AMEND000122R0026.pdf

PDF 368 KB Posted

Attached to
Hydraulic Excavator Federal contract opportunity
Solicitation number
W912CN-22-R-0026
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

This amendment modifies a solicitation for a hydraulic excavator. The required response date for quotes is changed from September 12, 2022 at 10:00 AM to September 15, 2022 at 10:00 AM Hawaii Standard Time. The solicitation, issued by the 413th Contracting Support Brigade on behalf of the Department of the Army Materiel Command Army Contracting Command, seeks a hydraulic excavator with at least 6.7 metric tons counterweight and quick coupler. Accompanying equipment includes a hydraulic hammer, hydraulic thumb, compactor vibrator, and screener capable of processing larger aggregates into smaller and finer aggregates. Relevant lower-level details include specifications for buckets and manual requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Hydraulic Excavator, newest first.
File Type Posted
CONFORMAMEND000122R0026.pdf PDF
Solicitation 22-R-0026.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011786962

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation cited in block 9a is amended as follow s:

1 - Change of Solicitiation closing date from 09/12/2022 10:00 AM HST to 09/15/2022 10:00 AM HST.

2 - Add information to CLIN 001 in the Extended Description for Screener 3 - See Summary of Changes for Details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Sep-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912CN22R0026

X 9B. DATED (SEE ITEM 11)

10-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Sep-2022

CODE

413 CSB

413TH CSB, RCO-HAWAII,

742 SANTOS DUMONT AVENUE

BLDG 108, 3RD FLOOR (WAAF)

SCHOFIELD BARRACKS HI 96857-5026

W912CN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912CN22R0026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 12-Sep-2022 10:00 AM to 15-Sep-2022 10:00 AM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Base Excavator with at least 6.7MT (14,770LB) Counterweight with Quick Coupler or Equivalent Quantity 1Hydraulic Hammer Quantity 1Hydraulic thumb Quantity 1Compactor Vibrator Quantity 1Screener Quantity Quantity 136” bucket or equivalent Quantity 148” bucket or equivalent Quantity 1Set Printed Operator's, Service & Parts Manuals Quantity 1Dealer installation of work tools Quantity 1Please complete fill able sections in 52.204-24 and 52.204-26

To:

Base Excavator with at least 6.7MT (14,770LB) Counterweight with Quick Coupler or Equivalent Quantity 1Hydraulic Hammer Quantity 1Hydraulic thumb Quantity 1Compactor Vibrator Quantity 1Screener (Screener is a bucket crusher made to operate with this size excavator. Screener has the capability of larger aggregates to smaller and finer aggregates.) Quantity 136” bucket or equivalent Quantity 148” bucket or equivalent Quantity 1Set Printed Operator's, Service & Parts Manuals Quantity 1Dealer installation of work tools Quantity 1Please complete fill able sections in 52.204-24 and 52.204-26

(End of Summary of Changes)

File details come from the government source that posted it. Updated .