Amendment to answer RFI Quest update FAR Clauses add specs

View the file

Other files for this federal contract opportunity

Other files attached to Knapps Narrow Earthwork, newest first.
File Type Posted
G24__Bid_Abstract_.xlsx XLSX spreadsheet
W912DR-16-B-0016-0003.pdf PDF
W912DR-16-B-0016-0001.pdf PDF
Specifications.pdf PDF
W912DR-16-B-0016.pdf PDF
Specifications.pdf PDF
Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to do the follow Ing :

1.Delete Item No. 5. “DESCRIPTION OF WORK” in Block 10 of the solicitation.

2.Updated FAR Clause 52.211-10 and 252.236-7001

3.Answ er RFI Questions

4. Attach list of the Knapps Narrow s Site Visit Attendees, held on June 8, 2016

5. Attach Boring Location Plan, Subsurface Exploration Notes, Drill Logs and Test Results

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-16-B-0016

X 9B. DATED (SEE ITEM 11)

31-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jun-2016

CODE

U.S.ARMY CORPS OF ENGINEERS, BALTIMORE

10 S. HOWARD STREET

ROOM 7000

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR-16-B-0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required performance has changed from 1. PROJECT TITLE/LOCATION: KNAPPS NARROW

EARTHWORK, TALBOT COUNTY,MD2. SET-ASIDE 100% Small Business Set-Aside3. NAICS CODE : North

Industry Classification System (NAICS) 237990 (Other Heavy and Civil Engineering Construction)4. BUSINESS

SIZE STANDARD: $27.5M5. DESCRIPTION OF WORK: The maintenance dredging of the Knapps Narrows must be performed using a hydraulic pipeline dredge. The proposed work consists of dredging the entire channel length of

1.7 miles to the authorized depth of 9 feet mean lower low water (MLLW), plus 2 feet of allowable over-depth. The material could be placed at a previously used placement site or used to create wetlands on an eroding shoreline off of Tilghman Island. to 1. PROJECT TITLE/LOCATION: KNAPPS NARROW EARTHWORK, TALBOT

COUNTY,MD2. SET-ASIDE 100% Small Business Set-Aside3. NAICS CODE : North Industry Classification

System (NAICS) 237990 (Other Heavy and Civil Engineering Construction)4. BUSINESS SIZE STANDARD:

$27.5M.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

RFI QUESTIONS AND ANSWERS

Q: Is the period of performance 120 or 180 days?

A: Period of performance is 120 calendar day.

Q: Are there soil boring for the placement site available?

A: See amendment.

Q: Do you have certain specifications for the design of the weir boxes?

A: Specifics for the material to be used are found in the plans and specifications. The design of the weir boxes is ultimately decided upon by the cont4ractor and approved by the Corps.

Q: What is to be done with the vegetation growing on the site?

A: Some of the vegetation will be removed prior to construction. Other remaining vegetation can be buried on site in one of the cells.

Q: Does the contractor need to obtain any permits?

A: The Corps is obtaining the sediment and erosion control permit from Maryland Department of the Environment. No permits need to be obtained by the Contractor.

Q: Does the contractor need to install the silt fence?

A: Yes, the Contractor is responsible for installing the silt fence.

Q: How is access going to be obtained by the site?

A: Contractors will use a road known on the plans as the bridle path. This path will be cleared and contoured by Talbot County before the project begins. Access along the main road through is restricted.

Q: Does the Combined Synopsis/Solicitation under solicitation number W912DR-16-B-0016 contain requirements similar to a current contract? If possible, please provide the current contract number. Or, is this a new requirement for the government?

A: This is a new requirement.

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

FILE: 45 MAPS: 16-020 THRU 16-023 SHEETS: 1 OF 7 THRU 7 OF 7

DATED: APR '16.

(End of clause)

SEE ATTACHEMENT FOR ADDITIONAL RFI QUESTIONS AND ANSWERS

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)

Knapps Narrows Site Visit Attendees Date: June 8, 2016 Time: 10:30 AM EST

Name Organization Bruce Howard Bruce Howard Contracting Inc.

Jesse Hodges Bruce Howard Contracting Inc.

Jim Salmons Salmons Dredging Francis McQuaid S Olivia Enterprises Julio Oliva S Olivia Enterprises Randy Blizzard Southside Land Management Sean Fritzges USACE Seth Keller USACE Danielle Szimanski USACE

Knapps Narrows Placement Site e1enxcef Oval e1enxcef Oval e1enxcef Oval e1enxcef Text Box C-1 e1enxcef Text Box B-2 e1enxcef Text Box A-1 e1enxcef Oval e1enxcef Text Box B-1

KNAPPS NARROWS DREDGE DISPOSAL SITE

TILGHMAN, MD.

SUBSURFACE EXPLORATION NOTES

1. EXPLORATION WAS PERFORMED DURING AUGUST 2015.

2. ALL BORINGS WERE MADE WITH A HAND AUGER.

3. COLUMN (b) SHOWS THE NATURAL WATER CONTENTS IN PERCENT OF DRY WEIGHT

OF THOSE SAMPLES TESTED.

4. SOIL DESCRIPTIONS ARE SHOWN IN COLUMN (c).

ALSO SHOWN IN THIS COLUMN ARE:

ATTERBERG LIMIT TEST RESULTS. LIQUID LIMIT (LL), PLASTIC LIMIT (PL),

AND PLASTICITY INDEX (PI).

5. SOIL DESCRIPTIONS ARE LABORATORY CLASSIFICATIONS BASED ON THE UNIFIED

SOIL CLASSIFICATION SYSTEM (ASTM D2487/2488), EXCEPT THOSE INDICATED

THUS (**), WHICH ARE FIELD INSPECTOR'S CLASSIFICATIONS.

6. GROUNDWATER DEPTHS ARE INDICATED ON THE LOGS AS , & AND ARE

SHOWN IN COLUMN (d). PERTINENT DATA FOR THESE READINGS ARE SHOWN AT

THE BOTTOM OF LOG UNDER GROUNDWATER DATA OR ADDITIONAL GROUNDWATER

DATA. THESE READINGS MAY VARY DEPENDING UPON SEASONS AND AMOUNT OF

RAINFALL.

NE - INDICATES GROUNDWATER NOT ENCOUNTERED

NT - INDICATES GROUNDWATER READING NOT TAKEN

7. FOR LOCATIONS OF SUBSURFACE EXPLORATIONS, SEE BORING LOCATION PLAN.

0.4

4.5

5.0

32.0%

NE

SPT

Water Jet

CA

Odex

WHILE DRILLING:

GROUNDWATER DATA

ON COMPLETION:

NT

Fill

Cored

Fish Tail Vibra Core

Hand

24 Hr. READING:

300 lb Tubex

A-1

Auger

NE

KNAPPS NARROWS DREDGE DISPOSAL SITE

Depth(ft)

E

N

COMPLETED:

STA.

(d) (a) (b)

TOP ELEV:

(c)

A-1

August 12, 2015

TILGHMAN, MD.OFFSET: 1 of 1

N A

B

F

IN

A L

G E

O T

E C

H L

O G

K N

A P

P S

N A

R R

O W

S

T

IL

G H

M A

N , M

D .G

P J

A C

E M

V D

W

IT

H R

A P

ID

C

P T

9_

_0 2.

G D

T

0/

/1

ELASTIC SILT (MH), reddish brown, moist, LL=54

PL=30

PI=24.

ELASTIC SILT (MH), reddish brown and reddish gray, moist.

BOTTOM OF HOLE

1.3

2.1

3.2

5.0

27.4%

20.6%

42.2%

NE

SPT

Water Jet

CA

Odex

WHILE DRILLING:

GROUNDWATER DATA

ON COMPLETION:

NT

Fill

Cored

Fish Tail Vibra Core

Hand

24 Hr. READING:

300 lb Tubex

B-1

Auger

NE

KNAPPS NARROWS DREDGE DISPOSAL SITE

Depth(ft)

E

N

COMPLETED:

STA.

(d) (a) (b)

TOP ELEV:

(c)

B-1

August 12, 2015

TILGHMAN, MD.OFFSET: 1 of 1

N A

B

F

IN

A L

G E

O T

E C

H L

O G

K N

A P

P S

N A

R R

O W

S

T

IL

G H

M A

N , M

D .G

P J

A C

E M

V D

W

IT

H R

A P

ID

C

P T

9_

_0 2.

G D

T

0/

/1

SILT/LEAN CLAY (ML/CL), light brownish gray, slightly moist, with fine sand.

SILT (ML), reddish brown, moist, with fine sand, LL=30, PL=25, PI=5.

SANDY SILT (ML), yellowish red, slightly moist, no plasticity.

LEAN CLAY (CL), dark gray and yellowish red, moist, with fine sand, LL=43

PL=25

PI=18.

2.5

4.0

5.0

41.6%

35.2%

55.3%

NE

SPT

Water Jet

CA

Odex

WHILE DRILLING:

GROUNDWATER DATA

ON COMPLETION:

NT

Fill

Cored

Fish Tail Vibra Core

Hand

24 Hr. READING:

300 lb Tubex

B-2

Auger

NE

KNAPPS NARROWS DREDGE DISPOSAL SITE

Depth(ft)

E

N

COMPLETED:

STA.

(d) (a) (b)

TOP ELEV:

(c)

B-2

August 12, 2015

TILGHMAN, MD.OFFSET: 1 of 1

N A

B

F

IN

A L

G E

O T

E C

H L

O G

K N

A P

P S

N A

R R

O W

S

T

IL

G H

M A

N , M

D .G

P J

A C

E M

V D

W

IT

H R

A P

ID

C

P T

9_

_0 2.

G D

T

0/

/1

ELASTIC SILT WITH SAND (MH), reddish gray, moist, trace rootlets, LL=61

PL=33

PI=28.

SILT WITH SAND (ML), dark gray and reddish brown, moist, LL=34

PL=24

PI=10.

ELASTIC SILT WITH SAND (MH), reddish gray and black, moist, LL=60, PL=28, PI=32.

0.4

3.0

4.0

5.0

33.8%

41.6%

55.2%

NE

SPT

Water Jet

CA

Odex

WHILE DRILLING:

GROUNDWATER DATA

ON COMPLETION:

NT

Fill

Cored

Fish Tail Vibra Core

Hand

24 Hr. READING:

300 lb Tubex

C-1

Auger

NE

KNAPPS NARROWS DREDGE DISPOSAL SITE

Depth(ft)

E

N

COMPLETED:

STA.

(d) (a) (b)

TOP ELEV:

(c)

C-1

August 12, 2015

TILGHMAN, MD.OFFSET: 1 of 1

N A

B

F

IN

A L

G E

O T

E C

H L

O G

K N

A P

P S

N A

R R

O W

S

T

IL

G H

M A

N , M

D .G

P J

A C

E M

V D

W

IT

H R

A P

ID

C

P T

9_

_0 2.

G D

T

0/

/1

SILT (ML), reddish brown, moist, LL=39

PL=27

PI=12.

LEAN CLAY (CL), reddish gray, moist, with fine sand.

LEAN CLAY (CL), dark gray and reddish brown, moist, with fine sand.

Hole No.

Sample No.

Depth (ft)

Moisture Content

% LL PL PI

Atterberg

Classification Symbol

A-1 Jar-1 0.4-4.5 32.0 54 30 24 Elastic Silt MH

B-1 Jar-3 1.3-2.0 27.4 30 25 5 Silt ML B-1 Jar-4 2.1-2.8 20.6 0 0 0 Non Plastic Silt ML B-1 Jar-7 3.5-5.0 42.2 43 25 18 Lean Clay CL

B-2 Jar-2 0.4-2.5 41.6 61 33 28 Elastic Silt MH B-2 Jar-3 2.5-3.5 35.2 34 24 10 Silt ML B-2 Jar-5 4.0-5.0 55.3 60 28 32 Elastic Silt MH

C-1 Jar-1 0.4-2.0 33.8 39 27 12 Silt ML C-1 Jar-4 4.0-5.0 55.2

Amount of Material in Soils Finer than No. 200 (75-μm) Sieve (ASTM D1140) TEST: Natural Moisture Contents (ASTM D 2216 Method B) & Atterberg Limits (ASTM D 4318)

LABORATORY TEST RESULTS

PROJECT: Knapps Narrows Dredge Disposal Site

AREA: Tighman, MD Page: 1 of 1

DATE: Sep 2015

Note: The Atterberg Limits test is only performed on minus No. 40 material portion of a sample and does not represent the entire sample. Refer to the Visual Classification or the Gradation Analysis for the complete classification.

C O A R S E

P L

PERCENT COARSER BY WEIGHT

J a r

H Y D R O M E T E R

F I N E

L L

E N G

F O R M

E N G K N A P P S

N A R R O W S

D R E D G E

D I S P O S A L

S I T E

G P J

C O B B L E S

F I N E

A -1

C l a s s i f i c a t i o n

A S T M

D

C O A R S E

U S

S T A N D A R D

S I E V E

O P E N I N G

I N

I N C H E S

D A T E

S A N D

S ep

PERCENT FINER BY WEIGHT

E L A S T I C

S I L T

0 1

S I L T o r

C L A Y

B O R I N G

N O

L e g e n d

G R A I N

S I Z E

I N

M I L L I M E T E R S

M E D I U M

R E

M A

R K

S

G R A V E L

N a t w c

S a m p l e

N o

G R

A D

A T

IO

N

C U

R V

E S

D e p t h f t

Jn ap ps N ar ro w s

T ilg hm an

, M D

M H

U S

S T A N D A R D

S I E V E

N U M B E R S

P I

P R O J E C T

A R E A

T E S T

M E T H O D S

A S T M

D

D

D

C O A R S E

P L

PERCENT COARSER BY WEIGHT

J a r

H Y D R O M E T E R

F I N E

L L

E N G

F O R M

E N G K N A P P S

N A R R O W S

D R E D G E

D I S P O S A L

S I T E

G P J

C O B B L E S

F I N E

N P

B -1

C l a s s i f i c a t i

S T M

D

C O A R S E

U S

S T A N D A R D

S I E V E

O P E N I N G

I N

I N C H E S

D A T E

S A N D

S ep

PERCENT FINER BY WEIGHT

S A N D Y

S I L T

0 1

S I L T o r

C L A Y

B O R I N G

N O

L e g e n d

G R A I N

S I Z E

I N

M I L L I M E T E R S

M E D I U M

R E

M A

R K

S

G R A V E L

N a t w c

S a m p l e

N o

G R

A D

A T

IO

N

C U

R V

E S

D e p t h f t

N P

N P

Jn ap ps N ar ro w s

T ilg hm an

, M D

M L

U S

S T A N D A R D

S I E V E

N U M B E R S

P I

P R O J E C T

A R E A

T E S T

M E T H O D S

A S T M

D

D

D

C O A R S E

P L

PERCENT COARSER BY WEIGHT

J a r

H Y D R O M E T E R

F I N E

L L

E N G

F O R M

E N G K N A P P S

N A R R O W S

D R E D G E

D I S P O S A L

S I T E

G P J

C O B B L E S

F I N E

B -2

C l a s s i f i c a t i

S T M

D

C O A R S E

U S

S T A N D A R D

S I E V E

O P E N I N G

I N

I N C H E S

D A T E

S A N D

S ep

PERCENT FINER BY WEIGHT

S I L T w i t h

S A N D

0 1

S I L T o r

C L A Y

B O R I N G

N O

L e g e n d

G R A I N

S I Z E

I N

M I L L I M E T E R S

M E D I U M

R E

M A

R K

S

G R A V E L

N a t w c

S a m p l e

N o

G R

A D

A T

IO

N

C U

R V

E S

D e p t h f t

Jn ap ps N ar ro w s

T ilg hm an

, M D

M L

U S

S T A N D A R D

S I E V E

N U M B E R S

P I

P R O J E C T

A R E A

T E S T

M E T H O D S

A S T M

D

D

D

C O A R S E

P L

PERCENT COARSER BY WEIGHT

J a r

H Y D R O M E T E R

F I N E

L L

E N G

F O R M

E N G K N A P P S

N A R R O W S

D R E D G E

D I S P O S A L

S I T E

G P J

C O B B L E S

F I N E

C -1

C l a s s i f i c a t i

S T M

D

C O A R S E

U S

S T A N D A R D

S I E V E

O P E N I N G

I N

I N C H E S

D A T E

S A N D

S ep

PERCENT FINER BY WEIGHT

S I L T

0 1

S I L T o r

C L A Y

B O R I N G

N O

L e g e n d

G R A I N

S I Z E

I N

M I L L I M E T E R S

M E D I U M

R E

M A

R K

S

G R A V E L

N a t w c

S a m p l e

N o

G R

A D

A T

IO

N

C U

R V

E S

D e p t h f t

Jn ap ps N ar ro w s

T ilg hm an

, M D

M L

U S

S T A N D A R D

S I E V E

N U M B E R S

P I

P R O J E C T

A R E A

T E S T

M E T H O D S

A S T M

D

D

D

Request for Information or clarification Regarding Knapp's Narrows Earthwork

1. During the site visit request was made for information regarding Boring of site location when will they be made available.

See soil borings attached with amendment 2

2. As stated in the Spec Section 01 35 26 - 1.5.1.1.1 revised Construction Specifications dated June 10th 2016 "The Contractors Quality Control Person cannot be the SSHO on this Project even though the QC has safety inspection responsibilities as part of the QC duties" by this statement we are to have a full-time SSHO that performs no other duty except acting as the SSHO or can our superintendent act as the SSHO if they meet the requirements 1.5.1.2.4 Safety Personnel training requirements for dredging

That is correct. A full time SSHO can only perform those duties. They cannot be shared by another as stated in EM 3856-1-1 Safety Manual (Nov. 2014).

3. At the site visit, it was requested that the design for the Weir Boxes to follow design criteria will this information be in an addendum Spec Section 35 20 23 - 2.4.4

The bidding contractor is required to provide a PE approved design of the spillway box construction. This design is submitted through the bidding contractor’s weir box construction submittal. Corps engineers review and approve submitted designs.

4. Can the QC person be the Superintendent on the project or are we to have a separate personal for this position.

See question #2.

5. Will we be receiving a typical detail for the Weir Box?

See question #3.

6. Are we to put into our bid any vehicle tracking pads off of hard top roadways or will this be maintained and supplied by the new access road that will be supplied by other forces prior to this contract being started.

Any tracking pads should be added into the bid.

7. Will we receive a copy of the submitted environmental protecting plan with outlining E&S control regarding silt fence or tracking pads layouts?

All E&S control is outlined on page 4 of the plans. And additional changes provided by Maryland Department of the Environment (MDE) will be provided before time of award when the E&S permit is obtained by the State.

8. Spec Section 35 20 23 2.6.7.2 Outlet Pipe for Weir Structure please supply design criteria that will need to be meet for the tie down for each pipe connection.

Tie down methods and design shall be submitted by the contractor to the COR for review and approval.

9. Spec Section 35 20 23 2.6.9 in the pass for when you are pumping into a containment area not for construction of a containment area are these items needed.

No, these items are not needed for the contraction of the site.

10. The low hanging power / communication line leading into the project location will be taken care of prior to the start of construction by others we are to base that we will be able to transport basic over the road construction equipment based on 13'6" height restrictions by 10'6 access into the construction site.

Talbot County will address and low hanging lines that may be blocking access.

11. Will contractor need to supply the Maryland's Department of the Environment erosion and sediment control certification at the bid or can it be submitted during the pre-construction meeting?

See question #7

Boring Location Plan, Subsurface Exploration Notes, Drill Logs and Test Results.pdf
Boring Location Plan
Subsurface Exploration Notes
Boring Logs
Test Results

File details come from the government source that posted it. Updated .