G24__Bid_Abstract_.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Poplar Island Spillway # 1 Modification Federal contract opportunity
- Solicitation number
- W912DR-16-B-0013
About this file
Bid Abstract of Offerors
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DR-16-B-003-0002.pdf | ||
| W912DR-16-B-0013-0001.pdf | ||
| PI_-_Spillway_1_Mod_Pre-bid_sign-in_5-13-16.pdf | ||
| W912DR-16-B-0013.pdf | ||
| PLANS.pdf | ||
| SPECIFICATIONS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chart1
SERVICE All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 0 682125.66 33013.629999999997 29632.97 30279.55 775051.81 SERVICE All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 0 789316 174824 174824 174824 1313788 -0.69509700261199303 538736.18999999994 SERVICE All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 0 1572000 275000 177000 28000 28000 130000 2210000 -5.9952038369304558E-2 -125000 SERVICE All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 SERVICE All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 SERVICE All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 SERVICE All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 SERVICE All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 SERVICE All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 Sheet1 BID ABSTRACT FOR W912DR-16-B-0013 POPLAR ISLAND SPILLWAY MODIFICATION #1 TALBOT COUNTY, MD
| LOCATION: POPLAR ISLAND - CHESAPEAKE BAY BETWEEN JEFFERSON AND COACHES ISLAND | ||||
| LINE | SERVICE | IGE | Consolidated Construction | Marine Technology |
| CLIN 0001 | All costs in connection with construction of the 2015 Spillway 1 Modifications, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, MD, complete as shown on drawings and specified, but exclusive of work covered under Optional Bid Item Nos. 0002, 0003 and 0004 below. | $682,125.66 | $789,316.00 | $806,400.00 |
| CLIN 0002 | All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 3, complete as shown on drawings and specified. | $33,013.63 | $174,824.00 | $30,000.00 |
| CLIN 0003 | All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 7, complete as shown on drawings and specified. | $29,632.97 | $174,824.00 | $30,000.00 |
| CLIN 0004 | All costs in connection with Plugging Abandoned Spillway Pipes, Spillway No. 10, complete as shown on drawings and specified. | $30,279.55 | $174,824.00 | $30,000.00 |
| TOTAL = | $775,051.81 | $1,313,788.00 | $896,400.00 | |
| PERCENT ABOVE/BELOW IGE = | -69.51% | -15.66% | ||
| AMOUNT OVER IGE = | $538,736.19 | $121,348.19 |