B.08.03_AMD 0001 W912DR21B0001.pdf

PDF 4 MB Posted

Attached to
Codorus Creek Flood Wall Improvements Federal contract opportunity
Solicitation number
W912DR21B0001
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

This solicitation is for a construction project to replace approximately 600 linear feet of an existing flood wall along Codorus Creek in York, Pennsylvania. The scope of work includes demolishing the existing wall, constructing a new flood wall made of cast-in-place concrete, removing sediments from the creek channel, installing steel H-piles as foundation elements, and performing other related incidental work. Bids are due on January 15, 2021 to the U.S. Army Corps of Engineers, Engineering District Baltimore. The contract is for a one-year period of performance beginning with the notice to proceed. Pricing will be on a firm-fixed-price basis for two separate bid items: all work except the steel H-piles, and the H-pile installation.

View the file

Other files for this federal contract opportunity

Other files attached to Codorus Creek Flood Wall Improvements, newest first.
File Type Posted
C.04.01_Abstract of Bids_W912DR21B0001.pdf PDF
B.08.03_AMD 0003 W912DR21B0001.pdf PDF
B.08.03_AMD 0002 W912DR21B0001.pdf PDF
B.08.02_Codorus Creek Flood Wall - RTA Drawings (10-28-2020).pdf PDF
B.08.02_Codorus Creek Flood Wall - RTA Specifications (10-28-2020).pdf PDF
B.08.02_W912DR-21-B-0001 Codorus Creek Floodwall Repair.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project Title: Codorus Creek Flood Wall Improvement Project, Codorus Creek, York, PA

The purpose of this amendment is to:

1. Incorporate a revised Price Schedule

2. Update the call-in information for the Bid Opening

3. Add provision 252.204-7019 and clause 252.204-7020

4. Provide an update Wage Determination

5. Provide the Site Visit sign-in sheet

6. Provide responses to Requests for Information (RFI) All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 4 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR21B0001

X 9B. DATED (SEE ITEM 11)

24-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Dec-2020

CODE

USACE, BALTMORE DISTRICT

2 HOPKINS PLAZA

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR21B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been modified:

PRICE SCHEDULE

PRICE SCHEDULE

Item Description Estimated Unit Unit Estimated

No. Quantity Price Amount

Base Bid Items

0001 All costs in connection with the construction of the Codorus Creek Retaining Wall Improvements, complete as shown on drawings and specified exclusive of work covered under Item 0002 1 JOB $____________

0002 All costs in connection with the construction of the Steel H Piles (as specified in Section 31 62 16.16) 3,475 LF $____________

BID AMOUNT $_________________

52.211-18 Variation in Estimated Quantity(APR 1984)

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

(End of clause)

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

VIRTUAL BID OPENING

VIRTUAL BID OPENING SOLICITATION INSTRUCTIONS

Due to COVID-19 health concerns, bids submitted in response to this solicitation will be submitted electronically.

The bid opening will be conducted via a telephone conference call that is open to the public.

Electronic Bid Submission

WHAT - Bids shall be submitted electronically, as described. The bid shall not contain classified data. The use of hyperlinks in bids is prohibited.

NOTE: The only authorized transmission method for bids in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (E- MAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.

WHEN - Bids must be submitted no later than the bid submission time. Bids submitted after the bid submission time will be considered late bids.

BID SUBMISSION TIME: 11:00 AM EST on 15 January 2021

Bids must be received by the Government by the date/time specified in the solicitation.

HOW - Bidders shall electronically send their bids using the following link:

https://safe.apps.mil/

WHO - The SAFE site will require contacts for bid submission to be provided. All requests for information and the bid submission must be sent to BOTH of the below contacts to ensure timely receipt of bids. Please use the following contact information to submit bids:

Contract Specialist: Evan Cyran at evan.m.cyran@usace.army.mil Contracting Officer: Gary Faykes at gary.faykes@usace.army.mil

BIDDERS MUST REQUEST AN UPLOAD CODE: Bidders must e-mail the Contract Specialist and Contracting Officer no later than five (5) working days prior to the bid opening date to receive a request code which will allow for file uploads via the SAFE site. Bidders that fail to request a code at least five (5) working days before bid opening date may not be able to receive a request code in time to upload their bids.

SUBMISSION FORMAT: Submission shall be in Adobe PDF format. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Bidders may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

BID GUARANTEE: This solicitation requires submission of a bid guarantee in accordance with FAR 52.228-1.

Electronic bid submissions must include a scanned copy of the original bid guarantee.

Minor discrepancies in receipt of the original bid guarantee due to COVID-19 related impacts may be waived solely at the discretion of the Contracting Officer. A scanned copy of the original bid guarantee must be included in the electronic bid submission for the bid to be considered responsive.

BONDS AND INSURANCE: The Contractor will be required to furnish proof of insurance, including copies of the required endorsements, and performance and payment bonds within 10 calendar days following the Contractor’s receipt of the contract award.

FILE DESCRIPTION: Include a “File Description” for each file you upload. The “File Description” will be included in the e-mail notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.

INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:

1. Once at the SAFE website, select the “Drop-off” icon. This allows users without a Common Access Card (CAC, an ID issued to certain Government users), or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.

2. After selecting the “Click Here” link, you will be prompted to add your personal information, file information, recipient (Government points of contact) information and e-mail settings.

3. When completing your file information, you will be required to enter the e- mail addresses for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer, listed above. Although the e- mail address of the Government employee who initiated the request code will be automatically entered, this address may not be correct. The Bidder must enter and add the e-mail addresses for both the Contracting Officer and Specialist listed above to the Recipient List. The Bidder can enter an additional e-mail address if desired. After entering the e-mail address, click the ADD button to add the e-mail to the “Recipients List” for your response. When your bid is submitted, a notification will be sent to the selected recipients.

NOTE: Do NOT send the SAFE site packages to group e-mail accounts.

Even if you successfully upload your bid to the SAFE site, notification will not be sent to the Government recipients until you verify your e-mail address. Entering an incorrect e-mail may result in the rejection of your submission for lateness. A Bidder can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.

NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Bidders will have more success utilizing any particular browser.

TIMELINESS OF BIDS:

For the purposes of establishing whether a bid submission is considered timely, the Government considers the date and time the submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.

The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids. Bidders are responsible for ensuring that bids are submitted so as to reach the designated recipient.

Bidders are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.

Bid Opening

Bids will be opened after bid submission time has expired and the Government has had time to download and organize the bids from the SAFE sight. No Government officials will open electronic documents until the Independent Government Estimate is finalized and received by the Bid Opening Official.

BID OPENING TIME: 11:00 AM EST on 15 JANUARY 2021

The bid opening will be conducted via public conference call. Bidders and members of the public may use the below information to access the conference call:

Call-In Information: 1-844-800-2712

During the bid opening, the Bid Opening Official will read the bid totals in the order received electronically. The Bid Opening Official will then read the line item prices and total for each submission. The Contract Specialist will record the bid opening results, which will be posted to www.beta.SAM.gov as quickly as practicable following the bid opening.

In accordance with FAR 14.402-1(c), interested persons may examine the bids after the bid opening. Interested persons may contact the Contract Specialist identified above following the bid opening to request an electronic copy of the bid(s). Please be considerate of limited Government resources and request bid copies only as necessary.

To preserve conference line stability, bidders are asked to limit the number of individual calls to the conference line to the minimum needed for participation. The bid opening will proceed as scheduled even if individual bidders or members of the public are not able to access the telephone line at the bid opening time. Any interested party may access the results of the bid opening on www.beta.SAM.gov shortly after the bid opening.

SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS

The following have been added by full text:

252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)

(a) Definitions.

Basic Assessment, Medium Assessment, and High Assessment have the meaning given in the clause 252.204-7020, NIST SP 800-171 DoD Assessments.

Covered contractor information system has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this solicitation.

(b) Requirement. In order to be considered for award, if the Offeror is required to implement NIST SP 800-171, the Offeror shall have a current assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204-7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order. The Basic, Medium, and High NIST SP 800-171 DoD Assessments are described in the NIST SP 800-171 DoD Assessment Methodology located at https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800- 171.html.

(c) Procedures.

(1) The Offeror shall verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) for all covered contractor information systems relevant to the offer.

(2) If the Offeror does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the Offeror may conduct and submit a Basic Assessment to webptsmh@navy.mil for posting to SPRS in the format identified in paragraph (d) of this provision.

(d) Summary level scores. Summary level scores for all assessments will be posted 30 days post-assessment in SPRS to provide DoD Components visibility into the summary level scores of strategic assessments.

(1) Basic Assessments. An Offeror may follow the procedures in paragraph (c)(2) of this provision for posting Basic Assessments to SPRS.

(i) The email shall include the following information:

(A) Cybersecurity standard assessed (e.g., NIST SP 800-171 Rev 1).

(B) Organization conducting the assessment (e.g., Contractor self-assessment).

(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--

(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and

(2) A brief description of the system security plan architecture, if more than one plan exists.

(D) Date the assessment was completed.

(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).

(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(ii) If multiple system security plans are addressed in the email described at paragraph (d)(1)(i) of this section, the Offeror shall use the following format for the report:

Brief

CAGE codes description of Date of Total Date score of System security plan supported by this the plan assessment score 110 will plan architecture achieved

(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system assessed:

(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).

(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).

(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.

(iv) A brief description of the system security plan architecture, if more than one system security plan exists.

(v) Date and level of the assessment, i.e., medium or high.

(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).

(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(3) Accessibility.

(i) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).

(ii) Authorized representatives of the Offeror for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.

(iii) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this section.

DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).

(End of provision)

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been added by full text:

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)

(a) Definitions.

Basic Assessment means a contractor's self-assessment of the contractor's implementation of NIST SP 800-171 that-

(1) Is based on the Contractor's review of their system security plan(s) associated with covered contractor information system(s);

(2) Is conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology; and

(3) Results in a confidence level of "Low" in the resulting score, because it is a self-generated score.

Covered contractor information system has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

High Assessment means an assessment that is conducted by Government personnel using NIST SP 800-171A, Assessing Security Requirements for Controlled Unclassified Information that--

(1) Consists of--

(i) A review of a contractor's Basic Assessment;

(ii) A thorough document review;

(iii) Verification, examination, and demonstration of a Contractor's system security plan to validate that NIST SP 800-171 security requirements have been implemented as described in the contractor's system security plan; and

(iv) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of "High" in the resulting score.

Medium Assessment means an assessment conducted by the Government that--

(1) Consists of--

(i) A review of a contractor's Basic Assessment;

(ii) A thorough document review; and

(iii) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of "Medium" in the resulting score.

(b) Applicability. This clause applies to covered contractor information systems that are required to comply with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, in accordance with Defense Federal Acquisition Regulation System (DFARS) clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

(c) Requirements. The Contractor shall provide access to its facilities, systems, and personnel necessary for the Government to conduct a Medium or High NIST SP 800-171 DoD Assessment, as described in NIST SP 800-171 DoD Assessment Methodology at https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800- 171.html, if necessary.

(d) Procedures. Summary level scores for all assessments will be posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) to provide DoD Components visibility into the summary level scores of strategic assessments.

(1) Basic Assessments. A contractor may submit, via encrypted email, summary level scores of Basic Assessments conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology to webptsmh@navy.mil for posting to SPRS.

(i) The email shall include the following information:

(A) Version of NIST SP 800-171 against which the assessment was conducted.

(B) Organization conducting the assessment (e.g., Contractor self-assessment).

(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--

(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and

(2) A brief description of the system security plan architecture, if more than one plan exists.

(D) Date the assessment was completed.

(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).

(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(ii) If multiple system security plans are addressed in the email described at paragraph (b)(1)(i) of this section, the Contractor shall use the following format for the report:

Brief

CAGE codes description of Date of Total Date score of System security plan supported by this the plan assessment score 110 will plan architecture achieved

(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system security plan assessed:

(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).

(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).

(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.

(iv) A brief description of the system security plan architecture, if more than one system security plan exists.

(v) Date and level of the assessment, i.e., medium or high.

(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).

(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(e) Rebuttals. (1) DoD will provide Medium and High Assessment summary level scores to the Contractor and offer the opportunity for rebuttal and adjudication of assessment summary level scores prior to posting the summary level scores to SPRS (see SPRS User's Guide https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf).

(2) Upon completion of each assessment, the contractor has 14 business days to provide additional information to demonstrate that they meet any security requirements not observed by the assessment team or to rebut the findings that may be of question.

(f) Accessibility.

(1) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).

(2) Authorized representatives of the Contractor for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.

(3) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this clause.

DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).

(g) Subcontracts.

(1) The Contractor shall insert the substance of this clause, including this paragraph (g), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items (excluding COTS items).

(2) The Contractor shall not award a subcontract or other contractual instrument, that is subject to the implementation of NIST SP 800-171 security requirements, in accordance with DFARS clause 252.204-7012 of this contract, unless the subcontractor has completed, within the last 3 years, at least a Basic NIST SP 800-171 DoD Assessment, as described in https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800- 171.html, for all covered contractor information systems relevant to its offer that are not part of an information technology service or system operated on behalf of the Government.

(3) If a subcontractor does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the subcontractor may conduct and submit a Basic Assessment, in accordance with the NIST SP 800-171 DoD Assessment Methodology, to webptsmh@navy.mil for posting to SPRS along with the information required by paragraph (d) of this clause.

(End of clause)

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE DETERMINATION

General Decision Number: PA20200006 12/04/2020

Superseded General Decision Number: PA20190006

State: Pennsylvania

Construction Types: Heavy and Highway

Counties: Adams, Berks, Bradford, Carbon, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lancaster, Lebanon, Lehigh, Luzerne, Lycoming, Monroe, Montour, Northampton, Northumberland, Perry, Pike, Schuylkill, Snyder, Sullivan, Susquehanna, Tioga, Union, Wayne, Wyoming and York Counties in Pennsylvania.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (Excluding Sewer Grouting Projects and Excluding Sewage and Water Treatment Plant Projects)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/14/2020 2 02/28/2020 3 05/01/2020 4 05/08/2020 5 05/15/2020 6 07/03/2020 7 07/24/2020 8 07/31/2020 9 09/11/2020 10 10/23/2020 11 12/04/2020

BOIL0013-003 03/01/2018

Rates Fringes

BOILERMAKER......................$ 45.89 33.39

CARP0167-006 05/01/2019

BERKS, CARBON and LANCASTER

Rates Fringes

CARPENTER........................$ 32.07 15.49

CARP0167-007 05/01/2020

LEHIGH and NORTHAMPTON COUNTIES

Rates Fringes

CARPENTER........................$ 35.34 26.49

CARP0219-007 06/08/2020

CARBON (Townships: East Penn, Lower Towamensing, Mahoning, Franklin, Towamensing, Penn Forest. Everything south of Route 903 and east to the Kidder Township Line. Boroughs: Hauto, Nesquehoning, Lansford, Summit Hill, Jim Thorpe, Weissport, Bownmanstown, Palmerton, Lehighton, and Parryville) , LEHIGH

AND NORTHAMPTON COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 44.00 31.43

CARP0219-008 05/01/2019

BERKS and LANCASTER COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 39.14 19.68

CARP0441-005 05/01/2020

BERKS, CARBON, LANCASTER, LEHIGH and NORTHAMPTON COUNTIES

Rates Fringes

PILEDRIVERMAN....................$ 43.70 37.22

CARP0443-002 05/01/2019

ADAMS, BRADFORD, CARBON (Banks, Lausanne, Lehigh, Packer, Kidder Twps., and part of Penn Forest Township north of Route

903) COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER,

LEBANON, LUZERNE (lower part of) MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (New Cumberland Army Depot and Harrisburg State Airport) COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 35.18 18.82

CARP2274-003 05/01/2020

Adams, Bradford, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lebanon, Luzerne, Lycoming, Monroe, Montour, Northumberland, Perry, Pike, Schuylkill, Snyder, Sullivan, Susquehanna, Tioga, Union, Wayne, Wyoming and York

Rates Fringes

CARPENTER........................$ 32.22 17.19

PILEDRIVERMAN....................$ 32.22 17.19

ELEC0126-001 06/01/2020

ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON,

LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES

Rates Fringes

Line Construction:

Cable Splicer...............$ 47.42 31.25%+11.75 Groundman...................$ 28.45 31.25%+11.75 Lineman.....................$ 47.42 31.25%+11.75 Truck Driver................$ 30.82 31.25%+11.75 Winch Truck Operator........$ 33.20 31.25%+11.75

ELEC1319-001 08/30/2020

BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING,

MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER,

SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES

Rates Fringes

Line Construction:

Equipment Operator..........$ 59.33 20.80 Groundmen...................$ 36.78 12.17 Linemen.....................$ 59.33 24.80 Truck Driver................$ 38.56 12.30

* ENGI0542-004 05/01/2020

Rates Fringes

Power equipment operators:

(HIGHWAY CONSTRUCTION AND

WATER LINES CONSTRUCTION

(OFF PLANT SITE))

GROUP 1.....................$ 37.56 24.24

GROUP 1a....................$ 39.81 24.92

GROUP 2.....................$ 36.38 23.90

GROUP 3.....................$ 35.69 23.69

GROUP 4.....................$ 35.23 23.57

GROUP 5.....................$ 34.72 23.42

GROUP 6.....................$ 37.79 24.31

GROUP 6a....................$ 40.04 24.97

BOOM LENGTH PAY:

On all machines with booms, jibs, masts and leads 100 ft. and over, twenty five cents ($0.25) per hour additional will be paid for each increment of 25 ft. over 100 ft. On machines with booms (including jibs, masts and leads,etc.), 200 ft.

and over, two (2) Operating Engineers shall be required.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1 - Pile drivers, all types of cranes, all types of backhoes, draglines, keystones, all types of shovels, derricks, trench shovels, trenching machines, paver (blacktop and concrete), gradalls, all front end loaders, tandem scrapers, pippin types backhoes, boat captains, batch plant with mixer, drill self contained (drill-master type), CMI Autograde, milling machine, vemeer saw, conveyor loader (euclid type) scraper and tournapulls, bulldozers and tractors, concrete pumps, motor patrols, mechanic welders, log skidder, side boom, bobcat type (with attachments), boring machines including directional boring machines, chipper with boom, hydro ax, machines similar to the above including remote control equipment.

GROUP 1a: Crawler backhoes and Crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; All types of cranes 15 ton and over factory rating; Single person operation truck cranes 15 ton and over factory rating; Cherry picker type machinery and equipment 15 ton and over factory rating;

Machines similar to above, including remote control equipment; Equipment in this Wage Group that does not require an oiler.

GROUP 2 - Spreaders, asphalt plant engineers, rollers (high grade finishing), machine similar to above, including remote control equipment, and forklifts 20ft and over.

GROUP 3 - Welding machine, well points, compressors, pump heaters, farm tractors, form line graders, ditch witch type trencher, road finishing machines, concrete breaking machines, rollers, miscellaneous equipment operator, seaman pulverizing mixer, power broom, seeding spreader, tireman - (for power equipment ) conveyors, loaders other than EUC type, conveyors, driller second class, machines similar to the above including remote control equipment, and forklift under 20 ft.

GROUP 4 - Fireman and grease truck

GROUP 5 - Oilers and deck hands

GROUP 6 - All machines with booms (including jibs, masts, leads, etc.) l00 ft. and over.

GROUP 6a: All machines with Booms (including Jibs, Masts, Leads, etc.) 100 feet 15 ton and over factory rating;

Machines similar to above, including remote control equipment; Equipment in this Wage Group that does not require an oiler.

***TOXIC/HAZXARDOUS WAST REMOVAL***

Add 20 per cent to basic hourly rate for all classifications

* ENGI0542-022 05/01/2020

Rates Fringes

Power equipment operators:

(HEAVY CONSTRUCTION:)

GROUP 1.....................$ 36.90 27.06+A

GROUP 1a....................$ 39.14 27.73+A

GROUP 2.....................$ 36.61 26.98+A

GROUP 2a....................$ 38.87 27.64+A

GROUP 3.....................$ 33.69 26.12+A

GROUP 4.....................$ 32.55 25.79+A

GROUP 5.....................$ 32.11 25.65+A

GROUP 6.....................$ 31.23 25.39+A

HEAVY CONSTRUCTION:

FOOTNOTE:

A: PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, the employee works the day before and the day after the holiday.

BOOM LENGTH PAY:

On all machines with booms, jibs, masts and leads 100 ft.

from ground up, fifty ($0.50) per hour additional will be paid for each increment of 25 ft. over 100 ft. On cranes with booms (including jibs, masts and leads, etc.) 200 ft.

and over, two (2) operators shall be required, no Oilers will be required, with seventy five ($0.75) in increments of 25 ft.

***TOXIC/HAZXARDOUS WASTE REMOVAL***

Add 20 per cent to basic hourly rate for all classifications

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Machines doing hook work, any machine handling machinery, cable spinning machines, helicopters, machines similar to the above, including remote control equipment, all types of cranes, cableways, and draglines.

GROUP 1a: Machines doing hook work; Machines handling machinery; All types of cranes 15 ton and over factory rating; Cable ways; Draglines 15 ton and over factory rating; High Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Winch Boom Type) 15 ton and over factory rating; Machines similar to above, including remote control equipment; Equipment in this Wage Group that does not require an oiler.

GROUP 2: Backhoes, keystones, shovels, derricks, trench shovels, trenching machines, hoist with two towers, pavers 21E and over, overhead cranes, building hoists (double drum) gradalls, mucking machines in tunnels, front end loaders, tandem scrapers, pippin type backhoes, boat captains, batch plant operators concrete drills, self-contained rotary drills, fork lifts, 20ft, lift and over, scrapers, tournapulls, spreaders, bulldozers and tractors, rollers (high grade finishing), mechanic-welder, motor patrols, concrete pumps, grease truck, bob cat type (all attachments), boring machines including directional boring machines, hydro ax, side boom, vermeer saw, chipper with boom, machines similar to the above including remote control equipment

GROUP 2a: Crawler backhoes and crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; Equipment 15 ton and over factory rating; Machines similar to above, including remote control equipment; Equipment in this Wage Group that does not require an oiler.

GROUP 3: Conveyors, building hoist (single drum), high or low pressure boilers, drill operators, well drillers, asphalt plant engineers, ditch witch type trencher, second class driller, forklift truck under 20ft. lift, stump grinder, tireman (for power equipment), machines similar to above including remote control equipment.

GROUP 4: Welding machines, well points, compressors, pumps, heaters, farm tractors, form line graders, road finishing machines, concrete breaking machines, rollers, seaman pulverzing mixer, power boom, seeding spreader, chipper without boom, machines similar to the above including remote control equipment.

GROUP 5: Fireman.

GROUP 6: Oilers and deck hands (personnel boats).

* IRON0404-006 07/01/2020

ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON,

LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY,

SCHUYLKILL, SNYDER, UNION and YORK COUNTIES

Rates Fringes

Ironworkers:.....................$ 33.76 30.13

* IRON0404-017 07/01/2020

BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE,

SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE and WYOMING COUNTIES

Rates Fringes

IRONWORKER.......................$ 33.76 30.13

LABO0158-001 05/01/2020

Rates Fringes

Laborers:

GROUP 1.....................$ 22.41 17.69

GROUP 2.....................$ 29.03 17.69

GROUP 3.....................$ 26.02 17.69

GROUP 4.....................$ 26.37 17.69

GROUP 5.....................$ 27.04 17.69

GROUP 6.....................$ 26.46 17.69

GROUP 7.....................$ 26.75 17.69

GROUP 8.....................$ 27.23 17.69

LABORERS CLASSIFICATIONS

GROUP 1: Flag person

GROUP 2: Hazardous/Toxic/Asbestos Waste Handler, Lead Paint Handler

GROUP 3: Asphalt tamper, concrete pitman, puddlers, highway guide rail right of way and property fence slab reinforcement placers, Laborers, landscaper, seeders, planters, magazine tenders, laser beam men for pipe laying and paving machines,, railroad trackman, signalman, asphalt rakers, lute or screed man, pneumatic and electric tool operators, jackmammers, paving breakers, concrete saws, whacker vibrator, chainsaw, highway concrete block layers, sheet hammer, pipe layers, Walk Behind Rollers, Walk Behind Trencher

GROUP 4: Caisson-open air below 8 feet, cofferdam open air below 8 feet where excavations for circular caissons and cofferdams 8 ft and below level of natural grade adjacent to starting point, form setters (road) wagon drill diamond point drill, gunite nozzle operators, walk behind rollers and concrete rubbers, blaster.

GROUP 5: Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and welding in Conjunction wth Rebar, and Concrete Surfacer.

FREE AIR TUNNELS AND ROCK SHAFTS

GROUP 6: Outside labers in conjuction with tunnels and rock shafts

GROUP 7: Chuck tenders, muckers, nippers, miners, inside laborers

GROUP 8: Miners, drillers, blasters, pneumatic shield operators, lining, spotting and timber workmen, rebar steel placer, bonding and securing, welders, and concrete surfacers

PAIN0021-026 05/01/2018

ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES

Rates Fringes

Painters:

Bridge......................$ 31.80 14.23 Brush.......................$ 23.92 14.23 Spray, Sandblast............$ 26.05 14.23

PAIN0057-021 06/01/2020

JUNIATA COUNTY

Rates Fringes

Painters:

Bridge, Towers..............$ 35.72 20.72 Commercial Brush & Roller...$ 28.80 20.72 Industrial Brush & Roller...$ 33.55 20.72 Spray.......................$ 28.80 20.72

PAIN1021-001 05/01/2012

BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES

Rates Fringes

Painters:

Bridge; Brush, Roller.......$ 30.85 14.80

Bridge; Spray...............$ 31.85 14.80 Brush and Roller............$ 26.55 14.80 Spray and Sandblast.........$ 27.55 14.80

PAIN1021-002 05/01/2009

BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR,

NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN,

SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES

Rates Fringes

Painters:

Bridge; Brush, Roller.......$ 25.60 12.05 Bridge; Spray...............$ 26.60 12.05 Brush and roller............$ 22.75 12.05 Spray, Sandblast............$ 23.75 12.05

PLAS0592-004 06/01/2020

MONROE COUNTY; (EXCEPT TOBYHANNA DEPOT)

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.78 13.30

PLAS0592-005 06/01/2020

COLUMBIA COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.78 13.30

PLAS0592-017 05/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

BERKS (Northeastern part lying North of a line starting from the Southern boundary line of Lehigh County continuing through Huffs Church, Fredericksville, Dryville, Lyon Station, Kutztown, Krumsville, and Stoney run in Berks County to the Lehigh County line), CARBON, LEHIGH, NORTHAMPTON (Northwest part including the towns of Walnutport, Bath, and Northampton) COUNTIES.......$ 31.60 23.18

PLAS0592-018 05/01/2020

Rates Fringes

Cement Mason/Concrete Finisher Adams, Lancaster and York Counties....................$ 30.80 21.45

PLASTERER

Adams, Berks (Portions of), Lancaster, and Lebanon Counties............$ 27.48 20.75

PLAS9592-002 05/01/2014

MONROE COUNTY (TOBYHANNA ARMY DEPOT)

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 31.23 10.00

TEAM0229-003 05/01/2018

Rates Fringes

TRUCK DRIVER (ADAMS, BERKS,

CARBON, COLUMBIA, CUMBERLAND,

DAUPHIN, JUNIATA, LACKAWANA,

LANCASTER, LEBANON, LEHIGH,

LUZERNE, LYCOMING, MONROE,

MONTOUR, NORTHAMPTON,

NORTHUMBERLAND, PERRY, PIKE,

SCHUYKILL, SNYDER, SULLIVAN,

SUSQUEHANNA, UNION, WAYNE,

WYOMING, AND YORK COUNTIES)

GROUP 1.....................$ 35.32 0.00

GROUP 2.....................$ 35.39 0.00

GROUP 3.....................$ 35.88 0.00

Truck drivers: (BRADFORD AND

TIOGA COUNTIES)

GROUP 1.....................$ 22.21 13.11

GROUP 2.....................$ 22.28 13.11

GROUP 3.....................$ 22.77 13.11

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1: Flat Bed Truck (Single-Axle), Dump Trucks (Under 10 Yds Single Axle), Stake Body Trck (Single Axle), Dumpster (Single Axle)

GROUP 2: Dump Truck (Over 10 Yds), Asphalt Distributors, Transit Mix (Under 5 Yds), Transit Mix (Over 5 Yds.), Flat or Stake Body (Tandem), Fuel Truck A-Frame/Winch Trucks, Dry Batch Truck, Truck Mounted Sweeper and Vac Trucks, Buses, Dumpster (Tandem)

GROUP 3: Euclid-Type, Off Highway Equipment-Back or Double Bottom Dump Trucks (Over 20 Tons), Straddle Trucks, Pusher, Articulate Dumped Trucks, Low Boy Trailers, Semi Trailers

Water Tank, Sprinkler Trucks, Winch Trucks and Fuel Trucks shall be governed by the appropriate classification as listed above.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .