B.08.02_DR19B0014_-_Solicitation_Amendment__3.pdf

PDF 396 KB Posted

Attached to
Baltimore Harbor Maintenance Dredging Federal contract opportunity
Solicitation number
W912DR-19-B-0014
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

Solicitation Amendment #3_29 July 2019

View the file

Other files for this federal contract opportunity

Other files attached to Baltimore Harbor Maintenance Dredging, newest first.
File Type Posted
Abstract_of_Bids_Revised_09AUG19.pdf PDF
Abstract_of_Bids_080919.pdf PDF
Certificate_of_Corporate_Authority.pdf PDF
B.08.02_DR19B0014_-_Solicitation_Amendment__4.pdf PDF
Payment_Bond_Form.pdf PDF
EFT_Form.pdf PDF
SF_LLL_Form.pdf PDF
Performance_Bond_Form.pdf PDF
B.08.02_DR19B0014_-_Solicitation_Amendment__2.pdf PDF
Amendment_0002_specification_attachments.pdf PDF
B.08.02_DR19B0014_-_Solicitation_Amendment__1.pdf PDF
B.08.02_DR19B0014_-_Solicitation.pdf PDF
H.08.04_DR19B0014_-_Specs_FY19-20_Baltimore_Harbor_Dredging.pdf PDF
Drawings_20190530_MD.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: Baltimore Harbor Maintenance Dredging, Chesapeake Bay, MD

The purpose of this solicitation amendment is to add responses to Request for Information (RFI)s and update clause 52.228-1 as w ell as incorporate the appropriate attachments.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR19B0014

X 9B. DATED (SEE ITEM 11)

08-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2019

CODE

U.S. ARMY CORPS OF ENGINEERS, BALTIMORE

2 HOPKINS PLAZA

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR19B0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

RFIS

1.Can you please post the 5x5 Average XYZ data set that is shown in the project plans? Thank-you Government Response. Files will be uploaded to FBO announcement.

2. Section 00 21 13, Page 6 of specifications states: "Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later than (NLT) 12:00 PM (EST) Friday, 12 July 2019." Please extend the deadline for technical inquiries to allow contractors ample time to review the plans and specifications.

Government Response. RFI period is now closed.

3. Clause 52.228-1 of the solicitation does not give the bid guarantee amount which is required for the bid bond.

Government Response. Information will be incorporated into solicitation amendment and uploaded to

FBO.

4. Are Attachments A -EFT Form, Attachment B-Lobbing Form SF-LLL and Attachment C - Certificate of Corporate Authority required with the bid package and if so, please provide the forms.

Government Response. Forms will be attached to Solicitation posting on FBO.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

INFORMATION TEXT

MAGNITUDE OF CONSTRUCTION PROJECT

The estimated value of the proposed work is between $25,000,000.00 to $100,000,000.00.

End of Text

EVIDENCE OF AUTHORITY TO SIGN BIDS/PROPOSALS

Evidence of the authority of individuals signing bids/proposals to submit firm bids/proposals on behalf of the bidder/offeror is required except where the bid/offer is signed, and shows that it is so signed, by: The President, Vice-President, or Secretary of Incorporated bidders; a partner in case of partnership; the owner in the case of sole proprietorships. Failure to submit with the bid satisfactory evidence of authority of all other persons may be cause for rejection of bid as an invalid or non-responsive bid.

PREAWARD SAFETY CONFERENCE

a. Where an apparent awardee, in performance of contracts during the previous three year period incurred one or more accidents, or where, in the opinion of the Contracting Officer, there is any question regarding his compliance with any safety or accident prevention requirement, the apparent awardee, on request of the Contracting Officer prior to any award under this solicitation, shall attend a conference with representatives of the Contracting Officer to discuss any such accidents or non-compliance, the reasons for their occurrence, and measures which will be taken to preclude any recurrence thereof.

b. Information elicited at this conference will be used by the Contracting Officer, in conjunction with other information obtained in the pre award survey, in determining the awardees’ responsibility.

c. The items discussed, the preventive measures considered, and any conclusions reached in this conference shall be recorded in minutes of the meeting, which shall be authenticated by the signatures of representatives of the awardee and the Contracting Officer, and any procedures noted therein as agreed upon shall become an obligation of the awardee, along with all other safety and accident prevention requirements of the contract, if award is made to him.

SAFETY REQUIREMENTS

The Contractor is advised that he shall be expected to comply with the OSHA Standards as well as the most recent Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1). EM 385-1-1 with applicable addenda and the OSHA Standards are hereby incorporated by reference, as if fully set forth.

HARBOR MAINTENANCE FEE

Offerors contemplating use of U.S. ports in the performance of the contract are subject to paying a harbor maintenance fee on cargo. Federal law establishes an ad valorem port use fee on commercial cargo imported into or exported from various U.S. ports. The fee is 0.125 percent (.00125). Cargo to be used in performing work under contracts with the U.S. Government is not exempt from the fee, although certain exemptions do exist.

Offerors are responsible for ensuring that the applicable fee and associated costs are taken into consideration in the preparation of their offers. Failure to pay the harbor maintenance fee may result in assessment of penalties by the Customs Service. The statute is at Title 26 U.S. Code sections 4461 and 4462. Department of Treasury Customs Service regulations implementing the statute, including a list of ports submit to the fee, are found at 19 CFR Section 24.24, Harbor Maintenance Fee. Additional information may be obtained from local U.S. Customs Service Offices or by writing to the Director, Budget Division, Office of Finance, Room 6328, U.S. Customs Service, 1301 Constitution Avenue, N.W., Washington, D.C. 20229.

DREDGING AND DREDGE RELATED MARINE WORK

The Contractor shall comply with the provisions of EM 385-1-1. If the Contractor is a currently accepted participant in the Dredging Contractors of America (DCA)/ United States Army Corps of Engineers (USACE) Dredging Safety Management Program (DSMP), as determined by the DCA/USACE Joint Committee, and holds am current valid Certificate of Compliance for both the Contractor Program and the Dredge(s) to be used to perform the work required under this contract, the Contractor may, in lieu of the submission of an Accident Prevention Plan (APP), make available for review, upon request, the Contractor’s current Safety Management System (SMS) documentation, submit to the Contracting Officer the current valid Company Certificate of Compliance for its SMS, submit the current dredge(s) Certificate of Compliance based on third party audit, and submit for review and acceptance, site-specific addenda to the SMS as specified in the solicitation.

ARITHMETIC DISCREPANCIES

a. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by bidder:

1) Obviously misplaced decimal points will be corrected;

2) Discrepancy between unit price and extended price, the unit price will govern;

3) Apparent errors in extension of unit prices will be corrected;

4) Apparent errors in addition of lump-sum and extended prices will be corrected.

b. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends his bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

c. These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

CAUTION TO BIDDERS--BID ERRORS

You are cautioned to exercise extreme care in preparation of your bid. Errors in bids are costly and could result in substantial loss to you as well as delayed award of contracts. Actions you can take to avoid errors are:

(a) Make sure your bid takes into consideration all amendments to the IFB. If you are uncertain whether you have received all amendments, call the Baltimore District Office, telephone 410-962-2197 or 410-962- 0192, in time to obtain any missing amendment.

(b) If you feel bidding requirements are unclear, contact the Baltimore District Office in writing for an explanation before preparing and submitting your bid.

(c) Verify all quantities and prices, especially quotations from subcontractors. Make sure no line items have been overlooked in recapitulating. Have your bid reviewed by qualified personnel other than those preparing the bid.

(d) Retain all original notes, subcontractor quotations, estimates, and summary worksheets from which your bid was prepared. If you have made a mistake in bid, you will need these papers to determine the nature and amount of an error and to support any request you may make for special relief.

AWARD TO SINGLE BIDDER

No separate award will be made for any item contained in Section B/00010. Bidders must submit a bid on all items contained in Section 00 10 00, or the Bid will be considered non-responsive and therefore rejected.

DELIVERY OF BIDS/PROPOSALS

Bids/Proposals shall be delivered in person to the:

Baltimore District Corps of Engineers Contracting Division, Room 00-A-22 2 Hopkins Plaza Baltimore, Maryland, 21201

SUBCONTRACTING GOALS

Prior to award, the selected large business bidder shall submit an acceptable subcontracting plan within the time limit prescribed by the Contracting Officer, consistent with Section 806b) of Public Law 100-180, 95-507 and PL 99- 661.

The following goals are considered reasonable and achievable during the terms of the contract:

62.50% as a minimum of the planned subcontracting dollars to be placed with small business concerns. (The following are subsets of the small business goal):

As of that portion placed with small business concerns;

5.00% shall be placed with small disadvantaged business concerns, to include Historically Black Colleges and Universities and Minority Institutes (HBCU/MI);

1.50% shall be placed with women owned small businesses;

1.00% shall be placed with HubZone small businesses;

1.50% shall be placed with Veteran-Owned small business;

1.00% shall be placed with Service-Disabled Veteran-owned small business

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be twenty (20) percent of the bid price or $3.0 Million, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS

The following have been modified:

INFORMATIONAL TEXT

EFT FORM

The Electronic Funds Transfer (EFT) form (attached) shall be completed if the bidder/offer does not have a current contract with the U.S. Army Corps of Engineers, Baltimore District. The completion and processing of this form ensures that Electronic Funds Transfer will make payment under a resultant contract. (See EFT Form attached after Section 00 73 00) This will be submitted with your bid.

(End of Text)

STANDARD FORM LLL, DISCLOSURE OF LOBBYING ACTIVITIES LOCATION

The Standard Form LLL “Disclosure of Lobbying Activities” and Instructions for Completion of SF LLL, Disclosure of Lobbying Activities. (See SF LLL attached after Section 00 73 00) This will be submitted with your bid.

CERTIFICATE OF CORPORATE AUTHORITY

The Certificate of Corporate Authority shall be submitted as part of the bid/proposal or signed contract if the bidder/offeror is a corporation (See Certificate of Corporate Authority Form attached after Section 00 73 00). This will be submitted with your bid.

(End of Summary of Changes)