Solicitation for Reservoir Cleaning Project W912DR-16-T-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001_W912DR16T0003_WITH_REVISED_ATTACHMENTS.pdf | ||
| C01_Presolicitation_Notice.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DR-16-T-0003 16-Nov-2015
b. TELEPHONE NUMBER
410-962-5129
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 30 Nov 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DR9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CARRIE MILLS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS BALTIMORE DIS
10 SOUTH HOWARD STREET
ROOM 7000
BALTIMORE MD 21201-2536
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 443-853-2061 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
10 MI
NAICS:
221310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF87
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912DR-16-T-0003
Section SF 1449 - CONTINUATION SHEET
INSTRUCTIONS TO QUOTERS
Quotes can be submitted via e-mail to Carrie.Mills@usace.army.mil or fax at (410)-962-2001, ATTN: Carrie Mills or via mail to U.S. Army Corps of Engineers, Contracting Division, Simplified Acquisition Team, ATTN: Carrie Mills, 10 South Howard Street, 7th floor, Room 7000, Baltimore, MD 21201-2530.
Contractors must complete all line items to be considered for award. All line items must be priced.
Quotes providing partial pricing shall be considered non-responsive.
Questions concerning this solicitation must be submitted by email no later than 24-Nov-2015 at 11:00 AM EST. This will allow responses to be posted on FBO prior to the solicitation closing date.
Email questions to Carrie.Mills@usace.army.mil.
SUBMISSION REQUIREMENTS
Quotes shall incorporate the following:
1. A cover letter on Contractor’s letterhead, summarizing the pricing total and outlining quote terms and conditions, signed by the representative managing the project. Include the Cage Code, DUNS # and Tax
ID.
2. Each Contractor is required to submit a quote consisting of two (2) separate volumes. The Volumes are I – Technical (including Past Performance); and II - Price. Contractor must organize their quote as described and outlined below. The contractor’s name, RFQ number, and date must be affixed to the outside of each volume. Each volume must have a table of contents and the contents must be separated by tabs, in accordance with the table of contents. The volumes must be in an 8½” x 11” format. Pages may be single-sided or double-sided (double-sided pages count as two pages). Pages in each volume must be numbered sequentially. Printing should be single spaced.
Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size with one inch margin on all sides applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscaped.
3. The following volumes must contain the following information and not exceed the page limits specified below:
Volume I – Technical (including Past Performance): The total number of pages must not exceed 25 pages. The 25 page limit includes technical proposal, as well as the past performance information, except for the actual past performance questionnaires provided directly by the references See attached Past Performance Questionnaire. This volume shall be free of any cost/price information.
Volume 2- Price: The cost/price quote shall be submitted with a narrative cover sheet. The Price Schedule shall be completed in full and all calculations should be accurate. There is no page limit for Volume 2. If you are submitting a hard copy of your quote, you must also submit Volume 2 electronically as an excel spreadsheet to Carrie.Mills@usace.army.mil.
4. Contractors are cautioned that “parroting” of the Technical requirements of the PWS with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Contractors are responsible for including sufficient details to permit a complete and accurate evaluation of each quote. Proprietary information shall be clearly marked.
5. Any pages that are changed (as a result of negotiations or quote revisions) should be of a different color and have changed information clearly marked. The revised pages shall be dated. Each Volume shall be clearly labeled with its Title, Submission Date, Solicitation Number and copy number.
SITE VISIT INFORMATION
A site visit will be held at 9:00a.m. on November 20, 2015. The starting location is the McMillan Water Treatment Plant located 2500 First Street, NW, Washington, DC 20001. Individuals interested in attending the site visit MUST submit their Name, Company Name, Date of Birth, Driver's License Number and Issuing State to Nathan Cole by email to Nathan.H.Cole@usace.army.mil no later than 2:00 p.m. on the business day before the site visit in order to be admitted to the site. Upon arriving for the site visit, individuals will be required to show their Driver’s License.
Individuals who do not have a driver's license will need to submit the information from a government issued ID (State or Federal) and be prepared to show that ID upon arrival. Quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
PRICE SCHEDULE
Item Estimated No. Description Quantity Unit Price* Amount*
0001 All costs in connection with JOB $_____
Mobilization, Demobilization, Pumping, Cleaning, Pressure Washing, Disinfection, Sediment Disposal, and Dechlorination, complete as shown and specified for the Third High Reservoir.
0002 All costs in connection with JOB $_____
Mobilization, Demobilization, Pumping, Cleaning, Pressure Washing, Disinfection, complete as shown and specified for the McMillan North Clearwell.
0003 All costs in connection with
Handling, Dewatering, Transportation and disposal of Lime sediments, complete as Shown and specified, from the McMillan North Clearwell.
0003AA First 2,000 Cubic Yards 2,000 CY $_____ $_____
0003AB Over 2,000 Cubic Yards 200 CY $_____ $_____
0004 Removal of Lime 2,200 CY $_____ $_____ Sediment from Abandoned
Sand Filter #9, complete as shown and specified in PWS para. 2.9
TOTAL ESTIMATED PRICE $___________
*All line items must be priced in order for the quote to be considered.
PERFORMANCE WORK STATEMENT
1. GENERAL
1.1 BACKGROUND INFORMATION: The Washington Aqueduct Division maintains and operates the Dalecarlia and McMillan Water Treatment Plants (WTP), from which approximately one million people in the District of Columbia and Northern Virginia are served with reliable and safe potable water. Raw water diverted from the Potomac River flows through two conduits and discharges directly into the Dalecarlia Forebay. The water in the Forebay is pumped into the Dalecarlia Reservoir via a booster pumping station. The water from the Dalecarlia Reservoir is distributed to both the Dalecarlia Plant and, via the Georgetown Reservoir to the McMillan Plant.
At the Dalecarlia WTP, after filtration, the water flows via a 15 million gallon (MG) Clearwell into a 30 MG Clearwell. Finished water from the 30 MG Clearwell is then pumped out to the public via distribution zone reservoirs.
The process is similar at the McMillan Plant. Water initially flows from the Dalecarlia Reservoir via the Georgetown Conduit to the Georgetown Reservoir for sedimentation purposes. From the Georgetown Reservoir, the water flows through the City Tunnel to the McMillan Reservoir. From there it is pumped through a filtration building and the filtered water flows via the North Clearwell to the South Clearwell.
The Washington Aqueduct also maintains 3 distribution reservoirs, which are supplied with water pumped from the Dalecarlia WTP into one of 3 pressure distribution zones, and provide peak demand storage for the city.
The Washington Aqueduct has determined that it is necessary to clean the potable water systems buried storage reservoirs. In general terms, the work shall consist of providing all necessary equipment to safely access each reservoir and perform dewatering, dechlorination, cleaning, and disinfection of the reservoir, as well as waste disposal of lime and sediment residuals.
The Washington Aqueduct is a self-supporting operation of the Corps of Engineers, and funds for operation and maintenance are derived solely from the sale of water.
LOCATION: The Washington Aqueduct facilities are located at the following locations:
Dalecarlia Water Treatment Plant, Administrative Office - 5900 MacArthur Boulevard, NW, Washington, D.C.
20016 McMillan Water Treatment Plant, North Clearwell - 2500 First Street, NW, Washington, D.C. 20001 Third High Reservoir, 3901 Donaldson Place, NW, Washington, D.C. 20016
This scope of this Performance Work Statement will provide for the cleaning of the Washington Aqueduct’s Third High distribution reservoir and McMillan North Clearwell in Washington, DC. The Contractor shall provide all supervision, labor, equipment, materials, permits, licenses, and any other resources necessary for the proper performance of this requirement contract. The Contractor shall perform all work within the interior of the Clearwell and Reservoir during an outage period initiated by the Government in the durations indicated. The work at the North Clearwell may only be completed during an annual outage in the March-April time frame. The work associated with the Abandoned Sand Filter #9 shall be completed prior to the beginning of the North Clearwell outage period. The entirety of the work shall be completed within 184 calendar days of award.
1.2 MANAGEMENT REQUIREMENTS: The Contractor's work and responsibility shall include all Contractor planning, programming, administration, and management necessary to provide services as specified. The work shall be conducted in accordance with the specifications stated in this solicitation and all applicable Federal, State and Local laws, regulations, codes, or directives. The Contractor shall perform all related Contractor administrative services necessary to perform the work, to include the following: furnishing of material, labor, quality control, Contractor financial control, and maintenance of accurate and complete records, files, and libraries of documents to include Federal, state, and local laws, regulations, and codes which are necessary and related to the functions being performed. The Contractor shall provide related services such as preparing and providing required reports, compiling historical data, performing administrative activities and submitting necessary information as specified. Tasks shall be performed in such a manner as to conform to the standards specified herein. The Contractor shall be responsible for providing all supervision, labor, equipment, materials, permits, licenses, and any other resources necessary for the proper performance in accordance with the solicitation.
1.3 REQUIREMENTS PRIOR TO MOBILIZATION: The Contractor shall ensure that all requirements and plans for the pumping, confined space entry, cleaning, dechlorination, disinfection, and residual material handling and disposal activities as defined within the scope of work are fully understood. It shall be the Contractor’s responsibility to develop an appropriate work plan, which meets these requirements and submit said plan for approval. The work plan and performance are subject to Government acceptance by the Washington Aqueduct.
SUBMITTALS: Prior to mobilization to perform any specific tasks, the contractor shall prepare, and obtain approval, for pre-cleaning submittals and shop drawings indicated in Section 3.4. The submittals shall be submitted within the time indicated in the attached deliverable table, Attachment A.
1.4 BASIS OF PAYMENT AND RESIDUALS QUANTITIES: Payment will be made for all work, complete and as specified, in connection with the pumping, cleaning, inspection, and disinfection of the reservoir under each item. The Contractor will be paid per unit price, for each cubic yard of in place sediment actually removed, handled, and disposed, where indicated on the price schedule for particular reservoirs, and in accordance with the invoice. Measurement will be made based on differences between the pre-survey baseline and post cleaning inspection.
INVOICES: Invoices shall be submitted to the COR complete with supporting documentation. Payment shall be made within the required time starting with the receipt of a proper invoice.
ESTIMATED QUANTITIES: The quantities stated herein are estimated amounts of lime residuals and sediment to be removed and disposed. They are not guaranteed amounts but are given only as a general guide for the preparation of the Contractor's proposal. These approximate quantities represent the best estimates of Washington Aqueduct and are based on an engineer's estimate of actual volumes in place.
SUBSTANTIAL COMPLETION: The work at each reservoir shall be substantially complete after verification of the final cleaning, receipt of a complete series of negative bacterial test results, and confirmation that the reservoir has a total chlorine concentration suitable for return to service, as indicated in this scope of work. All cleanup, site restoration, and demobilization shall be completed within 14 calendar days from substantial completion.
1.5 DEFINITIONS: As used throughout this Performance Work Statement (PWS), the following terms are defined:
CONTRACT DISCREPANCY REPORT (CDR) DA FORM 5479-R: A formal, written documentation of Contractor non-conformance or lack of performance for contracted work. Usually issued after an attempt has been made to resolve a performance issue at the Project Manager and Contracting Officer’s Representative (COR) level and a more formal resolution is needed.
SURVEILLANCE: Planned, or random, observations of the timeliness, accuracy, completeness, and/or quality of services performed by the Government.
UNIT PRICE - WORK: This level of work is defined as all residuals handling and disposal activities. Included in this level of work are planning, project management, hauling and disposal operations, supervision, overhead, profit, and recurring work. All labor, materials, and equipment required to execute work required under this level of work are the Contractor’s responsibility and are to be included in their unit prices.
CONTRACTING OFFICER’S REPRESENTATIVE (COR): A person, specifically appointed by the Contracting Officer, with specific authority to verify contract compliance.
SEDIMENT: Residuals or solid waste to be cleaned from the reservoir or produced as a result of the cleaning process, including, but not limited to: dirt, sand, silt, calcium, lime, and biomass.
RESERVOIR: Structure containing water, including both potable water distribution reservoirs and filtered water clearwells. References to the reservoirs shall include the filtered water reservoirs at Dalecarlia and McMillan Water Treatment Plant as well as the distribution reservoirs.
OUTAGE DATE: The date the Government anticipates that the indicated reservoir is taken out of service for the Contractor to begin work requiring access to the interior of the reservoir. For reservoirs which will be drained by Government operation of gravity drains, the actual date will be defined by a water level 24” or less. For reservoirs requiring the Contractor to perform preliminary pumping, the actual date will be defined as the date the Contractor is allowed to place his equipment into the reservoir.
2. DESCRIPTION OF WORK:
2.1 GENERAL: All work shall be conducted in accordance with the Performance Work Statement along with any specifications of this solicitation.
SCOPE: The Contractor shall provide cleaning services as described herein. This work shall include the planning, programming of services, and ancillary tasks necessary for the pumping, dechlorination, cleaning of interior reservoir surfaces, removal, transportation, and disposal of any sediment and waste residuals, disinfection, testing, and compliance with safety, records, and reporting requirements.
FACILITIES: In general, the reservoirs to be cleaned by the Contractor are buried concrete structures, used for the storage of filtered and potable water, consisting of column supported roof slabs with limited interior access. They are located on secure facilities with gates and limited staging or storage space. The interior of the reservoirs are considered a confined space. The Contractor shall comply with all Confined Space Entry, Security, and Sanitary regulations as described in EM 385-1-1 and as required by the Occupational Safety and Health Administration
(OSHA).
CONTRACTOR LAYOUT: The Washington Aqueduct has indicated areas in the proximity of each facility, on the attached site drawings, Attachment B, SK-1, which may be used for staging, storage, water supply, and pumping discharge. The Washington Aqueduct is not responsible for the security or disposition of any materials or equipment stored onsite. Water supply utilities and pumping discharge shall be utilized only as specified or directed, based on local use regulations. The contractor shall make provisions for providing their own power supply.
EQUIPMENT RESTRICTIONS: The roof slabs of each of the structures to be cleaned are elevated slabs supported by a series of columns. The roof slabs are subject to Live Load weight restrictions of 150 psf, or as further specified in the contract documents. The Contractor shall avoid operating motorized equipment over the roof slabs of the reservoirs. The structures to be cleaned under this contract provide for the storage of filtered and potable water. Any equipment or materials used within the interior of the reservoir or tank shall be approved for use in contact with potable water by the National Sanitation Foundation (NSF). No motorized or hydraulic equipment or machinery containing oils, fuels, or lubricants, or other non-NSF approved fluids shall be placed inside the reservoir or tank.
The Contractor shall provide proper means for sanitizing/disinfection of shoes, equipment and other items that will come in contact with the interior surface of the reservoirs to prevent any contamination.
2.2 EXECUTION: The contractor shall perform the following, as described in the PWS.
2.3 DRAINING, PUMPING, AND ENTERING THE RESERVOIRS: Washington Aqueduct employees will operate all valves and water isolation gates. The reservoirs shall be drained to allow entry to the reservoirs as indicated in Section 2.9 below. The Contractor shall be responsible for removing any remaining water to facilitate the cleaning and inspection of the reservoir. The Contractor should expect some shallow water due to the sloping and contours of the floor slab. The COR will coordinate draining activities with the contractor.
PUMP DISCHARGE: The contractor shall remove sediments and remaining water from the reservoirs. All water shall be disposed into sanitary, combined sewers, or as otherwise indicated. The Contractor shall install facilities to capture any sediments from flowing into the combined sewer/sanitary sewer, for disposal off site, by the Contractor.
No materials which are not NSF 61 approved for use with potable water may be discharged.
CLEANING WATER: Wastewater from the cleaning process shall not be drained into the existing storm drains.
The contractor shall remove the wastewater from the reservoirs and discharge it into the nearby sanitary or combined sewer. Wastewater shall be discharged at a rate that does not create flooding of the sewer beyond its capacity. The wastewater shall have sufficient water, not less than 100 gpm, so that sediments do not settle into the sewers. The wastewater discharged into sanitary or combined sewers shall comply with D.C. Law 6-95, the Wastewater Regulation Amendment Act of 1985, as amended. This act prohibits the discharge of wastewater into a separate storm sewer system or streams. Solid debris shall not be disposed of into sanitary or combined sewers.
PUMPING DURING CLEANING: Pressure washing residuals generated from the cleaning phase of the reservoir shall be collected and pumped as indicated on the drawings. At no time may residuals or discharge be conducted to the drain unless otherwise indicated. Leakage from the existing influent and effluent sluice gates is to be expected.
The Contractor shall plan to continuously run pumps to control sluice gate water leakage, and convey the discharge to locations as approved in the work plan. Solids from the cleaning process shall be pumped to removal equipment, located in the contractor's staging area where shown on the Site Plan, for handling and transportation to a government approved disposal site.
SOLIDS AND SEDIMENT: The Contractor is solely responsible for the removal and disposal of any existing sediment within the reservoir or other debris resulting from their operations. Depths of sediment may vary. It is expected that there will be less than the equivalent of ¼-inch of existing sediment on the floor distributed throughout the 3rd High Reservoir, except as noted. The volumes of sediment in the North Clearwell is noted in Section 2.9.
All material removed from the reservoir shall be removed by an approved method. All material removed from the reservoir shall be contained prior to disposal. Such material must be removed off site to an approved disposal area.
The Contractor shall comply with all local, state, and Federal regulations regarding the transport and disposal of solid wastes. The Contractor shall advise himself of all applicable regulations and shall undertake the necessary testing in order to comply with said regulations. The Contractor shall pay for all costs associated with testing, permits and disposal of solid wastes generated as a result of the project.
VENTILATION: The contractor shall provide all necessary equipment and materials to enter and work in the reservoir and clearwell safely. The contractor shall be responsible for ventilation and air monitoring until final inspection has been performed and approved.
PROTECTION OF CONNECTING PIPES: Immediately after the storage reservoir is drained and made available to the Contractor, the Contractor shall seal the reservoir inlet/outlet pipe in a manner that will prevent any debris from entering the inlet/outlet pipe.
RESERVOIR LAYOUT: It shall be the Contractor's responsibility to develop an efficient methodology that suits the layout of the reservoir to collect and transport the solid sediment to the removal equipment. The Contractor will not be allowed to remove any of the existing baffle wall panels to expedite solids removal from the reservoir. Any unidentified items or structures found within the limits of the reservoir shall not be disturbed nor shall removal be performed at these locations unless, and until, approved by the Contracting Officer.
2.4 CLEANING OPERATIONS: The Contractor shall provide all necessary equipment and procedures necessary to remove all sediment from the reservoir and then he shall pressure wash all surfaces (i.e. walls, columns, and sluice gates, etc.). The cleaning process shall conform to American Waterworks Association (AWWA) Standard C-652, Disinfection of Water-Storage Facilities. All surfaces (i.e. walls, columns, influent, effluent and drain sumps and valves) of the reservoir that come in contact with the water when the reservoir is filled to capacity/overflow elevation shall be cleaned by high-pressure water jets, maximum pressure 2,500 psi. The Contractor may use higher pressure to reach higher elevation of the walls and columns provided it does not damage the finished concrete surface. Surfaces shall be cleaned by application of high-pressure water without the use of cleaning solutions or detergents. The intent is to clean the interior surface of the reservoir, and not damage the concrete or coating surface. Prior to cleaning the entire storage facility, the Contractor shall clean a 100 SF area with detailed inspection performed by the COR to confirm adequate pressures and flow rate for cleaning. In general, pressures shall be a maximum of 2,500 psi at 4-6 gpm flow rate with a standard fan nozzle. The reservoirs shall be cleaned thoroughly using potable water with a maximum 2,500 PSI pressure, sweeping, scrubbing or equally effective cleaning methods without damaging concrete surfaces. The Contractor shall clean all walls, floors, ceilings, pits, pipes, columns, and beams. The cleaned reservoirs shall not contain any sediment, water, mildew, algae, black spots, rust spots, or debris. Water shall be fully contained, collected and disposed of properly. New squeegees and push brooms shall be used in each storage vessel. Floors and sumps shall be hosed clean to remove all sediment deposits. Work shall be performed in an expedited manner so as to minimize the time the reservoir is out of service.
2.5 HANDLING AND DISPOSAL OF SOLIDS: The work consists of furnishing and operating all equipment necessary to remove the sediment, dewater it, as necessary, and then transport it to an approved disposal location. The Contractor may remove the material mechanically, by pump, or by vacuum as determined to be most efficient. The material may be dewatered on-site, or transported wet (water tight), consistent with the dewatering and transportation requirements specified, or required by local transportation regulation or the approved receiving facility.
PRELIMINARY SURVEY: Before beginning cleaning operations within the reservoir, a survey of the volumes of existing sediment shall be performed. While the reservoir is in service, lime is deposited within the reservoir through lime application or precipitated hardness. The lime volume measurements indicated are the results from a previous surveys and estimates. However, the total quantity of lime provided for removal in the Unit Price Schedule is an estimated quantity of lime that will be found in the clearwells. Hence, prior to starting any lime removal work, the contractor shall provide the government with the quantity of lime to be removed. The Contractor shall do this by performing a field survey of the lime in the clearwell, in the presence of the Government during which, lime depth measurements throughout the clearwell will be recorded and used to calculate the total quantity of in-situ lime.
Progress payments will be made only for the quantity of lime removed based on the surveyed volume of lime.
LIME REMOVAL: The Contractor shall not be allowed to start lime removal operations until he has completed all preparations and has approval for all submittals, as indicated in the attached delivery table, Attachment A, permits and other items required in these specifications. Lime sediment shall be removed from all areas inside the clearwell including the influent, effluent and drain sumps. At no time during the removal phase, will any lime sediment, or filtrate, be discharged into the clearwell drain line or via the pumps used to control water leakage. All lime sediment shall be pumped to the dewatering units, or vacuum trucks, which will be setup in the designated Contractor's staging area. The contractor shall ensure the lime residue in the pumped water, due to sluice gate leakage, and the filtrate from the dewatering units does not exceed one percent solids by weight. All these materials shall be piped and pumped to the discharge points shown on the drawings. It shall be the contractor's responsibility to clean up any lime found deposited in the discharge structures. The Contractor shall submit to the Government for approval a plan detailing the discharge piping system. Submittals shall be accompanied with catalog cuts, sketches and/or drawings drawn to scale.
EQUIPMENT: The Contractor shall remove the lime by vacuums, push or pull pumps, conveyer belts, shovels, buckets or small mechanical equipment. The only mechanical equipment permitted in the confined space reservoirs are those that do not emit hazardous fumes. The size of the equipment is limited by the size of the access hatches (see drawings for sizes). The hydraulic system to any mechanical piece of equipment in the reservoirs shall use food grade vegetable oil. Refueling of any equipment will not be permitted in the reservoirs.
CHARACTER OF MATERIALS: The material to be removed under this contract has accumulated since the reservoir was last cleaned. The material consists principally of lime and filtered water sediment. The lime did not dissolve and has settled to the reservoir floor over the years. Harder, solidified layers and variations in the sediment composition are to be expected. The Contractor may use water pressure; manual labor, small mechanical equipment or other Government approved method to break-up any harder, solidified layers of lime sediment to facilitate removal. Equipment shall be submitted to the Government for approval. Due to the reservoirs being underground and in use it is not possible for quoters to examine the site of the project and decide for themselves the character of the materials. Attachment E of these specifications shows the results of a lab analysis performed on samples of the lime. Prospective quoters are encouraged to review these results in order to determine the most economical way of removing and disposing the lime.
DEWATERING EQUIPMENT: The Contractor shall furnish all the equipment necessary for the dewatering of the sediment for suitable transport and disposal. The number and size of dewatering units and other equipment shall be adequate to remove the volume of sediment and as required to finish the project within the time frame allotted. The Contractor shall submit for approval layout drawings and operating data describing the complete dewatering equipment and plant with sizes, weights, capacities, and number of units that he will be using throughout the project.
The Contractor shall ensure that all his dewatering plant equipment and his office trailer fit within the footprint of designated storage and staging areas at each reservoir location. The contractor's staging area shall be enclosed in temporary chain link fencing. Detailed calculations shall be submitted to the Government for approval of proposed daily and weekly productions.
CONVEYANCE OF SOLIDS: After the material is removed from the clearwell, it shall be carried through pipes or transported to the dewatering units. Transporting or piping the lime to the dewatering units shall be a clean operation. No leakage shall be allowed from pipe(s), which shall be a continuous fuse welded polyethylene pipe. If a leak occurs during removal and dewatering operations, the Contractor shall stop work and repair the leak immediately. Piping shall be routed to avoid roadway crossings. Should the piping be required to cross a roadway, the piping shall be ramped sufficiently to not impede vehicle traffic, but shall not be steeper than 12:1 horizontal to vertical slope. The Contractor shall indicate locations of ramps in his work plan layout drawings.
DEWATERING OPERATIONS: Dewatering operations shall be accomplished through Contractor provided portable mechanical dewatering units. The sediment may be mixed with a polymer, provided that the polymer is suitable for use with potable water. The Contractor shall submit to the Government, for approval, the polymer intended for use. The polymer shall be acceptable for use in potable water and be approved by the National Sanitation Foundation (NSF-61). Submittal shall have complete information, characteristics about the product, mixing proportions, and proposed feed rates. The Government reserves the right to reject the use of polymer containing acrylamide.
CAKE MATERIAL PRODUCTION: Cake material resulting from the filter presses shall be carried to leak-proof trucks and/or leak-proof roll-off bins. Once the truck or roll-off is full, it shall be immediately replaced so as not to halt progress of the dewatering operation. At no time during the operation will the cake material be stockpiled or stored awaiting removal. The Contractor shall ensure that cake material is not spilled in the contractor's staging area or in any other place. The Contractor shall take all necessary precautions to maintain a clean environment and operations within Washington Aqueduct boundaries and along transportation routes.
FILTRATE TESTING: The Contractor shall hire an independent laboratory to sample and test the water being discharged from the dewatering units and the pumps installed to control leakage, or other liquid waste stream from the cleaning and sediment handling operations. A ¾” sample collection fitting and valve shall be provided on all return water pipes from which the lab can take samples. A sample shall be taken at random once a week from each discharge line and results of this test shall be submitted to the Government for approval. Water being discharged into the discharge structure shall not exceed 1.0% (one percent) total suspended solids by weight. If results from the laboratory show that this level has been exceeded, the Contractor shall make the necessary changes to achieve the required water quality. If the Contractor does not comply with the water quality limits, he shall be ordered to stop operations until tests confirm that solids limits are below the indicated limits.
2.6 DISPOSAL OF DEWATERED MATERIAL: Solid waste, residuals, and sediment removed from the reservoirs shall be the responsibility of the Contractor to properly dispose.
TRANSPORTING OF MATERIALS: All vehicles and/or roll-off bins used to transport dewatered material shall be sufficiently sealed to prevent leakage or spillage of cake material. Transport vehicles shall be the type(s) approved for this application by the Department of Environment of the state(s) in which they will be traveling. The Contractor shall submit evidence or certification from the state that the transport vehicles are approved.
TRANSPORT ROUTES AND WEIGHTS: Transport routes shall avoid heavily populated areas whenever possible.
It shall be the responsibility of the Contractor to familiarize themselves with allowable trucking routes from the different sites. Vehicles shall be loaded within all legal weight limits. It shall be the sole responsibility of the Contractor and his drivers to monitor the loading of each truck and order a cut-off at such time as to insure a legal weight. Any violation of weight regulations or traffic laws shall be the sole responsibility of the Contractor. The Contractor shall drive in a safe, courteous, and considerate manner in full compliance with all local and interstate speed limits and traffic regulations. The use of a “Jake Brake” shall be minimized while driving on neighborhood roads within the Beltway. Washington Aqueduct reserves the right to request alternate drivers if these requirements are not met.
DISPOSAL RESPONSIBILITIES: During the disposal operations, the Contractor's duties and responsibilities shall include, but not be limited to:
a. Inspection of transport vehicles daily to ensure that tailgates are property sealed, trailers are properly covered, equipment valves are in proper working order, vehicle fluid levels are correct, and that all brake lights, turn signals, and other such equipment are in proper working condition.
b. Inspection of vehicles before leaving the staging area and before leaving the disposal site to ensure that vehicles, including tires, are properly cleaned of cake material, trash or soil which might be deposited on WA grounds or roadways. Any such material will be removed either manually or mechanically.
c. Disposal shall be in accordance with all Federal, state and local laws.
d. Residuals shall be picked up, hauled, and disposed of by the Contractor. As part of the pick-up activity, the Contractor shall be responsible for establishing a wash station and washing his trucks. He shall ensure that solids are not deposited on government property or neighborhood streets as the loaded trucks travel to their selected offsite disposal site. If necessary to facilitate offsite disposal at the selected remote site(s), the Contractor shall also be responsible for temporary offsite storage of residuals prior to final disposal.
2.7 INSPECTION: The contractor shall provide assistance for Government personnel to inspect the reservoir, both during the execution of the work and for the inspection of the reservoir after the completion of the work.
NOTICE: The contractor shall provide a written notice to the Contracting Officer’s Representative (COR) when a reservoir is initially clean and ready for inspection. The COR shall inspect the cleaning operations.
INSPECTION EQUIPMENT: After the initial cleaning operation, the Contractor shall provide walkie-talkies, a portable cellular phone, barriers, scaffolds, ladders, lights, fresh air supply, gas monitors, and any other equipment necessary for a safe environment for the inspection of each facility.
STAGING AND OBSTRUCTIONS: Furnishing, erecting, dismantling, and removing all rigging and scaffolding on the interior of the storage reservoir required for all work shall be the responsibility of the Contractor. Scaffolding and rigging shall be erected in a manner that will permit access for visual inspection of all interior surfaces.
INSPECTION ASSISTANCE: The contractor shall provide a crew of three men, including all materials and equipment to assist during the inspection of each facility. The work shall consist of, but not be limited to:
a. moving or holding scaffolds, ladders, lights, tapes;
b. passing tools;
c. cleaning surfaces;
d. bringing materials in and out of the reservoir;
e. Operating the generator for lights, air blowers, pumps and any other necessary equipment.
TIMING OF INSPECTION: After each reservoir or tank is cleaned and prior to disinfection, the Contractor shall provide access for the Government and consultants to perform a detailed inspection of the facility. The Contractor should provide entry permit, certified attendant, lighting, ventilation, scaffolding and necessary equipment. The Contractor shall provide access for two workdays (8 am to 5 pm) over a five (5) day period for the inspection. The Contractor shall coordinate with the COR at least 2 weeks in advance.
PROGRESS INSPECTIONS: The Contractor shall maintain access for Government personnel to make periodic or regular inspection of the progress of the work at the Government’s discretion. The Contractor’s attendant for Confined Space Entry shall provide the services necessary to facilitate progress inspections by the Government in compliance with the Confined Space Entry permit.
FINAL INSPECTION: Upon completion of all work, but prior to disinfection, a final inspection of the site will be undertaken at which time representatives of the Government and Contractor will be in attendance. Any unsatisfactory cleanup will be indicated and the Contractor shall promptly and properly correct all such deficiencies to the satisfaction of the Government. After the correction of such deficiencies a re-inspection may be necessary.
Upon final acceptance of all work, the Contractor shall fully demobilize from the project site.
2.8 DISINFECTION OF CLEARWELLS AND RESERVOIRS: The interior of the reservoir shall be thoroughly power washed as described above and all sediment, debris and other materials shall be removed. At the conclusion of all work, and prior to disinfection, the Contractor shall remove all unused material, equipment, debris, and unwanted evidence of construction from the storage reservoir interior and from the work site. Any plugs shall be removed from the inlet/outlet pipes and the pipes and sumps shall be completely cleaned from any sediment or debris and flushed with clean water. The contractor shall remove all equipment and materials after the inspections are completed. The reservoirs shall be cleaned as necessary to remove residual debris and materials before disinfection.
REINSTALLATION OF VENTS AND HATCHES: Following the final cleaning operation, the contractor shall check and put in satisfactory condition the vents, screens, overflow screens, and any other screened openings to prevent birds, insects, and other possible contaminants from entering the facility.
DISINFECTION METHOD: After the final cleaning the Contractor shall provide materials and labor to disinfect each reservoir indicated in accordance with the AWWA C-652. The Contractor shall submit a plan and procedure for the disinfection and testing of the reservoir with his work plan.
DISINFECTION TESTING: Washington Aqueduct will test water samples for odor, fecal coliforms, total coliforms, and chlorine residuals to determine if the water meets EPA requirements. Samples shall be taken after the reservoir has been filled to the overflow elevation, and again at 24 hours and 48 hours contact time. If any test fails to meet EPA requirements, the contractor shall remove all disinfected water from the reservoir at the Contractor’s expense. The contractor shall repeat the above requirements until each reservoir meets EPA requirements. Samples shall be taken by Washington Aqueduct personnel. The Contractor shall schedule the testing with the Government at least 72 hours in advance of the first test.
CHLORINE CONCENTRATION FOR RETURN TO SERVICE: The Contractor shall plan and perform the disinfection procedure such that the free chlorine residual concentration is at an acceptable level, not more than 3.9 mg/l and not less than 2 mg/l, for returning the reservoir to service after negative bacterial test results are received.
The Contractor shall take into account the lack of gravity drainage at certain locations when preparing his disinfection plans for submittal. The Contractor shall be responsible for removing water with a disinfectant residual above the specified limits from the reservoir.
DECHLORINATION OF WATER: Where indicated in Section 2.9. The Contractor shall set up dechlorination equipment and properly dechlorinate all water released to storm drain facilities. The equipment shall be set up to establish a feed rate and mixing dynamics sufficient to completely neutralize any chlorine residual in the effluent water to non-detectable levels. Grab sample shall be taken and analyzed at the beginning of each day a discharged is made, and a second time after approximately half that days discharge duration has elapsed. The Contractor shall submit a plan for dechlorination with his Work Plan, as indicated in the attached delivery table, Attachment A.
2.9 SITE SPECIFIC CONDITIONS: The specific reservoirs and volume of work to be performed is as follows.
MCMILLAN NORTH CLEARWELL 14.6 MG FILTERED WATER RESERVOIR
a. The Government shall drain the reservoir by gravity. The floor elevation at the south end of the clearwell is approximately 1.5’ below the invert of the clearwell drain. The remaining water shall be pumped out by the Contractor.
b. Pumping effluent shall be conveyed to the discharge point indicated on the attached drawings, Attachment B, Sk-1. The rate of discharge shall not exceed 600 gpm.
c. The Contractor shall remove lime and residual solids as indicated in Section 2.
d. A description and plans of the reservoir (clearwell) are included in the Attachments, Attachment C.
e. The floor of the North Clearwell is sloped from north to south and towards the center from both the east and west walls. The influent gate has significant leakage, which can create fast shallow flows through the center of the clearwell. The Contractor shall anticipate the water leaking through the influent gate down the slope during the planning and execution of the work.
f. The Contractor shall be responsible for disinfecting the reservoir, as indicated in this PWS, after final cleaning.
g. The Contractor shall perform an initial cleaning and expect to remove approximately 2,000 cubic yards of lime sediment of varying consistency, with at least 10% of the volume deposited in solidified layers that will need to be broken up and in not pumpable. The Contractor shall remove the lime from the clearwell and transfer and deposit the sediment evenly throughout out Abandoned Sand Filter #9, indicated on the attached sketches, Attachment B,Sk-1 and Sk-4.
h. Prior to beginning of the outage period the Contractor shall remove approximately 2200 cubic yards of fully and partially hydrated lime from Abandoned Sand Filter #9, and dispose of it at an approved disposal facility, in accordance with this PWS.
i. Prior to removing any lime residual from the North Clearwell the Contractor shall construct a weir box in the corner of the Abandoned Sand Filter #9. The Contractor shall use the weir box to control the overflow rate from the sand filter such that the residual solids are retained in Abandoned Sand Filter #9.
FORT RENO THIRD HIGH 21.2 MG DISTRIBUTION RESERVOIR
a. The Contractor shall pump approximately 19’ (15.5 MG) of water from the reservoir. The water shall be discharged to the sewers indicated the attached drawings, Attachment B, Sk-1. A maximum discharge rate is 680 gpm and 300 gpm, respectively as indicated.
b. Pumping effluent resulting from cleaning and dewatering operations performed shall be similarly conveyed to the sewer service discharge points with similar restriction on the maximum rate and pressure of discharge. The gravity drain for this reservoir will remain closed for the duration of the cleaning process.
c. The Contractor shall remove lime and residual solids as indicated in Section 2.
d. A description and plans of the reservoir are included in the Attachments, Attachment C.
e. Access to this facility is through premises controlled by DC Water. The Contractor shall confine their operations to the Third High Reservoir property.
f. The Contractor shall be responsible for disinfecting the reservoir, as indicated in this PWS using AWWA
C-652 Method 1, after final cleaning.
g. The Contractor shall be responsible for dechlorination and disposal of the entire contents of the reservoir up to overflow elevation after satisfactory bacterial testing is achieved. The dechlorinated water shall be discharged through the gravity drain to the storm system near Belt Road. The Contractor will be responsible for dechlorinating the flow in the downstream manhole and performing grab samples to ensure the efficacy of his procedures.
3. MANAGEMENT AND PERSONNEL
3.1 MANAGEMENT REQUIREMENTS. The Contractor shall act as, or designate a Project Manager readily available by telephone. The Contractor’s Project Manager shall conduct overall management coordination and shall be the central point of contact with the Government for performance of all work. A competent Contractor employee shall be designated to act for the Project Manager during the Project Manager's absence. The Contractor shall provide written notice of Project Manager, and Alternate Project Manager, designation as part of their QA Plan to the Government for approval by the COR.