ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER 2. DATE ISSUED DATE OPENED PAGE OF 3/30/2016 1 of 4
4. ISSUING OFFICE Name and title of Certifying Official (Type) Department of the Army I CERTIFY that I have opened, read, and Baltimore District, Corps of Engineers recorded on this abstract all offers Signature Date Signed 10 S. Howard Street, Room 7000 received in response to this solicitation.
Baltimore, MD 21203 Contracting Officer: GARY A. FAYKES
5. PROJECT TITLE
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F.)
A. HIRED LABOR
B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)
6. NUMBER OF AMENDMENTS ISSUED 3 (Three) X C. REASONABLE CONTRACT C. Amendment Acknowledged C. Amendment Acknowledged (Including Profit)
7A. 7B. 7C. D. E. F. E. F. E. F.
ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED
No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-05 Booster Pumping Station Substation, complete as own on the drawings and specified.
1 JOB 63,498.00$ 54,300.00$ 46,200.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-06 Booster Pumping Station, complete as shown on the drawings and specified.
1 JOB 64,235.00$ 56,000.00$ 45,100.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-11 Administration Building, complete as shown on the drawings and specified.
1 JOB 358,799.00$ 401,300.00$ 470,500.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-12 Visitor Center, complete as shown on the drawings and specified.
1 JOB 118,361.00$ 139,200.00$ 120,500.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring, and pre-action system improvements to include associated demolition work for Building D-15 Chemical Building, complete as shown on the drawings and specified.
1 JOB 393,379.00$ 673,200.00$ 595,600.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-16 Pumping Station, complete as shown on the drawings and specified.
1 JOB 354,217.00$ 254,400.00$ 238,200.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-49 Maintenance Building, complete as shown on the drawings and specified.
1 JOB 387,549.00$ 391,200.00$ 291,300.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-51 Dispatch Building, complete as shown on the drawings and specified.
1 JOB 86,511.00$ 53,400.00$ 45,900.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-55 Chlorine Building, complete as shown on the drawings and specified.
1 JOB 111,471.00$ 97,000.00$ 83,500.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-57 Basin 1 and Substation, complete as shown on the drawings and specified.
1 JOB 46,863.00$ 49,000.00$ 37,200.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building WAD-22 Backwash Chemical Building, complete as shown on the drawings and specified.
1 JOB 75,745.00$ 84,300.00$ 95,800.00$
No. 2
Tidewater, Inc.
6625 Selnick Dr., Suite A
Elkridge, MD 21075
2/5/2016W912DR-16-B-0007
Fire Protection System Improvements Washington Aqueduct, Washington, DC
No. 1
9. OFFERS
Yes
Bid Bond 20% Bid Bond 20%
IMI, Inc.
3 College Ave. #6
Frederick, MD 21701
Yes
31 MAR 2016
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building LF-1 Little Falls Pumping Station, complete as shown on the drawings and specified.
1 JOB 100,824.00$ 126,000.00$ 76,200.00$
All cost in connection with operations necessary for installation of flow sensors to include associated demolition work for Building DS-45 Warehouse #6, complete as shown on the drawings and specified.
1 JOB 45,111.00$ 26,200.00$ 23,200.00$
All cost in connection with operations necessary for installation of networking connections to include associated demolition work for Dalecarlia Campus, complete as shown on the drawings and specified.
1 JOB 455,357.00$ 653,700.00$ 208,200.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-01 East Shaft Pumping Station, complete as shown on the drawings and specified.
1 JOB 78,111.00$ 63,500.00$ 49,200.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-06 North Clearwell Gatehouse, complete as shown on the drawings and specified.
1 JOB 51,702.00$ 52,200.00$ 46,800.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-8C Pumping Station, complete as shown on the drawings and specified.
1 JOB 82,327.00$ 75,300.00$ 59,100.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-10 Annex Building, complete as shown on the drawings and specified.
1 JOB 78,195.00$ 73,900.00$ 57,200.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-17 Electrical Shop, complete as shown on the drawings and specified.
1 JOB 89,141.00$ 84,600.00$ 66,200.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-26 Chemical Building, complete as shown on the drawings and specified.
1 JOB 273,684.00$ 449,800.00$ 342,600.00$
All cost in connection with operations necessary for installation of networking connections to include associated demolition work for McMillan Campus, complete as shown on the drawings and specified.
1 JOB 116,096.00$ 129,100.00$ 123,600.00$
BASE BID AMOUNT 1 JOB 3,431,176.00$ 3,987,600.00$ 3,122,100.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-59 Residuals Processing Facility (OPTIONAL), complete as shown on the drawings and specified.
1 JOB 229,941.00$ 281,700.00$ 275,900.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-62 Hypochlorite and Caustic Soda Facility (OPTIONAL), complete as shown on the drawings and specified.
1 JOB 134,264.00$ 90,000.00$ 71,300.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-28 Hypochlorite and Ammonia Building (OPTIONAL), complete as shown on the drawings and specified.
1 JOB 57,012.00$ 89,200.00$ 58,900.00$
TOTAL BASE AND OPTIONAL BID AMOUNT 1 JOB 3,852,393.00$ 4,448,500.00$ 3,528,200.00$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)
1. SOLICITATION NUMBER PAGE OF
ABSTRACT OF OFFERS W912DR-16-B-0007 3 of 4 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-05 Booster Pumping Station Substation, complete as own on the drawings and specified.
1 JOB 40,382.00$ 54,201.00$ 23,900.00$ 40,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-06 Booster Pumping Station, complete as shown on the drawings and specified.
1 JOB 50,337.00$ 55,341.00$ 40,000.00$ 42,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-11 Administration Building, complete as shown on the drawings and specified.
1 JOB 301,780.00$ 423,531.00$ 158,000.00$ 420,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-12 Visitor Center, complete as shown on the drawings and specified.
1 JOB 89,533.00$ 115,747.00$ 53,000.00$ 110,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring, and pre-action system improvements to include associated demolition work for Building D-15 Chemical Building, complete as shown on the drawings and specified.
1 JOB 583,305.00$ 514,083.00$ 510,000.00$ 738,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-16 Pumping Station, complete as shown on the drawings and specified.
1 JOB 250,134.00$ 299,585.00$ 260,000.00$ 370,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-49 Maintenance Building, complete as shown on the drawings and specified.
1 JOB 316,774.00$ 323,121.00$ 235,000.00$ 465,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-51 Dispatch Building, complete as shown on the drawings and specified.
1 JOB 48,485.00$ 50,782.00$ 30,000.00$ 35,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-55 Chlorine Building, complete as shown on the drawings and specified.
1 JOB 93,947.00$ 95,231.00$ 55,000.00$ 80,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-57 Basin 1 and Substation, complete as shown on the drawings and specified.
1 JOB 36,347.00$ 46,223.00$ 23,000.00$ 30,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building WAD-22 Backwash Chemical Building, complete as shown on the drawings and specified.
1 JOB 57,600.00$ 90,872.00$ 48,000.00$ 82,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building LF-1 Little Falls Pumping Station complete as shown on the drawings and specified.
1 JOB 169,869.00$ 105,375.00$ 55,000.00$ 93,000.00$
All cost in connection with operations necessary for installation of flow sensors to include associated demolition work for Building DS-45 Warehouse #6, complete as shown on the drawings and specified.
1 JOB 20,533.00$ 39,385.00$ 12,000.00$ 25,000.00$
All cost in connection with operations necessary for installation of networking connections to include associated demolition work for Dalecarlia Campus, complete as shown on the drawings and specified.
1 JOB 676,130.00$ 311,666.00$ 450,000.00$ 325,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-01 East Shaft Pumping Station complete as shown on the drawings and specified.
1 JOB 94,922.00$ 67,878.00$ 38,000.00$ 51,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-06 North Clearwell Gatehouse, complete as shown on the drawings and specified.
1 JOB 51,761.00$ 49,642.00$ 28,000.00$ 30,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-8C Pumping Station, complete as shown on the drawings and specified.
1 JOB 74,509.00$ 69,018.00$ 49,000.00$ 55,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-10 Annex Building, complete as shown on the drawings and specified.
1 JOB 81,845.00$ 63,318.00$ 48,000.00$ 50,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-17 Electrical Shop, complete as shown on the drawings and specified.
1 JOB 95,189.00$ 70,157.00$ 50,000.00$ 60,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-26 Chemical Building, complete as shown on the drawings and specified.
1 JOB 296,237.00$ 292,177.00$ 169,000.00$ 280,000.00$
All cost in connection with operations necessary for installation of networking connections to include associated demolition work for McMillan Campus, complete as shown on the drawings and specified.
1 JOB 220,121.00$ 124,692.00$ 195,000.00$ 110,000.00$
BASE BID AMOUNT 1 JOB 3,649,740.00$ 3,262,025.00$ 2,529,900.00$ 3,491,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-59 Residuals Processing Facility (OPTIONAL), complete as shown on the drawings and specified.
1 JOB 327,128.00$ 221,404.00$ 169,000.00$ 60,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-62 Hypochlorite and Caustic Soda Facility (OPTIONAL), complete as shown on the drawings and specified.
1 JOB 84,646.00$ 67,742.00$ 52,000.00$ 40,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-28 Hypochlorite and Ammonia Building (OPTIONAL), complete as shown on the drawings and specified.
1 JOB 114,596.00$ 71,062.00$ 41,000.00$ 9,000.00$
TOTAL BASE AND OPTIONAL BID AMOUNT 1 JOB 4,176,110.00$ 3,622,233.00$ 2,791,900.00$ 3,600,000.00$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)
Bid Bond 20%
Yes Yes Yes
No. 6No. 3 No. 4
Biscayne Contractors, Inc.
5845 Richmond Hwy., Suite 500
Alexandria, VA 22303
SAF, Inc.
8433 Backlick Road, Suite D
Lorton, VA 22079
Bid Bond 20%Bid Bond 20% Bid Bond 20%
No. 5
Yes
OFFERS (Continued)
Washington Aqueduct, Washington, DC Fire Protection System Improvements QSS International, Inc.
10301 Democracy Lane, Suite 401 Fairfax, VA 22030
American Contracting & Environmental Services, Inc.
10330 Old Columbia Road, Suite 102 Columbia, MD 21046
1. SOLICITATION NUMBER PAGE OF
ABSTRACT OF OFFERS W912DR-16-B-0007 4 of 4 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-05 Booster Pumping Station Substation, complete as own on the drawings and specified.
1 JOB 72,232.60$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-06 Booster Pumping Station, complete as shown on the drawings and specified.
1 JOB 77,976.80$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-11 Administration Building, complete as shown on the drawings and specified.
1 JOB 231,000.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-12 Visitor Center, complete as shown on the drawings and specified.
1 JOB 105,404.20$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring, and pre-action system improvements to include associated demolition work for Building D-15 Chemical Building, complete as shown on the drawings and specified.
1 JOB 293,062.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-16 Pumping Station, complete as shown on the drawings and specified.
1 JOB 242,377.30$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-49 Maintenance Building, complete as shown on the drawings and specified.
1 JOB 317,506.20$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-51 Dispatch Building, complete as shown on the drawings and specified.
1 JOB 61,425.10$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-55 Chlorine Building, complete as shown on the drawings and specified.
1 JOB 96,800.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-57 Basin 1 and Substation, complete as shown on the drawings and specified.
1 JOB 68,700.50$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building WAD-22 Backwash Chemical Building, complete as shown on the drawings and specified.
1 JOB 81,655.20$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building LF-1 Little Falls Pumping Station complete as shown on the drawings and specified.
1 JOB 158,655.20$
All cost in connection with operations necessary for installation of flow sensors to include associated demolition work for Building DS-45 Warehouse #6, complete as shown on the drawings and specified.
1 JOB 24,724.70$
All cost in connection with operations necessary for installation of networking connections to include associated demolition work for Dalecarlia Campus, complete as shown on the drawings and specified.
1 JOB 42,350.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-01 East Shaft Pumping Station complete as shown on the drawings and specified.
1 JOB 53,300.50$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-06 North Clearwell Gatehouse, complete as shown on the drawings and specified.
1 JOB 61,404.20$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-8C Pumping Station, complete as shown on the drawings and specified.
1 JOB 79,664.20$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-10 Annex Building, complete as shown on the drawings and specified.
1 JOB 71,962.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-17 Electrical Shop, complete as shown on the drawings and specified.
1 JOB 90,695.00$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-26 Chemical Building, complete as shown on the drawings and specified.
1 JOB 264,000.00$
All cost in connection with operations necessary for installation of networking connections to include associated demolition work for McMillan Campus, complete as shown on the drawings and specified.
1 JOB 24,653.20$
BASE BID AMOUNT 1 JOB 2,519,548.90$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-59 Residuals Processing Facility (OPTIONAL), complete as shown on the drawings and specified.
1 JOB 119,253.20$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building D-62 Hypochlorite and Caustic Soda Facility (OPTIONAL), complete as shown on the drawings and specified.
1 JOB 71,953.20$
All cost in connection with operations necessary for installation of fire alarm system and electrical wiring to include associated demolition work for Building M-28 Hypochlorite and Ammonia Building (OPTIONAL), complete as shown on the drawings and specified.
1 JOB 114,524.30$
TOTAL BASE AND OPTIONAL BID AMOUNT 1 JOB 2,825,279.60$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)
Bid Bond 20%
Yes Yes
No. 10No. 7 No. 8
Meltech Corporation, Inc.
3321 75th Avenue, Suite G/K
Landover, MD 20785
No.9 OFFERS (Continued)
Washington Aqueduct, Washington, DC Fire Protection System Improvements
| 2016-03-31T11:23:46-0400 | |
| FAYKES.GARY.A.1086691600 |
File details come from the government source that posted it. Updated .