B.01.01_Amendment 0001_20210505.pdf

PDF 62 KB Posted

Attached to
Construct Rubble Pile Material Federal contract opportunity
Solicitation number
W912DQ21R4008
Issued by
Department of the Army Corps of Engineers Engineering District Kansas City

View the file

Other files for this federal contract opportunity

Other files attached to Construct Rubble Pile Material, newest first.
File Type Posted
Combined Synopsis-Solicitation-Rubble Pile Material.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to provide answ ers to questions for the solicitation. (see Continuation Page for details)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ21R4008

X 9B. DATED (SEE ITEM 11)

07-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-May-2021

CODE

USACE, KANSAS CITY +

FEDERAL BUILDING CT-M, RM 647 601 EAST 12TH S

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ21R4008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text: AMENDMENT-0001

THE SOLICITATION IS AMENDED AS FOLLOWS:

1. The purpose of this Amendment is to provide answers to questions concerning the solicitation.

2. The following questions have been asked, and the associated answers are provided, as follows:

QUESTION 1: Do you have an anticipated award date? Material prices are very sporadic lately and knowing the anticipated award date will help narrow in on pricing.

ANSWER: Anticipated Award date is mid June 2021 but could be as late as end of June 2021.

QUESTION 2: Do you expect the rubble pile to be constructed or is the intent to only deliver the materials?

ANSWER: Please refer to FAR Clause 52.212-1, Instructions to Offerors, B and C.

QUESTION 3: If we are to construct the rubble pile can you provide any details on how to construct?

ANSWER: Not applicable. Please refer to FAR Clause 52.212-1, Instructions to Offerors, B and C.

QUESTION 4: If we are to only deliver the rubble pile materials are we to unload or will the Government unload the trucks?

ANSWER: Please refer to FAR Clause 52.212-1, Instructions to Offerors, B and C.

QUESTION 5: Materials are getting increasingly difficult to source in timely manner and specifically the steel reinforcement that would be required for these items. It’s going to be nearly impossible for anyone to source the steel and still have time to cast these items. Right now, I’m being told that we are looking at around 45-60 days to get this done.

ANSWER: Please refer to FAR Clause 52.211-8, the second table, which gives the Contractor the option to provide their preferred delivery schedule. Additionally, FAR Clause 52.212-1, Instructions to Offerors, A.

3. The time and date for submission of proposal is not changed.

4. All other terms and conditions remain unchanged and in full force and effect.

End of Summary of Changes