction to include design quality control; tracking design evolution and changes during design to meet the schedule; management of the design during construction, including control and approval of revisions to the accepted design; requests for information; shop drawing and submittal reviews and approvals; progress meetings; site visits, if any; and as-built drawings.

In accordance with the Army Source Selection Supplement (AS3), Section 3.1, the Army methodology for evaluating Management Approach and Related Risk is the Combined Technical/Risk Rating, (see Table 1 below). This methodology considers risk, in conjunction with the strengths, weaknesses, significant weaknesses, uncertainties, and deficiencies in determining technical ratings.

TABLE 1 – COMBINED TECHNICAL/RISK RATINGS

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition DEC 2021 52.215-20 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

DEC 2021

52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort

OCT 2009

52.217-5 Evaluation Of Options JUL 1990 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (AUG 2020)

(a) Definitions. As used in this provision--

Color Rating Description

Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.

Proposal is unawardable.

Commercial and Government Entity (CAGE) code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.

(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:

Immediate owner CAGE code:

Immediate owner legal name: ___

(Do not use a ``doing business as'' name)

Is the immediate owner owned or controlled by another entity?:

[ ___ ] Yes or [ ___ ] No.

(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:

Highest-level owner CAGE code:

Highest-level owner legal name:

(Do not use a ``doing business as'' name)

(End of provision)

52.204-20 Predecessor of Offeror (AUG 2020)

Commercial and Government Entity (CAGE) code means--

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.

Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.

(b) The Offeror represents that it [____] is or [____] is not a successor to a predecessor that held a Federal contract or grant within the last three years.

(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):

Predecessor CAGE code: ____ (or mark “Unknown”).

Predecessor legal name: ____.

(Do not use a “doing business as” name).

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

28.0% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is [DC District of Columbia; MD Charles; MD Montgomery, MD Prince Georges; VA Rrlington; VA Fairfax; VA Loudoun; VA Prince William; VA Alexandria; VA Fairfax City; VA Falls Church ].

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .