Conformed_Solicitation_W912CL17R0007.doc
DOC document 505 KB Posted
- Attached to
- MAUD WILLIAMS SCHOOL CONSTRUCTION - BELIZE CITY, BELIZE Federal contract opportunity
- Solicitation number
- W912CL-17-R-0007
- Issued by
- Department of the Army Cyber Command
About this file
Conformed Solicitation with incorporated Amendment 0001
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 30 - BLOCK 14 CONTINUATION PAGE
QUESTIONS AND RESPONSES
W912CL-17-R-0007 Questions and Response from Industry
Question 1: On clause 1 General of the SOW; on the second paragraph it indicates that the contractor is responsible to construction permits; my question is if the "construction permit" referred to here on this clause it the permit that has to be paid city council for the actual building construction?
Response: Refer to Sections 1. General and 1.5.18 Licenses and Permits. The Contractor shall request and pay for all required construction permits as dictated by Belize City ordinances and the Government of Belize.
Question 2: It was discussed that at the first site meeting that a probable bench mark to define the finish floor level of the lower level would be the height of the existing adjacent building; can you confirm this level?
Response: Refer to Section 5.4.1 Surveying and Leveling. The Contractor shall keep the same finished floor level of the lower level story as the adjacent existing building.
Question 3: For the design phase we understand that contractor is only responsible for the a). Soil Test and b). Foundation Design. All other structural information is to be provided by CSB. Do we understand correct?
Response: Refer to Sections 1.1. Scope of Work, 5.1.1.2 Foundation Design, 5.3 Required Studies. The Contractor is responsible for conducting soil study, validate project design (i.e. foundation, structural, architectural, site utilities, drainage, electrical, water, sewer, and mechanical designs) based on the results of the soil studies. The Contractor shall ensure to include Belize Building Occupancy requirements in the Technical Exhibit 2 -Revised School Designs.
Question 4: Item 5.5.1.1 indicates strip footing foundation for the building. We know the area and Belize City in a whole requires piled foundation (end bearing) we design for what is required correct?
Response: Refer to Sections 1.1. Scope of Work, 5.1.1.2 Foundation Design, 5.3 Required Studies. Contractor shall conduct soil study and validate project design (i.e. foundation, structural, architectural, site utilities, drainage, electrical, water, sewer, and mechanical designs) based on the results of the soil studies.
Question 5: Mentioned is made that design is to accommodate a third level on this building. We do not see any provision to allow for flight of stairs for future development. Do we take any into consideration?
Response: Refer to Sections 5.1.1.2 Foundation Design and 5.1.1 Designs. Structural designs shall allow for the future construction of a third story to include access stairs.
Question 6: What would be the required material for the bathroom partitions?
Response: Refer to Section 5.11.2 Partition Walls for the type of acceptable materials.
Question 7: Who will pay for BEL (Belize Electricity Ltd); BWSL (Belize Water services Ltd) connection for permanent use in the building?
Response: Refer to Section 1.1 Scope of Work. At this location power, water, and sewer utilities are available, and it is the contractor’s responsibility to identify the location of the utility to connect to, make all necessary connections, and request and pay for these utilities until project is completed. The Contractor shall coordinate with the local authorities of Belize City to arrange for the connections if needed. Work executed by the contractor shall include the followings plus any other related works for the construction of the school building.
Connection charges, consumption/use, and additional power company charges for the building are the Belizean Ministry of Education responsibility once project is completed.
Question 8: What will be the limits of our staging area in the school compound?
Response: Refer to Section 4.1 General. The Contractor shall coordinate with school director for staging area. The Contractor also needs to verify existing conditions prior to actual staging of the equipment.
Question 9: Is this a tax exempted Project? (GST, ET, Import Duties and Business Tax).
Response: Project is tax exempt. Once contract is awarded, 410th Contracting Support Brigade will provide a copy of the contract to the U.S. Embassy representative. U.S. Embassy representative will request tax exempt memo to Belizean Ministry of Finance. Contractor will submit invoices and will get tax exemption. A memo will be provided to the contractor to get tax exemption.
Question 10: According to the site visit I took the measurements for the existing building 100’ Length by 35’ Wide. The drawings provided shown building 126’8” length by 47’10” wide. Is necessary check the design because the distance between the building to be demolish and the small construction by south side is just 20’?
Response: Refer to Section 5.1.1 Design. The Contractor is required to site adapt design and shall comply with all Belizean construction codes, laws, and regulations.
Question 11: Scope of work included soil test, design, or just construction?
Response: Refer to Section 5. This section provides details on project requirements to include tests, designs, demolition, site prep, and construction work.
Question 12: There is technical exhibit #3 in pdf and autocad versions. The drawings are different in a few areas, for instance technical exhibit #3 in pdf which is of a two-story building, does not show the kitchenette nor sidewalk, while the autocad version which is of a 3 story building, includes the kitchenette and the sidewalks.
Per industry protocol, drawings take precedence over the BOQ and other documents unless otherwise specified. In light of this, please indicate which of the two drawings we should align to the scope of works.
Response: Technical Exhibit 2-School Designs.dwg.is revised. Additional School Designs are added to Technical Exhibit 2.
Question 13: Statement of Work - Part 1 “General”
Will we be held responsible to meet all missing code requirements in Section 6 if Belize codes do not address them? Examples are ANSI Section 505 Handrails, 202 Drinking Fountains, Section 604 18” Grab bars, etc.
Response: Refer to Part 1 General and Section 6. Contractor shall meet with Section 6 codes and standards. The listed codes and standards in this section is not intent to be completed. It is contractor responsibility to apply required codes and standards in accordance with established construction practice even if they are not listed in this section. Section 6 of the Statement of Work is revised.
Question 14: Statement of Work 1.1 Scope of Work.
Elevated water tank and reserve cistern is addressed in this section. However, there are no more discussions in Part 5 of the specifications. Can you please provide more information about the elevated water tank and reserve cistern?
Response: Refer to Section 1.1. Elevated water tank and reserve cistern are not needed in this project.
This requirement is deleted from Section 1.1 of the Statement of Work.
Question 15: We are responsible to meet U.S. Army Corps of Engineers EM 385-1-1, Safety and Health Requirements Manual minimum requirements where Belizean Safety regulations and laws do not exist. Can the supervisor or field engineer act as the Site Safety & Health Officer, which is a requirement of EM 385-1-1? In addition, shall the SSHO have 30 hours OSHA training and first aid and CPR qualifications as required by the EM 385-1-1?
Response: Refer to Section 1.1 of the Statement of Work. Yes. The supervisor or field engineer can act as the Site Safety & Health Officer (SSHO). The SSHO shall have 30 hours OSHA training and first aid and CPR qualifications.
Question 16: Statement of Work 1.4 Required Delivery.
Does the 360 days schedule includes design and plan review time?
Response: Yes. Refer to Section 1.4 of the Statement of Work. The 360 day period shall include the time for mobilization, demobilization, clean-up of the site area, design, design review, construction time, and downtime.
Question 17: Statement of Work 1.5 General Information.
1.5.1 Quality Control (QC).
What are the minimum guidelines how to develop the Quality Control Plan (QCP)?
Response: Refer to Section 1.5.1. This section of the Statement of Work is revised to address minimum requirements for the Contractor Quality Control Plan.
Question 18: Statement of Work 1.5.11.
* How often shall our quality control personnel be on site?
Response: Refer to Section 1.5.11. Quality control personnel shall be at the project site at least once a week and during critical work phases such as earthwork, rebar work, concrete pour, plumbing, electrical, roof, and punch list.
Question 19: Statement of Work, 4 Insurance.
Does the contractor need insurance to protect the structure?
Response: In accordance with the Statement of work. It is the responsibility of the contractor to obtain any required insurance applicable to the country of Belize as stated in Section 00800, Special Contract Requirements, paragraph 3, The Contractor shall obtain (at Contractor’s own expense) any applicable types of insurance and certifications required by Belizean law that is customary and ordinary for the type of work required in the Statement of Work (i.e., construction, electrical, communication, etc.).
Question 20 (3Part Question): Statement of Work, Paragraph 5 Specifications.
5.5.1.1 School Building.
Question 20a: Front doors are specified as “varnish protected hardwood with aluminum frames”, is this accurate? Price breakdown Worksheet has steel doors with steel frames.
Response: Refer to Section 5.5.1.1. Aluminum doors with aluminum frames entrance doors.
Question 20b: Interior doors are “varnished protected and metal frames. “ Will you accept solid core wood doors with metal frames?
Response: Refer to Section 5.5.1.1 solid core wood interior doors varnished protected and metal frames are accepted.
Question 20c: Conceptual design has acoustical ceiling tiles. Shall we eliminate the ceiling tiles and install surface mounted LED light fixtures?
Response: Refer to Section 5.6.9.17. Acoustical ceiling tiles are not required for this project. LED light fixtures can be surfaced mounted.
Question 21: Statement of work 5.6.15 Tiles.
5.6.15.4 Terrazzo Tiles.
Terrazzo tiles and floor buffing are described in this section. However, Section 5.5.1.1 describes ceramic floor tiles and 8” wall base. Which floor tiles and wall base specifications shall we use for estimating?
Response: Refer to Section 5.5.1.1. Terrazzo tiles is required for wall base and floor tiles.
Question 22 (2 Part Question): Statement of Work 5.6.17 Doors and Windows.
Question 22a: Where shall we install the 2 steel doors & frames with lite kits? What are the remaining exterior doors’ specifications?
Response: Refer to Section 5.6.17 and Technical Exhibits 2 and 3. At first floor, doors shall be located between the office and professor bathroom. At the second floor, door shall be installed between the office and electrical room.
Question 22b: Conceptual plans have 41 pairs and a single louvered window. Price Breakdown Worksheet has 40 louvered windows. Which quantity shall we use for estimating?
Response: This attachment is only a guide. The quantities presented in the price breakdown are approximate. It is the Offerors responsibility to validate the quantities to reflect actual site conditions, Statement of Work, and Technical Exhibits. The Offeror shall adjust quantities and add any missing items. This attachment is only a guide for the contractor and it is not intent to be final. Recommended this last sentence be deleted.
Question 22c: Are the aluminum commercial grade louvered style windows hurricane resistant, double glass pane and energy efficient as described in the Price Breakdown Worksheet? If not, are the windows’ louvers aluminum and not glass?
Response: Refer to Section 5.6.17 for the specifications of the windows.
Section 00010 - Solicitation Contract Form
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
Demolition and Disposition of Material
FFP
Contractor shall demolish the existing building and disposed of all materials as stated in paragraph 5.2, other applicable paragraphs of the Statement of Work, applicable Technical Exhibit(s).
FOB: Destination
PURCHASE REQUEST NUMBER: 0010995075
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
School Construction
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items services necessary to construct a new school building at the Maud Williams School in Belize City, Belize in accordance to the Specifications of the Statement of Work, and applicable Technical Exhibit(s).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
Defense Base Act Insurance
Refer to paragraph 4.12 of the Statement of Work and FAR 52.228-3. The estimated amount will be adjusted throughout the contract period as necessary using projected and actual labor expenditures. The contractor shall be reimbursed for reasonable, allowable, and allocable DBA insurance costs upon submission of proof of payment of the insurance provider. If applicable, the US Department of Treasury Rates of Exchange will be used to convert the payment(s) into US Dollars on the date payment was made
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
Furniture First Story - Option 1
This may or may not be awarded. The Government has six (6) months from the time of award to exercise this line item. The contractor shall provide and install the furniture and appliances listed under paragraph 5.9 of the Statement of Work and Attachment - Price Breakdown Worksheet - Material List.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
Equipment First Story - Option 2
This may or may not be awarded. The Government has six (6) months from the time of award to exercise this line item. The contractor shall provide and install the equipment listed under paragraph 5.10 of the Statement of Work and Attachment - Price Breakdown Worksheet - Material List.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
Furniture Second Story - Option 3
This may or may not be awarded. The Government has six (6) months from the time of award to exercise this line item. The contractor shall provide and install the furniture and appliances listed under paragraph 5.9 of the Statement of Work (SOW), and Attachment - Price Breakdown Worksheet - Material List.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
Equipment Second Story- Option 4
This may or may not be awarded. The Government has six (6) months from the time of award to exercise this line item. The contractor shall provide and install the equipment listed under paragraph 5.10 of the Statement of Work and Attachment - Price Breakdown Worksheet - Material List.
NET AMT
Section 00100 - Bidding Schedule/Instructions to Bidders
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
MAUD WILLIAMS SCHOOL CONSTRUCTION
BELIZE CITY, BELIZE, C.A.
29 July 2017
PART 1
1. GENERAL: Under this contract, the Contractor shall furnish all labor, transportation, equipment, materials, and any other items necessary to construct classrooms at Maud Williams School in Belize City. Contractor shall construct two-story school building and provide a foundation capable of supporting a third story (to be built by others). As Options, contractor shall provide cost estimate for the following: furniture for first and second story and equipment for first and second story.
The work shall comply with all applicable construction country and International Building codes (IBC) codes and standards listed in Section 6 of this SOW. The Contractor shall obtain all required construction permits and shall conduct a site visit to verify details and the scope of work. Only the Contracting Officer (KO) has authority to make changes to any contract resulting from the solicitation of this project, including but not limited to increases, decreases, time extensions, and changes in prices. The USG shall not exercise any supervision or control over the contract providers performing the tasks herein. Any tasks provided under this contract are considered non-personal in nature.
1.1 Scope of Work: Under this contract, the Contractor shall furnish all labor, transportation, equipment, materials, and any other items and services necessary to demolish an existing two-story school building, and construct a new two-story school building in the same location. The school construction work will include preliminary work, total of 4 student bathrooms, 2 staff bathrooms, 3 administrative offices, 1 staff break room, 1 conference room, 2 storage areas, 1 janitors closet, 1 electrical closet, 1 computer lab, 1 science lab, 1 food and nutrition classroom, 1 clothing and textile classroom, 1 drafting classroom, 1 electrical classroom, and landscaping in accordance with (IAW) the Statement of Work (SOW) and Technical; Exhibit 2 and 3, School Designs. Any services provided under this contract are considered non-personal in nature. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the terms of this statement of work. The Contractor shall provide soil study, geotechnical study, validation of foundation design, and labor required for the construction of the school complex. The school complex shall be constructed of concrete masonry unit (CMU) blocks and reinforced concrete. At this location power, water, and sewer utilities are available, and it is the contractor’s responsibility to identify the location of the utility to connect to, make all necessary connections, and request and pay for these utilities. The Contractor shall coordinate with the local authorities of Belize City to arrange for the connections if needed. Work executed by the contractor shall include the followings plus any other related works for the construction of the school building.
· Demolition of existing classrooms;
· Site preparation (i.e. cut, fill, level, drainage);
· Construction of school complex;
· Construction of required bathrooms (general and professors);
· Provision of required furniture and equipment (as an option); and
A licensed structural engineer shall approve the foundation designs. A geotechnical engineer shall conduct and approve soil study results and recommendations. Electrical and mechanical engineers shall review and approve electrical load requirements, testing, and other related works.
The Contractor and their sub-contractors shall comply with Belizean Safety regulations and laws. Where project activities are not governed by Belizean regulation, the contractor shall comply with safety and health requirements as established by the U.S. Army Corps of Engineers EM 385-1-1, Safety and Health Requirements Manual. The supervisor or field engineer can act as the Site Safety & Health Officer (SSHO). The SSHO shall have 30 hours OSHA training and first aid and CPR qualifications.
1.2 Background: The project is part of U.S. Southern Command (USSOUTHCOM) Humanitarian Assistance Program in support to the Belizean Security Cooperation Office.
1.3 Objectives: The objective of this project is to improve the local government by having the ability of emplacing them on the face of every project or civic action in the future. This will help the local government to provide basic needs to their people. There is an existing two-story school building that is in poor condition and has some structural deficiencies.
1.4 Required Delivery: The work shall begin within 5 calendar days after the Contractor receives the award, and the project shall be completed in 360 calendar days after the Notice to Proceed or less from receipt of contract award. The 360 day period shall include the time for mobilization, demobilization, and clean-up of the site area design, design review, construction time, and downtime.
1.5 General Information:
1.5.1 Quality Control (QC). The Contractor shall develop, implement, and maintain a QCP and program to ensure all work described in this contract is performed at or above the standard defined in the Performance Requirements Summary (PRS). The QCP is developed by the contractor for its internal use to ensure that it performs and delivers high-quality work. The contractor’s QCP is the means by which the contractor ensures all work complies with the requirements of the contract. The QCP identifies and corrects potential and actual problem areas throughout the entire scope of the contract.
1.5.1.1. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective work. The QCP shall be submitted within thirty (30) days of contract award. After acceptance of the QCP, the contractor shall receive the contracting officer’s (KO) acceptance in writing or any proposed changes to the QC procedures. The contractor shall submit QCP changes within five (5) days to the KO and Contracting Officer’s Representative (COR) for review and approval prior to implementation.
1.5.1.2 The Quality Control Plan shall address as a minimum:
1.5.1.2.1 Inspection Program. Included shall be a quality control inspection program covering all general and specific tasks included in the contract scope of work. It shall specify tasks or areas to be inspected on a scheduled or unscheduled basis, the manner in which inspections are to be conducted, the titles of the individuals who will perform the inspections, and the percentage of the work that will be inspected on a recurring basis. In developing this inspection program, the Contractor shall identify the key activities and associated characteristics in each process that have a significant influence on specific work and provide for methods for evaluation of the selected characteristics.
1.5.1.2.2 Deficiency Identification. The QCP shall include a method of identifying deficiencies in the quality of work performed before the level of performance becomes unacceptable as defined in the PRS. This shall contain processes for corrective action without dependence upon Government direction.
1.5.1.2.3 Deficiency Correction. The program shall contain process control and process performance measurement procedures that shall include how the Contractor shall implement preventive corrective actions. The Contractor shall demonstrate that it has designed quality into the delivery of the work thereby mitigating the risk(s) associated with delivery of deficient or nonconforming work.
1.5.1.2.4 Documentation and Enforcement. The QCP shall include a method of documenting and enforcing quality control operations of both prime contractor and subcontractor work; including inspection and testing.
1.5.1.2.5 Trend Analysis. The QCP shall include a method of performing trend analysis and assessments through the use of metrics.
1.5.1.2.6 Surveillance Methods. The QCP shall contain specific surveillance techniques for all contract work. The surveillance methods shall be comprehensive and adaptable to the reporting system of the plan.
1.5.2 Quality Assurance (QA). The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.3 Recognized Holidays. The Contractor is not required to perform work on Belizean holidays. Following is a list of approved Belizean holidays:
Jan 1
New Year's Day
Mar 7
National Heroes and Benefactors Day
Mar 25
Good Friday
Mar 26
Holy Saturday
Mar 28
Easter Monday
May 2
Labor Day
May 23
Sovereign’s Day
Sep 10
St. George’s Caye Day
Sep 21
Independence Day
Oct 10
Pan American Day
Nov 19
Garifuna Settlement Day
Dec 26
Christmas Day
Dec 27
Boxing Day
1.5.4 Hours of Operation. The Contractor is responsible for developing a work schedule with the School superintendent and or the Ministry of Education that allows completion of all items of work, to include connection of utilities and cleanup of the site area, within the allowed timeframe notated in section 1.4. Work hours are Monday thru Friday from 07:00 a.m. to 17:00 p.m. subject to coordination with the school Superintendent. The contractor is not required to work on Belizean holidays or when the local Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.5.5 Place of Performance. The work to be performed under this contract will be performed at the Maud Williams School located on Dolphin St between Racoon St and Iguana St in Belize City, Belize, C.A. Prior to the commencement of work, access to the site will be coordinated with the following point of contacts:
POC:
Mr. Lloyd Flowers
Senior Civil Works Supervisor
Building & Maintenance Unit
Ministry of Education.
Phone: 504-203-1762/504-223-6018
Email: lflowersbz@yahoo.com
1.5.6 Type of Contract. The Government plans to award a Firm Fixed-Price contract for this requirement. Federal Acquisition Regulation (FAR) clause 52.211-12 Liquidated Damages – Construction is included in this contract.
1.5.7 Security Requirements. The Contractor and/or associated sub-contractor employees shall comply with applicable site access and local security policies and procedures.
1.5.7.1 Background Checks. At the time of award of the contract or when hiring new contract workers, the Contractor shall ensure contractor employees and sub-contractor employees performing services under this contract have passed a security check done by the Host Nation and Security Force at the local government. Security checks that have been completed as part of a security clearance background investigation, or a previous background check that was a condition of employment, meet this requirement. Documentation of these checks will be made available to the COR upon request. The Government retains the right to exclude any employee from performance of duties under this contract if a security check reveals information an employee is a security risk. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. If the Government determines additional background checks are required, at a minimum, and upon request from the Government, the Contractor shall provide to the COR, the following information on any contractor or sub-contractor employee performing services under this contract:
Full birth name
Married name (if applicable)
Social Security Number or local equivalent (ID card number)
Date of birth
Place of birth (city, country)
1.5.7.2.2 Background Check Results. If a background check on any employee performing services under this contract, whether the check was conducted as a condition of employment or as part of the contract with the Government, reveals any information from any source of criminal activity by Contractor employees, sub-contractors, or sub-contractor employees, the Contractor shall immediately notify the KO and COR of that information. The Contractor shall make notification of:
(A) Traffic violations, other than parking, will be reported to the KO or COR only if the contract is for drivers for the Government;
(B) Any suspicious activity by Contractor employees, sub-contractors, or sub-contractor employees the Contractor believes may pose a risk to U.S. or host nation national security or imminent risk of deadly bodily harm to any person; and
Any actions taken against Contractor employees, sub-contractors, or sub-contractor employees pursuant to this requirement.
1.5.7.2.3 Remedies. In addition to other remedies available to the Government, the Contractor’s failure to comply with the requirements of this paragraph may result in requiring the Contractor to remove a Contractor employee or employees from the performance of the contract.
1.5.7.2.4 Subcontracts. The Contractor shall include the substance of this paragraph in all subcontracts.
1.5.7.5 Identification. If required by the Government, contract personnel and all associated sub-contractors employees accessing U.S. facilities or activities, shall present a valid picture ID provided by the Government while accessing Government owned or contracted facilities and shall adhere to facility security policies and restrictions. If applicable, Government issued access badges will not be worn outside designated facility where visible to the general public.
1.5.7.6 Vetting. The Contractor’s company and all associated sub-contractor’s companies must have been vetted by the U.S. Embassy in the country which the contract will be performed. For the purposes of this contract, the company is considered vetted if the company is located in the country which the contract will be performed unless the company has been previously barred from performing services for the Government. If during a previous vetting process the company was barred from performing service for the Government, then that is grounds for termination of the contract. If the company is located outside of the country which the contract will be performed, the company must be vetted by the U.S. Embassy in the country of performance. Vetting will coordinated through the U.S. Embassy's DOD Security Cooperation Office in the country of performance. If during any previous vetting process in other countries, the company was barred from performing services for the Government that is grounds for termination of the contract.
1.5.7.7 Operations Security. If the contractor, or a sub-contractor, or employees of either disclose any information that disrupts or harms the Government's operations or activities, then the Government retains the right to exclude any employee from performance of duties under this contract. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. By way of example, personnel shall not sketch or take photos of government facilities or activities, unless related to service to be provided. Personnel shall not post or discuss government facility activities on any unauthorized public access media. All government paper products and removable digital storage material that is received, generated, or stored during the contract will be destroyed completely when no longer needed to preclude recognition of information.
1.5.7.8 Government Information. The Contractor shall take appropriate security measures to protect Government critical and sensitive information. Contractor shall not disclose specifics of services to unauthorized personnel. Contractor will provide sub-contractors only required specifics to accomplish services and/or products delivery.
1.5.7.9 Information Disclosure. Neither the Contractor nor the Contractor’s personnel shall disclose, or cause disclosure of any information concerning DoD operations and activities which could result in, or increase the likelihood of, the possible breach of the activity’s security or interrupt the continuity of DoD operations. Unauthorized disclosure of and/or failure to properly safeguard information, material, equipment, supplies, or proprietary data by the Contractor may subject the Contractor, its agent(s), or employees to criminal liability.
1.5.7.10 Advertisement and Social Media. The contractor shall NOT post information to public website or social media locations, personal or professional, that in any way disclose conference names, locations, hotel data, conference participants, discussions, pictures, etc. before, during or after the conference without the express consent of the Government. The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at (http://www.defenseimagery.mil/products/DODimagery/commercialuse.html). The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.5.7.11 Medical: Contractor shall ensure that all Contractor employees and sub-contractor employees are medically, dentally, and psychologically fit for performance of their duties. All U.S. citizen and TCN contractor and sub-contractor personnel must meet the medical screening requirements established by the USSOUTHCOM Commander in the Medical Suitability Screening Regulation (SC Reg 40-501), as well as the requirements identified in FORCE HEALTH PROTECTION (FHP) GUIDANCE FOR DEPLOYMENT in the USSOUTHCOM AOR or their successors and follow immunization and health protection guidelines outlined therein. All immunizations must be obtained prior to traveling to the USSOUTHCOM AOR. U.S. citizen and TCN contractor and sub-contractor personnel traveling from a country outside of the USSOUTHCOM AOR must travel into the USSOUTHCOM AOR with a current copy of the Public Health Service Form 791, “International Certificate of Vaccination”. In addition, U.S. citizen and TCN contractor and sub-contractor personnel traveling to the USSOUTHCOM AOR are required to be beneficiaries of a medical evacuation plan and service through an insurance plan provided by their employer or paid for individually.
1.5.7.12 Security Clearance: A security clearance for contracting personnel is not required for this project. Contractor personnel will not be accessing any restricted areas to accomplish this task.
1.5.7.13 Anti-Terrorism (AT) Awareness Training for Contractor Personnel Traveling Overseas. Upon award of the contract, or within 30 days of employment of new personnel performing services under this contract, the Contractor will coordinate with the supporting Department of Defense Agency AT Officer through the COR or KO, for Area Of Responsibility specific AT awareness training for U.S. based Contractor employees and associated sub-contractor employees. This training will be updated as required by the supporting installation AT policies. Verification of the training will be made available to the COR or KO upon request.
1.5.7.14 Foreign (OCONUS) Requirements. All U.S. citizen or resident, and TCN contractor personnel not normally residing in the USSOUTHCOM AOR, must comply with the training requirements listed in the Foreign Clearance Guide (FCG). Verification of the training shall be made available to the COR or KO upon request. Additionally, they must receive personal security training that includes at a minimum:
(a) Safety and security issues facing employees within the USSOUTHCOM AOR,
(b) Identifies safety and security contingency planning activities, and
(c) Identifies ways to utilize safety and security personnel and other resources appropriately.
1.5.7.15 Theater and Country Clearance Requirements. Contractor shall ensure all U.S. citizen or U.S. resident contractor employees and sub-contractor employees performing services under this who are traveling in the USSOUTHCOM AOR follow the requirements identified in the electronic Foreign Clearance Guide (FCG) at https://www.fcg.pentagon.mil/fcg.cfm and must have all necessary passports, visas, and other documents required to enter, exit, or work in the USSOUTHCOM AOR; must have the appropriate DOD identity credential(s); must have the appropriate special area, country, and theater clearance as required in DOD Directive 4500.54E.
1.5.7.16 Deoxyribonucleic Acid (DNA) Samples. The Contractor shall collect a DNA record for all U.S. citizen contractor and sub-contractor personnel traveling to the USSOUTHCOM AOR and shall have arrangements for storage of the DNA referenced specimen through a private facility or arrange for the storage of the specimen by contacting the Armed Forces Repository of Specimen Samples for the Identification of Remains (AFRSSIR) at http://www.afmes.mil/index.cfm?pageid=afdil.afrssir.overview or phone: (302) 346-8800. In addition, U.S. citizen contractor and sub-contractor personnel shall comply with the requirements of DoDI 3020.41, Enclosure 3, para 8.b., or its successor.
1.5.8 Physical Security: The Contractor shall be responsible for safeguarding all government equipment, information and property provided for Contractor use. At the end of each work day, if applicable, all government facilities, equipment, and materials shall be secured. The Contractor shall be responsible for safeguarding all equipment and materials. Further, at the end of each work day, all storage facilities, contractor equipment, and materials shall be secured/
1.5.8.1 U.S. Government Critical and Sensitive Information. Contractor and workforce shall take appropriate security measures to protect U.S. Government critical and sensitive information. The Contractor shall not disclose specifics of the project to unauthorized personnel. Contractor shall provide their sub-contractors with only the required information to enable them to accomplish project delivery. All work related paper products and removable storage material that is received, generated, or stored during the contract shall be completely destroyed when no longer needed. Site access badges will not be worn outside of the Government facility where visible to the general public. The Contractor and workforce personnel shall not sketch or take photos of Government facilities or activities, unless directly related to service to be provided. The Contractor shall not post or discuss government facility activities on any unauthorized public access media. The Contractor shall immediately report suspicious activities to security personnel.
1.5.8.1.1 Site Access. The site is in Belize City and there is a sufficient road network for the contractor to access the site.
1.5.9 Post Award Conference/Periodic Progress Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. It is mandatory the field engineer/architect, project superintendent/foreman attend the Post Award conference. The KO, COR, with other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the U.S. government. Minutes are due 5 days after the meeting.
1.5.9.1. The Project Engineer/Architect may be required to meet at least weekly with the KO/and/or the COR during the first month of construction and then as required throughout the period of performance. The Contractor shall be responsible for keeping minutes of these meetings. The written minutes of these meetings shall be signed by the Project Engineer/Architect and any other individuals in attendance, and be submitted to the KO for approval. Minutes are due five (5) days after the meeting has concluded.
1.5.10 Contracting Officer Representative (COR). The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance every three (3) months and provide input to the KO for approval of progress payments on a monthly basis. The COR shall notify both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting Contract. The COR will be identified by separate letter. A copy of the letter will be provided to the Contractor which the contractor will be required to signed to acknowledge the COR’s responsibility and authority with regard to this project.
1.5.11 Key Personnel. The following personnel are considered key personnel by the government: The quality control representative, the project engineer/architect, Field and Design engineer, project superintendent/foreman and any other engineers performing calculation or verification efforts related to the project. The Contractor shall provide a project engineer/architect who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the project engineer/architect when they are absent shall be appointed in writing to the KO within ten (10) days of contract award. The project engineer/architect shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The project engineer/architect or alternate shall be available between 07:00 a.m. to 17:00 p.m., Monday thru Friday except Belizean holidays or when the government facility is closed for administrative reasons. Quality control personnel shall be at the project site at least once a week and during critical work phases such as earthwork, rebar work, concrete pour, plumbing, electrical, roof, and punch list.
1.5.11.1 Minimum Qualifications. The project engineer/architect shall have a bachelor’s degree and at least ten (10) years of relevant experience. Field and design engineers/architects shall have a bachelor’s degree in engineering/architecture and maintain a valid Belizean professional registration, and at least five (5) years of experience with projects of a similar type and magnitude.
The project superintendent/foreman shall have at least three (3) years or three (3) projects of experience with projects of a similar type and magnitude.
The Contractor’s quality control representative shall have at least five (5) years as a quality control inspector in the construction field.
1.5.11.2 Adequate Workforce. The Contractor shall provide sufficient number of personnel, properly trained and qualified (i.e. civil engineer, architect, geotechnical engineer, electrical engineer, certified electricians and foremen), to perform the requirements of this contract at the worksite location. All non-laborer Contractor employees on this project shall maintain a proficiency license from the Belizean Government or an equivalent license from a foreign entity if the Contractor is based in a country other than Belize.
1.5.11.3 Project Engineer/Architect. The Contractor shall provide a Project Engineer/Architect who shall be a licensed engineer or architect and responsible for the performance of all work. The name of this person and an alternate(s), who shall act on behalf of the Contractor when the Project Engineer/Architect is absent, shall be designated in writing to the KO at least ten (10) days prior to contract performance. The Contractor shall not replace, substitute, or remove key personnel without prior written consent from the KO. In the event the Contractor removes key employees, replacement personnel must be equally or better qualified. The Project Engineer/Architect shall be responsible for overall management and coordination of this contract; directing the onsite work; acquiring materials; resolving construction issues; and providing information about work progress to the COR. The Project Engineer/Architect shall be highly knowledgeable of the project progress and have a good working knowledge of English and be able to communicate effectively. “Good working knowledge” means the employee should be able to read and speak English and understand agency regulations, operating instructions, memoranda, and related material concerning the field of work, to prepare correspondence and standardized reports, and to communicate effectively with staff members and the general public. The Project Engineer/Architect or their designated alternate shall be available to meet with U.S. Government personnel, or the KO, within 30 minutes after the U.S. Government representative or KO notified of a project issue or problem unless otherwise coordinated with such designated personnel. After duty hours, the Project Engineer/Architect or designated alternates shall be available within two (2) hours in case of emergency.
1.5.11.4 Field Engineer/Architect and Superintendent/Foreman. The Field Engineer/Architect and Superintendent/Foreman shall be designated in writing to the KO at least ten (10) days prior to contract performance. These key personnel shall be physically present at the worksite between the hours of 07:00 a.m. to 17:00 p.m, excluding Belizean holidays, and any other time work is being performed at the site, as coordinated between the Contractor and COR. The Contractor shall provide to the KO and COR the phone numbers of the Project Engineer/Architect and alternate(s), Field Engineer/Architect and Superintendent/Foreman to be available during duty and non-duty hours (to include evenings, holidays, and weekends).
1.5.11.5 Personnel Listing. After award of the contract, the Contractor shall have ten (10) days to submit to the KO a list of workers and Project Managers assigned to work. Required information for each individual on the personnel list shall include:
Full Birth Name
Place and Date of Birth
Current Address
Identification number
1.5.11.5.1 Failure to provide any of the above information may be considered grounds for rejection and/or re-submittal of the application(s).
1.5.12 Identification of Contractor Employees. Contractor employees shall identify themselves as contractor personnel and shall not represent themselves as Government employees. This identification includes meeting attendance, answering Government telephones, email communications, and working in other situations where contractor status is not obvious. Contractor personnel identification shall be easily identifiable through the display of badges, name tags, lanyards, etc. which they shall clearly display on their person during all work hours. The badges or nametags shall identify the contract number. Contractor employees shall use a colored shirt with company Logo and Contract number. Shirt color will be dictated by School director.
1.5.13 Contractor Travel. Contractor Travel is not required nor authorized travel for the performance of this contract.
1.5.14 Other Direct Costs. Not applicable.
1.5.15 Data Rights. The U.S. Government has unlimited rights to all documents/materials produced under this contract. Any documents, designs, drawings, study and test outcomes, survey maps, belong to the U.S. Government and shall be turned over to the COR upon completion of the project. All documents and materials produced under this contract shall be U.S. Government owned and are the property of the US Government with all rights and privileges of ownership/copyright belonging exclusively to the U.S. Government. These documents and materials may not be used or sold by the Contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.5.16 Organizational Conflict of Interest. Contractor and sub-contractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.5.17 Laws and Regulations:
1.5.17.1 Compliance Required. The Contractor shall, as a minimum, and without additional expense to the U.S. Government, be responsible for complying with all Belizean laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the host country, and with the lawful orders of any governmental authority having jurisdiction. In the event that a Belizean law or regulation does not exist for a particular event, then the U.S. version of at least equal coverage will be specified by the U.S. Government in the particular section of this SOW. In the event of a conflict between the contract and such laws, regulations and orders, the Contractor shall promptly advise the KO of the conflict and of the Contractor's proposed course of resolution.
1.5.17.2 Labor, Health and Safety Laws.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .